RESOLUTION NO. 228 - 2015
A RESOLUTION OF THE MONROE COUNTY BOARD OF
COUNTY COMMISSIONERS ADOPTING FEMA TECHNICAL
BULLETIN 5 "FREE -OF- OBSTRUCTION REQUIREMENTS"
DATED AUGUST 2008 AS REQUIRED PURSUANT TO MONROE
COUNTY CODE SECTION 122 -2(C)
WHEREAS, Monroe County is currently a participating community in the National
Flood Insurance Program (NFIP) and is working on internal County policies to improve upon its
interpretation of NFIP regulations; and
WHEREAS, Monroe County desires to become eligible to enter FEMA's Community
Rating System (CRS); and
WHEREAS, Monroe County Code Section 122 -2(c), in part, requires that in interpreting
other provisions of this chapter, the building official shall be guided by the current edition of
FEMA's 44 CFR, and FEMA's interpretive letters, policy statements and technical bulletins as
adopted by resolution from time to time by the board of county commissioners;
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF MONROE COUNTY, FLORIDA:
Section 1. Pursuant to Monroe County Code Section 122 -2(c), the Board hereby adopts
FEMA Technical Bulletin 5 "Free -of- Obstruction Requirements" dated August 2008, a copy of
which is attached hereto.
Section 2. The Clerk of the Board is hereby directed to forward one (1) certified copy of
this Resolution to the Building Department.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
BOARD OF COUNTY COMMISSIONERS
OF MONR COUNTY, FLORI A
BY: \ '
Mayor D L. Kolhage
MONROE COUNTY ATTORNEY
14PPROVED AS FORM:
STEVEN T. WIUL AMS
ASSISTANT C ATTORNEY
Date i�
PASSED AND ADOPTED by the Board of County Commissioners of Monroe County,
Florida, at a regular meeting held on the 16 of September, 2015.
Mayor Danny L. Kolhage Yes
Mayor pro tem Heather Carruthers Yes
Commissioner Sylvia Murphy Yes
Commissioner George Neugent Yes
Commissioner David Rice Yes
I E
/ �� i,
a °-i
ri,� "
r,l THIS IS MAXIMUM HEIGHT IN GARA0E,•
{ A :�£ �'':£,, _- ♦�-ten
f I It
tit
t s� r>� i II III
��• Isms s' • r, ' II I � -
# f f `1.
k # •
p f ftv, '' :.,rn
•i may"' � ,_ ,id' I �; r t.
'i 'a ,..,. 1_ YriC
`.
'4',..,,..r,A,A.: 4-,„4.-..„..- ,-,:ztiver.„.2 .4. .4 .1!,-.L44;tt,' , '''4\,. _
- ' -
FreeFree _ of- Obstruction
Requirements
for Buildings Located in Coastal High Hazard Areas
in accordance with the National Flood Insurance Program
Technical Bulletin 5 /August 2008
,,% ,, ........„ „..,
FEMA
Table of Contents
Introduction.................................................................................................... ..............................1
NFIPRegulations ............................................................................................
..............................3
Flood Insurance Implications ........................................................................
..............................4
Obstruction Considerations ...........................................................................
..............................5
Below-ME Building Elements ........................................................................
..............................6
AccessStairs and Ramps ......................................................................
..............................6
Decksand Patios .................................................................................
..............................9
Elevators..............................................................................................
.............................10
EnclosedAreas ...................................................................................
.............................10
Equipment...........................................................................................
.............................10
FoundationBracing
...........................................................................
.............................12
GradeBeams ......................................................................................
.............................13
Shear'Walls ..........................................................................................
.............................14
Slabs.....................................................................................................
.............................15
Site Development: Practices and Issues .........................................................
.............................18
Accessory Structures ..........................................................................
.............................18
DetachedGarages ...............................................................................
.............................19
Erosion Control Structures .........................
9
Fences and Privacy Walls ...................................................................
.............................21
Fill.......................................................................................................
.............................21
Ground Elevations At or Above the BEE ..........................................
.............................24
Restroom Buildings and Comfort Stations .......................................
.............................23
SepticSystems .....................................................................................
.............................25
SwimmingPools and Spas .................................................................
.............................26
TheNFIP .........................................................................................................
.............................27
NFIPTechnical Bulletins ...............................................................................
.............................27
Ordering Technical Bulletins
........................................................................
.............................28
FurtherInformation ......................................................................................
.............................28
Glossary...........................................................................................................
.............................29
Comments on the Technical Bulletins should be directed to:
Department of Homeland Security
FEMA Mitigation Directorate
500 C Street, SW.
Washington, D.C. 20472
Technical Bulletin 5 -08 replaces Technical Bulletin 5 -93, Free -of- Obstruction Requirements.
Cover photo: Area beneath an elevated building that is free of obstructions.
Introduction
Protecting buildings that are constructed in special flood hazard areas (SFHAs) from dam-
age caused by flood forces is an important objective of the National Flood Insurance Program
(NFIP). in support of this objective, the NFIP regulations include minimum building design
criteria that apply to new construction, repair of substantially damaged buildings, and substan-
tial improvement of existing buildings in SFH.ks. The base flood is used to delineate SFHAs on
Flood Insurance Rate :Maps (FIRMs) prepared by the NFIP. The base flood is the flood that
has a 1- percent chance of being equaled or exceeded in any given year (commonly called the
"100- year" flood). Certain terms used in this Technical Bulletin are defined in the Glossary.
Coastal waves and flooding can exert strong hydrodynamic
forces on any building element that is exposed to the waves
or flow of water. Therefore, foundations that offer minimal
resistance to waves and floodwaters passing beneath elevated
buildings (e.g., pile and column foundations) are required
in Coastal High Hazard Areas (Zones V, VE, and V1 -V30).
Standard foundations such as solid masonry or concrete or
wood -frame walls will generally obstruct flow and be at risk of
damage from high - velocity flood forces. In addition, these sol-
id foundations and other obstructions may cause wave runup
or reflection, or divert floodwaters, into the elevated portion
of the building or into adjacent buildings. Use of structural fill
to support buildings in V zones is prohibited because fill will
be subject to erosion during a flood event. In either case, the
result is generally structural damage to, or catastrophic failure
of, the affected buildings.
For floodplain manage-
ment purposes, an area
beneath a structure elevat-
ed on an open foundation is
considered to be free of ob-
structions if flood flow and
waves can pass through
the area relatively freely.
Some flow diversion, wave
reflection, and wave run-
up will occur as flood flow
and waves encounter the
foundation, but the effects
will be small and localized,
and will not lead to flood
damage to the elevated
structure.
Under the NFIP general requirement that buildings be constructed by methods that will min-
imize flood damage, the placement of any construction element (as described later in this
bulletin) on a building site in a V zone must include consid-
This Technical Bulletin dis-
cusses obstructions below
the BFE. Readers should
check with the communi-
ty to determine whether a
higher elevation standard
is enforced. For example,
communities may add free-
board or may regulate to
the design flood elevation
(DFE). In those cases, ref-
erences in this Technical
Bulletin should be con-
strued as references to the
community's regulatory
requirement.
erasion of the potential effects on the building and adjacent
buildings. In addition to potential wave and floodwater diver-
sion effects, obstructions can become floodborne debt - is that
may strike other buildings, resulting in large impact forces on
the buildings.
The NFIP requires that all new and substantially improved
structures in V zones be elevated to or above the base flood
elevation (BFE), on open foundations (pilings, columns, or
piers, and, sometimes, shear walls) that allow floodwaters and
waves to pass beneath the elevated structures. The NFIP fur-
ther requires that the area beneath these elevated structures
remain free of any obstructions that would prevent the free
flow of coastal floodwaters and waves during a base flood
event. These requirements have been instituted to minimize
Technical BulIeTin 5— auGuST2008
the transfer of flood forces to the building foundation and to preclude the deflection or redi-
rection of flood forces that could damage the elevated building or neighboring buildings.
This Technical Bulletin pro6des specific guidance concerning the NFIP's free -of- obstruction
requirement in V zones, as well as the general requirement for construction that will minimize
flood damage potential, as it applies to V zone construction. Typical building elements and
site development issues discussed in this Technical Bulletin include:
Below -BFE Building Elements
• Access stairs and ramps
• Decks and patios
• Elevators
• Enclosed areas
• Equipment
• Foundation bracing
• Grade beams
• Shear walls
• Slabs
Site Development: Practices and Issues
• Accessory structures
• Detached garages
• Erosion control structures
• Fences and privacy walls
• Fill
• Ground elevations at or above the BFE
• Restroom buildings and comfort stations
• Septic systems
• Swimming pools and spas
Under the free -of- obstruction requirements in the NFIP regulations, any type of lower area
enclosure or other construction practice (as described below) that prevents the free flow of
coastal floodwaters and waves beneath an elevated building during a base flood event is not
allowed.
Any construction element that is structurally dependent on, that is attached to, or upon which
a V zone building depends, is considered to be part of that building and must meet the re-
quirements of Sections 60.3(e) (4), (6), and (6). If any of these elements are attached to the
building and located below the lowest horizontal structural member of the building, they may
constitute an obstruction and may be prohibited. The attachment of any feature that is pro-
hibited by NFIP regulations to an otherwise compliant building will result in a significantly
higher flood insurance premium because of the increased risk of damage to the building.
Further, if a community is found to have a pattern and practice of failing to address such vio-
lations, the NFIP may exercise its authority to place the community on probation or under
suspension, which affects the cost and availability of Federal flood insurance.
Construction elements outside the perimeter (footprint) of and not attached to a coastal
building (such as bulkheads, swimming pools, and accessory structures) and site develop-
ment practices (e.g., the addition of fill) may alter the physical characteristics of flooding or
significantly increase wave or debris impact forces affecting nearby buildings. As part of the cer-
tification process for V zone buildings, the design professional must consider the effects that
these elements and practices will have on the building in question and on nearby buildings.
Construction elements and practices that will increase flood - related loadings on the building
2 Technical BulIeTin 5— auGuST2008
(and that are not specifically prohibited by the NFIP regulations) may be constructed if the
impacted buildings are designed to withstand the additional flood and wave forces. Increased
foundation element embedment depth, size, and number might be employed to compensate
for increased flood forces. Such compensatory design calculations must be made by the reg-
istered design professional, who must provide a V zone certification for the structure prior to
construction.
NAP Regulations
The NFIP regulations for V zone construction are codified in Title 44 of the Code of Federal
Regulations. Specific to this Technical Bulletin, Section 60.3(a) (3) of the NFIP regulations
states:
"Ifa proposed building site is in a oodpronearea, all new construction and substantial
improvements shall ... (iii) be constructed by methods and practices that minimize ood
damages ..."
Section 60.3(e) (4) states that a community shall require:
". . . that all new construction and substantial improvements in Zones V1430, VE,
and also Zone V if base ood elevation data is available, on the commun itys FIRM, are
elevated on pilings or columns so that: (i) the bottom of the lowest horizontal struc-
tural member of the lowest oor (excluding pilings or columns) is elevated to or above
the base ood level; and (ii) the pile or column foundation and the structure attached
thereto is anchored to resist otation, collapse, and lateral movement due to the com-
bined effects ofwind and water loads acting simultaneously on all building components.
Water loading values used shall be those associated with the base ood. Wind loading
values used shall be those required by applicable State or local building standards. A
registered professional engineer or architect shall develop or review the structural design,
speci cations, and plans for the construction, and shall certifythat thedesign and meth-
ods of construction to be used are in accordance with accepted standards of practice for
meeting the provisions of paragraphs (e)(4)(i) and (ii) of this section."
Section 60.3(e) (:5) further states that a community shall require:
"... that all new construction and substantial improvements within Zones V1 430, VE,
and Von the community's FIRM have the space below the lowest oor either free ofob-
struction or constructed with non -supporting breakaway walls, open wood lattice work,
or insect screening intended to collapse under wind and water loads without causing col-
lapse, displacement, or other structural damage to the elevated portion of the building
or supporting foundation system. For the purpose of this section, a breakaway wall shall
have design safe loading resistanceof not less than 10 and nomorethan 20 pounds per
square foot. Use of breakaway walls which exceed a design safe loading resistance of 20
pounds per square foot (either by design or when so required by local or State codes) may
be permitted only if registered professional engineer or architect certi es that the designs
Technical BulIeTin 5— auGuST2008
proposed meet the following conditions: (i) Breakaway wall collapse shall result from a
water load less than that which would occur during the base ood; and (ii) The elevated
portion of the building and supporting foundation system shall not be subject to collapse,
displacement, or other structural damage due to the effects of wind and water loads act-
ing simultaneously on all building components (structural and non - structural). Water
loading values used shall be those associated with the base ood. Wind loading values
used shall bethoserequired byapplicableStateor local building standards. Such enclosed
space shall be useable solely for parking of vehicles, building access, or storage."
Section 60.3(e) (6) states that a community- shall:
"Prohibit the use of Il for structural support of buildings within Zones V1 -30, VE, and
V on the community's FIRM."
The NFIP Technical Bulletins provide guidance on the minimum requirements of the NFIP regulations.
Community or State requirements that exceed those of the NFIP take precedence. Design profes-
sionals should contact the community to determine whether more restrictive provisions apply to the
building or site in question. All other applicable requirements of the State or local building codes must
also be met for buildings in all flood hazard areas.
Further guidance on coastal construction can be found in the Coastal Construction Manual
(FENLk 55) and in the Home Builder's Guide to Coastal Construction (FEM;k 499). Further guid-
ance on the breakaway wall requirements of Section 60.3(e) (5) can be found in Technical
Bulletin 9, Design and Construction Guidance for Breakaway Walls Below Elevated Buildings.
It is important to note that building materials used below the BFE must meet the flood damage -
resistant materials requirement of Section 60.3(a) (3). Further guidance on this requirement
can be found in Technical Bulletin 2, Flood Damage-Resistant Materials Requirements for Buildings
Located in Special Flood Hazard Areas.
Flood Insurance Implications
The floodplain management and insurance programs of the NFIP may treat some below -BFE
building elements differently. NFIP floodplain management regulations allow certain con-
struction elements below the BFE, which may or may not break away during the base flood,
and which may or may not be considered obstructions for Federal flood insurance rating pur-
poses (e.g., stairwells, elevator shafts, shear walls).
Design professionals and owners may wish to contact a qualified insurance agent or the NFIP
- before a building is designed and constructed - regarding the flood insurance premium im-
plications of obstructions. For example:
Technical Bul I eTin 5 - auGuST 2008
n The NFIP floodplain management regulations in 44 CFR Section 60.3 allow open wood
lattice, insect screening, and non- load - bearing solid breakaway walls below an elevated
building in the Coastal High Hazard Area. These features have been judged not to be ob-
structions to flood flow or waves, but building designers and owners should be aware that
solid breakaway walls and garage doors — even though permitted by floodplain manage-
ment regulations — can result in significantly higher flood insurance premiums. Thus, use
of breakaway construction below the BFE will not allow- a structure to be classified as "free
of obstructions' for flood insurance rating purposes (a free -of- obstruction classification
makes the building eligible for the lowest V zone flood insurance premium rate).
n NFIP floodplain management regulations restrict uses of space below the BFE to park-
ing of vehicles, building access, and storage. Stairs, ramps, and elevators are permitted.
However, depending on how they are constructed, stairs, ramps, and elevators may be con-
sidered obstructions for flood insurance rating purposes, and could result in significantly
higher flood insurance premiums.
For flood insurance rating purposes, an area beneath a structure elevated on an open foundation is
considered to be free of obstructions only if the following criteria are satisfied:
• There are no solid walls of any kind — including breakaway walls — below the BFE (insect screen-
ing, open lattice, and open slats are not considered obstructions).
• Any stairs below the BFE are open (any stairs enclosed by or containing solid walls are considered
obstructions).
• There is no machinery or equipment below the BFE. Machinery and equipment include any items
permanently affixed to the structure and that provide utility services to the building (e.g., furnaces,
hot water heaters, heat pumps, air conditioners, elevators, etc.).
Obstruction Considerations
Several of the NFIP's flood- resistant design and construction requirements are performance
requirements, not prescriptive requirements. In other words, the expected building perfor-
mance is stated, but the ways by which that performance may be achieved are not prescribed.
It is up to the community official to determine whether a spe-
cific design submitted by a design professional satisfies the
performance requirements.
In the case of the free -of- obstruction requirement, it is not
always clear whether a particular building element or site devel-
opment practice will be a significant obstruction that prevents
the free passage of floodwaters and waves. The term "signifi-
cant" is used here because any construction or development
practice below the flood level will cause a localized disruption
of flow and waves during the base flood. Determining whether
the disruption is significant is not always easy. In some cas-
es, the analytical tools necessary to answer the question with
Any construction or devel-
opment practice below the
BFE (even piles and col-
umns permitted by the
NFIP) will cause a local-
ized disruption of flow and
waves during the base
flood. Whether the localized
disruption is great enough
to harm the elevated build-
ing or surrounding buildings
is the central question.
Technical BulIeTin 5— auGuST2008 5
certainty are not available and local experience, post- disaster
investigations, and coastal process and building science prin-
ciples must be relied upon in order to reach a concluslOn.
Many local floodplain management ordinances contain lan-
guage that calls for evaluating potential obstructions below or
near a building for their effects on flow deflection and wave
runup (or "ramping "). Standard fluid mechanics texts and
coastal engineering references such as the U.S. Army Corps
of Engineers (USaCE) Coastal Engineering Manual provide
some guidance, but the methods contained therein general-
ly are not capable of evaluating the potential effects of small
building elements, small amounts of fill, etc., on flooding and
waves during a base flood. Numerical models for coastal storm
surge and waves do not have the resolution required to resolve
building element sized disruptions to flow and wave fields,
and constructing such models at this time would be technical-
1v challenging, time - consuming and cost- prohibitive. Recently
developed, sophisticated n unerical models show- some prom-
ise of being able to resolve and analyze flow around potential
Obstructions, but their use at present is not economically
feasible for communities, owners, or designers interested in
examining potential obstructions such as those discussed in
this Technical Bulletin.
Below -BFE Building Elements
Potential flow diversion -
and wave runup or wave
reflection - toward pre -
FIRM buildings at or near
grade is problematic. Many
of these buildings may be
damaged or destroyed dur-
ing a base flood, regardless
of the presence of new
NFIP - compliant structures.
Communities must deter-
mine whether and how
to weigh the presence of
low- elevation pre -FIRM
buildings when construction
and development decisions
are made.
This Technical Bulletin does
not recommend a blanket
prohibition of below -BFE
building elements and site
development practices
when pre -FIRM buildings at
or near grade are nearby.
The sections that follow discuss common building elements that may significantly affect the
free passage of flood flow and waves under elevated buildings. By following the guidance be-
low, potential obstructive effects are minimized and the elements are judged to comply with
the NFIP free -of- obstruction requirement.
Access Stairs and Ramps
Access stairs and ramps that are attached to or beneath an elevated building may be enclosed
with breakaway walls or may be unenclosed, without walls. However, stairs and ramps, like
foundation bracing, can impede the intended failure of breakaway walls. Unenclosed stairs
and ramps are preferred.
Stairs and ramps are not required to break awav themselves, but this is a design option. Stairs
and ramps must be designed and constructed to either:
n Break awav during base flood conditions without causing damage to the building or its
foundation, or
6 Technical Bul I eTin 5 — auGuST 2008
n Resist flood loads and remain in place during the base
flood. If this option is selected, the elevated building
and its foundation must be designed to resist any flood
loads that are transferred from the stairs or ramp to the
building.
Figure I shows an example of stairs that did not break away
cleanly - the stairs pulled out the exterior wall of the elevated
building as they failed.
Construction of access stairs with sides and risers open (to the
extent that building codes allow) will minimize flood loads
acting on the stairs themselves, thereby minimizing flood dam-
age, and also minimize transfer of flood loads to the elevated
building. Open stairs should be considered whenever possible
(see Figure 2).
Ramps must be designed and constructed to minimize the
obstruction of floodwaters and waves, and configured so that
floodwaters and waves cannot flow directly up the ramp to-
ward the elevated building. This means that ramps must be
positioned to avoid a straight alignment that extends from the
elevated building down toward a likely direction of wave and
surge approach.
A solid entry door capable
of resisting all design loads
must be installed at the
top of any access stairs or
ramps.
Access stairs are some-
times constructed inside a
breakaway enclosure, with
an entry door at the bot-
tom of the enclosure, but
without an entry door into
the elevated building. This
practice leads to building
damage. The lack of an en-
try door at the top results
in a large opening in the
building envelope when the
enclosure breaks away. This
exposes the building inte-
rior to higher internal wind
pressures and wind - driven
rain, and provides floodwa-
ters an easy path into the
building.
Figure 1. Stairs did
not break away cleanly,
resulting in damage to the
elevated building.
Technical BulIeTin 5— auGuST2008
Figure 2. Example of
open stairs that minimize
transfer of flood and wave
forces (note that building
codes enforced by most
communities require use
of risers that prevent
passage of a 4 -inch
sphere).
Massive exterior stairs have been constructed for some elevated homes in V zones (see Figure
3). Stairs such as these clearly act as obstructions and increase the likelihood of trapping or de-
flecting waves and flood flow beneath the elevated buildings. They are not necessary for building
access purposes and are not permitted because they are obstructions that increase the poten-
tial for damage.
Figure 3. Massive
stairs adjacent to an
elevated coastal home are
an obstruction.
Note that, in some cases, life - safety code requirements will dictate that stairs and stairwells
in certain occupancy structures have to be constructed to be fire- resistant and structurally
stable even if portions of the adjacent structure fail. Stairs and stairwells that meet these re-
quirements are usually constructed of some combination of steel, reinforced masonry, and
reinforced concrete, and will not break away under expected base flood loads and conditions.
These stairs and stairwells, typically found in mid- and high -rise buildings, must be designed
to withstand all flood loads, including wave impact and floodborne debris impact.
Technical Bul I eTin 5 — auGuST 2008
Decks and Patios
Decks and patios typically lie outside the footprint of elevated V zone residential and commer-
cial buildings, and can be constructed at elevations vaning from at grade, to above grade but
below the BFE, to at or above the BFE.
n If a deck is structurally attached to a structure, the bottom of the lowest horizontal sup-
porting member of the deck must be at or above the BFE; deck supports that extend
below the BFE (e.g., pilings and bracing) must comply with V zone design and construc-
tion requirements; and the structure must be designed to accommodate any increased
loads resulting from the attached deck.
n Some attached decks are located above the BFE but rely on support elements that ex-
tend below the BFE. These supports must comply with V zone design and construction
requirements.
n If a deck or patio (not counting its supports) lies in whole or in part below the BFE, it
must be structurally independent from the structure and its foundation system.
Decks and patios must not adversely affect the adjacent structures or nearby structures during
base flood conditions by diverting floodwaters and waves. For floodplain management pur-
poses, "low- profile" decks and patios constructed at natural grade or on small amounts of fill
for site drainage purposes (see the section on Fill) will not lead to harnifttl diversion of flood-
waters or wave runup and reflection
A "low - profile" deck or patio is defined as one where the vertical thickness of the deck or patio
is 12 inches or less, some of which may be below the adjacent finished grade. This thickness
does not include railings (which should be open). Seats, benches, tables, planters, or other
obstructions must not be built into or attached to the deck or patio.
Decks and patios must be designed and constructed so that, when subject to base flood con-
ditions, they do not create debris that will damage NFIP - compliant structures. For floodplain
management uurposes, this means that decks and ratios must either: a) remain intact and in
place during the base flood, or b) break apart into small pieces so that the resulting debris will
not lead to structural damage of NFIP- compliant structures
Decks that are structurally attached to V zone structures must be supported to resist the si-
multaneous action of design wind loads and base flood loads. In some cases, attached decks
can be cantilevered but, in most cases, attached decks must be supported on piles, posts, or
columns embedded into the ground and capable of surviving anticipated erosion and scour.
Post -storm investigations frequently identify decks that were elevated on small diameter posts
or were elevated on structural elements without sufficient embedment into the ground. The
result of inadequate support is loss of the decks and sometimes damage to the elevated struc-
tures as the decks fail. Unless the building code or local community, prescribes otherwise, a
rule of thumb is the foundation for an elevated deck attached to a V zone structure should be
similar to the structure's foundation.
Technical Bul I eTin 5 — auGuST 2008 9
Elevators
Elevators attached to or beneath an elevated V zone structure must comply with building, fire,
electrical, and mechanical code requirements. Like access stairs, elevators are excluded from
the NFIP breakaway requirement, but mast meet the NFIP flood damage- resistant material
requirements. Elevator equipment below the BFE vvt'll result in higher flood insurance premi-
ums.
Flood loads acting on the elevator components and any non - breakaway shaft walls must be ac-
counted for in the design of the elevated structure and its foundation system: therefore, it is
advantageous to minimize the size of residential elevators. Additional details can be found in
Technical Bulletin 4. Elevator Installation for Buildings Located in Special Flood Hazard Areas, Tech-
nical Bulletin 2, Requirements for Flood Damage- Resistant Materials for Buildings Located in Special
Flood Hazard Areas, and in Flood Resistant Design and Construction (ASCF. 24). ASCE 24 is refer-
enced by model building codes and has been determined by FENLA to be consistent with the
NFIP regulations.
Enclosed Areas
Use of enclosed areas is restricted to parking of vehicles, building access, and storage. En-
closed areas, including foyers, must be constructed of flood damage- resistant materials and
not be finished. Enclosed areas must not be used for habitable or recreational put
The NFIP regulations state that the area beneath the elevated
portion of a V zone structure may be enclosed only with open
lattice, insect screening or non - supporting breakaway walls
(see Technical Bulletin 9, Design and Construction Guidance for
Breakaway Walls Below Coastal Buildings). Guidance on lattice
has been developed and incorporated into FEMA documents,
including the Flood Insurance Manual. The guidance states the
followin as being acceptable lattice:
n Wooden or plastic lattice, with at least 40 percent of its
area open, and made of material no thicker than ►/ inch.
n Wooden or plastic slats or shutters, with at least 40 percent
of their area open, and made of material no thicker than 1
inch.
Figures 4 and 5 show examples of compliant slats, which typi-
cally are installed flat against the foundation pilings (Figure 4)
or angled like louvers between the pilings (Figure 5) .
Equipment
The NFIP does not limit the
size of enclosures under
elevated structures. How-
ever, higher NFIP flood
insurance premiums will be
assessed for V zone struc-
tures with enclosed areas
that are 300 square feet
or more in size (including
stairwells and elevator en-
closures), even if enclosed
by compliant breakaway
walls.
The NFIP does not require
flood openings in V zone
enclosures; however, some
communities may have
such a requirement.
In general, mechanical, electrical, and plumbing equipment and fixtures are required to be
elevated at or above the BFE. There are some exceptions for elevator equipment that cannot
be elevated, but these exceptions are very specific and are outlined in Technical Bulletin 4,
Elevator Installation for Buildings Located in Special Flood Hazard Areas and ASCE 24.
to Technical Bul I eTin 5 — auGuST 2008
Figure 4. Wood slats
installed flat against
foundation pilings
,� ms�.� «sir. s.��•s���• r.7
_
" It
Figure 5. Wood slats
installed between pilings
at an angle (louvers)
Utility risers, electric meters, and similar elements that must be located below the BFE must be
installed to minimize flood damage. The following techniques help to achieve this objective:
n The elements must not be attached to or penetrate through breakaway walls.
n The elements should be located on the sides of piles and columns that are opposite from
the anticipated direction of flood flow and wave approach, where possible.
Additional guidance can be found in Protecting Building Utilities From Flood Damage (FEMA
348) .
Designers and owners should be aware that the presence of equipment below the BFE, even if
allowed by permit, can result in higher NFIP flood insurance premiums.
Technical BulIeTin 5— auGuST2008 11
Foundation Bracing
Bracing is often used to stiffen pile foundations and /or to improve comfort and reduce sway
in elevated buildings. As a general rule, building designs that do not include bracing will mini-
mize obstructions to flow and waves and are preferred. However, if bracing is required for a
stable design, its use should be minimized.
Diagonal timber cross - bracing is the most common type of bracing used on foundations un-
der coastal homes (see Figure 6). Unfortunately, timber braces frequently fail during severe
flood events due to wave and or debris impacts. If they survive, they can trap debris and trans-
fer lateral flood loads to the foundation. Metal rod braces, while less susceptible to failure,
can also trap floating debris (see Figure 7). Knee braces at the tops of pilings are sometimes
preferred since they will likely extend a shorter distance below the flood surface and present
less obstruction to flow and waves.
Free -of- obstruction considerations call for using only the minimum amount of bracing that is
necessary to add rigidity to the design for the comfort of occupants. Many coastal construction
experts and references suggest relying on shore - perpendicular bracing and minimizing the
use of shore - parallel bracing. However, since wind and seismic loads can act in any direction,
this alternative may not always provide the structural stability that is required in some loca-
tions. Increasing the number of piles (by decreasing horizontal spacing), detailing moment
connections at the tops of the piling (in the case of concrete piles and beams), using grade
beams, and extending pilings above the first elevated floor level are accepted ways of eliminat-
ing or reducing the need for bracing.
Where foundation bracing is used below the BFE, it must be placed so as not to interfere with
the intended failure of breakaway wall panels. Avoiding interference may require eliminating
breakaway walls, shifting the location of breakaway walls, or redesigning the foundation so the
need for certain braces is eliminated. Breakaway walls and foundation bracing should not be
placed in close proximity if either can affect the intended performance of the other.
Figure 6. Elevated
coastal home with timber
cross - bracing, principally
in the shore - perpendicular
direction
1'_' Technical Bul IeTin 5 — auGuST2008
Figure 7. Trapping of
floating debris by metal
rod cross - bracing
Grade Beams
Grade beams typically are made of reinforced concrete or wood; they are used to tie together
the foundation piles or columns to provide additional lateral support. Grade beams that are
placed with their upper surfaces flush with or below the natural grade are not considered
obstructions and are allowed under the NFIR However, storm erosion and local scour will
often expose and undermine grade beams, leaving them suspended above the post storni
ground profile. Designers must anticipate this circumstance and design grade beams to resist
flood, wave, and debris loads and to remain in place and functional when undermined (see
Figure 8). Grade beams also must be designed and constructed so that the vertical thickness
is minimized, thereby reducing the lateral flood, wave, and debris loads acting on the beam
and limiting the transfer of these loads to the foundation. Designers are cautioned that grade
beams should not be used as a substitute for adequate number, size, and embedment of piles
or columns.
MWOW
Figure 8. Grade beams
must resist flood, wave,
and debris loads when
undermined.
Technical Bul IeTin 5 — auGuST2008 13
Shear Walls
A strict interpretation of the NFIP regulations indicates that only pile and column founda-
tions are permitted in V zones. In practice, this requirement has been relaxed to allow solid
walls that are necessary to transfer lateral loads acting on the upper stories of tall buildings
to the ground, particularly in extreme -wind zones. These walls, called shear walls, are often
constructed parallel to the anticipated direction of flood flow and wave attack (i.e., perpen-
dicular to the shoreline) so as to allow floodwaters and waves to pass freely. In some cases,
however, building designs require both shore - perpendicular and shore - parallel shear walls.
Use of shore - parallel shear wall segments should be limited to that minimum length required
to transfer upper story loads to the foundation. Shore - parallel shear walls should be designed
with openings in and between shear wall segments, to minimize trapping of floodwaters, waves
and debris, and to minimize the total flood load acting on the building. In any case, flood
forces on these walls must be certified as part of the overall V zone certification required by a
community.
Low -rise, V zone buildings can usually be designed with pile and column foundations only, al-
though some communities allow below -BFE shear walls without regard to building height or
size. Thus, some low-rise buildings have been constructed in V zones with shear walls below
the BFE (see Figure 9), usually with the walls perpendicular to the shoreline.
Figure 9. House
elevated on shore -
perpendicular shear walls.
This design approach
is risky for low -rise
buildings since lateral
out -of -plane loads (wind
and flood acting on the
faces of the shear walls)
can be large and special
design considerations and
detailing are required.
The practice of allowing shear walls beneath low -rise construction is controversial. This is due
to the fact that any solid foundation wall below the BFE can act as an obstruction, and these
walls can be subject to extreme loads during a base flood event. Indeed, post -flood investiga-
tions have found that many such walls do not survive a severe storm event. This is illustrated in
Figure 10, which shows an example of a building supported on columns and shore- perpendic-
ular walls, where a wall section failed, leading to failure of the elevated floor beam and floor.
In this instance, the building was a pre -FIRM building with the solid walls resting on shallow
footings (a means of support not permitted under post-FIRM V zone regulations), and the
failure was likely due to both lateral flood loads and foundation undermining.
14 Technical Bul I eTin 5 - auGuST 2008
Figure 10. Failure of shore - perpendicular (and shore -
parallel) solid foundation walls, and of beam and floor
system supported by the shore - perpendicular wall (pre -FIRM
structure)
Shear walls beneath low -rise V zone structures, regard-
less of orientation, are obstructions that are contrary
to the NFIP free -of- obstruction requirements They
should not be permitted unless special justification
exists, such as the need for a public, military, or func-
tionally dependent, low -rise structure in a V zone,
which cannot be supported on piles and columns
alone. Even in these cases, they should be allowed only
if detailed engineering calculations demonstrate that
the foundation and building are designed to resist all
base flood conditions (including erosion, which will
increase the height of waves and wave forces striking
the foundation), all design loads, and all appropriate
load combinations.
For floodplain management purposes, below BFE shear walls should only be permitted below
fully-engineered mid- and high -rise structures where the walls are necessary to transfer lateral
loads from upper stories to the ground, and where engineering calculations demonstrate the
viability of such an approach under design wind and flood conditions. Below BFE shear walls
should be oriented perpendicular to the shoreline whenever possible. Shore - parallel shear
walls below the BFE should be limited to the absolute minimum necessary by designing them
to be as narrow as possible with openings, and separated or offset to present the minimum
possible obstruction to water and waves.
Concrete slabs beneath elevated V zone buildings are commonly used for vehicle parking and
as a floor in an enclosed storage area or building access area. FEMA's post - disaster investiga-
tions have consistently concluded that reinforced concrete slabs thicker than 4 inches can act
as obstructions to the free flow of water and waves under elevated buildings and can transfer
flood loads to the foundation if the slabs are undermined, displaced from a horizontal orien-
tation, or fail to break into small pieces (see Figures 11 and 12).
The experience gained in post -storm evaluations suggests that slabs should either:
n Be frangible (break away), "floating' slabs that are supported by compacted soil, are not
attached to the building foundation, and are designed and constricted with a maximum
thickness (traditionally 4 inches), without reinforcement and without turned down edges,
or
Technical Bul I eTin 5 — auGuST 2008 15
n Be designed and constructed to be self - supporting structural slabs capable of remaining
intact and functional under base flood conditions, including expected erosion. Building
foundations must be capable of resisting any added loads due to the presence of these
slabs, and any increase in local scour due to the presence of the slabs.
For most circumstances and for small, low-rise V zone structures (including residences), the
first alternative of frangible slabs should be employed. This alternative is also appropriate for
other uses of slabs such as pool decks, sidewalks, and patios. Figure 13 illustrates one possible
design for such a slab.
Figure 11. Damage
to building foundation,
due in part to failure
of reinforced slab that
imposed loads on the
pilings
Figure 12. NFIP-
compliant, unreinforced
slab broke apart and
performed well.
16 Technical Bul I eTin 5 — auGuST 2008
Pile /Column (Typical)
Contraction Joint
(Typical- See Detail)
Isolation
t at
mn
Ran Mew
Detail — Section Through Slab
Tooled Joint
Tooled Contraction Joint
T
"Max.
4 �4
I
Crack Resulting From
Concrete Curing Process
Sawcut Contraction Joint Sawcut Joint
T
4 "Max.
Crack Resulting From
Concrete Curing Process
IME INSTALL EXPANSION AND ISOLATION JOINTS AS APPROPRIATE IN
ACCORDANCE WITH STANDARD PRACTICE OR AS REQUIRED BY
STATE AND LOCAL CODES.
Figure 13. Example of
frangible slab (FEMA 55)
Technical Bul I eTin 5 - auGuST 2008 17
For larger mid- and high -rise structures, both alternatives could be considered, although the
second option of self - supporting structural slabs will likely mean a significant increase in NFIP
flood insurance premiums (since the bottom of the slab — or the bottom of the lowest hori-
zontal member supporting the slab — will become the lowest floor for flood insurance rating
purposes). Reinforced, self - supporting structural slabs may be appropriate for large structures
that are supported on large concrete piles and columns, since these structures are typically
much heavier and are less prone to damage from flood loads. If a frangible parking slab is
constructed beneath such a structure, timely reoccupation after a severe coastal storm event
— of an otherwise intact and usable structure — may be prevented. A self-supporting structural
slab could be considered in such situations
Reinforced, self- supporting structural slabs and beams beneath large buildings should be de-
signed to be only as thick as necessary to support vehicle loads and other design loads, but no
thicker. The slabs and beams should be connected and integral to the foundations, and all
below BFE components should be designed to act together to resist flood loads and other de-
sign loads. Obstructive effects will be minimized as long as the slab systems remain intact and
horizontal so that floodwaters and waves pass above and below the slabs.
Site Development: Practices and Issues
The sections that follow discuss common site development practices and issues that may signif-
icantly affect the free passage of flood flow and waves under elevated buildings. By following
the guidance below, potential obstructive effects are minimized and the practices are judged
to comply with the NFIP free -of- obstruction requirement.
Accessory Structures
Unless elevated on piles or columns, accessory structures in V zones should be limited to
low -cost and small structures such as metal, plastic, or wooden sheds that are "disposable."
Guidance available from the NFIP suggests the term "small" means less than or equal to 100
square feet in size, and "low cost" means $1,000 or less. Some States and communities recom-
mend other values.
If an accessory structure does not meet the criteria established to allow below -BFE installation,
or if it is of a significant size and nature that it would likely create either damaging debris or
flow and wave diversion problems, it should be constructed and elevated in full compliance
with the NFIP requirements. Examples of structures that exceed size and value limits, or con-
tain equipment prohibited below the BFE, or facilitate uses prohibited below the BFE, include
detached garages and restroom buildings/ comfort stations (see sections that follow).
Small, low -cost accessory structures that are not elevated must be designed and anchored to
resist wind loads (see Figure 14), and to resist flotation that may occur even under relativelv
shallow flood depths. However, because small accessory structures are unlikely to withstand
wave loads, their loss should be anticipated during the base flood, and the effects that the re-
sultant debris may have on nearby structures must be considered. In addition, small accessory
18 Technical Bul I eTin 5 — auGuST 2008
structures must be unfinished on the interior, constricted of flood damage - resistant materi-
als, used only for storage, and, if provided with electricity, the service must be elevated above
the BFE.
Figure 14. Small accessory structure
anchored to resist displacement by
wind
An alternative to an accessory structure is to create storage space below the elevated structure
by enclosing an area with breakaway walls. However, creation of such an enclosure may result
in higher flood insurance premiums. Owners and communities should weigh the alternatives
carefully.
Detached Garages
Detached garages, such as those typically built for single -fam-
ily homes or for multi- family structures, are too large and too
costly to be considered accessory structures that may be al-
lowed below the BFE (see guidance for Accessory Structures).
Therefore, detached garages must be properly elevated on
piles or columns and comply with other requirements for
structures in V zones.
Garages may be construct-
ed under elevated buildings
and enclosed with break-
away walls (see Technical
Bulletin 9).
Note that large, fully - engineered, free - standing parking garages that satisfy NFIP V zone de-
sign and construction requirements are permitted, even if portions lie below the BFE (e.g.,
vehicle ramps, stairwells, elevator shafts, and parking spaces) . These structures are not walled
and roofed in the traditional sense, and can be designed to allow the free passage of floodwa-
ters and waves through the structures.
Erosion Control Structures
Erosion control structures such as bulkheads, seawalls, retaining walls, or revetments that
are installed beneath elevated coastal buildings are obstructions and are prohibited, even
if they are not attached to the building foundations. These erosion control structures can
transfer damaging flood loads to building foundations, and greatly increase the potential for
Technical BulIeTin 5— auGuST2008 19
redirecting flood flow and wave action onto the elevated por-
tions of coastal buildings. Figure 15 shows an example of
timbers attached to a pile foundation (constituting a bulk-
head) that are not pennitted.
While the NFIP does not prohibit bulkheads, seawalls, retain-
ing walls, or revetments that are outside a building's footprint
and that are not attached to the building, communities and
design professionals must carefully consider the potentially
significant effects of these structures. A general rile of thumb
is: the greater the horizontal distance between the erosion
control structure and the building, the less likely
that wave runup or reflection will adversely affect the
building. While some local or State regulations may
prohibit the constriction of an erosion control struc-
ture until erosion is within a few feet of the building
foundation (to maximize the recreational beach area
seaward of the device), the close proximity of the de-
vice to the building may contribute to flood damage.
FEMA's coastal mapping guidance suggests that a
30 -foot wide NE splash zone" (the area where waves
breaking on or running up the seaward face of an
erosion control structure will land or splash down)
should be mapped landward of erosion control struc-
tures, but provides for site - specific calculations that
can lead to a narrower splash zone width. For flood -
plain management purposes, a 30 -foot splash zone
width is desirable for new construction landward of
existing erosion control structures, but may not be
feasible where an erosion control structure is con-
structed seaward of an existing building. There is no
established minimum distance between a building
and an erosion control structure, but a reasonable
minimum width would be on the order of 10 to 15
feet. States and communities should take local con-
ditions and observed building damages into account
when such determinations are made.
Guidance for evaluating po-
tential effects of erosion
control structures on waves
is contained in the U.S.
Army Corps of Engineers
(2002) Coastal Engineering
Manual. Generally, those
devices with a steep face
(1:2 [vertical to horizontal]
or steeper) will result in the
greatest wave runup.
Figure 15. Shore - parallel timbers attached
to a pile foundation were intended to act as
a bulkhead, but constitute an obstruction
and are prohibited.
Options are limited when erosion threatens coastal buildings that are supported by shallow
foundations or pile foundations with insufficient embedment. Post - disaster investigations
indicate that low-cost and small erosion control structures offer no real protection to ero-
sion-threatened buildings since they are easily overtopped or fail when exposed to severe
coastal flooding. Without substantial erosion control structures, foundations may be un-
dermined and buildings may collapse. With substantial erosion control structures in place,
building foundations are less likely be undennined, but nearby buildings may be subject to in-
creased damage from wave runup and reflection. More lasting and less damaging solutions to
20 Technical Bul I eTin 5 — auGuST 2008
impending erosion damage include landward relocation of buildings and widening and rais-
ing beaches through nourishment.
Fences and Privacy Walls
Fences and privacy walls (including walls separating one property from another) may obstruct
or divert flood flow and waves. They must be analyzed for their effects on flood conditions
and the effects of debris generated by fence /wall failure during flood events. For floodplain
management purposes it can be presumed that open fences (e.g., slat
fencing with generous openings etc) will not lead to harmful diversion of floodwaters or
wave runup and reflection Fences with smaller openings, and solid fences and walls, may be
prone to trapping debris.
Solid fences and privacy walls, and fences prone to trapping debris, must be designed and con -
structed to fail under base flood conditions without causing harm to adjacent NFIP- compliant
buildings. Where building or fire codes require ground level walls for tenant fire separations,
efforts should be made to satisfy code requirements while minimizing potential adverse effects
due to flood diversion.
Siting of new buildings near existing fences or walls should be reviewed carefully. Figure 16
shows an example of a shore - perpendicular solid wall that failed during a coastal flood event
and damaged the pile foundation of an adjacent elevated building.
Figure 16. Shore-
perpendicular reinforced
masonry wall failed
and collapsed into the
foundation of an adjacent
building, contributing
to failure of the corner
foundation piling and pile
cap /beam.
Fill
NFIP regulations prohibit the use of fill for structural sup-
port of buildings in V zones. However, minor grading, and
the placement of minor quantities of fill, is allowed, but only
Non - structural fill described
in this Technical Bulletin
must be ignored for load
calculation and foundation
design purposes.
Technical Bul I eTin 5 — auGuST 2008 21
for landscaping, drainage under and around buildings, and support of parking slabs, pool
decks, patios, walkways, and similar site elements. Fill must not prevent the free passage of
floodwaters and waves beneath elevated buildings. Fill must not divert floodwaters or deflect
waves such that increased damage is sustained by adjacent or nearby buildings.
Given the difficulty that many communities and designers
have had in determining whether the placement and shaping
of non - structural fill will be detrimental, some State and local
regulations essentially prohibit placement of any non- structur-
al fill in V zones. This approach may itself lead to problems,
such as ponding of rainfall around or under buildings. Oth-
er States and communities may accept some (unspecified)
amount of non - structural fill, provided an engineering analy-
sis is performed and an engineer will certify that the fill will
not lead to damaging flow diversion or wave ramping and de-
flection. Given the state of engineering methods and models,
credible and defensible analyses are almost impossible to per-
form for small quantities of fill.
The following evaluation criteria are recommended for deter-
mining acceptable placement of non - structural fill in V zones.
Note that there are several criteria listed, and it is possible that
some may be in conflict, depending on specific circumstances.
The local official is expected to use discretion in such cases
to achieve the desired performance while giving deference to
the general intent of these criteria.
n Type of 11. Fill placed on V zone sites should be similar
to natural soils in the area. In many coastal areas, this skill
be clean sand or sandy soils, free of large quantities of clay,
For floodplain management
purposes, this Technical
Bulletin describes ac-
ceptable placements of
non - structural fill in V zones,
which can be assumed not
to lead to damaging flood
and wave conditions on a
site or adjacent sites.
"Minor grading" shall be that
required or allowed by com-
munity regulations, subject
to the limitations described
herein.
"Minor quantities of fill" shall
mean the minimum quan-
tity required for: adequate
drainage of areas below
and around elevated build-
ings; support of parking
slabs, in- ground pool decks,
patios, walkways, etc.; and
for site landscaping, subject
to the limitations described
herein.
silt, and organic material. Non - structural fill should not
contain large rocks and debris. If the fill is similar to and
compatible with natural soils, there is no need for communities to require designers to in-
vestigate or certify whether the fill has a tendency for "excessive natural compaction" (a
common requirement in many floodplain regulations) If the fill material is trulv similar
to natural soils, its behavior under flood conditions should be si►nilar to the behavior of
natural soils, and should not be a subject of debate.
n Height or elevation of 11 at building. Generally, it is unreasonable to expect that the ad-
dition of 1 to 2 feet of site - compatible, non - structural fill in a V zone will lead to adverse
effects on buildings. Thus, placement of up to 2 feet of fill under or around an elevated
building can be assumed to be acceptable (without engineering analysis or certification)
provided basic site drainage principles and vertical clearance limitations are not -dolat-
ed (see below); and provided there are no site - specific conditions or characteristics that
would render the placement of the fill as damaging to NFIP - compliant construction (e.g.,
if local officials have observed the placement of similar quantities of suitable fill has led
to building damage during coastal storm events). If additional fill height is proposed for
a site, the proposed final grade should be compared to local topography. If the proposed
22 Technical But I eTin 5 — auGuST 2008
final fill configuration is similar to grades and slopes in the immediate vicinity, a detailed
analysis of the effects on flood flow and waves need not be required. If more than 2 feet of
fill is proposed and the proposed fill configuration exceeds local grade heights and varia-
tions, an analysis must be perfonned.
n Grading to prevent pond ing. In addition to requirements to elevate buildings to or above
the BITE, most communities have established minimum floor elevations to ensure that wa-
ter does not collect at or under buildings. The floor elevation requirements frequently
are tied to nearby road elevations and, on low -lying or level parcels, the quantity of fill
required to raise building footprint areas typically will fall within the 2 -foot fill height allow-
ance mentioned above. Even though these floor elevation requirements are implemented
across entire jurisdictions, there is no reason to automatically assume that application in a
V zone will be detrimental. Even if habitable portions of a building are elevated to satisfy
floodplain management requirements (usually several feet above grade in most V zones),
there is no compelling reason to restrict the placement of site - compatible non - structural
fill beneath those buildings if it will prevent ponding and /or saturated soil conditions,
and as long as other drainage requirements for grades and slopes can be satisfied.
n Site drainage requirements. Most communities have established minimum slopes for
building sites to facilitate drainage away from buildings (typically 5 percent [one unit ver-
tical to 20 units horizontal]). Shallow slopes such as these will not lead to wave ramping,
runup, or deflection. Indeed, much steeper slopes (generally one unit vertical to three
units horizontal, or steeper) are required to enhance wave runup. For floodplain man -
agement purposes, site slopes shallower than one unit vertical to five units horizontal
(regardless of fill height) are assumed not to cause or worsen wave runup, or reflection
capable of damaging adjacent buildings Figure 17 shows an example of fill placement
that is considered acceptable; the fill height is modest and the side slopes are gentle. Al-
though an adjacent pre -FIRM building is lower, the pre -FIRM building would likely sustain
structural damage during a coastal flood, even if the fill was not present. Swales and con-
ventional site drainage practices should be used to mitigate potential effects of runoff
from the fill area.
Figure 17. Post -
hurricane photo showing
elevated building
surrounded by gently
sloping fill, with adjacent
damaged pre -FIRM
building (the presence
and configuration of the
fill were judged by the
damage inspection team
not to have led to flood
or wave damage to the
elevated building or the
nearby pre -FIRM building).
Technical BulIeTin 5— auGuST2008 ':
n Vertical clearance between top of II and the elevated
lowest oor. Regardless of whether fill is used for drain-
age or landscaping purposes, it should not be placed to an
elevation that buries any portion of the lowest floor system
(i.e., beams, girders, trusses, or joists supporting the walk-
ing surface of the floor) . While the likelihood of such fill
leading to structural damage is deemed to be small, it is
considered good practice to provide some vertical clear-
ance between the top of the fill and the bottom of the
lowest floor system. This clearance will allow for sheet flow
(such as that caused by waves overtopping a dune or barri-
-) t b �neath the b ildin - There are no established
eu o pass c u g.
rules as to what constitutes acceptable vertical clearance
but, for floodplain management purposes, a vertical clearance of 2 feet is considered ad-
equate in most cases.
n Compaction of ll. The NFIP regulations are very explicit— fill shall not be used for struc-
tural support of buildings in V zones. However, for floodplain management purposes,
compaction of fill below and around elevated buildings in order to support parkin6 slabs,
in- ground pool decks, patios, sidewalks, and similar site amenities is consistent with the in-
tent of the regulations
n Dune construction, repair, or reconstruction. Dunes are natural features in many coast-
al areas, and they can erode during storms and recover naturally over time. The natural
recovery process can be accelerated by replacing the eroded dune with compatible sand,
planting dune grasses, and installing sand fences (see Chapter 5 of Rogers and Nash,
2003). In general, these activities should not be considered as detrimental, even if part
of the dune lies under a building's footprint. The addition of sand to restore a site to
its pre -storm grades and stabilization with dune vegetation will likely do more good than
potential harm in terms of flood damage reduction. Concerns about placement of non-
structural, clean sand under and around beachfront buildings should not be the basis for
prohibiting dune maintenance and construction, beach nourishment, or similar activities.
Dune construction, repair, and reconstruction under or around an elevated building matt
be assumed to be acceptable (without engineering analysis or certification) as long as: 1)
the scale and location of the dune work is consistent. with local beach -dune morphology,
and 2) vertical clearance is maintained between the top of the dune and the building's
floor system. Note, however, this guidance is not intended to give license to violate the
other limitations on use of fill where buildings are distant from the shoreline and where
dunes would not otherwise occur naturally.
Ground Elevations At or Above the BFE
In some V zones, it is not uncommon to have ground elevations at or above the BFE, particu-
larly along shorelines with well- developed dune fields. Having a mapped V zone with a BFE at
or below grade seems counterintuitive, but it is possible because of two V zone mapping con-
siderations:
24 Technical Bul I eTin 5 — auGuST 2008
n Dune erosion. Dunes can erode during the base flood (or lesser floods), resulting in a
substantial lowering of the pre -storm grade to a level below the mapped BFE. The BFE is
mapped based on surge and waves passing over the lowered ground surface.
n The presence of a primary frontal dune. V zones are mapped to the inland extent (heel)
of the primary frontal dune. The BFE on the seaward face of the dune will be extended as
a horizontal line from the seaward toe, through the dune feature, to the location of the
heel.
Having grade elevations at or above the BFE may complicate,
but does not eliminate, the need to comply with V zone design
and construction requirements. But this prompts a question:
how does the free -of- obstruction requirement apply in this sit-
uation: Because the soil at the site may erode during a severe
coastal flood event, the area under the building will be ex-
posed — this exposed area must be free of obstructions.
Excavation to place the low-
est floor at the BFE is not
recommended, and may in
fact violate the NFIP regula-
tion not to alter sand dunes
if such alteration increases
potential flood hazards.
The same free -of- obstruction considerations that apply to buildings elevated far above grade
apply to elevated buildings where the lowest floors are at or near grade. The buildings must
still be designed and constructed on pile or column foundations that are embedded deep into
the ground, and the bottoms of the lowest horizontal supporting members must still be at or
above the BFE. As rioted in the section on Fill, a 2 -foot vertical clearance between the bot-
tom of the lowest horizontal supporting member and the ground is recommended. The soil
around such buildings should be graded to drain water awav from the foundations.
Restroom Buildings and Comfort Stations
One question that arises is whether restroom buildings or comfort stations can be treated dif-
ferently than other types of V zone structures and be constructed below the BFE, particularly
when those facilities are situated in public parks or recreation areas. The answer is no. These
structures must meet the same V zone design and construction requirements as other build-
ings.
Septic Systems
Post - disaster assessments show that buried septic systems and mounded septic systems in V
zones frequently are exposed and /or displaced. In addition to compromising their subse-
quent use, damage to these systems can release their contents. Septic systems frequently are
destroyed if they are near the shoreline. Therefore, septic systems should be located either
outside areas subject to erosion during the base flood or, if placed in an area subject to ero-
sion, below the depth of expected erosion. This latter stipulation may conflict with septic
system groundwater considerations, in which case a septic system is not appropriate for the
area.
Septic system tanks must not be structurally attached to building foundations. Plumbing and
piping connections will be required, and these items are allowed in V zones. However, plumb-
ing and piping components must not be attached to or pass through breakaway wall panels.
Technical BulIeTin 5— auGuST2008 25
Mounded septic systems can require significant volumes of fill, which, if placed under or im-
mediately adjacent to buildings, likely will constitute an obstruction that diverts flood flow and
waves. Mounded septic systems may be allowed in V zones if they will not worsen flood and
wave conditions for the buildings they serve, or for other nearby buildings (see the discussion
in the section on Fill for guidance on evaluating mounded systems near elevated buildings).
An additional consideration for septic systems in V zones is addressed by Section 60.3 (a) (6) (ii)
of the NFIP regulations, which requires "on -site waste disposal systems to be located to avoid
impairment to them or contamination from them during flooding." FEMA 348 provides ad-
ditional guidance.
Swimming Pools and Spas
Two primary considerations are related to the placement of
swimming pools and spas under or adjacent to buildings in
V zones:
n Whether the pool and. /or spa configuration is subject to
NFIP use limitations for enclosed areas under elevated
buildings, and
n U'liether the pool or spa will lead to increased flood
loads on buildings or exacerbate scour and erosion near
buildings.
The NFIP permits a swimming pool or spa to be placed be-
neath an elevated building only if the top of the pool /spa
and accompanying deck or walkway are flush with the exist-
Pools and spas are allowed
adjacent to coastal build-
ings only if these amenities
will not act as obstruc-
tions that lead to damage
to nearby buildings. This ef-
fectively means that most
pools and spas must be in-
stalled in- ground (either
frangible or immovable), or
completely elevated above
the BFE. This constraint ap-
plies where the ground level
is below, at, or above the
BFE.
ing grade, and only if the space around the pool /spa remains
unenclosed. However, some states and communities may prohibit restrict pools and spas
beneath elevated buildings — designers should check with the jurisdiction for any additional
requirements.
The NFIP limits the use of enclosures to parking of vehicles, building access, and storage.
Because pools and spas are for recreational use, they are not allowed to be enclosed, even if
enclosed by glass or breakaway walls. Use of lattice and insect screening around pools and spas
is permitted.
Registered design professionals must certify to local officials that a pool or spa beneath or
near a V zone building will not be subject to flotation or displacement that vrill damage build-
ing foundations during a coastal flood. Figure 18 shows a case where a spa was displaced and
likely caused failure of two piles that supported an elevated deck. Pools, pool decks, and walk-
ways that are placed tinder or adjacent to coastal buildings must be structurally independent
of the building and its foundation.
26 Technical BulIeTin 5— auGuST2008
Figure 18. Movement of
a spa likely caused failure
of two piles supporting an
elevated deck.
The NFIP
The U.S. Congress established the NFIP with the passage of the National Flood Insurance
Act of 1968. The NFIP is a Federal program enabling property owners in participating com-
munities to purchase insurance as protection against flood losses, in exchange for State and
community floodplain management regulations that reduce future flood damages. Participa-
tion in the NFIP is based on an agreement between communities and the Federal Government.
If a community adopts and enforces adequate floodplain management regulations, FEMA will
make flood insurance available within the community.
Title 44 of the U.S Code of Federal Regulations contains the NFIP criteria for floodplain man-
agement, including design and construction standards for new and substantially improved
buildings located in SFHAs identified on the NFIP's Flood Insurance Rate Maps. FEMA en-
courages communities to adopt floodplain management regulations that exceed the minimum
NFIP criteria. As an insurance alternative to disaster assistance, the NFIP reduces the escalat-
ing costs of repairing damage to buildings and their contents caused by floods.
NFIP Technical Bulletins
This is one of a series of Technical Bulletins that FEMA has produced to provide guidance
concerning the building performance requirements of the NFIP. These requirements are con-
tained in Title 44 of the U.S. Code of Federal Regulations at Section 60.3. The bulletins are
intended for use by State and local officials responsible for interpreting and enforcing the re-
quirements in their floodplain management regulations and building codes, and by members
of the development community, such as design professionals and builders. New bulletins, as
well as updates of existing bulletins, are issued periodically, as necessary. The bulletins do not
create regulations; rather, they provide specific guidance for complying with the requirements
of existing NFIP regulations. Users of the Technical Bulletins who need additional guidance
Technical Bul I eTin 5 — auGuST 2008 27
should contact their NFIP State Coordinator or the appropriate FEND regional office. The
User's Guide to Technical Bulletins (littp://wiNiNr.f'eiiia.gov/pdf,/fiina/giiide0l.pdf) lists the bul-
letins issued to date.
Ordering Technical Bulletins
The quickest and easiest way to acquire copies of FENLN's Technical Bulletins is to down-
load them from the FEMA website (http: / / -.fema.gov/ plan /prevent /floodplain /techbul.
shtm).
Technical Bulletins also may be ordered free of charge from the FENLA, Publications Ware-
house by calling 1- 800 - 480 -2520, or by faxing a request to 301 - 362 -5355, Monday through
Friday between 8 a.m. and 5 p.m. EST. Please provide the FEMA publication number, title,
and quantity of each publication requested, along with your name, address, zip code, and day-
time telephone number. Written requests may be also be submitted by mail to the following
address:
FEMA Publications
P.O. Box 2012
Jessup, MD 20794
Further Information
The following sources provide further information concerning free -of- obstruction require-
ments.
American Society of Civil Engineers, Structural Engineering Institute. 2005. Flood Resistant
Design and Construction, ASCE /SEI 24-05.
FENLA. 1993. NFIP Technical Bulletin 4 -93, Elevator Installation for Buildings in Special Flood
Hazard Areas.
FENIA. 1999. Protecting Building Utilities from Flood Damage. FEND 348.
FENIA. 2003. Guidelines and Speci cations for Flood Hazard Mapping Partners, Appendix D: Guid-
ance for Coastal Flooding Analyses and Mapping.
FENIA. 2005. Coastal Construction Manual, FENIA 55CD (3rd edition).
FEND. 2005. Home Builder's Guideto Coastal Construction: Technical Fact Sheet Series, FENLN 499.
FENLN. 2008. NFIP Technical Bulletin 2 -08, Flood Damage- Resistant Material Requirements for
Buildings Located in Special Flood Hazard Areas.
28 Technical Bu I eTin 5 — auGuST 2008
FEMA. 2008. NFIP Technical Bulletin 9 -08, Design and Construction Guidance for Breakaway Walls
Below Coastal Buildings.
FEMA. 2008. Flood Insurance Manual.
Rogers, S.M., Jr. and D. Nash. 2003. The Dune Book. North Carolina Sea Grant Report
SG -03 -03.
USAGE. 2002. Coastal Engineering Manual.
Glossary
Accessory structure — A structure that is on the same parcel of property as a principal struc-
ture, the use of which is incidental to the use of the principal structure.
Base ood —The flood having a I- percent chance of being equaled or exceeded in any given
vear, commonly referred to as the "100 -year flood." The base flood is the national standard
used by the NFIP and all Federal agencies for the purposes of requiring the purchase of flood
insurance and regulating new development.
Base ood elevation (BFE) — The height of the base (1- percent annual chance or 100 -year)
flood in relation to the datum specified on the community's flood hazard map, usually the
National Geodetic Vertical Datum of 1929 (NGVT)), or the North American Vertical Datum
of 1988 (NAND).
Coastal H igh Hazard Area — An area of special flood hazard extending from offshore to the
inland limit of a primary frontal dime along an open coast and any other area subject to high -
velocity wave action from storms or seismic sources.
Design ood elevation (DFE) —Elevation of the design flood, including wave effects, relative
to the datum specified on a community's flood hazard map.
Enclosure or enclosed area — Areas created by a crawlspace or solid walls that fully enclose
areas below the BFE.
Federal Emergency Management Agency (FEMA) — The Federal agency that, in addition to
carrying out other activities, administers the National Flood Insurance Program.
Flood Insurance Rate Map (FIRM) — The official map of a community on which FEMA has
delineated both the special flood hazard areas (SFIIAs) and the risk premium zones appli-
cable to the community.
Flow diversion — Change in course of flood flow when it encounters an object or structure.
Diversion can be accompanied by an increase in the local flood level and /or flood velocity
when the blockage is large relative to the area through which the flow would otherwise pass.
Technical Bul I eTin 5 — auGuST 2008 29
Hydrodynamic load — The load imposed on an immersed object, such as a foundation
element or enclosure wall, by water flowing against and around it. The magnitude of the hy-
drodynamic load varies as a function of velocity and other factors.
Lowest oor — The lowest floor of the lowest enclosed area of a building, including a base-
ment. Any NFIP- compliant unfinished or flood- resistant enclosure usable solely for parking
of vehicles, building access, or storage (in an area other than a basement) is not considered
a building's lowest floor, provided the enclosure does not render the structure in violation of
the applicable design requirements of the NFIP.
Mitigation Directorate —The component ofFEMA directly responsible for administering the
flood hazard identification and floodplain management aspects of the NFIP.
Primary frontal dune — The Primary Frontal Dune is a continuous or nearly continuous
mound or ridge of sand with relatively steep seaward and landward slopes immediately land-
ward and adjacent to the beach and subject to erosion and overtopping from high tides and
waves during major coastal storms. The landward limit of the primary frontal dune, also
known as the toe or heel of the dune, occurs at a point where there is a distinct change from
a relatively steep slope to a relatively mild slope. The primary frontal dune toe represents the
landward extension of the Zone VF coastal high hazard velocity zone.
Registered Design Professional — An individual who is registered or licensed to practice
their respective design profession as defined by the statutory requirements of the professional
registration laws of the State or jurisdiction in which the project is to be constructed.
Special Flood Hazard Area (SFHA) —An area delineated on a Flood Insurance Rate Map as
being subject to inundation by the base flood and designated as Zone A, AE, AI -A30, AR, AO,
AH, A99, `, W, or V1-V30.
Substantial damage — Damage of any origin sustained by a structure whereby the cost of re-
storing the structure to its before - damaged condition would equal or exceed 50 percent of
the market value of the structure before the damage occurred. Structures that are determined
to be substantially damaged are considered to be substantial improvements, regardless of the
actual repair work performed.
Substantial improvement — Any reconstruction, rehabilitation, addition, or other improve-
ment of a structure, the cost of which equals or exceeds 50 percent of the market value of the
structure (or smaller percentage if established by the community) before the "start of con-
struction" of the improvement. This term includes structures that have incurred "substantial
damage," regardless of the actual repair work performed.
Wave re ection — Return or redirection of a wave striking an object.
Wave runup — Rush of a wave up a slope or structure.
i0 Technical Bul I eTin 5 — auGuST 2008