MONROE COUNTY, FLORIDA
MONROE COUNTY BOARD OF COUNTY COMMISSIONERS
RESOLUTION NO. 232 - 2015
A RESOLUTION OF THE MONROE COUNTY BOARD OF
COUNTY COMMISSIONERS ADOPTING FEMA TECHNICAL
BULLETIN 9 "DESIGN AND CONSTRUCTION GUIDANCE FOR
BREAKAWAY WALLS" DATED AUGUST 2008 AS REQUIRED
PURSUANT TO MONROE COUNTY CODE SECTION 122 -2(C)
WHEREAS, Monroe County is currently a participating community in the National
Flood Insurance Program (NFIP) and is working on internal County policies to improve upon its
interpretation of NFIP regulations; and
WHEREAS, Monroe County desires to become eligible to enter FEMA's Community
Rating System (CRS); and
WHEREAS, Monroe County Code Section 122 -2(c), in part, requires that in interpreting
other provisions of this chapter, the building official shall be guided by the current edition of
FEMA's 44 CFR, and FEMA's interpretive letters, policy statements and technical bulletins as
adopted by resolution from time to time by the board of county commissioners;
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF MONROE COUNTY, FLORIDA:
Section 1. Pursuant to Monroe County Code Section 122 -2(c), the Board hereby adopts
FEMA Technical Bulletin 9 "Design and Construction Guidance for Breakaway Walls" dated
August 2008, a copy of which is attached hereto.
Section 2. The Clerk of the Board is hereby directed to forward one (1) certified copy of
this Resolution to the Building Department.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
PASSED AND ADOPTED by the Board of County Commissioners of Monroe County,
Florida, at a regular meeting held on the 16 of September, 2015.
Mayor Danny L. Kolhage
Yes
Mayor pro tem Heather Carruthers
Yes
Commissioner Sylvia Murphy
Yes
Commissioner George Neugent
Yes
Commissioner David Rice
Yes
BOARD OF COUNTY COMMISSIONERS
OF MONROE COUNTY, FLORIDA
BY:
Mavo L. Kolhage
MONROE COUNTY ATTORNEY
PPROVEDAS ATE? FORM:
STEVEN T. V'Vii J L� , l. , AM
ASSISTANT O ATTORNEY
Date 8$ffix
__
vk t ,
ti' :iir: ' i A.11. ". . 4 - 4 - t—
a Mia g 1 i *''IP`"" it' 11111111,_ ,., , ,,. . 1 ..
I i ' / + x 1
a
t �l� y x . '
d 1 } 1
,.,yam
j.
1-
Design a nd
ul ance or rea awa
Walls
Below Elevated Buildings Located in Coastal High Hazard
Areas in accordance with the National Flood Insurance
Program
Technical Bulletin 9 / August 2008
`„pARI t,.
���-= FEMA
9,vn,e"
Table of Contents
Introduction .1
. NFIP Regulations 3
Flood Insurance Considerations 4
Building and Residential Code Considerations 5
Wave Loads on Building Elements 5
Performance of Breakaway Walls 5
Options for Enclosing Areas Below Elevated Buildings 12
Prescriptive Design Method for Breakaway Walls 13
Simplified Design Method for Breakaway Walls 18
Performance-Based Design of Breakaway Walls 25
Impact of Breakaway Wall Provisions on Other Building Elements 96
Construction Materials 27
Existing Buildings: Repairs, Remodeling, Additions, and Retrofitting 28
Recommendations for Coastal A Zones 98
The NFIP 30
NFIP Technical Bulletins SO
Ordering Technical Bulletins 31
Further Information 31
Glossary 32
Comments on the Technical Bulletins should be directed to:
Department of Homeland Security
FEMA Mitigation Directorate
500 C Street, SW.
Washington, D.C.20472
Technical Bulletin 9-08 replaces Technical Bulletin 9-99, Design and Construction Guidance for
Breakaway Walls.
Cover photo: Post-Hurricane Ivan photo of the underside of an elevated V zone building.The break-
away walls underneath the building failed as intended during the hurricane.
Introduction
Protecting buildings that are constructed in special flood hazard areas (SFHAs) from dam-
age caused by flood forces is an important objective of the National Flood Insurance Program
(NFIP). In support of this objective, the NFIP regulations include minimum building design
criteria that apply to new construction,repair of substantially damaged buildings,and substan-
tial improvements of existing buildings in SFHAs. The base flood is used to delineate SFHAs
on Flood Insurance Rate Maps (FIRMS) prepared by the NFIP.The base flood is the flood that
has a 1-percent chance of being equaled or exceeded in any given year (commonly called the
"100-year" flood). Certain terms used in this Technical Bulletin are defined in the Glossary.
Coastal waves and flooding can exert strong hydrodynamic
forces on any building element that is exposed to the waves Under the NFIP,the"low-
or flow of water. The NFIP requires that all new buildings, est floor is the floor of the
lowest enclosed area of a
substantially damaged buildings, and substantially improved building.An unfinished or
buildings in Coastal High Hazard Areas (Zones V, VE, and flood-resistant enclosure
VI030) be elevated to or above the base flood elevation (BFE) that is used solely for park-
on open foundations consisting of piles, posts, piers, or col- ing of vehicles, building
umns. These open foundations must be designed to allow access, or storage is not
waves and water moving at high velocity to flow beneath build- the lowest floor, provided
the enclosure is built in
ings. compliance with applicable
requirements.
NFIP regulations require that the area below the lowest floor
of elevated buildings either be free of obstructions or have As used by the NFIP, an
any enclosed areas be constructed of non-supporting break- "enclosure"is an area that
away walls, open lattice-work, or insect screening. The walls, is enclosed on all sides by
lattice,or screening are intended to collapse under wave loads walls.
without causing collapse, displacement, or other structural
damage to the elevated building or the supporting founda-
tion system (see Figure 1). Obstructions below an elevated building can significantly increase
the potential for flood damage by increasing the surface area subject to wave impact and ve-
locity flow.
The NFIP regulations also specify that enclosures may be used only for parking of vehicles,
building access, or storage; that all materials below the BFE, including materials used to con-
struct enclosures, be flood damage-resistant materials; and that construction methods and
practices minimize the potential for flood damage.
Specific design requirements for breakaway walls are included in the NFIP regulations. Those
parameters were the subject of research on breakaway walls performed for the Federal Emer-
gency Management Agency (FEMA) and the National Science Foundation by North Carolina
State University and Oregon State University (Tung et al., 1999). The research evaluated fail-
ure mechanisms that were demonstrated by full-scale, laboratory wave-tank tests of breakaway
wall panels.
Technical BulleTin 9 — auGuST2008 1
_= I = BMW _I-I III `'IIId1I1 limn 11 111
a —
Floor joists/trusses
0
0
o `
Breakaway V—
supportFloor beam
Breakaway
wall•
_ �---Vertical
c foundation member
Figure 1. Area enclosed by breakaway walls below an elevated building
This Technical Bulletin presents three design methods that are consistent with the NFIP
regulations:a prescriptive design approach,a simplified design approach,and a performance-
based design approach. Regardless of the approach used, breakaway walls must be designed
and constructed to meet applicable building or residential codes, such as the International
Building Code® (IBC°) or the International Residential Code's (IRC ), respectively. In many cases,
design wind speeds will exceed the prescriptive limits specified in the governing residential
code, which means designs must be in accordance with the governing building code or other
approved standard. For example, the prescriptive design provisions of the 2006 IRC are not
applicable to designs where 3-second gust design wind speeds exceed 100 mph; thus, residen-
tial structures in these areas must be designed in accordance with the IBC or other standard
2 Technical BulleTin 9 — auGuST2008
referenced in the IRC (see IRC Section R301.2.1.1). The primary reference for wind and seis-
mic loading in building and residential codes is Minimum Design Loads for Buildings and Other
Structures (ASCE 7-05).
The prescriptive design approach for breakaway walls requires the use of typical detailing,but
allows the designer to design the elevated portion of the home and the foundation system
without consideration of flood forces acting on the breakaway walls. This approach is only al-
lowed for walls designed to have a safe loading resistance (also referred to as allowable load)
of 20 pounds per square foot (psf) or less, as defined in this Technical Bulletin.
The simplified design approach is permitted for walls designed to have a safe loading resis-
tance of more than 20 psf. The approach requires the use of typical details that are similar
to those used in the prescriptive method. Although special certification is required for these
walls, the process is simplified since these walls are designed to minimize flood loads to the
elevated structure and foundation system.
The performance-based design approach allows more detailing freedom for breakaway walls,
but requires the designer to consider the combined effect of wind forces acting on the elevat-
ed portion of the structure, as well as wind and flood loads acting on the foundation system
and the breakaway walls.
NFIP Regulations
The NFIP regulations for breakaway walls are codified in Title 44 of the Code of Federal Regu-
lations, in Section 60.3(e)(4),which states that a community shall:
"Provide that all new construction and substantial improvements in Zones V1-V30 and
VE, and also Zone V if base [lood elevation data is available on the community's FIRM,
are elevated on pilings and columns so that (i) the bottom of the lowest horizontal struc-
tural member of the lowest Thor(excluding the pilings or columns) is elevated to or above
the base rood level; and(ii)the pile or column foundation and structure attached thereto
is anchored to resist _otation, collapse and lateral movement due to the effects of wind
and water loads acting simultaneously on all building components. Water loading val-
ues shall be those associated with the base `ood. Wind loading values used shall be those
required.by applicable State or local building standards. A registered professional engineer
or architect shall develop or review the structural design speci'-cations and plans for the
construction, and shall ce-tifythat the design and methods of construction to be used are
in accordance with accepted standards of practice for meeting the provisions of paragraphs
(e)(4)(i)and(ii) of this section."
Section 60.3(e)(5) further states that a community shall require:
"...that all new construction and substantial improvements within Zones Vl-V-30, VE,
and Von the community's FIRM have the space below the lowest Thor either free of ob-
struction or constructed with non-supporting breakaway walls, open wood lattice-work,
Technical Bul l eTin 9 — auGuST 2008 3
or insect screening intended to collapse under wind and water loads without causing col-
lapse, displacement, or other structural damage to the elevated portion of the building or
supporting foundation system. For the purposes of this section, a breakaway wall shall
have a design safeloading resistance of not less than 10 and no more than 20 pounds per
square foot. Use of breakaway walls which exceed a design safe loading resistance of 20
pounds per square foot (either by design or when so required by local or State codes) may
be permitted only if a registered professional engineer or architect certi Les that the designs
proposed meet the following conditions: (i) Breakaway wall collapse shall result from a
water load less than that which would occur during the base rood; and (ii) The elevated
portion of the building and supporting foundation system shall not be subject to collapse,
displacement, or other structural damage dueto the effects of wind and water loads acting
simultaneously on all building components(structural and non-structural). Water load-
ing values used shall be those associated with the base Hood.
Wind loading values used shall be those required by applicable The NFIP Technical
State or local building standards. Such enclosed space shall Bulletins provide guid-
be useable solely for parking of vehicles, building access, or ance on the minimum
storage." requirements of the NFIP
regulations. Community or
Proposals for substantial improvement of existing buildings in State requirements that ex-
V zones, and proposals to repair those buildings that have sus- peed those . the NFIP take
precedence. Design profes-
tained substantial damage,must comply with the requirements sionals should contact the
for new construction, including requirements for breakaway community to determine
walls surrounding enclosed areas below the BFE. As part of whether more restrictive
issuing permits, community officials must review such propos- provisions apply to the
als to determine whether they comply with the requirements. building or site in question.
All other applicable require-
Further information on substantial improvement and substan ments of the State or local
tial damage is found in Answers to Questions About Substantially building codes must also be
Damaged Buildings (FEVLA 213). met for buildings in all flood
hazard areas.
Flood Insurance Considerations
Elevated buildings in V zones that do not have obstructions or enclosures below the BFE are •
subject to less flood damage and thus lower rates are used to determine premiums for NFIP
flood insurance. Some considerations affecting the rates and costs of NFIP flood insurance
for elevated buildings in V zones include:
n The use of an enclosure with breakaway walls increases the premium for the entire
building.
n An increase in the flood insurance premium resulting from the presence of an enclosure
depends upon the area of the enclosure; substantially higher premiums are charged for
enclosures that are 300 square feet or greater in area.
n The presence of garage doors below an elevated building, even if designed in accordance
with this Technical Bulletin, may increase the flood insurance premium for the building.
NFIP flood insurance policies have limits on coverage of contents in enclosures under elevat-
ed buildings. Designers, contractors, and owners may wish to contact a qualified insurance
agent or the NFIP for more information about policy coverage, coverage limits, and costs.
4 Technical BulleTin 9 — auGuST2008
Building and Residential Code Considerations
The IBC requires that breakaway walls be designed and detailed in accordance with Flood Re-
sistant Design and Construction (ASCE 24-05).ASCE 24-05 provides minimum requirements for
flood-resistant design and construction of structures that are located in flood hazard areas. It
requires breakaway walls and their connections to be in accordance with the flood loads speci-
fied in ASCE 7-05. In addition,ASCE 24-05 states that utilities and attendant equipment shall
not be mounted on, pass through, or be located along breakaway walls.
The IRC contains NFIP-consistent provisions and requires that the design of breakaway walls
be certified by a registered design professional if wind loading values exceed 20 psf. As an al-
ternative, the IRC permits the use of ASCE 24-05 for the design of breakaway walls. It should
be noted that component and cladding values presented in the IRC exceed 20 psf in locations
where the 3-second gust design wind speed equals or exceeds 110 mph.
Wave Loads on Building Elements
Buildings in areas where conditions produce breaking waves are exposed to different loads
and more severe loads than are imposed on buildings in flood hazard areas without waves.As
a breaking wave passes a pile foundation or other element of an open foundation, the struc-
ture experiences an oscillating, high-velocity flow that peaks at the wave crest,just as the wave
breaks.While drag forces are imposed on the relatively narrow vertical surfaces of open foun-
dations as water moves under the building and past the foundation elements, most of the flow
is relatively undisturbed, which makes open foundations an appropriate design in V zones.
Water flows past piles under a building in much the same way rivers flow past piles and piers
used to support bridges.
The effect is quite different when a breaking wave hits a wider, relatively continuous, verti-
cal surface, such as a wall.When the crest of a breaking wave impacts a wall, a pocket of air is
trapped and compressed by the wave (see Figure 2). As the air pocket collapses, an exceed-
ingly high-pressure burst (i.e., shock wave) impacts the wall, with the force centered around
the stillwater level. Peak pressures from a 5-foot breaking wave can be 100 times higher than
the safe loading resistance of 10 to 20 psf that is specified for breakaway walls in the NFIP reg-
ulations.
Performance of Breakaway Walls
FEMA's Mitigation Assessment Team (MAT) Reports
FEMA deploys Mitigation Assessment Teams after some disasters to evaluate the performance
of buildings and related infrastructure. MAT reports prepared after significant coastal storms
have consistently concluded that breakaway wall systems perform as intended when they are
designed and constructed to break away without damaging the elevated home and without
becoming debris that can be trapped under buildings. Figure 3 shows an example of success-
ful breakaway wall performance. MAT reports have also shown that some breakaway walls
have been designed, constructed, or modified in ways that conflict with the NFIP regulations.
In many cases, these non-compliant walls have led to unnecessary damage to, or collapse of,
elevated structures.
Technical BulleTin 9 — auGuST 2008 5
Figure 2. Impact of
a breaking wave on a Wave crest ------
vertical surface
,
,
Stillwater elevation
2 ,-.
Center of high pressure burst
Trapped air • Vertical surface
compressed by wave
Ground
i I
Figure 3. Successful r- iFI l J�14 � 1 , �1,111 _� , ,1 i„, 11,„! ► 4�f` L I .�!away w `= T =_ .0 - _ '_ I'
performance - -
_
/1 , ; l , 1
• (l:
i
" -� :. I I i i� '1 ,
•
The most commonly observed problems involving breakaway wall systems are caused by poor
detailing practices, inappropriately constructed additions; or other construction features.
Such practices do not comply with the letter or intent of the NFIP regulations, which require
structures to be "constructed by methods and practices that minimize flood damages."
Figures 4 through 8 illustrate some of the non-compliant construction problems that have
been illustrated in MAT reports:
6 Technical Bul I eTin 9 — auGuST 2008
n Figure 4 shows access stairs supported by component walls that were not designed and
detailed to break away from the structure. To be compliant with the NFIP's free-of-obstruc-
tion requirement, stairs must be designed to either break away or to independently resist
flood loads and to minimize transfer of loads to the structure (for more information, see
Technical Bulletin 5, Free-of-Obstruction Requirements for Buildings Located in Coastal High Haz-
ard Areas). It should also be noted that the backfilled concrete masonry unit walls and
planter may also significantly alter the flow of water toward adjacent structures.
n Figure 5 shows damage to exterior wall covering caused by lack of a horizontal separation
joint between the breakaway wall and the wall above.
n Figure 6 illustrates what is probably the most common problem that contributes to dam-
age — poor detailing practices. In this example, utilities were attached to the breakaway
wall. Similar damage is caused when utility lines are run through access holes, which then
prevent the walls from breaking away. All utility components that must be installed below
the elevated structure must be flood damage-resistant, designed for flood forces, and at-
tached to permanent structural elements on the side opposite to the anticipated direction
of flow and wave approach.
n Figure 7 shows cross braces that were installed inside the breakaway walls and that could
have prevented the breakaway walls from performing as designed. Braces, when required
by the structural design, must be installed so as not to interfere with the intended perfor-
mance of breakaway walls (see Technical Bulletin 5).
n Figure 8 shows a detailing practice where the breakaway walls spanned across vertical foun-
dation elements, unnecessarily strengthening the breakaway wall and preventing it from
performing as intended.
11F -1 = ,
, - - �' t 5 Figure 4. Non-
�� � �/.. 9. *i r compliant stairs
. 4 .,, ..6___
rif
.r ° [ LAICa- 'x I1ijl1 u ' � �, �•� $sue -
lgl
- 7r
44
Jl . , ter. w
'
, _ _,- . -2 m fir$"}g 1 ? '0 ,Ia L gt .:. j %'
Q
- '` ; = ._
Technical BulleTin 9 — auGuST2008 7
Figure 5. Non- + I
�'J i k
i ,-. _,
- - —:
compliant breakaway wall �. .
joint detailing /, ,
' �•' 7,
_�, if,
/iiI
l ^ ' ii
0
°MI
I J,M• !or' om
_11 1 it----'
*,-- t .—
�r.• i ,, 1 1 f- I
y
.r _°1�• Qr-� '/ .M t t ova -I it
1� ." I ;f -
Figure 6. Non- - --
compliant utilities
p /�
attached to breakaway �,. • -_-71rr ' --di ,
wall - ; _
a — f ,
i '7, 1'' , 'Ns,'\
1 J I - %
141 L ,..i 1 ,
'6._ 1_.;4 . ,.'I.:71,-c.,4:
',?;-;,:fi:::::::-."--;:..--.'';;
I F _ a::frart,-,- _
I 1
I S' I,
., f i ' I 2�od0 9i29
t
8 Technical BuI l eTin 9 — auGuST 2008
-- ;,. Figure 7. Non-
-__ compliant bracing
'�' ""� " . , 7I arrangement
, ., ,. - tit
v "b I t "y.
' -
x-
Figure 8. Non-
` compliant breakaway
G
wall spanning across
1i a vertical foundation
1, = —�. n I :_ _ _ element
r ,;
w
li-
6. t'... - I:4 a-- \
k-- a.mot_
'
1 .`,, y ..
I .-.--- -,,-,,,,,f--.- ,-.. -,-'7...- RI (... - 1, -,---- _--...•,.,:-,,_:. ;':::-\
y 7 b
J _ -,- 4S} -� Its/ 1. pi .4� l� -
Technical BulleTin 9 — auGuST2008 9
Research on Breakaway Walls
Early analyses of breakaway walls assumed base flood conditions and oscillating (non-break-
ing) wave conditions.More recent research conducted by North Carolina State University and
Oregon State University assumed two significant differences to better model coastal storm
conditions: breaking waves and rising water levels with time (Tung et al., 1999). In addition,
full-scale wall panels were tested in a wave tank to confirm the theoretical results.
The research published in 1999 found that walls constructed using standard wood studs and
structural wood sheathing failed after being hit by several breaking waves averaging less than 2
feet in height.Those wave conditions usually occur early in coastal storms,when the stillwater
depth is approximately 2 feet above ground. Although the forces acting on walls are signifi-
cant, when the stillwater depth is shallow the forces are expected to act close to the ground,
where much of the force is transferred into the ground or to the foundation near the ground.
Since loads experienced prior to failure of a properly designed and constructed breakaway
wall are applied near the bottom of the wall, forces transferred upward to the elevated build-
ing are minimized.
The tests on full-scale wall panels showed that wood-frame breakaway walls that are designed
to resist extreme-wind conditions will fail reliably at the connection between the bottom plate
of the wall and the floor (see Figure 9). The tests showed that the failure begins with bowing
and gradual displacement of the bottom plate, or a similar secondary failure beginning with
the central studs of the breakaway wall.
The testing determined another secondary failure mode that can occur if the bottom plate of
the wall does not break away.In this case,with only a slight increase in applied load, failure will
occur at the connection between the bottom plate of the wall and the bottom of each wall stud
(see Figure 10). The researchers concluded that wood-framed breakaway walls will effectively
fail before the excessive loads imposed by higher wave forces are transferred to the elevated
building or foundation.
While no similar research on the performance of steel stud-framed breakaway walls currently
exists, these types of walls are expected to fail in a manner similar to wood-framed breakaway
walls.
•
While no similar research has been undertaken to illustrate the performance of unreinforced
masonry breakaway walls, these types of walls are expected to fail at the mortar joints between
the unreinforced masonry units. Failure begins near the stillwater level where the pressure on
the wall is assumed to be greatest (see Figure 11).
10 Technical BulleTin 9 — auGuST2008
V� U
Wave force v
Figure 8. Expected failure
Wave crest / mode ofwood-framed
~— breakaway wall based on full-
scale tooting
wave height
Stillwater
elevation
Breakaway wall
Vertical
foundation member Exterior sheathing
1.5-foot minimum
Permanent 2x4
Bottom plate
nailer Failure of
' nails holding
Ground plate to' bottom
nailer plate
Concrete
,�
+� Concrete� �''~ slabF�um�mmno�o between w��
bottom plate and permanent ex4 nailer plate
Wave force Yk Figure 10. Secondary failure
Wave crest [ « mode nfwood-framed
breakaway wall uodetermined
from full-scale testing
1.5-foot minimum
~
wave height
Stillwater
Elevation Breakaway
wall
Vertical
foundation
member Exterior
sheathing
Failure of nails
holding studs to Exterior sheathing
bottom plate broken at bottom of
breakaway wall studs
Ground
Concrete
nailer plate Bottom plate
Failure of connection between bottom of breakaway
wall studs and breakaway wall bottom plate
Technical Bu| | aTin 9 — auGuGT 2008 ll
Figure 11. Expected failure
mode of unreinforced masonry Vertical
breakaway wall foundation member
Wave crest
1 /-- a.
•p'• - Hollow concrete masonry .
a: units are ungrouted
1.5-foot minimum / •.:::
wave height 4
r .c.:-:
I .
Stillwater
elevation I\ p...
D.
•
r - �
d• Breakaway wall constructed of
`• unreinforced,hollow concrete
masonry units
A
Groun. -'
Concrete slab
Options for Enclosing Areas Below Elevated Buildings
• According to Section 60.3(e)(5) of the NFIP regulations, areas below elevated buildings in V
zones may be enclosed in one of three ways: with non-supporting breakaway walls, open lat-
tice-work, or insect screening.
Breakaway Walls
The NFIP regulations specify that buildings in V zones must resist the effects of wind and wa-
ter loads acting simultaneously on all building components (where applicable, seismic loads
must also be addressed). The NFIP regulations further specify that breakaway walls may be
designed and constructed either:
n With a design safe loading resistance of not less than 10 and not more than 20 psf, in
which case special certification by a registered design professional is not required.This ap-
proach is described below as the Prescriptive Design Method, or
n With a design safe loading resistance that exceeds 20 psf, provided a registered design
professional certifies that the design meets certain conditions. To help the design profes-
sional certify these conditions, two approaches are described below: a Simplified Design
Method and a Performance-Based Design Method.
12 Technical BulleTin 9 — auGuST 2008
•
Open Lattice-Work and Insect Screening
Open lattice-work and insect screening are not considered to be walls or obstructions as long
as they will collapse under wind and water loads without causing damage to the building.
To increase the likelihood of collapse as intended, it is recommended that the vertical fram-
ing members (such as 2x4s) on which the screen or lattice-work is mounted be spaced at least
2 feet apart. Either metal or synthetic mesh insect screening is acceptable. Wood and plastic
lattice is available in 4-foot x 8-foot sheets. The material used to fabricate the lattice should
be no thicker than '/ inch, and the finished sheet should have an opening ratio of at least 40
percent. (Although the regulations explicitly identify wood lattice, plastic lattice is acceptable
provided it meets these recommendations.)
Although not specified in the regulations, areas below elevated building may also be sur-
rounded by plastic or wood shutters, slanted slats, or louvers (see Technical Bulletin 5).These
materials must meet the following criteria:
n They must be cosmetic in nature,
n The material used for the slats must be no thicker than 1 inch, and
n They must have an opening ratio of at least 40 percent.
Prescriptive Design Method for Breakaway Walls
Walls with a design safe loading resistance of not less than 10 psf and not more than 20 psf
are considered breakaway walls and do not require special certification by a registered design
professional. This statement has caused much confusion among developers, designers,and lo-
cal officials.The intent is to allow flood loads acting on breakaway walls to be neglected when
designing the foundation elements and the elevated structure itself. It was never the intent
to allow breakaway walls to be designed for wind and seismic pressures that circumvent or
lessen local building or residential code requirements. The previously cited research showed
that breakaway walls with a design safe loading resistance of not more than 20 psf will fail at
very low flood loads (i.e., 1.5-foot wave height). Thus, combining wave and wind loads on
breakaway walls with maximum loads acting on an elevated structure and foundation system is
unrealistic, and not required when using the prescriptive design method.
Breakaway walls that are built in accordance with the following prescriptive design method are
considered to have a design safe loading resistance of approximately 20 psf. Modern building
and residential codes used along the Gulf and Atlantic coasts likely will require unfactored
design wind pressures that exceed 20 psf. Building codes and material standards no longer
permit allowable stress increases for masonry, and thus prohibit unreinforced masonry break-
away walls to be designed using this method.
Applicability
The prescriptive design method for wood-framed and steel stud-framed breakaway walls does
not require a design professional and is permitted to be used if all of the following conditions
are satisfied:
Technical BulleTin 9 — auGuST2008 13
•
1. Breakaway wall heights are between 6 and 9 feet,where piles,
columns,or piers are spaced between 8 and 12 feet apart(the The NFIP does not require
installation of flood open-
performance-based methods shall be used for situations that ings (vents) in breakaway
fall outside of these limitations). walls under buildings in V
zones. However, a num-
2. The 3-second gust design wind speed does not exceed 110 ber of State and local
mph per ASCE 7-05 (see Figure 12) for all parts of breakaway governments do require
walls, except those parts that are located within 4 feet of a openings in breakaway
building corner. Walls at building corners are subjected to walls.Check with the eal
building official or floodd-
substantially higher wind loads. plain administrator for local
requirements.Technical
3. The 3-second gust design wind speed does not exceed 100 Bulletin 1 provides guid-
mph per ASCE 7-05 for those parts of breakaway walls that ance on flood openings.
are located within 4 feet of a building corner.
4. The prescriptive design method is permitted for all Seismic Design Categories identified
in ASCE 7-05.
5. Breakaway walls serving as backup for brick veneer or other material that may be damaged
by excessive deflections shall not be designed using the prescriptive design method.
Design Methodology
Wood-framed breakaway walls and steel stud-framed breakaway walls shall be constructed in
accordance with Figures 13 and 14, respectively. A note in Figure 13 refers to Table 1; Table
1 is a set of tables presenting alternative nail requirements. A note in Figure 14 refers to Ta-
ble 2, which presents requirements for screws. Interpolation for different pile spacings and
wall heights is permitted when using these tables. Wood-framed walls shall be constructed us-
ing flood damage-resistant, No. 2 Grade Spruce-Pine-Fir or better grade/species (e.g., No. 2
Southern Pine is better as defined by its higher allowable bending stress).
14 Technical Bul l eTin 9 — auGuST 2008
—I T
re u.
0 a
O IV `, `� �1�. �`
v1�f�11010111,41122X1 ko dt��90(40)
co Oa
ti p
��r ks �+�`� ' �C: j� �1/_iL� `•r■ " �ti► � ~�����AP
100(45)
a `` li ■■ e■e fir i hir + �flL"ico
til P 4,4 IsS_It`.
fa f ■■�■•■■r Z1�t ■t7 *a i ■■■■�t�'1 �fr�L 'ff�'1';ri' 120 54
a rrti /
� l �era � wt�� n rr�i ■ ■�■ 1 ■■ ■ ■■ a�•. I■■■■.rf .i�fr■•tfyG�il•�'�l,'
cn• A ! �� Yam- r1111224�■■�"LL � 115 ter. 7 trge t it4;4 8�014.1,7
�l L.wn.{ "i �■tt• r '`'� u,...l■A; ■,,►■1, r7i^..r■p�r�•��1r)I � �►•C�p'
i O. ,�4�'r�f� . {�'i�?i` ��a�flin%3�1� +uo��l� ��/r■I'i�1�i�L:fiQ��l�+t ji'�K��•�y��}f'•T,�
ID CD ,� >_ �' r■ ■■■■ •'�■ ■ rif,1i r•Lwpstreri g.rt� 'a$ •'�1 I
C N fir '.� � r�t�L �.■■ _1�•. ^�•• t1r • • I�n•pd vt���•�'�s.� lZ't`�w;�/�
�� �m � , ■■ r .141 w �= 2 it r ■..jlra.•.P4CI D/
Ip �1 / a ■ ■�■ ■u��■`wi■rCLkr.r.�r.i-tete1 r�0171 r 1=..�I•^4•Ir014444
C O �, ,y 1 1 ■fC 1■ ■r■, i es "ItAl+ra� r i f'■''•: t;,rltN r P1.42;Ii
'6 �' r~i � '� ■■ r tees ■ti.�1�Y1����rir�!��► iL�.�••S.■.i��f 41l• r.1.
cn . m rsuitAwarril, ■■ IL
-- Cry}r Ws•r ttt"ir•"oti�141.4111 li�!:c 130(58)
N �umra ■C ��� r i•s t..�-�Li='ate 1C1r/t1'aY: i
C. Mr � i ■::!'4r
�r ■4■ i�■ 140(63)
� cn
Crr; �atCD : w r - E atT :t: *. 'I'r■■•�r-�n to►q t►ice■rrrtl�.�a�d.'.�:u4�3.
n PAR1111120( 442...
`�m ■■7\rikt�0 1414..E'4.4%a':rr•�■)e. r-er±a laths
� 11,49) �4 rar401:0-r 01. ._� .lt�•;.��;:,:,-R..�ra�r.�l.'1•.1 4 w r■ �_�� Yr �:uq•1�
mv , _'1 100 49) , '��ra�■��:(kiTr� `-`; `.`r '�,�1O 130(58}
O 130(58 -.�T- . s0 •' P ans.4O��!�•' :'>. 140 63)``'Si` , 140(63)
Cn �T40(63) 150(67) ( ,:11 •1 ( )
mE' ° °''
R ,50(67)
Special Wind Re ionPi" 90(40) gCL
100(45) 130(58) Location Vmph (m,$)
� �� �_ 90 4 110(49)120(54) Hawaii 105 (47)
�1�/ ��r- w ( Puerto Rico 145 (65)
ccgo !� ���� �..i v Guam 170 (76)
„a, pier� y� Virgin Islands 145 (65)
130(58 `i � American Samoa 170 (56)7
,00
Notes:
�' 130(58) 111. �''E•'1� 110(49)) 1 Values are nominal design 3-secondgust wind speeds in milesper hour m/s
g P ( )
120(54 at 33 ft(10 m)above ground for Exposure C category.
130(58) ) 2.Linear Interpolation between wind contours is permitted.
-166 3.Islands and coastal areas outside the last contour shall use the last wind speed
tso �� 136 130 contour of the coastal area.
-148 -142 4.Mountainous terrain,gorges,ocean promontories,and special wind regions
shall be examined for unusual wind conditions.
Figure 13. Typical wood- /—Beam Permanent 2 x 4 nailer
framed breakaway wall
construction (prescriptive > ' I la L
method)
4-inch wide--V)r- -`
utility blockout -.----Breakaway 2 x 4 @
24 inches o.c.
- Exterior
' sheathing
- Nails per Table 1
' 2-16d Toe nails(typical)
,-
Gap_, I.:'
Breakaway 2 x 4(typical)
- • Built-up
2x4 '
framing
T.
�^1 J � , 'l
v <M1T.TT. ,_1 . .j r P a: n y
:. v .'s.• •ea :;.-^ o.•e.
aC
> .: . -,•saTa ,
Permanent 2 x 4 nailer
Table 1 a. Total required number of galvanized common nails(divided equally between top and bottom)for
wood-framed breakaway wall configurations with 8-foot pile spacing
Breakaway Wall Height(feet) 6 7 ' 8 9
Nail Size 8d 10d 8d 10d 8d 10d 8d 10d
Nails Required 18 12 22 14 24 16 28 18
Table 1 b.Total required number of galvanized common nails (divided equally between top and bottom and
evenly spaced)for wood-framed breakaway wall configurations with 10-foot pile spacing
Breakaway Wall Height (feet) 6 7 8 9
Nail Size 8d 10d 8d 10d 8d 10d 8d 10d
Nails Required 24 16 28 18 32 20 34 24
Table 1 c.Total required number of galvanized common nails(divided equally between top and bottom and
evenly spaced)for wood-framed breakaway wall configurations with 12-foot pile spacing
Breakaway Wall Height (feet) 6 7 . 8 9
Nail Size 8d 10d 8d 10d 8d 10d 8d 10d
Nails Required 28 18 32 22 38 24 42 28
16 Technical Bul I eTin 9 - auGuST 2008
Beam Permanent 2 x 4 nailer Figure 14. Typical steel
stud-framed breakaway
wall construction
t T T T T cif (prescriptive method)
4-inch wide
utility blockout Breakaway 362S162-33
at 24 inches o.c.
I-i .or
sheathing Screws per Table 2
2 No.6 screws
(typical)
Gap '
— Built up Breakaway 362T150-27
framing
.T. I�, i . T Ti t i
Permanent 2 x 4 nailer
Table 2.Total required number of No. 6 self tapping screws (divided equally between top and bottom and evenly
spaced)conforming to SAE J78 with a Type II coating in accordance with ASTM B 633 for steel-stud framed
breakaway wall configurations
Breakaway Wall Height (feet) 6 7 8 9"
Screws Required for 8-foot Pile Spacing 22 26 30 32
Screws Required for 10-foot Pile Spacing 28 32 36 42
Screws Required for 12-foot Pile Spacing 32 38 44 50
Design Details
All breakaway walls designed using the prescriptive design method shall be detailed in accor-
dance with the following:
1. Breakaway walls shall be designed to meet all applicable local requirements and building
code requirements.
2. As shown in Figures 13 and 14, wood-framed and steel stud-framed breakaway wall panels
shall not be attached to the pilings or other vertical foundation members. Only the tops
and bottoms of wall panels shall be connected to permanent 2x4 nailer plates.High-capac-
ity connectors such as bolts, lag screws, metal straps, or hurricane fasteners (e.g., clips or
straps) shall not be used.
Technical Bull elm 9 — auGuST2008 17
3. The exterior sheathing on breakaway wall panels shall neither overlap nor be attached to
the vertical foundation members.
4. Breakaway wall sheathing and siding shall be discontinuous at elevated floor beams and
joists; horizontal separation joints shall be provided to prevent damage to the sheathing
or siding above the floor of the elevated building (see Figure 5). As shown in Figure 15,
a watertight seal shall be provided for separation joints to prevent wind-driven rain water
and sea spray from entering the building envelope. A similar vertical sealed joint may be
needed in front of the piling.
5. Utilities,including electrical wiring,breaker boxes,power meters,plumbing,conduits,and
ventilation ducts,shall not be placed in or attached to breakaway wall panels.Building supply
lines and other utility fixtures,such as light switches or electrical outlets,may be attached to
the sheltered side of vertical foundation members as allowed by applicable building codes
and floodplain management regulations (which generally require that utilities be elevated
above the BFE). If utility lines must be routed into or out of an enclosure, one or more of
the walls shall be constructed with a utility blockout (see Figures 13 and 14).Utility lines
that pass through the blockout shall be independent of the walls and therefore will not be
damaged if the wall panels break away.
6. Breakaway wall panels shall be positioned such that, on failure, they do not collapse against
cross-bracing or threaten other foundation components (for more information,see Techni-
cal Bulletin 5).
•
7. Partial height breakaway wall systems are not permitted.
Prescriptive Design Method Example
Problem: Design a 10-foot wide by 9-foot tall wood-framed breakaway wall for a 3-second gust
design wind speed of 110 mph. The Seismic Design Category is D, deflection of the wall is not
important, and the wall is not within 4 feet of a building corner. Wood framing shall be con-
structed using flood damage-resistant No. 2 Grade Spruce-Pine-Fir 2x4s.
Solution: The problem description clearly allows the use of the prescriptive design method.
Figure 13 shows that 2x4 studs at 24 inches on center (o.c.) shall be toe nailed to the top and
bottom plates using two 16d nails. According to Table lb, twenty-four 10d nails (12 top and
12 bottom) can be used to connect the breakaway top and bottom plates to permanent 2x4
nailer plates.
Simplified Design Method for Breakaway Walls
In most coastal areas, the adopted building codes include wind and/or seismic design require-
ments that exceed the 20 psf maximum limit allowed for breakaway walls that do not require
certification by a registered design professional. NFIP performance criteria also allow for de-
signs that meet these higher load requirements. Breakaway walls with allowable loads higher
than 20 psf are permitted if a designer certifies that (1) the wall will collapse before base flood
conditions are reached, and (2) the elevated building will not be damaged by combined wind
and flood loads acting on all building components.
18 Technical Bul l eTin 9 — auGuST 2008
House walls and Sealed separation joint
breakaway walls ,'"1` (see cutaway detail)
covered withstucco \..:
i
Enclosed area
//AY& ///,Y// , //AY&
A 01
Lath for
house wall House sheathing Stucco
Watertight separation Lath
�'♦D♦��♦♦♦Di. joint at bottom of
��������� Sheathing
i�♦♦ . ��� lowest horizontal
:� .*�, structural member
�. in accordance with ,
' Stucco-covered local codes
• � house wall ` Beam
Non breakaway ►� • ` Separation
construction ; , 1 joint
Breakaway .� ' 1= i\
construction ♦ 1 Stucco covered
1
/��� ♦ breakaway 1VI Breakaway
�: i1 . k ♦� wall Stucco,lath, wall
�j ♦ and sheathing framing
Breakaway wall ♦♦♦� ♦♦ discontinuous♦♦♦�♦ ♦1 members
framing ���♦♦� ♦♦ at separation
members \•k.♦Q;.♦♦♦♦♦ joint ' Vertical
�♦��� foundation
Vertical - I member
foundation member
A .
Breakaway wall
sheathing Section AA
Flood-resistant
lath for breakaway wall
Figure 15. Separation joint between sheathing and wall covering (e.g.,stucco,siding) on house walls and
breakaway walls
Breakaway walls designed in accordance with the simplified design method will have a de-
sign safe loading resistance that exceeds 20 psf. The previously cited research showed that
wave loads on elevated structures are minimized if breakaway walls are designed to resist
wind loads up to 55 psf. Therefore, walls designed using the simplified design method meet
NFIP performance criteria. Stud, nail, and screw requirements presented in this section meet
the stringent design conditions described below and may be relaxed as long as the designer
Technical Bul I eTin 9 — auGuST 2008 19
ensures that the breakaway wall satisfies the governing code's wind and/or seismic require-
ments.Future research and testing on walls with design wind pressures significantly exceeding
55 psf may allow use of the simplified method where the 3-second gust design wind speed ex-
ceeds 140 mph.
Applicability
The simplified design method for wood-framed and steel stud-framed breakaway walls does
not require a design professional and is permitted to be used if all of the following conditions
are satisfied:
1. Breakaway wall heights are between 6 and 9 feet,where piles, columns or piers are spaced
between 8 and 12 feet apart (the performance-based method shall be used for situations
that fall outside of these limitations).
2. The 3-second gust design wind speed is between 110 and 140 mph (see Figure 12).
3. The simplified design method is permitted for all Seismic Design Categories identified in
ASCE 7-05.
Figure 16 shows that 3—
4. Breakaway walls serving as backup for brick veneer or other 16d toe nails are required
material that may be damaged by excessive deflections shall for all cases.Although
no specific pattern for
not be designed using the simplified design method. toe nailing is required in
this Technical Bulletin,
Design Methodology the National Design
Specification for Wood
Wood-framed walls shall be constructed using flood damage- Construction requires that
resistant Spruce-Pine-Fir or better species (e.g., Southern Pine edge distances, end dis-
is a better species as defined by its higher allowable bending tances, and spacings be
stress). Wood-framed breakaway walls and steel stud-framed sufficient to prevent splitting
breakaway walls shall be constructed in accordance with Fig- of the wood. If horizontal
ures 16 and 17, respectively (notes in Figure 16 refer to Tables construction is preferred
by the contractor, 1 —16d
3 and 4, and notes in Figure 17 refer to Tables 5 and 6): nail installed end grain to
n Tables 3a, 3b, and 3c provide required stud spacing for the stud can be used with
2—16d toe nails installed
Stud Grade, Construction Grade, and No. 2 Grade studs as in alternate directions once
a function of wind speed and wall height. Stud spacing val- the wall is placed vertically
ues may not be interpolated (e.g., use 120-mph design wind (see Figure 16). Likewise,
speed if actual design wind speed is greater than 110 mph, 2—40d nails installed end
but less than 120 mph). grain to the stud can be
used so that the breakaway
n Tables 4a, 4b, 4c, and 4d provide the total required number wall can be assembled hori-
of nails for different design wind speeds as a function of zontally and then nailed in
wall height and pile spacing (interpolation is allowed). place to the permanent top
and bottom nailer plates. It
n Table 5 provides required spacing for steel studs as a func- should be noted that pre-
don of wind speed and wall height. Stud spacing values may drilling may be required in
not be interpolated (e.g., use 120-mph design wind speed if some cases.
actual design wind speed is greater than 110 mph, but less
than 120 mph).
20 Technical BulleTin 9 — auGuST2008
n Tables 6a, 6b, 6c, and 6d provide the required number of self tapping screws for differ-
ent design wind speeds as a function of wall height and pile spacing (interpolation is
allowed).
Careful plan review and inspection by local jurisdictions is paramount when the simplified
design method is used. Plan reviewers must ensure that the proper number and type of con-
nectors are specified for both the top and the bottom plate connections,and inspectors should
pay close attention that the installation complies with the approved plans.
In areas where design wind speeds are less than or equal to 140 mph, inspectors may accept
more top and bottom connectors than are specified in Table 4 (for wood studs) and Table 6
(for steel studs). However, because breakaway walls fail near the ground, it is important that
the number of bottom plate connectors not exceed one or two more than the number of con-
nectors specified in Table 4d and Table 6d (regardless of design wind speed), or performance
will be jeopardized. •
Design Details
Design details described for the prescriptive design method in the previous section apply for
the simplified design method (see page 17).
Beam Permanent 2 x 4 nailer Figure 16. Typical wood-
framed breakaway wall
ITIEWAINg construction (simplified
method)
utility4-inch blockwideout f Breakaway 2 x 4
(spacing per Table 3)
i /7I
sheathing
Nails per Table 4
3-16d toe nails(typical)
Gap
Built-up Breakaway 2 x 4(typical)
I2x4
framing
Permanent 2 x 4 nailer
Technical BulleTin 9 — auGuST2008 91
Table 3a. Required 2x4 stud spacing (inches)for different design wind speeds (mph)and wood-framed
breakaway wall heights (Stud Grade)
Design Wind Speed per ASCE 7-05 110 ' 120' 130 140
Stud Spacing for 6-foot Wall Height 24 16 16 16
Stud Spacing for 7-foot Wall Height 16 16 12 12
Stud Spacing for 8-foot Wall Height 12 12 X X
Stud Spacing for 9-foot Wall Height X X X X
Table 3b. Required 2x4 stud spacing (inches)for different design wind speeds (mph) and wood-framed
breakaway wall heights (Construction Grade)
Design Wind Speed per ASCE 7-05 110 120 130 140
Stud Spacing for 6-foot Wall Height 24 24 24 16
Stud Spacing for 7-foot Wall Height 24 16 16 16
Stud Spacing for 8-foot Wall Height 16 16 12 12
Stud Spacing for 9-foot Wall Height 12 12 X X
Table 3c. Required 2x4 stud spacing (inches)for different design wind speeds (mph)and wood-framed
breakaway wall heights (No. 2 Grade)
Design Wind Speed per ASCE 7-05, 110 120 130 140
Stud Spacing for 6-foot Wall Height 24 24 24 24
Stud Spacing for 7-foot Wall Height 24 24 16 16
Stud Spacing for 8-foot Wall Height 16 16 16 12
Stud Spacing for 9-foot Wall Height 16 12 12 X
Table 4a.Total required number of 10d galvanized common nails (divided equally between top and bottom and
evenly spaced)for wood-framed breakaway wall configurations(design wind speed'=110 mph)
Breakaway Wall Height (feet) 6 7 8 . 9
Nails Required for 8-foot Pile Spacing 18 20 22 24
Nails Required for 10-foot Pile Spacing 20 24 28 32
Nails Required for 12-foot Pile Spacing 24 30 34 38
Table 4b.Total required number of 10d galvanized common nails (divided equally between top and bottom and
evenly spaced)for wood-framed breakaway wall configurations (design wind speed = 120 mph)
Breakaway Wall Height (feet) 6 7 8 9
Nails Required for 8-foot Pile Spacing 20 22 26 30
Nails Required for 10-foot Pile Spacing 24 28 32 36
Nails Required for 12-foot Pile Spacing 30 34 38 44
22 Technical BulleTin 9 — auGuST2008
Table 4c.Total required number of 10d galvanized common nails (divided equally between top and bottom and
evenly spaced)for wood-framed breakaway wall configurations (design wind speed =130 mph)
Breakaway Wall Height (feet) 6 7 ' 8 9
Nails Required for 8-foot Pile Spacing 22 26 30 34
Nails Required for 10-foot Pile Spacing 28 32 38 42
Nails Required for 12-foot Pile Spacing 34 40 44 50
Table 4d.Total required number of 10d galvanized common nails (divided equally between top and bottom and
evenly spaced)for wood-framed breakaway wall configurations (design wind speed = 140 mph)
Breakaway Wall Height (feet) 6 7 8 9
Nails Required for 8-foot Pile Spacing 26 30 34 38
Nails Required for 10-foot Pile Spacing 32 38 42 48
Nails Required for 12-foot Pile Spacing 38 44 52 58
Figure 17. Typical steel e Beam Permanent 2 x 4 nailer
stud-framed breakaway
wall construction
a 1 11 i t 11 la 1
(simplified method)
4-inch wide
utility blockout -iii—Breakaway 362S162-33
(spacing per Table 5)
µ Exterior
-~ sheathing
Screws per Table 6
-- 2 No.6 screws
- (typical)
Gap
Breakaway 362T150-27
Built-up
-- framing
\_
Permanent 2 x 4 nailer
Table 5. Required 362S162-33 stud spacing for different design wind speeds(mph)and steel stud-framed
breakaway wall heights
Design Wind Speed per ASCE 7-05 110 120 130 140
Stud Spacing for 6-foot Wall Height 24 24 24 24
Stud Spacing for 7-foot Wall Height 24 24 24 16
Stud Spacing for 8-foot Wall Height 24 16 16 12
Stud Spacing for 9-foot Wall Height 16 12 12 X
Technical BulleTin 9 - auGuST2008 93
•
Table 6a.Total required number of No.6 self tapping screws (divided equally between top and bottom and
evenly spaced) conforming to SAE J78 with a Type II coating in accordance with ASTM B 633 for steel-stud
framed breakaway wall configurations(design wind speed= 110 mph)
Breakaway Wall Height (feet) 6 7 8 9
Screws Required for 8-foot Pile Spacing 30 34 38 44
Screws Required for 10-foot Pile Spacing 36 42 48 54
Screws Required for 12-foot Pile Spacing 44 50 58 66
Table 6b.Total required number of No. 6 self tapping screws(divided equally between top and bottom and
evenly spaced) conforming to SAE J78 with a Type II coating in accordance with ASTM B 633 for steel-stud
framed breakaway wall configurations(design wind speed= 120 mph)
Breakaway Wall Height (feet) 6 7 8 9
Screws Required for 8-foot Pile Spacing 34 40 46 50
Screws Required for 10-foot Pile Spacing 42 50 56 64
Screws Required for 12-foot Pile Spacing 50 60 68 76
Table 6c.Total required number of No. 6 self tapping screws (divided equally between top and bottom and
evenly spaced) conforming to SAE J78 with a Type II coating in accordance with ASTM B 633 for steel-stud
framed breakaway wall configurations(design wind speed = 130 mph)
Breakaway Wall Height(feet) 6 7 8 9
Screws Required for 8-foot Pile Spacing 40 46 52 60
Screws Required for 10-foot Pile Spacing 50 58 66 74
Screws Required for 12-foot Pile Spacing 60 70 78 88
Table 6d.Total required number of No. 6 self tapping screws(divided equally between top and bottom and
evenly spaced) conforming to SAE J78 with a Type II coating in accordance with ASTM B 633 for steel-stud
framed breakaway wall configurations (design wind speed= 140 mph)
Breakaway Wall Height (feet) 6 7 8 9
Screws Required for 8-foot Pile Spacing 46 52 60 68
Screws Required for 10-foot Pile Spacing 56 66 76 84
Screws Required for 12-foot Pile Spacing 68 78 90 102
Simplified Design Method Example
Problem: Design a 10-foot wide by 9-foot tall wood-framed breakaway wall for a 3-second gust
design wind speed of 130 mph.The Seismic Design Category is D, deflection of the wall is not
important, and the wall is within 4 feet of a building corner.Wood framing shall be construct-
ed using flood damage-resistant No. 2 Grade Spruce-Pine-Fir.
Solution: The problem description clearly allows the use of the simplified design method.
According to Table 3c, 2x4 studs at 12 in. o.c. shall be toe nailed to breakaway 2x4 top and
bottom plates using three 16d nails (from Figure 16). According to Table 4c, forty-two 10d
nails (21 top and 21 bottom) shall be used to connect the breakaway top and bottom plates to
permanent 2x4 nailer plates.
24 Technical Bul l eTin 9 — auGuST 2008
As explained in the section on design methodology (see page 21), because this example is in
an area with a design wind speed of less than or equal to 140 mph, additional top and bot-
tom connectors may be used and accepted by inspectors. However, to allow the wall to break
away as intended, inspectors should not accept more than the number of bottom connectors
specified in Table 4d (plus an additional one or two). Therefore,while the solution indicated
by Table 4c requires 21 nails at the top plate and 21 nails at the bottom plate, the maximum
number that inspectors should accept for the bottom plate is 26 nails (per Table 4d, 24 nails
plus not more than two extra nails).
Performance-Based Design of Breakaway Walls
Breakaway walls designed in accordance with the performance-based design method will nor-
mally have an allowable load of more than 20 psf. Flood loads (i.e.,wave loads, hydrodynamic
loads, and impact loads) on breakaway walls must be calculated and taken into account when
designing the elevated structure and the foundation system. However, as described below, the
designer is given slightly more freedom when detailing breakaway wall systems.
Applicability
Performance-based design of breakaway walls must be performed by a design professional.
This method is always permitted and these walls may be designed and constructed using wood
studs, steel-studs, unreinforced masonry, or alternative materials. However, it is anticipated
that performance-based design will be used primarily when the applicability criteria (e.g.,
taller walls,wider spans,higher design wind speeds) for the prescriptive and simplified design
methods cannot be satisfied.
Design Methodology
Performance-based design of breakaway walls consists of designing the breakaway wall to resist
the largest out-of-plane load of (a) the design wind pressure in accordance with ASCE 7-05,
(b) the design seismic out-of-plane load in accordance with ASCE 7-05, or (c) 10 psf.Although
breakaway walls are permitted by NFIP regulations, the effects of flood loads on these walls
(and any other building components that are below the BFE) must be included in the design
of the elevated structure and its foundation. It should be noted that more resistant breakaway
walls increase the potential forces from debris impact loading on foundation elements and
possibly on neighboring structures.
Design Details
All breakaway walls designed using the performance-based design method shall be detailed in
accordance with the following:
1. Breakaway walls shall be designed to meet all applicable local requirements and building
code requirements.
2. Breakaway wall sheathing and siding shall be discontinuous at elevated floor beams and
joists; horizontal separation joints shall be provided to prevent damage to the sheathing
or siding above the floor of the elevated building (see Figure 5). As shown in Figure 15,
a watertight seal shall be provided for separation joints to prevent wind-driven rain water
Technical Bul I eTin 9 — auGuST 2008 95
and sea spray from entering the building envelope. A similar vertical sealed joint may be
needed in front of the piling.
3. Utilities,including electrical wiring,breaker boxes,power meters,plumbing,conduits,and
ventilation ducts,shall not be placed in or attached to breakaway wall panels.Building supply
lines and other utility fixtures,such as light switches or electrical outlets,may be attached to
the sheltered side of vertical foundation members as allowed by applicable building codes
and floodplain management regulations (which generally require that utilities be elevated
above the BFE). If utility lines must be routed into or out of an enclosure, one or more of
the walls shall be constructed with a utility blockout (see Figures 13 and 14). Utility lines
that pass through the blockout shall be independent of the walls and therefore will not be
damaged if the wall panels break away.
4. Breakaway wall panels shall be positioned such that, on failure, they do not collapse against
cross-bracing or threaten other foundation components (for more information,see Techni-
cal Bulletin 5).
5. Partial height breakaway wall systems are not permitted.
When using the performance-based design method, wood-framed and steel stud-framed
breakaway wall panels may be attached to pilings or other vertical foundation members (i.e.,
all four sides of the panel may be attached) as accounted for in the design of the wall and
foundation elements.
Unreinforced, ungrouted hollow-cell masonry units may be attached to floor beams and to
concrete or masonry vertical foundation members with standard mortars and minimum pe-
rimeter connections, as accounted for in the design of the wall and foundation elements.
Continuous breakaway wall systems that span across pilings are not permitted.
Impact of Breakaway Wall Provisions on Other Building Elements
The NFIP requirements for breakaway walls have direct impacts on the other building ele-
ments described in this section.
Utilities
Utilities and attendant equipment shall not be mounted on,pass through, or be located along
breakaway walls.Where utilities and attendant equipment (e.g., lighting circuits, switches, re-
ceptacles) are required to be installed below the BFE to address life safety and electric code
requirements, they shall be mounted on the sheltered (i.e., landward) side of foundation
members. If utility lines must be routed into or out of an enclosure, one or more of the walls
shall be constructed with a utility blockout.Utility lines that pass through the blockout shall be
independent of the walls and therefore will not be damaged if the wall panels break away.
Garage Doors
Garage doors installed in enclosures with breakaway walls are not exempt from the NFIP re-
quirements to break away under flood conditions. Standard residential garage doors may be
26 Technical BulleTin 9 — auGuST2008
considered breakaway panels and flood loads acting on these doors need not be considered.
Although such doors have not been tested under wave loads, the IRC requires the use of doors
that have been tested for wind loads. Experience has shown that these doors fail under very
low wave loading that will not significantly affect the elevated home or foundation. Garage
doors maybe designed and detailed using the performance-based design provisions described
in this Technical Bulletin.
Partial-Height Breakaway Wall Systems
Partial-height breakaway walls do not satisfy the NFIP requirements and are not permitted.
These walls are constructed so that the bottom portion of the wall breaks away while the top
portion of the wall (above the BFE but below the elevated structure) is strengthened to survive
the design event. The NFIP regulations specifically state that walls below the lowest floor of an
elevated building shall be breakaway walls.
Exterior Façade
Exterior facade treatments such as brick veneer, concrete plank, stucco, or other unrein-
forced nonstructural elements may be attached to breakaway walls provided the facade does
not inhibit the breakaway characteristics of the walls. Facade connections shall be designed
and detailed to meet building code requirements for wind and seismic loading. Horizontal
separation joints shall be used at the elevated floor level to minimize damage to the elevated
structure.
Interior Finishes •
Enclosures below elevated buildings are allowed only for parking of vehicles, building access,
or storage. Installing utility stub-outs. (i.e., purposely placed utility access points for future
connections) is inconsistent with the allowable uses of an unfinished enclosed area. Likewise,
finishing the interior of enclosures with drywall or other finish materials is not permitted un-
less required to address life-safety and fire code requirements. An exception exists for steel
stud-framed breakaway walls, where structural performance under wind loads requires con-
tinuous lateral bracing of both stud flanges.
Construction Materials
The NFIP requires that construction materials used below the BFE be resistant to flood dam-
age. Flood damage-resistant materials are those that are capable of withstanding direct and
prolonged contact (i.e., at least 72 hours) with floodwaters without suffering significant dam-
age (i.e., damage requiring more than reasonable cleanup or low-cost cosmetic repair, such
as painting). More details are found in Technical Bulletin 2, Flood Damage-Resistant Materials
Requirements for Buildings Located in Special Flood Hazard Areas.
Unless other materials are required to address life safety and fire code requirements, flood
damage-resistant materials shall be used for breakaway walls and wall panels, as outlined be-
low.
Technical BulleTin 9 — auGuST2008 97
Wood-Frame Materials
n All lumber shall be preservative-treated or decay-resistant (e.g., redwood, cedar, some
oaks, and bald cypress).
n Exterior siding shall be exterior grade and no thicker than 1/2-inch plywood, APA 32/16
rated sheathing or other equivalent sheathing material.
n Wall studs shall be no larger than 2 inches x 4 inches (nominal dimensions) unless designed
using the performance-based design provisions described in this Technical Bulletin.
n Interior wall sheathing shall not be permitted.
Metal Connectors
n Metal connectors shall be corrosion-resistant (see Technical Bulletin 8, Corrosion Protection
for Metal Connectors in Coastal Areas).
Other Materials
n Light-gauge steel framing, such as steel studs, shall be coated to resist corrosion.
n Stucco, Exterior Insulation Finishing System (EIFS) walls, and other lightweight exterior
sheathing material may be applied, as long as a separation joint is provided where the
material is attached at or near the bottom of the elevated floor beam or joists (see Fig-
ure 15). Insulation shall also be installed with a separation joint so that it does not hinder
performance.
n Foam sheathed walls may be designed and used as breakaway walls in accordance with the
performance-based design provisions presented in this Technical Bulletin.
Existing Buildings: Repairs, Remodeling,Additions, and Retrofitting
Work that is determined to be substantial improvement of an existing building (including
additions and repairs of substantial damage) must comply with the NFIP regulations and the
entire structure must also be brought into compliance.Work on any existing building that was
constructed in compliance with the NFIP requirements must comply with the requirements
and not jeopardize the continued compliance of the building. Therefore, if enclosures are
added below compliant buildings,breakaway walls shall be used. For more information about
requirements for substantially improved and substantially damaged buildings, see Answers to
Questions About Substantially Damaged Buildings (FEMA 213).
Recommendations for Coastal A Zones
FEMA's MAT reports consistently show that buildings in areas mapped as AE zones and sub-
ject to tidal flooding, wave forces, scour, and debris impacts often are severely damaged. The
landward boundary of the V zone is where the depth of water can no longer support a 3-foot
breaking wave. A zones are mapped inland of the V zone to the landward boundary of the
SFHA.
Figure 18 shows older homes located in a mapped AE zone that may have sustained significant
flood damage caused by debris impact resulting from inundation and waves. Figure 19 shows
28 Technical Bul l eTin 9 — auGuST 2008
a structure in an AE zone that was elevated above the BFE, where the enclosure's breakaway
walls performed as intended,without damage to the elevated structure.
Portions of the AE zone areas where wave-related damage occurs have been determined to
be areas where the depth of flooding can support waves between 1.5 and 3 feet high (which
only requires approximately 2 feet of water depth). These areas are called Coastal A Zones
(CAZs). Historically, CAZs have not been delineated on FIRMs, although some communities
are delineating them or are requesting that the delineation be provided as an informational
layer when FEMA produces new digital FIRMs. Where the informational layer is provided by
h'LMA on coastal map studies, the boundary line is called the Limit of Moderate Wave Action
(LiMWA).
FE1\'IA strongly recommends that structures in CAZs be designed and constructed to meet
V Zone requirements, including requirements for breakaway walls. However, the NFIP regula-
tions also require flood openings in walls surrounding enclosures below elevated buildings in
CAZs (see Technical Bulletin 1,Openings in Foundation Walls and Walls of Enclosures). Breakaway
walls used in CAZs must have flood openings that allow for the automatic entry and exit of
floodwaters to minimize damage caused by hydrostatic loads. Openings also function during
smaller storms or if anticipated wave loading does not occur with the base flood.
' w / Figure 18. Homes in
7e AE zone devastated by
1+., •iy.', - .,,"! / wave forces and debris
, '4. r� ` 4- ' r ?3 44 •'
y+,_ '' %a`h.-J- -� -_,-.-C 1,-�-- .1.,—' _ _,�f'o
.J _
r;.sl'it 4 � �'1 * �... V � ram' 2_ JJi -�• S.
�1a �y r
•.tom ,i„ ",744 s 4 , '�'� ,..-e��/"'r' __r,�+a- 3^: --- 'ram s$ ..�„m,-,.-.—�-.
LGc .a c
4s „,. .,.. ±ct-: "jiff a4 Caf'..:sY,a. } . "; .„°VxE cr'" t,.,.,-,/ s.. :4-4.4'
Technical BulIeTin 9 — auGuST 2008 29
.' r h , . .
Figure 19. Structure � .,, % ,... ix, 4- , ,;�, �„ ; 1,, ,,,,...7,
elevated above BFE s ;.'=A'oX Ae• •,( ; v.; fir' ``.�5,:: �'``' 7;
in AE zone showingt,,R .. >.,, .1.` ,I<Y: y t."*
successful response of �; :41
IA G
breakaway walls ` -�. , c -ki-,
4-----LIF
i t:
ti
7 k
' !L 11 1 i 'l 4L'I 1:1 r r � _ 10! R
I it �I 15
3 I '•�; ': i' ..
--�- -•.. -.
.14
'.9 -- - J
2
The NFIP
The U.S. Congress established the NFIP with the passage of the National Flood Insurance
Act of 1968. The NFIP is a Federal program enabling property owners in participating com-
munities to purchase insurance as protection against flood losses, in exchange for State and
community floodplain management regulations that reduce future flood damages. Participa-
tion in the NFIP is based on an agreement between communities and the Federal Government.
If a community adopts and enforces adequate floodplain management regulations,FEMA will
make flood insurance available within the community.
Title 44 of the U.S. Code of Federal Regulations contains the NFIP criteria for floodplain man-
agement, including design and construction standards for new and substantially improved
buildings located in SFHAs identified on the NFIP's FIRMs. FEMA encourages communities
to adopt floodplain management regulations that exceed the minimum NFIP criteria. As an
insurance alternative to disaster assistance, the NFIP reduces the escalating costs of repairing
damage to buildings and their contents caused by floods.
NFIP Technical Bulletins
This is one of a series of Technical Bulletins that FEMA has produced to provide guidance
concerning the building performance requirements of the NFIP.These requirements are con-
tained in Title 44 of the U.S. Code of Federal Regulations at Section 60.3. The bulletins are
intended for use by State and local officials responsible for interpreting and enforcing the
requirements in their floodplain management regulations and building codes, and by mem-
bers of the development community,such as design professionals and builders. New bulletins,
as well as updates of existing bulletins, are issued periodically, as necessary. The bulletins do
not create regulations; rather, they provide specific guidance for complying with the require-
ments of existing NFIP regulations. Users of the Technical Bulletins who need additional
30 Technical BulleTin 9 — auGuST2008
guidance should contact their NFIP State Coordinator or the appropriate FEMA regional office.
FEr'LA's User's Guide to Technical Bulletins (http://www.fema.gov/pdf/fima/guideOl.pdf) lists
the bulletins issued to date.
Ordering Technical Bulletins
The quickest and easiest way to acquire copies of FEMA's Technical Bulletins is to down-
load them from the FEMA website (http://www.fema.gov/plan/prevent/floodplain/techbul.
shtm).
Technical Bulletins also may be ordered free of charge from the FEMVIA Publications Ware-
house by calling 1-800-480-2520, or by faxing a request to 301-362-5355, Monday through
Friday between 8 a.m. and 5 p.m. EST. Please provide the FEMA publication number, title,
and quantity of each publication requested, along with your name, address, zip code,and day-
time telephone number. Written requests may be also be submitted by mail to the following
address:
FEMA Publications
P.O. Box 2012
Jessup, MD 20794
Further Information
The following sources provide further information concerning breakaway walls below elevat-
ed coastal buildings.
American Forest & Paper Association/American Wood Council, 2005, NDS: National Design
Speci=cation for Wood Construction.
American Society of Civil Engineers, Structural Engineering Institute. 2005. Flood Resistant
Design and Construction,ASCE 24-05.
American Society of Civil Engineers, Structural Engineering Institute. 2005. Minimum Design
Loads for Buildings and Other Structures, ASCE 7-05.
FEMA. 1991. Answers to Questions About Substantially Damaged Buildings. FEMA 213.
FEMA. 2000. Coastal Construction Manual, FEMA 55CD (3rd edition).
FEMA. 2005. FEMA 499: Home Builder's Guide to Coastal Construction Technical Fact Sheer Series.
FEMA. 2008. NFIP Technical Bulletin 1-08. Openings in Foundation Walls and Walls of Enclo-
sures.
Technical Bul I eTin 9 — auGuST 2008 31
FEMA. 2008. NFIP Technical Bulletin 2-08. Flood Damage-Resistant Materials Requirements.
FEMA. 2008. NFIP Technical Bulletin 5-08. Free-of-Obstruction Requirements.
FEMA. 1996. NFIP Technical Bulletin 8-96. Corrosion Protection for Metal Connectors in Coastal
Areas.
International Code Council, Inc., 2006. International Building Code®, IBC 2006.
International Code Council, Inc., 2006. International Residential Code®, IRC 2006.
Rogers, Spencer M. 1991. Foundations and Breakaway Walls of Small Coastal Buildings in Hurri-
cane Hugo. Proceedings of Coastal Zone '91. American Society of Civil Engineers. New York,
NY.
•
Tung, C.C.; Bohumil Kasal; Spencer M. Rogers,Jr.; S.C.Yeh. 1999. Behavior of Breakaway Wall
Subjected to Wave Forces: Analytical and Experimental Studies. North Carolina Sea Grant, North
Carolina State University. Raleigh, NC.
Glossary
Base Mod—The flood having a 1-percent chance of being equaled or exceeded in any given
year; commonly referred to as the "100-year flood." The base flood is the national standard
used by the NFIP and all Federal agencies for the purposes of requiring the purchase of flood
insurance and regulating new development.
Base Cood elevation (BFE) —The height of the base (1-percent annual chance or 100-year)
flood in relation to the specified datum on the community's flood hazard map, usually the
National Geodetic Vertical Datum of 1929 (NGVD), or the North American Vertical Datum
of 1988 (NAVD).
Breakaway wall — A wall that is not part of the structural support of the building and is in-
tended through its design and construction to collapse under specified lateral loading forces,
without causing damage to the elevated portion of the building or supporting foundation sys-
tern.
Coastal A Zone —An area within a special flood hazard area, landward of a V zone or land-
ward of an open coast without mapped V zones; in a Coastal A Zone, the principal source of
flooding must be astronomical tides, storm surges, seiches, or tsunamis, not riverine flooding.
During the base flood conditions, the potential for wave heights shall be greater than or equal
to 1.5 feet. Coastal A Zones are not normally designated on FIRMs.
Coastal High Hazard Area—An area of special flood hazard extending from offshore to the
inland limit of a primary frontal dune along an open coast and any other area subject to high-
velocity wave action from storms or seismic sources.
32 Technical Bull eTin 9 — auGuST 2008
Detailing—The design practice of using structural and architectural drawings and specifica-
tions to arrange, configure, and connect structural and nonstructural building components
of a building system. Design details convey to the contractor exactly how the structural and
nonstructural components of a building should be built.
Federal Emergency Management Agency(FEMA) —The Federal agency that, in addition to
carrying out other activities, administers the National Flood Insurance Program.
Flood Insurance Rate Map (FIRM) —The official map of a community on which FEMA has
delineated both the Special Flood Hazard Areas (SFHAs) and the risk premium zones appli-
cable to the community.
Hydrodynamic load — The load imposed on an immersed object, such as a foundation
element or enclosure wall, by water flowing against and around it. The magnitude of the hy-
drodynamic load varies as a function of velocity and other factors.
Hydrostatic load —The load imposed on an immersed object such as an enclosure wall, by
standing or slowly moving water.The magnitude of the hydrostatic load increases linearly with
water depth.
Limit of Moderate Wave Action (LiMWA) — The boundary line given by FEMA on coastal
map studies marking the extents of Coastal A Zones.
Lowest 'Thor — The lowest floor of the lowest enclosed area of a building, including a base-
ment. Any NFIP-compliant, unfinished or flood-resistant enclosure usable solely for parking
of vehicles, building access, or storage (in an area other than a basement) is not considered
a building's lowest floor, provided the enclosure does not render the structure in violation of
the applicable design requirements of the NFIP.
Mitigation Directorate—The component of FEMA directly responsible for administering the
flood hazard identification and floodplain management aspects of the NFIP.
New construction—For floodplain management purposes,new construction means structures
for which the start of construction commences on or after the effective date of a floodplain
management regulation adopted by a community and includes subsequent improvements to
the structure.
Registered Design Professional—An individual who is registered or licensed to practice their
respective design profession as defined by the statutory requirements of the professional reg-
istration laws of the State or jurisdiction in which the project is to be constructed.
Special Flood Hazard Area(SFHA)—An area delineated on a FIRM as being subject to inun-
dation by the base flood.
Standard residential garage door —A door, typically up to 18 feet wide by up to 8 feet tall,
intended for use in a residential garage for vehicular access and normally expected to be op-
erated less than 1,500 cycles per year.
Technical Bul l eTin 9 — auGuST 2008 33
Substantial damage —Damage of any origin sustained by a structure whereby the cost of re-
storing the structure to its before-damaged condition would equal or exceed 50 percent of
the market value of the structure before the damage occurred.Structures that are determined
to be substantially damaged are considered to be substantial improvements, regardless of the
actual repair work perfonmed.
• Substantial improvement —Any reconstruction, rehabilitation, addition, or other improve-
ment of a structure, the cost of which equals or exceeds 50 percent of the market value of the
structure (or smaller percentage if established by the community) before the "start of con-
struction" of the improvement. This term includes structures that have incurred "substantial
damage," regardless of the actual repair work performed.
34 Technical Bul l eTin 9 — auGuST 2008