Loading...
2nd Task Order 03/15/2017KEVIN MADOK, CPA MONROE COUNTY CLERK OF THE CIRCUIT COURT & COMPTROLLER DATE: April 11, 2017 TO: Rhonda Haag Sustainability Coordinator VIA: Lindsey Ballard, Aide to County Administrator FROM: Pamela G. Hanco k eputy Clerk SUBJECT: March 15 BOCC Meeting Enclosed is a duplicate original, of each of die following items, for your handling: N3 A $0 on -call Contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services. N4 A $21,499.00 Task Order 1 for CEI and construction administration services for the 290 air curtain installation, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services. N5 A $87,762.00 Task Order 2 for CEI and construction administration services for the canal 83 muck removal / backfilling/ air curtain installation, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services. Should you have any questions, please feel free to contact me at ext. 3130. Thank you. cc: County Attorney electronic copy Finance electronic copy File ✓ TASK ORDER #2 FOR ON CALL PROFESSIONAL ENGINEERING SERVICES FOR CANAL RESTORATION SERVICES BETWEEN MONROE COUNTY AND AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR CONSTRUCTION ENGINEERING INSPECTION AND ADMINSTRATION SERVICES CANAL #83 IN KEY LARGO, MONROE COUNTY, FLORIDA In accordance with the Continuing Contract for On Call Professional Engineering Services made and entered on the 15th day of March. 2017 between Monroe County, hereinafter referred to as the "County" and Amec Foster Wheeler Environment & Infrastructure, Inc. hereinafter referred to as "Consultant" where design services are allowed if construction costs do not exceed $2,000,000. All terms and conditions of the referenced Contract for On Call Professional Engineering Services apply to the Task Order, unless the Task Order modifies an Article of the Agreement of which will be specifically referenced in this Task Order and the modification shall be precisely described. This Task Order is effective retroactive to March 3. 2017 and shall expire 60 days after the final deliverable to the County is submitted. Article II Scope of Basic Services, Paragraph 2.1.1 is amended as follows: Task 1: Construction Inspections and Administration The Consultant will provide construction engineering and environmental site inspections and construction administration services for the Canal #83 Organic Removal, Backfilling, and Air Curtain Installation Project. Adventure Environmental Inc. was selected as the construction contractor for the Canal #83 Organic Removal, Backfilling, and Air Curtain Installation Project and provided a 120 day construction schedule for completion. Below are the services to be provided: a) Site Inspections: The Consultant will provide up to five hours daily site inspections for the 120 day construction schedule Monday through Friday during field construction activities through August 1, 2017 and prepare daily work reports showing contractors activities, equipment, maintenance of traffic and environmental compliance. b) Construction Administration — The Consultant will provide consultation and advice to County regarding the Contractor's performance of the Contract. The Consultant will liaise with the County, homeowners, and other stakeholders as necessary to administer the construction contract through the estimated August 1, 2017 project completion date. CEI & CA Services for Canal #830rganic Removal, Backfilling, and Air Curtain Installation Amec Foster Wheeler Environment & Infrastructure, Inc. March 15, 2017 Page I of 2 Article VII, Paragraph 7.1.1 is amended to include the following: The Consultant shall be paid monthly for time and expenses based on hourly rates and the following not to exceed amounts (except where noted): Task 1: Construction Inspections and Administration $ 87,762.00 Total (not to exceed) $ 87,762.00 The total for services to be paid under this Task Order 2 and All 3 from the demo design contract will not exceed $88,612. IN WITNESS WHEREOF, each party caused the Task Order to be executed by its duly authorized representative. CONSULTANT: WITNESS: AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE INC. 3. 31. 1 - 4 Sign Date Date , ! S�, 2,-17 c cV CL - llJ __.i t - 4. c% C-4 1 , IN i I 1 0 pox, Date BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA CEI & CA Services for Canal #830rganic Removal, Backfilling, and Air Curtain Installation Amec Foster Wheeler Environment & Infrastructure, Inc. March 15, 2017 Page 2 of 2 5 .:&� 1' Title by: 4. 4,44A, CA �) ayor /Ch irman EXHIBIT A CONSULTANT'S PROPOSAL 4hA- March 1, 2017 Rhonda Haag amec f oSter Monroe County Sustainability /Projects Director 102050 Overseas Highway, Ste. 246 wheeler Key Largo, Florida 33037 Re: Scope of Work Related to Construction Engineering Inspections and Administration Services related to Canal #83 Organic Removal, Backfilling, and Air Curtain Installation in Key Largo, Monroe County, Florida Dear Ms. Haag: Amec Foster Wheeler is pleased to provide you a proposal to assist the County with construction engineering inspections and administration for the Canal #83 Organic Removal, Backfilling, and Air Curtain Installation in Key Largo. Details of the proposed scope of services are provided below. A cost estimate to perform these services under Amec Foster Wheeler's existing contract rate schedule is also included. SCOPE OF SERVICES Task 1: Construction Inspections and Administration Amec Foster Wheeler will provide construction engineering and environmental site inspections and construction administration services for the Canal #83 Organic Removal, Backfilling, and Air Curtain Installation Project. Adventure Environmental Inc. was selected as the construction contractor for the Canal #83 Organic Removal, Backfilling, and Air Curtain Installation Project and provided a 120 day construction schedule for completion. Below are the services to be provided: a) Site Inspections: Amec Foster Wheeler will provide up to five hours daily site inspections for the 120 day construction schedule Monday through Friday during field construction activities through August 1, 2017 and prepare daily work reports showing contractors activities, equipment, maintenance of traffic and environmental compliance. b) Construction Administration — Amec Foster Wheeler will provide consultation and advice to County regarding the Contractor's performance of the Contract. Amec Foster Wheeler will liaise with the County, homeowners, and other stakeholders as necessary to administer the construction contract through the estimated August 1, 2017 project completion date. COST ESTIMATE Amec Foster Wheeler has prepared a cost spreadsheet which provides details of the labor and expense by task. The total project cost estimate will be performed on a Time and Materials (T &M) basis not to exceed $ 87,762, unless approved by Monroe County. CLOSING 1 1 Page Scope of Work for CEI & CA Services For Canal #290 Air Curtain Installation Big Pine Key, Florida Amec Foster Wheeler appreciates the opportunity to assist Monroe County with this exciting project. Should you have any questions regarding this proposal or need additional information, please contact Greg Corning at (314) 920 -8359 or via email at grea.corning@amecfw.com Sincerely Amec Foster Wheeler Environment & Infrastructure, Inc. Ricardo Fraxedas, PE Chief Engineer Direct Tel: + 1 305 525 0079 Direct Fax: + 1 305 826 1799 E -mail: ricardo.fraxedas @amecfw.com Greg rning, PE Technical Professi nal III - Engineer Direct Tel: + 1 314 920 8359 Direct Fax: + 1 305 826 1799 E -mail: cireg.cornino @amecfw.com Attachments: Cost Spreadsheet Amec Foster Wheeler Rate Schedule 21 Page §§&2 ( ##mm s #£I■ § § ■ » t - � 0 0`- §'o |2 i§� ` § � 'a - ■ R OF ��&� ! §§ 2 D \ k ) _ o§� - 7) cc vva § a 0 li § ko a2■ & mama# qmm 2 §8812 cc __/ k§ k� £ ) ®! i 7 !Z ° | oW {}aaa $i27§ Lu ! }k! C3 c � | ; « LU k k B k \2af. 2 0 ° �% &2} ■ 2 } _ \ t \ CL § LU ! LL § CL �■�! ° k kk32■ § ®at| \! S. w k « ;■ Amec Foster Wheeler Environment & Infrastructure, Inc. 2017 Schedule of Fees Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00 /hour Staff II $77.00 /hour Project $86.00 /hour Senior $109.00 /hour Principal /Project Manager $155.00 /hour Senior Principal /Senior Project Manager $159.00 /hour Chief Engineer /Scientist $194.00 /hour B. Technical Services (Engineering and Science) Technician I $45.00 /hour Technician II $55.00 /hour Senior Technician I $60.00 /hour Senior Technician II $70.00 /hour Project Administrator /Project Coordinator /Subcontract Administrator /Project Accountant $75.00 /hour Technical Writer /Document Production $ 78.00 /hour CADD /Draftsperson (includes PC /CAD) I $66.00 /hour CADD /Draftsperson (includes PC /CAD) II $101.00.hour Admin I $40.00 /hour Admin 11 $52.00 /hour C. Surveying Services Field Surveyor I $43.00 /hour Field Surveyor II $47.00 /hour Survey Technician I $67.00 /hour Survey Technician II $72.00 /hour Survey Chief $75.00 /hour D. Information Management Software Engineer $92.00 /hour Data Technician $132.00 /hour Senior Software Engineer $162.00 /hour Business Analyst $132.00 /hour E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. II. Expenses A. Travel Expenses 1. Transportation: Company pickup truck /personal vehicle, per mile — current allowable rate per County and Florida State Statutes a. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00 /day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00 /day (min 2 days) Underwater Camera Equipment /Video up to 50 $1,900.00 /day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00 /day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In -house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% III. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15