2nd Change Order 05/02/2017M E M O R A N D U M DATE: May 5, 2017 TO: Pam Hancock, Deputy Clerk FROM: Beth Leto, KWIA RE: CO #2 — West Construction, Inc. Enclosed please find the fully -executed original of no -cost Change Order #2 increasing substantial completion by 56 days to August 3, 2017, for the Marathon Airport New Storage Hangars Project. The change order was executed by Acting County Administrator Sheryl Graham on 5/d,//17 in accordance with Ordinance 004-1999. Should you have any questions, please feel free to contact me at x5239. cc: Don DeGraw T.J. Henderson Pedro Mercado Ryan Forney Martha A. Morgan Emie Coughlin Bill Chase MONROE COUNTY/FLORIDA KEYS MARATHON INTERNATIONAL AIRPORT PROJECT TITLE: Marathon Airport New Storage Hangars TO CONTRACTOR: West Construction, Inc. 18 South Dixie Highway, Suite 4-5 Lake Worth, FL 33460 The Contract is changed as follows: CONTRACT CHANGE ORDER CHANGE ORDER NO: 2 INITIATION DATE: April 19, 2017 CONTRACT DATE: May 18, 2016 The original (Contract Sum) (Guaranteed Maximum Price).....................................................$1,798,035.00 Net change by previously authorized Change Orders............................................................. $1,340,329.00 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was ............ $3,138,364.00 ✓ The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order ...............$ -0- ✓ The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ..... $3,138,364.00 The Contract Time will be (increased) (decreased) (unchanged) by......................................56 days ✓ The date of Substantial Completion as of the date of this Change Order is .......................... August 3, 2017 Detailed description of change order and justification: West Construction prepared the site and stormed work for a period of 3 calendar days due to Hurricane Matthew. In addition, the metal building manufacturer, Star Building, incorrectly designed some of the structural steel above the hangar doors which caused a delay in the erection of the building. During the metal building erection West identified the issue. They coordinated with Star Building to determine the extent of the issue. Star Building reengineered structural components of the metal building above the hangar doors. Revised signed and sealed metal building drawings and a narrative of the issue was submitted, reviewed and accepted. Star Building then had to manufacture additional steel and have it shipped to the site. West had to remove the incorrect structural members and erect and weld the new structural steel. This process caused a 53 calendar day delay in the construction schedule. Therefore, a time extension of 56 calendar days is required. There is no additional General Conditions or money owed to West It Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Additional time needed due to inclement weather conditions and manufacture delay of reengineered structural components. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: