03rd Change Order 01/29/2016MONROE COUNTY/ENGI�NEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER F-ROJECT TITLE: CHANGE ORDER NO:3 Construction of the Monme County Fire Training Academy, Crawl Key, FL INITIATION DATE: Jon 27, 2016 TO CONTRACTOR: tva-f,4, F616-in-E46-*-A-L 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: -*- i 68- ULVa ARE hqvinmui PrJU2� ...... ..... i A (uuara-n-to-owizi-a-xi-m-U-M-PTZU) prior rd'iffig Cinange U-pe I ows 1� The (ConAract Sum (Guaranteed Maximum Price) will be (bS"jLq0_) (decreaSed) (unchanged) by this Change Order ...... 3�61423. The new Contract Sum) (Guaranteed Maximum Price) including this Change Order '" .......... The Contract Time will be (increased) (decreased) (uncha by ............................. 0 days 11 The date of Substantial Completion as of the date of this Chango Order is.. o ..... June 20", 2016 11-17,1277-115. xeukf� Christian DIRECTOR PROJECT MANAGEMENT:- �� Doug-SpAIS 11111M All 0 Oil COUNTY/ASSIST. ADMINISTRATOR ko-m-an Gofitesi Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Testing of existing Reduced Pressure Zone Device (RPZD) attached to existing Fire Main yielded unacceptable pressure and flow for the proposed Fire Sprinkler system in the classroom building, county must upgrade fire line service through RPZD to meet code. Existing gate valves and fire hydrant leak and need to be replaced as well. Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: Change Order exceeds $25,000 or 5% of contract price (whichever is greater).Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: Project architect approves the change order. Yes ® No ❑ If no, explanation of why: Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: t a � 1160 Avenue C, Big Pine Key, FL 3 31 (30 072- 00 - Fax (305) 72.2 1 EC 13003 16! CGC 1607617 www,podrofalcon.com Request I I' Project Crawl l(cv Fire Academy Change Order Request No: Four Description: t rvner Requested Changes Rework Tap under existing fire plug, demolishing the connection and stub to existing Fire Hydrant at the Crawl Key Fire Academy and installation of a new "T" with connection for new training hydrant and service to the new building. Include all necessary piping for running potable water line to the building combined with Fire sprinkler service from the combination meter, eliminating the need for the street connection as described on the Plumbing floor plan on Sheet P-2. Subcontractor Materials and Labor See enclosed proposal from B&L Beneway below. Materials..................................................... . . . .. ............ ............. $3,470.00 Labor and Equipment ............. . ...................................... . ...... ......... $2,940.00 Subtotal.............................................. . . . . ............................. . .....$6,410.00 5% Overhead & 5% Profit. ..... ....... ..... -- ........................ . — — — —..$657.02 Total.......................................................................................$7,067.02 Project Coordination: 2 Hours @$100............................................................................$200.00 SUBTOTAL: MATERIALS, EQUIPMENT, COORDINATION ...........$7,267.02 Overhead@ 5%.............................. ................................................................$363.35 Subtotal.....................................................................................$7,630.37 Profit@ 5%............................................................................................................$381.52 TOTAL ALL OFT E ABOVE:.....................................................$8,011.89 Permit Fees and Design Drawings are Not Included in this proposal. If additional permit fees are required the Owner is to reimburse all permit fees. Net Amount of Request for Change Order: ......... ......................, ......... ........$8,011.89 A. If Modification is issued within (20) Twenty Calendar Days from the Date of the Request for Change Order then a no time extension will be required. B. If Modification is to be issued later than (20) Twenty Calendar Days from the Date of the Request for Change Order then both the time extension and cost proposal will need to be evaluated at that time and a modified proposal will be submitted reflecting required time extension and cost increase due to lead time for materials. Respectfully Submitted, p } y� Christian Digitally signed by Christian Brisson S 1. I 1 i DN: cn=•Christian Brisson, o=Pedro Falcon Electrical Contractors, Inc., ou, r' en7ail=cb@pedrofalron corn, c=US 1 a Bris on Daw:2015.10.090653;49-04'00' Project Manager a TELEPHONE: 305-743-4394 FAX: 305-743-4294 October 5, 2015 Pedro Falcon Electrical & General Contractors 31160 Avenue C Big Pine, FL 33043 Attn: Christian Brisson CRAWL V.;, Material Hydrant $ 2,000.00 6" Gate Valve 600.00 6 X 6 T 250.00 Valve BOX 250.00 Housekeeping Pad 300.00 Brass ID Tag 70.00 $ 3,470.00 Labor 1 Supervisor 12 hours @ $75.00 900.00 1 Pipe layer 12 hours @ $65.00 780.00 1 Backhoe/w Operator 12 hours @ $105 1.260.00 $ 2,940.00 Total $ 6,410.00 + 5% Overhead 320.50 Total 6,730.50 + 5% Profit 336.52 TOTAL $7,067.02 31160 Avenue C, Big Pine Key, FL 33043-4616 (305) 872-2200 - Fox (305) 872-2219 EC 13003416 1 CGC 1607617 www.pedrofalcon.com Request for Change Orde 01/26/16 1 Project: (..ravel Key Fire -Academy Change Order Request No: Six Description: Qwiier R,equested Cliaiiges Remoi,,al ofold unit, install new uwLt test and cei:ttjOld unit mqlshe delhered to count� Lor reci,elitw� RELlycL!g oLfhe six inch Wilkins 9 75XL includinr,,, metered b s �a ss; - wide 9171k it i s 3 75A S mett T yed hWass, and two 6 hich QS& Y vahe.v. Rut ue�vi , Per email received on 0111912016 Subcontractor Materials and Labor See enclosed proposal from B&L Beneway below. Materials ... .......... ......... . ......................... $7,800.00 Labor and Equipment ....... .......... ...... -- ......... — ........... ... . —$8, 100.00 Total....................................................................................... $15,900.00 Project Coordination: 8 Hours * $100 ............................................................................ $800.00 SUBTOTAL: MATERIALS, EQUIPMENT, COORDINATION ......... $16,700.00 Overhead* 5% ............................................................ ......... ............................. $835.00 Subtotal...................................................................................$17,535.00 Profit@ 5%................................................... .................................................$876.75 Permit Fees and Design Drawings are Not Included in this proposal. If additional permit fees are required the Owner is to reimburse all permit fees. Net Amount of Request for Change Order ............................ .................$18,411.75 • I I f1, � � A. If Modification is issued within (20) Twenty Calendar Days from the Date of the Request for Change Order then a no time extension will be required. B. If Modification is to be issued later than (20) Twenty Calendar Days from the Date of the Request for Change Order then both the time extension and cost proposal will need to be evaluated at that time and a modified proposal will be submitted reflecting required time extension and cost increase due to lead time for materials. January 24, 2016 Pedro Falcon Electrical & General Contractors 31160 Avenue C Big Pine, Fl, 33043 936 CRANE BOULEVARD SUGARLOAF, FL 33042 TELEPHONE: 305-743-4394 FAX: 305-743-4294 PROPOSAL B & L Beneway, Inc., hereby proposes to furnish labor, equipment, material to perform the following: Remove existing 6" RPDA and replace with new 6" Wilkins RPDA assembly including new valves and risers. Also including new 6" gate valve with 4" concrete housekeeping pad with new galvanized pipe supports. Material $ 7,800.00 Equipment & Labor 8.100.00 TOTAL $15,900M MEMORANDUM TO: Board of County Commissioners From: Roman Gastesi County Administrator Date: January 28, 2016 RE Change Orders Attached is a proposed Change Order #3 Pedro Falcon Electrical Contractors, Inc., Construction of the Monroe County Fire Training Academy, Crawl Key. The Contract Sum will be increased by this Change Order $26,423.64. The date of Substantial Completion as of the date of this Change Order is June 20, 2016. According to Ordinance No. 004-1999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The County Administrator intends to approve this change order on Friday, January 29, 2016. Roman Ga esi County Administrator RG/ef