04th Change Order 04/18/2016O ROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Construction of the Monroe County Fire Training Academy, Crawl Key, FL TO CONTRACTOR: Pedro Falcon Electrical Contractors, Inc. 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows; CHANGE ORDER NO:4 INITIATION DATE: Apr. 4'h, 2016 CONTRACT DATE: May 201h 2015 The original (Contract Sum) (Guaranteed Maximum Price)..................................$1,818,835.00 Net change by previously authorized Change Orders...............................................$41933.12 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was ... $1,860,768.12 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order ....... $71,904.13"® The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is............................................................................................................ $1,932,672.25 The Contract Time will be (increased) (decreased) (unchanged) by ............................30 days The date of Substantial Completion as of the date of this Change Order is ......... July 201h, 2016 Detailed description of change order and justification: for the purchase and installation of IT e ui ment to provide Internet and network access to the building, Count initiated reguest for the installation of connection points for new optional card swipe access system to the building pave the driveway in front of the garage with concrete in lieu of asphalt, andblackto entire Training Academy compound, It was recommended by the contractors mechanical installer to switch the intake of the buildinc AC system to the South side of the buildinq array from the Fire Training Surn Building. Contractor needs an additional 30 day added to the schedule on account of rain dela s. Not valid until signed by Owner. Architect flf al2plica le), and Contractor ARCHITECT: Will` ate CONTRACTOR: ° 1 Chris Ian rr o Date DIRECTOR PROJECT MANAGEMENT: it Doug Sposit Date COUNTY/ASSIST. ADMINISTRATOR Roman Gastesi Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Drawings do not illustrate connection to potable water service. Old connection could not support the demand of the new facility. Drawings did not include IT services including Wifi internet and connection to the county intra-network. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: Change Order exceeds $25,000 or 5% of contract price (whichever is greater).Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: e Project architect approves the change order. Yes ® No ❑ If no, explanation of why: Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: 1 MI EC r,, www.pedroMeon.com Request for Change Order 01/26/16 Project: Crawl e%y Fire Acad�:mXv Change Order Request No: Seven Description: Owner Requested Changes Furnish and install a new paLgble water service tapping the existing water main seruicim- the Medical Examiller' Office in lieu of what was, deli ned. F1�iA charge (See enclosed FKAA Service Worksheet below) TapFees .......................... ....................................................-31,000.00 Total................. ........................ . ....... ,.........................................$1,000.00 Project Coordination: 4 Hours @$100............................................................................$400.00 SUBTOTAL: TAP FEE AND COORDINATION...............................$1,400.00 Overhead@ 5%............................................ ............................ ......................$70.00 Subtotal......................................................................................$1,470.00 Profit@ 5%.............................................................................................................$73.50 TOTAL ALL OF THE ABOVE: ........... .......................................... $1,543.50 Permit Fees and Design Drawings are Not Included in this proposal. If additional permit fees are required the Owner is to reimburse all permit fees. Net Amount of Request for Change Order:............................................$1,543.50 Additional Time Requested for Change: A. If Modification is issued within (20) Twenty Calendar Days from the Date of the Request for Change Order then a no time extension will be required. B. If Modification is to be issued later than (20) Twenty Calendar Days from the Date of the Request for Change Order then both the time extension and cost proposal will need to be evaluated at that time and a modified proposal will be submitted reflecting required time extension and cost increase due to lead time for materials. Chrj Digitally iigned by Christlan Brisson 1stian DN: cm01fistian Brisson, o=Pedro Falcon Electrical Contractors, Inc„ on, cia�tiil=cb@pedrdalw :or, ,c=US �•i sso t`"aw ""2076.01.26060 Oct;.05'00' Florida Keys Aqueduct Authority Service Worksheet Estimate my -Fees Subject to Change This sheet is applicable on date of preparation O t . iers Name and Mailing Address: Agent's dame and Mailing Addre troe County Johnnie Yongue ri!M-1 4.17=11= Date: 7/3012015 Rev 0820ai2-2s-r5.01-13-16 Map No,'. 3.079 Key: Crawl Key Name: Monroe County Fire Academy_ Lot Pt Lot 1 Pt Lot 3 Block: Subdivision: Address or Other: 56633 Overseas HhwayMaralhon Real Estate #: 00099540-000000 Plans ubmitted? Yes Mail to/Gal! for Pick-up? _Email Return Plans/Letter to: Type of Work. Addition (whit NO meter Upgrade2 Demolishing Structures? Yes WWTP? No Type of Service: Commercial Type: Light Commercial Government? Yes Sewer District? Not in Seer District Irrigation Size; Water Meter Account Number(s) Currently Servinq this Property, if any: 047724, 047721(Fire) Water Fixture Value Charge 79.1 X $75,00 $5,932.50 Size Drop -in or Tap No T70 DC Tap Fee 1 X $1.000.00 = $1,000.00 0.0 0 X $0.00 = $0.00 Deposit $90.00 Service Charge 1 X $20 00 - $20.00 Front Footage 0 X $0.00 $0.00 Water S.D.C. Credit Grandfather Fixtures 52.5 X $75 00 $3,937.50 Water S.D.C. Unit Credit 0 X $5,000.00 = $0.00 Sewer S.D.C. Credit Grandfather Fixtures 0 X $0.00 _ $0.00 Sewer S.D.C. Unit Credit 0 X $2,700.00 $0.00 Plan Review Fee 1 X $50 00 m $50.00 Water S.D.C. Single Family 0 X $3,750,00 u $0.00 Water S.D.C. Single Family (3 or Less) 0 X $3,188.00 = $0.00 Water S.D.C. Single Family (4 or More) 0 X $2,813,00 = $0.00 Irrigation Fee 0 X $0,00 - $0.00 Sewer S.D.C. Single Family Unit 0 X $0,00 = $0.00 Fees Waived Due to Government Service = -$90.00 TOTAL $3,065.00 FRONT FO TAdi iWajer Only); Front Footage Due: No - Existing Account on Property Size of the Line: 6" Date Installed: 1999 *FIXTURE WORKSHEET* Description: New Building - Sizing Only Number of Units: Date: 7/30/2015 Map No.: 3-079 Key: Crawl Key Name: Monroe County Fire Academy Lot: Pt Lot 1, Pt Lot 3 Block: Subdivision: Address or Other: 56633 Overseas Highway, Marathon___ _ Additional Notes: Combined 6" fire line with 2" domestic meter and RPDA to remain in service for fire sprinler & fire hydrant. Install new 5/8" T10DC meter for domestic use. Customer to mark location of new meter. This spreadsheet does not reflect fire requirements. Fire Engineer to determine proposed fire line size. *GRANDFATHERED FIXTURES WORKSHEET* Description: Demolished Building Number of Units: 1 Date: 7/30/2015 Map No.: 3-079 Key: Crawl Key Name: Monroe County Fire Academy _ Lot: Pt Lot 1, Pt Lot 3 Block: Amount: _ Subdivision: Address or Other: 56633 Overseas Highway, Marathon Weight of Sub -Total Number of Description of Fixtures X Fixture Units _ Fixture Value Fixtures Water Sewer Water Sewer Bathtub/Spa X 8 - Shower Head (Shower Only) X 2.5 - Water Closet: Flush Valve 1 X 35 35 Lavatory:3/8" 1 X 1.5 - 1.5 Wash Sink X 4 Kitchen Sink: 1/2" X 2.2 - Ice Machine (Commercial) 1 X 2 = 2 Washing Machine: 1/2" X 6 - Service/Bar Sink 1/2" X 3 - Hose Bib 3/4" 1 X 12 = 12 Drinking Fountain (public) 1 X 2 - 2 Pool X 10 TOTAL FIXTURE VALUES: 525 Additional Notes: Combined 6" fire line with 2" domestic meter and RPDA to remain in service for fire sprinler & fire hydrant. Install new 5/8" T10DC meter for domestic use. Customer to mark location of new meter. This spreadsheet does not reflect fire requirements. Fire Engineer to determine proposed fire line size. Prepared by: Kim Judge Rev 08-20 & 12 23 P5 01-1316-- Date: 8/312015 Pre-TreatmentRev: Reviewed by: Marnie Walterson Rev 05-20 & f2-2.3-45, 01--10-16 Date: 8/11 /2015 Date: Date Paid: ng SubjectFlorida Keys Aqueduct Authority Service Workshee', Estimate Only -Fees a...... Change This sheet is appficabie'on date of preparation orily, Johnnie Date. 713012015 Rear sea +08-- 26-15 Map No . 3-079 - Key: Crawl tte j Name: Monroe County Fire Academy_Lot: Pt Loot. Pt Lot 3 Block: Subdivision: Address or Other: 56633 Overseas Hi_ hwa r, Maralhon Real Estate #: 00099540-000000 Ptans Sub Mad? Yes Mail to/Call for Pick-up? Email Return PtanstLetter to: Type of Work: Addition (with NO meter U22rade) Demd1shing Structures? Yes -_ - WWTP? No Type of Service: Commercial Type: Li ht Commercial Government? Yes Sewer District? Not in Sewer District Irrigation Size: Water Meter Account Numberlsl Currenlly Servine this ProPeriv. if anv: 047720, 047721 (Fire) Water Fixture Value Charge Sewer Fixture Value Charge Size Drop -in or Tap Meters: 79.1 0 No. 0 0 X $75.00 = X $0,00 X $0.00 m X $0.00 µ $5,932.50 $0.00 $0.00 $0.00 0 X $0.00 $0.00 Deposit t $0.00 Service Charge 1 X $20 00 $20.00 Front Footage 0 X $0,00 - $0.00 Water S.D.C. Credit Grandfather Fixtures 52.5 X $75,00 = $3,937.50 Water S.D.C. Unit Credit 0 X $5,000.00 $0.00 Sewer S.D.C. Credit Grandfather Fixtures 0 X $0.00 = $0.00 Sewer S.D.C. Unit Credit 0 X $2,700.00 = $0.00 Plan Review Fee 1 X $50.00 a $60.00 Water S.D.C. Single Family 0 X $3.750 00 Y $0.00 Water S.D.C. Single Family (3 or Less) 0 X $3,188.00 = $0.00 Water S.D.C. Single Family (4 or More) 0 X $2,813.00 - $0.00 Irrigation Fee 0 X $0,00 = $0.00 Sewer S.D.C. Single Family Unit 0 X $0.00 - $0.00 Fees Waived Due to Government Service = $0.00 TOTAL $2,065.00 Front Footage Due: No - Existing Account on Property of the Line: 6' Installed: 1999 "FIXTURE WORKSHEET'S Description: New Building Number of Units: 1 Date: 7/30/2015 Map No.: 3-079 Key: Crawl Key Name: Monroe County Fire Academy Lot: Pt Lot 1, Pt Lot 3 Block: Subdivision: Address or Other: 56633 Overseas Highway, Marathon Weight of Sub -Total Description of Fixtures Number of X Fixture Units Fixture Value Fixtures Water Sewer Water Sewer Bathtub/Spa X 8 Shower Head (Shower Only) 3 X 1 5 4, 5 Water Closet: Flush Valve 4 X 1.6 6,4 Lavatory:3/8" 4 X 0.5 = 2 Janitors Sink 1 X 1.5 = 1,5 Kitchen Sink: 1/2" 1 X 2.2 2.2 Urinal: Pedestal Flush Valve 1 X 0.5 = 0.5 Washing Machine: 3/4" 1 X 12 12 Service/Bar Sink 1/2" X 3 Hose Bib 3/4" 4 X 12 = 48 Drinking Fountain (public) 1 X 2 — 2 Pool X 10 TOTAL FIXTURE VALUE79,1 S: Backftow Prevention fgr,CmmgL%0I lypie Development WV IfAJtCFt{ w._ BackfiM Assembly,, Conditions: New construction with unknown potential hazards Hazard:High Backilow Assembly:__ RPZ ........_--__— Additional Notes: Combined 6" fire line with 2" domestic meter and RPDA to remain in service for new building. Fees due for new, additional fixtures. This spreadsheet does not reflect fire requirements. Fire Engineer to determine proposed fire line size. *GRANDFATHERED FIXTURES WORKSHEET* Description: Demolished Building Number of units: 1 Date: 7/30/2015 Map No.: 3-079 Key: Crawl Key Name: Monroe Countz Fire Academy Lot: Pt Lot 1, Pt Lot 3_ Block: Amount: Subdivision: Address or Other: 56633 Overseas Ftighway„ Marathon Weight of Sub -Total Description of Fixtures Number of X Fixture Units Fixture Value Fixtures Water Sewer Water Sewer Bathtub/Spa X 8 - Shower Head (Shower Only) X 2.5 - Water Closet: Flush Valve 1 X 35 35 Lavatory:3/8" 1 X 1.5 - 1.5 Wash Sink X 4 Kitchen Sink: 1/2" X 2.2 Ice Machine (Commercial) 1 X 2 = 2 Washing Machine: 1/2" X 6 Service/Bar Sink 1/2" X 3 = Hose Bib 3/4" 1 X 12 = 12 Drinking Fountain (public) 1 X 2 2 Pool X 10 — TOTAL FIXTURE VALUES' 52.5 Additional Notes: Combined 6" fire line with 2" domestic meter and RPDA to remain in service for new building. Fees due for new, additional fixtures. This spreadsheet does not reflect fire requirements. Fire Engineer to determine proposed fire line size, Prepared by: Kim Judge Reviewed by: Rene Hatalovsky Revised 08-20-15 Revised 08-20-15 Date: 8/3/2015 Date: 8/11 /2015 Pre-TreatmentRev: Date: Date Paid: f`a 00 i'M i,J 872-2219 EC i Request for Change Order Per email dated 03/17/2016 Project: Crawl ley Fire ;cadeW Change Order Request No: Ten Description: Owner Requested Changes from email dated_03/l_7/1 1. To blacktop the rest of Fire Rescues asphalt training area(approximately (12,000 sgft.) and remove and asphalt patch the four post holes in the asphalt and one two foot wide 60 foot long trench in the asphalt(pictures attached), 2. Replace the approximately 1200 sq.ft. area between the new academy and the burn building with concrete instead of asphalt. Item #1: Subcontractors Work a) Mill at asphalt at edge of existing concrete to tie in asphalt ....... Tack Coat and asphalt surface prep. (includes asphalt patch and 4 post holes ion asphalt and one 2-foot wide 60' long trench. b) 123 tons 1.5 inches of SP 9.5 Bituminous Asphalt Paving .............$25,830.00 @ $210.00 per ton (approximately 1300 square yards) c) Credit to not pave in front of the vehicle bays .................. ......... <$6,600.00> Totalfor Items a b c...... .................... ......................................... $26 430.0 Item #2: Self Perform Work(Item #2 Furnish and install Concrete SOG in front of vehicle bays) Excavate down 6", level and re -compact, form, install #5 rebar .................. $12,286.00 @ 12" OC both ways (one layer), pour and place 6" concrete, apply curing compound Labor: $3,861.00 Materials: $7,525.00 Others: $900.00 Subtotal...................................................................................$12,286.00 Project Coordination: 4 Hours @$100.......................................................................... $400.00 SUBTOTAL: LABOR; EQUIPMENT, AND COORDINATION for Items 1,2.................................................... $39,116.00 Overhead@ 5%...................................................................................................$1,955.80 Subtotal..................................................... ........................... $41,071.80 Profit@ 5%.............................................................................. $2,053.59 TOTAL ALL OF THE ABOVE ................................................... $43,125.39 Permit Fees and Design Drawings are Not Included in this proposal. If additional permit fees are required the Owner is to reimburse all permit fees. Net Amount of Request for Change Order: ................................................ $43,125.39 Additional Time Requested for Change: A. A 10 work day time extension is requested because of the additional work involved. This is based on receiving a signed Change Order no later than 01 June 2016. B. If a Change Order has not been received by 01 June 2016 the time extension and cost proposal will need to be evaluated at that time and a modified proposal will be submitted reflecting required time extension and cost increase due to lead time for materials. This proposal only encompasses the item(s) specifically outlined above and does not include any other items, whether stated or inferred, in any other documents. The terms set forth in this proposal shall have precedence over any other agreement and this proposal shall be included in any modification agreement. Respectfully Submitted, Christian Brisson Project Manager April 4, 2016 Pedro Falcon Electrical & General Contractors 31160 Avenue C Big Pine, FL 33043 Attn: Christian Brisson 936 CRANE BOULEVARD SUGARLOAF, FL 33042 TELEPHONE: 3 05 -743 -4 3 94 FAX: 305-743-4294 PROPOSAL CRAWL KEY FIRE ACADEMY ASPHALT PARKING OVERLAY B & L Beneway, Inc., hereby proposes to furnish labor, equipment, material to perform the following: Mill existing asphalt at edges of existing concrete slab locations. Apply tack coat and install 1.5" 9.5 asphalt. Remove asphalt patch and four (4) post holes in asphalt and one 2-foot wide 60' long trench. 123 tons SP 9.5 Asphalt $210.00 per ton $25,830.00 Milling, Tack Coat, & Asphalt Surface Prep LS 7,200.00 TOTAL $33,030.00 B & L Beneway will take all means necessary to promote positive drainage although we cannot guarantee without complete site survey. As we will be raising existing elevation by 1.5 inches. 0, 2.2219 EC 13003416 1 C40C 150761 www.padmfalemi.com Request for Change Order Per email dated 03/17/2016 Project: Crawl Key Fire Acadef-n Change Order Request No: Eleven Description: R I #22 (Relocate OA to the 'South Side) There is a concern that the outside air intake that is located on the north side of the building will be pulling smoke from the burning activities performed on the North side of the building. This smoke will bring in smell and trigger the smoke detector whenever they are training with real fire on the north side of the facility. This smoke haze will also build up inside the HVAC duct and make it a maintenance issue. According to our mechanical subcontractor, this fresh air intake should be relocated on the south side of the building to alleviate this type of problem and provide clean and healthy air into the building. Item #1: Subcontractors Work Relocate HVAC duct (see RG Mechanical proposal below) . ............. $3,612.25 Total for Item #1 . $3,612.25 Item #2: Self Perform Work Item 92 Modify,Existing O en n s Enlarge existing 18 x 18 outside air on the South side to 30 x 18.................$2,172.63 Enlarge existing 18 x 18 outside air on the South side to 26 x 18 Reduce the 30 x 30 outside air on the north side down to 18 x 18 Labor: $792.00 Materials: $80.63 Others: $1,300.00 Subtotal.................................................................................... $2,172.63 Project Coordination: 2 Hours @$100.......................................................................... $200.00 SUBTOTAL: LABOR; EQUIPMENT, AND COORDINATION for Items 1,2..................................................... $5,984.88 Overhead@ 5%......................................................................................................$299.24 Subtotal....................................................................................$6,284.12 Profit@ 5%................................................................................... $314.21 TOTAL ALL OF THE ABOVE ....................................................... $6,598.33 Permit Fees and Design Drawings are Not Included in this proposal. If additional permit fees are required the Owner is to reimburse all permit fees. Net Amount of Request for Change Order: ............................................. $6,598.33 Additional Time Requested for Change: A. A 6 work day time extension is requested because of the additional work involved. This is based on receiving a signed Change Order no later than 15 April 2016. B. If a Change Order has not been received by 15 April 2016 the time extension and cost proposal will need to be evaluated at that time and a modified proposal will be submitted reflecting required time extension and cost increase due to lead time for materials. This proposal only encompasses the item(s) specifically outlined above and does not include any other items, whether stated or inferred, in any other documents. The terms set forth in this proposal shall have precedence over any other agreement and this proposal shall be included in any modification agreement. Respectfully Submitted, Christian Brisson Project Manager F5W7YJ4! STATE CERTIFIED & LICENSED CIVIC 032355 - PCC 046213 Reinaldo "Ray" Garrido MECHANICAL CONTRACTOR MONROE (305) 852-4555 MIAMI DADE (305) 388-3441 NATION WIDE (877) 610-5685 FAX (305) 852-6029 P.O. BOX 1575, TAVERNIER, FL 33070 Monroe County Academy Relocate OA Intake in Wrapped Sheet Metal Job Change Order: HVAC # 2 Revised Customer: Pedro Falcon Electric Attention: Ken Bygler Project: Monroe County Academy 56633 Overseas Highway, Marathon, Crawl Key, Florida 33050 Amount of this request to modify original contract: $3,610.00 Description of and reason for change: Relocate OA Intake for AHU-2 to south side of building to prevent the direct intake of smoke from the Fire Training Facility located on the north side of the building, also relocating EF 2-3 and associated ducts. This change requires sheet metal ductwork (rectangular and round snaplock) with fiberglass duct wrap in place of the fiberglass duct board in our contract. CREDIT is issued for a portion of fiberglass duct that will not be installed. Schedule Impacts: 4 to 5 days Impacts on Other Trades: Shell (new openings and blocking) Detailed Cost Breakdown RELOCATE OA INTAKE $ 3,612.25 Materials OA SNAPLOCK PIPE WRAPPED $ 902.36 Materials SHEET METAL WRAPPED $ 371.64 Labor 21VID OA SNAPLOCK 2 $ 320.00 $ 640.00 Labor 21VID SHEET METAL 3.5 $ 320.00 $ 1,120.00 Labor Supervision/Coord 1.5 $ 243.00 $ 364.50 CREDIT Ductboard & Labor $ (142.50) Tax 7.5% $ 27.87 Overhead 5% $ 164.19 Profit 5% $ 164.19 Job Order Approved by Owner: (Signature) (Title) (Date) t s 1A,. 13 0 10, 9 9 . xzI 9xzL -, z- - a N3 0ot- - 0 vO t` . gxo i ' -01. eke 1 Till, .1 =icr -kxz L y KjO Ozt Ajo Ozt o 0 9x0 t - 11 AiD � 1 9 x 6xz t 6x*° t`y4jol 06 xi W :) 0 S CI M ano IL P ILI �r�F,V X ; 3 06 I _ 01 9 t V� aV, qxg W njo 08 t vwio 0 ,, 0 LSO t 3, z i lr r 3AVAr v o ,3, 0 1XOC 31160 Avenue ,dig Rne Key, FL 330434516 d3 ¢ 672- - Fax ( ) 972,2219 EC 130034161 ISM17 wwwpadrafalconxom Request for Change Order Per email dated 03-15-2016 Revised 04/05/16 Project: Crawl Key Fire. Academy Change Order Request No: Nine Description: Owner Requested Changes 1. Rough in conduit and boxes at each of the three exterior doors for future installation of card readers for the academy as shown in the layout attached. 2. Run Category 6 cable to the data connections at each of the classroom tables the wireless connection in the back corner of the classroom, the podium at the front of the classroom and the office(a total of 15 connection points). 3. We need the items in the attached list of materials to be ordered. 4. Proposal cost for the installation of the proposed IT Cage as shown in the revised drawing A-2. Electrical Work for items 1 3 from the alcove list. Security System Conduit for 3 exterior doors.......................................$5,379.00 Labor: $3,105.00 Materials: $2,150.00 Others: $124.00 Communication /data ............. .................................... .................. $7,773.00 Labor: $6,847.00 Materials: $652.00 Others: $274.00 Anixter (I-T Rack) (Material List) ....................................... .. ............$ 763.36 Subtotal................................................................................. $13,915.36 Overhead@ 5%............................................................_..............$ 695.77 Subtotal.................................................................................$ 14,611.13 Profit@ 5%.................................................................................$ 730.56 Totalfor Items 1 2 3..................................................................$15 341.69 Self Perform Work Item #4 Furnish and install IT case Install IT Cage: .................. .................... ...... —..........................$2,976.60 Labor: $506.25 Materials: $2,345.65 Others: $124.70 Subtotal..................... ...................................................... . .........$2,976.60 Project Coordination: 4 Hours @$100......................................................................... $400.00 SUBTOTAL: LABOR; EQUIPMENT, AND COORDINATION for Items 1,2, 3, 4..............................................$18,718.29 Overhead@ 5%.....................................................................................................$935.91 Subtotal......................................................................$19,654.20 Profit@ 5%................................................................................$982.71 TOTAL ALL OF THE ABOVE....................................................$20,636.91 Permit Fees and Design Drawings are Not Included in this proposal. If additional permit fees are required the Owner is to reimburse all permit fees. Net Amount of Request for Change Order: ................................................ $20,636.91 Additional Time Requested for Change: A. A 5 work day time extension is requested because of the additional work involved. This is based on receiving a signed Change Order no later than l l April 2016. B. If a Change Order has not been received by l 1 April 2016 the time extension and cost proposal will need to be evaluated at that time and a modified proposal will be submitted reflecting required time extension and cost increase due to lead time for materials. C. Note:: No cost for any doors door frames modification,,,,mag locks and or hardware has been included in this pro2osal since these items are unknown at this time. This proposal only encompasses the item(s) specifically outlined above and does not include any other items, whether stated or inferred, in any other documents. The terms set forth in this proposal shall have precedence over any other agreement and this proposal shall be included in any modification agreement. Respectfully Submitted, Christian Brisson Project Manager Date: 04/12/16 Crawl Key Fire Academy Materials breakdown for the Communication/data for RFCO #9 CAT 6E Jack & Terminate 151 EA $ 5.75 $ 86.25 CAT 6 E Cable (1 box) 1000 FT $ 0.21 $ 210.00 Cable support 60 EA $ 1.10 $ 66.00 Gas for Saw 1 LS $ 5.00 $ 5.00 Diamond Cutting Blades 1 EA $ 50.00 $ 50.00 3/4" PVC x 10 FT 2 EA $ 3.00 $ 6.00 Single Gang masonry box 1 EA $ 5.00 $ 5.00 PVC cou lin and connectors 1 LS $ 4.00 $ 4.00 Patchin2 mortar 1 Ban$ 4.00 $ 4.00 Saw use and or rental 1 LS 0.00 $ 100.00 Pick-up/delivery/shippin 1 LS E$7 0.00 $ 70.00 Subtotal $ 606.25 TaxI 7.50% $ 45.47 Total 1 $ 651.72 Door #1 1" EMT to IT room 50 ft 1 $ 0.59 $ 29.30 1" steel compression coupling 5 ea 1 $ 0.76 $ 3.80 1" steel connectors $ 0.15 $ 0.30 1/2" Galvanized rigid conduits $ 1.11 $ 22.20 Nema1 12 x 12 x 6 J Box $ 10.83 $ 10.83 Nema3R 12 x 12 x 6 J Box Wea $ 19.40 $ 19.40 Sin le Gang Galvanized Bell box$ 1.75 $ 1.75 Tube Fire Sto $ 9.33 $ 9.33 Material/Cut/Patch $ 255.00 $ 255.00 Subtotal $ 351.91 TaxI 7.50% 1 $ 26.39 Total $ 378.30 Door #2 1" EMT to IT room 20 ft 1 $ 0.59 $ 11.80 1" Steel compression couplings--,--,,, 2 ea $ 0.76 $ 1.52 1" Steel Connectors 2 ea $ 1.52 $ 3.04 Nema1 12 x 12 x 6 J Box 1 ea $ 10.83 $ 10.83 Nema 3R Jbox 1 ea $ 19.40 $ 19.40 Single Gan2 Galvanized Bell Box 1 ea $ 1.75 $ 1.75 Tube Fire Stop 1 ea $ 9.33 $ 9.33 Material/Cut/Patch 1 LS $ 255.00 $ 255.00 Subtotal $ 312.67 TaxI 7.50% 1 $ 23.45 Total 1 $ 336.12 1" Galvanized rigid conduit 1" Galvanized 90 degree elbows 1" Galvanized straps 12 x 12 x 6 Galvanized 5 Box Sinale aana Galvanized Bell box Tube Fire Stop Material/Cut/Patch 80 ft $ 1.85 $ 148.00 2 ea $ 2.57 5.14 10 ea $ 0.12 $ 1.20 2 ea $ 19.40 $ 38.80 2 ea $ 1.75 $ 3.50 1 ea $ 9.33 $ 9.33 1 LS $ 510.00 $ 510.00 Subtotal $ 715.97 TaxI 7.50% $ 53.70 Total $ 769.67 rent Rental protection Scaffoldin 1 1 1week Is 1 $ 40.00 $ 117.00 $ $ 40.00 117.00 Delive 1 ea $ 125.00 $ 125.00 ,Pick-up 1 ea $ 125.00 $ 125.00 Transportation sure charge 1 ea $ 21.20 $ 21.20 Subtotal $ 428.20 Tax 7.50% $ 32.12 Total $ 460.32 Gas for truck 1 Is 1 $ 50.00 $ 50.00 Small tools & consumables 1 Is $ 150.00 $ 150.00 Material breakdown total for communication and data Grand Total $ 651.72 Door 1 + Door 2 + Apparatus Bay Grand Total $2,144.41 Additional + Gas for truck QUOTATION See attached An inter Terms and Conditions of Sale ED BURR MONROE COUNTY 1200 TRUMAN AVE, STE 211 KEY WEST, FL33040 Phone: Fax: Date: 3/7/2016 Quote #: 00338 Customer #: 328519 Anixter Inc. Corporate Headquarters 2301 Patriot Blvd. Glenview, IL6_0026 ED - RACK ADDED- 00338 Item Quantity Anixter Catalog Number and Description Unit Unit Price Extended Price 01 1 201935 EA 70.00 $70.00 ORTRONICS ES-19-313 EQUIPMENT SHELF FOR 19"RACK 17.38"W X 15.5"D SOLID ALUMINUM - BLACK 02 1191241 EA 41.00 $41.00'' PANDUIT CP24WSBLY 24-PORT BLANK METAL PANEL ACCEPTS ALL MINI-COM MODULE W/ SUPP BAR BLK 1U ROHS 03 2 204328 EA' 37.50 $75.00 PANDUIT CMPHF2 CABLE MGMT D-RING PANEL HORZ 19"W X 3.5"H X 4"D FRONT ONLY BLACK 2RMU ROHS 04 50'311268 EA 5.60 $280.00 PANDUIT CJ688TGBL 1-PORT MOD JACK IDC 8W8P UTP T568A/B CAT6 IP5 MINI-COM GIGA-TX BLACK ROHS 05' 10174014 EA 2.92 $29.20 PANDUIT CBXJ2IW-A 2-PORT SURFACE MOUNT UNLOADED ADHESIVE BACKED MINI -MOD OFF WHITE ROHS 06 1 239731 EA 215.00 $215.00 CPI 11791-718 STD SWING GATE WALL MOUNT RACK 19"W X 38.5"H X 18"D,ALLUMINUM 21U, BLACK Page Total: $710.20 TERMS NET30, subject to credit approval Quote Total: $710.20 F.O.B. SHIP.PT., PPD/CHARGE SHIPMENT: NOTES: "Call to learn about special financing and lease -to -own options on orders over $10,000. Please refer all inquiries to: ANIXTER FT LAUDERDALE Phone: 561.274.3318 RYAN LUND 1255 NW 17TH AVENUE Fax:561.278.4304 COMMENTS: DELRAY BEACH, FL. 33445 Page 1 of 1 J Q � m CO U N �_ M J F m w Z < C) LU Z N o F- C F Cl)Z. Q L) C.% CM LU Q..,,, Of � LL Z O d Q O', Z U' N L L 3 CL a U C N a)J U Q O ti W m 0 U Y c iz > �� J�'•� W Y w W z — z a m O U (7 O U o C/) O J m U y z w Q U) ',, 0 LLJ O Z m a ~ �- °n Z < � m m c O c U) O m O W Z O ''. } ,C N O V Uw o� 2 N oLL O LU p $ o O _j Z U,OL�-B �] t N .NE m a Z_ z Qa. O Q a N N Y N cc O C/) E w Ycl `mom HD d a m a E Z w d o Q 0 a o A .. c a o c O M ` y w L c N oD �, C y Q N 'C C a N a)Y Z g Q c a U �o V . d m c 3 z N� m R U CD a `o E O t o au Y a ca c� E a._ O c°� 3 L y c U)o w i m a lL `c O 0 'C O a (D cn w (0 U) Q O'. L' ul Z Z z LU H m O D tc d z s 51 i I 6' 24, 2 �r yak3 m i i 4 11 4 s 1 .em® rcn J LU r LU V t f as it -1 A 3 1 i q N LU a. '2 1 A j I g I I t I I I MEMORANDUM TO: Board of County Commissioners From: Sheryl Graham Acting County Administrator Dater April 19, 2016 RE Change Orders Attached is a proposed Change Order #4 Pedro Falcon Electrical Contractors, Inc., Construction of the Monroe County Fire Training Academy, Crawl Key, FL.. The Contract Sum will be increased by this Change Order $71,904.13.`'The date of Substantial Completion as of the date of this Change Order is July 20, 2016. According to Ordinance No. 004-1999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Acting County Administrator intends to approve this change order on Wednesday 20, 2016. Sheryl Graham Acting County Administrator SG/ef