13th Change Order 04/20/2017MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Construction of the Monroe County Fire Training Academy, Crawl Key, FL TO CONTRACTOR: Pedro Falcon ffiectrIcal ContractorS, PIC, 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) .................................. $1,818,835.00 Net change by previously authorized Change Orders ........................................... $133,656.59 The (qontract SUM) (Guaranteed Maximum Price) prior to this Change order was. ..$1,952, 491,59 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) ) by this Change Order— ..... .,$0.00 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is.... .......................................................... -- ....... ....... ..... —$1,952,491.59 The Contract Time will be (increased ) (decreased) (unchanged) by ........................... 24 days The date of Substantial Completion as of the date of this Change Order is............ May 18, 2017 Detailed description of change order and justification: MEW lull 11-- 11offla 0 �-= M ARCHITECT: Will "H rrt r •Date CONTRACTOR: Christian '1' -soil Date DIRECTOR PROJECT MANAGEMENT: Doug Sposito to COUNTY/ASSIST. ADMINISTRATOR 20 In Roman Gastesi —AcIffig County r ate Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Delay was caused by window manufacturer. '� Change Order was included in the original specifications. Yes ❑ No ® " If Yes, explanation of increase in price: Change Order exceeds $50,000 or 5% of contract price (whichever is greater).Yes ❑ No ® ' If Yes, explanation as to why it is not subject for a calling for bids: Project architect approves the change order. Yes 6NoE] If no, explanation of why: Change Order is correcting an error or omission in design document. Yes ❑No ®'' Should a claim under the applicable professional liability policy be made? Yes ❑ No ®'" Explain: i 1i, f EC 13003416 1 CGC 1507617 www.pedrofalcon.com March 15, 2017 Monroe County Public Works & Engineering Division Project Management Department Attention: Johnnie Yongue Project Manager RE: Project Name: Construction of the Monroe County Fire Training Academy, Crawl Key, FL Reuest for a Time Extension Dear Mr. Yongue, The purpose of this letter is to request a 24 calendar day non -compensatory time extension. As stated in our letter, dated 16 January 2017 explained, we are still waiting on the manufacturing of the windows and storefront doors. The manufacturing of these items have gone to the maximum manufacturing time as given to us, and some. Since the window industry is so busy and the back log is excessive, our window and storefront doors could not be manufactured any faster. We even requested the manufacturer to expedite our order for additional compensation and this could not be done. We were given an estimated arrival date of 04/24/17 for the windows and storefront doors. This long lead time has delayed the delivery and installation which in turn has made the entire schedule slip equally. We will have to install the windows/storefront, then complete the stucco and GWB work around these items, and then complete the painting and associated tasks while the ceramic tile is getting installed. According to our CPM schedule which was just updated, this delay has pushed the Substantial Completion date to 04/28/17. Ten days beyond the Substantial Completion date of 04/18/17. Keep in mind, the 04/28/17 date is only the Substantial Completion date and not the Final Inspection and Acceptance date of 06/12/17. Furthermore, we already have requested a five work day time extension to install epoxy grout in lieu of regular standard grout for the ceramic tile on the up and coming Change Order #12. As you are aware, we are progressing as fast as possible under the circumstances. We are working overtime and on weekends to accelerate and complete the project by the 18 April per our Contract; however, with not having the windows/storefront doors and also other materials because of long lead items, it is not realistic to provide substantial completion by 18 April. We still have pending Change Orders which still has to be executed and provide the same Change Orders to our subcontractors. As the County knows, this process takes time which we do not have at the present time. We believe these delays were and are beyond our control and for those reasons; we feel that a time extension is warranted. We have no desire to delay the completion of this project. Delays cost money and serve us no purpose. The intent is to complete the project as soon as possible. Please contact me if you have any questions. Sincerely, Pedro Falcon Electrical Contractors, Inc. Christian Brisson President uny 10WqT Wholesale Aluminum and Building Products A Division of ABC Supply Co, Inc. 660 W 83rd Street, Hialeah, FL 33014 Phone: 305-819-0509 Fax:305-819-0512 3/28/17 To whom it may concern:. RE: Project Name: Construction of the Monroe County Fire Training Academy, Crawl Key, FL The purpose of this letter, regarding aluminum windows ordered by ACE ALUMINUM & GLASS CORP through our company Town and Country, serves as notification that the order was placed on 1 /28/17. The units were ordered directly to CGI WINDOWS & DOORS with a lead time of 6-8 weeks. The complete order arrived to our warehouse on 3/27/17. The manufacturing of these items have gone to the maximum manufacturing time as given to us. Our vendor CGI is at full capacity and the back log is excessive, these windows could not be manufactured any faster. We believe the completion time of these units was and is beyond our control, since our vendor stipulates the ship dates on their orders. Should you have any questions, please do not hesitate to contact us. Sincerely,