Loading...
Sugarloaf Blvd. Bridge Replacement 1st Amendment 05/17/2017c aOURr4 Kevin Madok, cPA Clerk of the Circuit Court & Comptroller — Monroe County, Florida C DATE: May 23, 2017 TO: 11rcarine Erickson Engineering Services FROM: Pamela G. Hmmcc 4-C. SUBJECT: Mai, 17th BOCC Meeting Enclosed is a duplicate original of Item C 17, Amendment 1 to the Task Order with Kisinger Campo & Associates in the amount of $37,401.00 for engineering design and permitting services for the Sugarloaf Boulevard Bridge Replacement project to add supplemental design services to evaluate raising the profile of the roadway and bridge to accommodate an additional 12 inches of navigational clearance and to develop a detailed cost estimate for this alternative, for your handling. Should you have an}' duestions, please feel Irce to contact nic at ext. 3130. Thank ),ou. cc: Count}, At(orne), rla email Finance rIa c-mail File KEY WEST 500 Whitehead Street Key West, Florida 33040 305-294-4641 MARATHON 3117 Overseas Highway Marathon, Florida 33050 305-289-6027 PLANTATION KEY 88820 Overseas Highway Plantation Key, Florida 33070 305-852-7145 PK/ROTH BUILDING 50 High Point Road Plantation Key, Florida 33070 305-852-7145 AMENDMENT 1 TO THE TASK ORDER FOR ENGINEERING DESIGN AND PERMITTING SERVICES BETWEEN MONROE COUNTY AND KISINGER CAMPO & ASSOCIATES FOR SUGARLOAF BOULEVARD BRIDGE REPLACEMENT PROJECT THIS AMENDMENT 1 to the Task Order IS ENTERED INTO BETWEEN Monroe County, whose address is 1100 Simonton Street, Room 2-216 Key West, Florida 33040, hereafter the "County", and Kisinger Campo & Associates, Corp. a Corporation of the State of Florida, whose address is 201 North Franklin Street, Suite 400, Tampa, Florida 33602, its successors and assigns, hereinafter referred to as "CONSULTANT", 1. Paragraph 2.1.1 is added to ARTICLE II SCOPE OF BASIC SERVICES, and is to state the following: 2.1.1 The CONSULTANT will perform for the COUNTY supplemental Engineering Design Services to evaluate raising the profile of the roadway approaches and bridge to accommodate an additional 12 inches of navigational clearance and develop a detailed cost estimate for this alternative as described in Attachment A, Proposal To Produce A Cost Estimate For Raising Sugarloaf Boulevard Bridge an Additional 12 Inches. The service's as described are for a Lump Sum fee not to exceed $37,401.00 2. Article IX MISCELLANEOUS, Paragraph 9.21 shall be amended to add the following: Public Records Compliance. Contractor must comply with Florida public records laws, including but not limited to Chapter 119, Florida Statutes and Section 24 of article I of the Constitution of Florida. The County and Contractor shall allow and permit reasonable access to, and inspection of, all documents, records, papers, letters or other "public record" materials in its possession or under its control subject to the provisions of Chapter 119, Florida Statutes, and made or received by the County and Contractor in conjunction with this contract and related to contract performance. The County shall have the right to unilaterally cancel this contract upon violation of this provision by the Contractor. Failure of the Contractor to abide by the terms of this provision shall be deemed a material breach of this contract and the County may enforce the terms of this provision in the form of a court proceeding and shall, as a prevailing party, be entitled to reimbursement of all attorney's fees and costs associated with that proceeding. This provision shall survive any termination or expiration of the contract. The Contractor is encouraged to consult with its advisors about Florida Public Records Law in order to comply with this provision. Pursuant to F.S. 119.0701 and the terms and conditions of this contract, the Contractor is required to: (1) Keep and maintain public records that would be required by the County to perform the service. (2) Upon receipt from the County's custodian of records, provide the County with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. (3) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the contractor does not transfer the records to the County. (4) Upon completion of the contract, transfer, at no cost, to the County all public records in possession of the Contractor or keep and maintain public records that would be required by the County to perform the service. If the Contractor transfers all public records to the County upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the County, upon request from the County's custodian of records, in a format that is compatible with the information technology systems of the County. (5) A request to inspect or copy public records relating to a County contract must be made directly to the County, but if the County does not possess the requested records, the County shall immediately notify the Contractor of the request, and the Contractor must provide the records to the County or allow the records to be inspected or copied within a reasonable time. If the Contractor does not comply with the County's request for records, the County shall enforce the public records contract provisions in accordance with the contract, notwithstanding the County's option and right to unilaterally cancel this contract upon violation of this provision by the Contractor. A Contractor who fails to provide the public records to the County or pursuant to a valid public records request within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. The Contractor shall not transfer custody, release, alter, destroy or otherwise dispose of any public records unless or otherwise provided in this provision or as otherwise provided by law. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS, BRIAN BRADLEY AT PHONE# 305-292- 3470 BRADLEY-BRIAN@MONROECOUNTY-FL.GOV, MONROE COUNTY ATTORNEY'S OFFICE 1111 12TH Street, SUITE 408, KEY WEST, FL 33040. 3. Force and Effect. In all other respects the Contract dated January 16, 2014 and Task Order effective October 21, 2015 remain in full force and effect. Irr'W-U,N PS WHEREOF each party hereto has caused this contract to be executed by its ,afith(i representative. o o j CD rn r c�: C 3 ' N MADOK, CLERK C'� F ca o Z rn .� :..+ By. r O O Deputy Clerk Mayor/Chairman 2, o x o Date: - `t 1, 20 17 (SEAL) Attest: By: p Title C�DLlr �/ a ht� • MONROE COUNTY ATTORNEY _APPROVED A,-} TO FORM: C:HF11SIlNE M. 1_1N•1BERT-BARROWS ASSISTANT COUNTY ATTORNEY Date �� Attachment A Proposal To Produce A Cost Estimate For Raising Sugarloaf Boulevard Bridge An Additional 12 Inches. KCAKISINGER CAMPO & ASSOCIATES March 27, 2017 Judith S. Clarke, P.E. Director of Engineering Services 1100 Simonton Street Key West, Florida 33040 Project Description: Monroe County on Call Professional Engineering Services Re: Task Work Order #2 — Sugarloaf Boulevard Bridge Replacement — Supplemental Agreement #1 — Detailed Cost Estimate for Raising the Profile of the Bridge Dear Ms. Clarke: Kisinger Campo & Associates (KCA) is pleased to submit this Scope of Services and Fee Estimate for the supplemental work to raise the profile of the roadway approaches and bridge to accommodate an additional 12 inches of navigational clearance above what was proposed in the 60% plan set. This supplemental work will be added to the Task Work Order #2. The current bridge concept as submitted at the 60% Phase provides approximately 10 feet of navigational clearance to the Mean High Water (MHW) Line. A detailed cost estimate was provided for this 60% Phase Submittal. As part of this scope, KCA will provide a detailed cost estimate for raising the bridge and associated roadway approaches an additional 12 inches to provide I 1 feet of navigational clearance to the Mean High Water (MHW) Line. Additional cost associated with the change in profile may include: • expanded project limits • additional roadway reconstruction quantities • additional guardrail quantity • possible side street/driveway/trail construction for harmonization • possible temporary walls between construction phases due to profile increase • increased substructure concrete quantity • increased piling quantity • increased riprap quantity • reconstruction/strengthening of existing retaining wall • additional retaining walls at the right-of-way line due to slope tie down point In order to estimate the cost changes associated with the above items, KCA will create a new concept profile, generate cross sections, determine project/roadway reconstruction limits, determine wall limits, evaluate larger foundations, determine piling requirements and determine new riprap limits. The results of this evaluation will be quantified and an updated cost estimate will be provided using current unit costs. The final deliverable will be a Cost Comparison Report (Memo) that details the increase in cost of the raised bridge concept. Revised concept plans are not included as part of this scope. The cost comparison will be for construction cost only and will not include the additional consultant/sub-consultant design and plans production effort if the raised bridge alternate is preferable to the County. 201 North Franklin Street, Suftc• 400 Nampa. Honda 33602 ; 813 871-y331 81 3 877 > 13i KCKISINGER CAMPO & ASSOCIATES We have estimated the level of effort required for all engineering services described above. Our total estimated lump sum fee amounts to $37,401.00. This fee includes all KCA analysis efforts, coordination, QA/QC and supervision. The fee estimate is based on the hourly rates which were previously approved for this contract. Our expenses were estimated separately and are not included in the lump sum fee estimate. It is not anticipated that any additional site visits or additional expenses will be required for this detailed cost analysis. We sincerely appreciate the opportunity to continue our working relationship with you on this project. Please do not hesitate to call me if you have any questions or need any additional information. Best Regards, Jason L. LaBarbera, P.E. Project Manager File: 12013.16 (KCA) 201 North Franklin Street, Swte 400 1?arnpa Honda 33602 813 871 -S331 1 81 1 8'1 S 1 35 r O Q ee Y Zc3= E Z m Z c ❑ E m 0 W » O oU U • co m C N m Q! O E E w O U m m N # Q V m C mm U m K ao m '2 i 0 O m W O O m c O O y � m a` o o-'o o Q o o g Q Q Q Q Q Q Q Q o 0 0 0 0 o g Qq H O '° O O � � m m❑❑ m O❑ O❑❑ � � � O � 0 O � O O❑❑❑❑❑❑ � w e w w» w o 0 0 0 0 0 0 0 0 o w$ w w w- H O $ In U Q M� N N N H N M H N H p N Q N a m c •a° o o N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 faq � o c g 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 o0 0 w H ma '� 'q O 4 C O o0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 N � O U a o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N a m O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N • U attpp $ 0 0 0 o O O O o 0 0 0 o N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 H p• N p U c w o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o N N nj N _`o c c W o � H o N o 0 0 0 0 0 0 0 0 0 0 0 0 o m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o ro O cmi N � � o OO W G m 0 0 0 0 OI r O O m 0 0 0 0 0 P O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0� 0 N G `• p 00 . O 0 0 O C C N 0 0 0 OI r O O� 0 0 0 0 0 r O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N O � pW C O g W o m o 0 0 o w a o o m o 0 0 0 o N O o 0 0 0 0 0 0 0 0 0 0 0 0 0 o N r a m c U ro o o f w v m w E 1 y E C O m 0 0 0 0 A O OO O O O N O O O O O O O O O O O O O O O O o to 2 N O m IC r O � ri r w w „ c • c • r t F U u o m o w U m o t ap ~ m � � r • c m _ ii•@ c m� Q a i, a r � o m � a m • ._ g 2 o o c a gg r �E a a € • am Eam 2 Eo' c m 3 t E 10 A» 3��ii• ° i E w n m r N f N fn f K� �� Qc d -• r�� a o�� 8 o r ~ t �❑ o o• 2 2 05 0 j J o m •o c• °m fn N rA tlI fq m m m t%1 N Vl fn d f F Q 2<< (7 W a C C❑ N r m of o � av eo < vi m � ai of o � ry ri a vi m r ai •i �� ry v vi n w n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r W N N N O+ W W H H H W. W W W W � N � N M o 0 0 0 o w a E m a o _ a O 'T U p o a Q m a a n n n a n a n n W Q U V F W fA rA N r%I N rA N N1 N N w? uwi gq qq qq qq qq qq RQ 4' RQ J. -Rq R. gIr¢ U a 2 m 2S 1S 2S X E X E E E X 3 w w N O O LL W fn 30 N fn M fA fn y rA fA fA N M o F Z 0 0 0 0 0 Soggy N N N CERTIFICATE SIX x.: holder in lieu of such 3 E BrownPRODUCER ik X X3 Park X Place Assoc.INSURED Zcs, Irl 201 N. Franklin Street, Ste. 400 Tampa FL 33602 1 =;r r 9.6 MA61 #dAW Micky flan Wormer PHOgL IAC.N: 727 442-769 ADDRESS. anwormer bbpinellas.com INSURER;SI AFFORDING COVERAGE NAIC # INSURER A. Admiral Insurance Company i241359 INSURERS -The Travelers Indemnity PWG2any of i 56Eb INSURER The Charter Oak Fire Insurance Como !25615 INSURER Travelers Casualty and Surety Compa .19038 INSURER E COVERAGES CI*RTIFICATE NiJ FER: 976017792 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR 'IADDLTW2FC LTR , TYPE OF INSURANCE .INSO.INVD . POLICY EFF — POLICY EXP POLICY NUMBER MMIDDIYYYY MMIDDIYYYY LIMITS C X COMMERCIAL GENERAL LIABILITY 630.8254A604 9111201 911/2017 EACH OCCURRENCE $1.000,000 * * D B I K M �� ' AN SES RTu IJ CLAIMS -MADE X OCCUR A� (EaR Rae $300,000 X X _Q n c 1 BY X MED EXP (Any one person) +510,000 X &WIL111flik x Y PERSONAL 6 AOV INJURY +S1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER. DATE GENERAL AGGREGATE X X +$2,000,000 WAIVER N/ s�+ POLICY JECT LOC PRODUCTS-COM_PIOPAGG 52,000,000 OTHER. S B 'AUTOMOBILE LIABILITY 8108254A604 91112016 911/2017 COMBINEDl S1,OOD,OOD X ANY AUTO BODILY INJURY (Per person) S Egpp AAtL 85 NED AUTOSULED BODILY INJURY (Per accident)+ S X , X NON -OWNED + isR�AERTYDA96T S HIRED AUTOS AUTOS LPer accident] .S B X UMBRELLA LIAB X OCCUR CUP8254AB04 9/1/2016 9/112017 EACH OCCURRENCE S4,000,000 + EXCESS LIAB CLAIMS -MADE AGGREGATE $4,000.000 + DEB . X ' RETENTIONS 10,000 + S D 'WORKERS COMPENSATION UB213641560 10/312016 10/3/2017 X STATUTE X ORH' U.SL.H AND EMPLOYERS' LIABILITY YIN ' ANY PROPRIETORIPARTNERIEXECLITIVE E.L EACH ACCIDENT $500.000 OFFICERIMEMBER EXCLUDED? �N N I A (Mandatory In NH) E.L. DISEASE - EA EMPLOYEE $500.000 0 yes. describe under DESCRIPTION OF OPERATIONS below . E.L. DISEASE - POLICY LIMIT , $500.000 A Professional Liability E000002720503 11/2/2016 11/2/2017 Per Claim 5,000,000 Claims Made Aggregate 5,000,000 Deductible 250,000 DESCRIPTION OF OPERATIONS 1 LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space Is required) Certificate Holder is an additional insured with respect to general liability, auto liability and umbrella liability. Explosion, collapse and underground hazard included in CGL. ON -CALL PROFESSIONAL ENGINEERING SERVICES AGREEMENT AND ALL TASK WORK ORDERS AUTHORIZED HEREUNDER. GO -DAYS NOTICE OF CANCELLATION OR NON -RENEWAL PER ATTACHED FORM IH-03020608. (KCA PROJECT #1201316.00) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE ONOE COUNTY - DODD THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED I ATTNI JUDITH S CLARKE, PE. DIRECTOR OF END SV S ACCORDANCE WITH THE POLICY PROVISI N , 1100 SIMO TON STREET, #216 ICE°)° VVEfi FL 33040AUTHORGOO REPRESENTATIVE * s 1 5-214 ACORD CORPORATION. All rights reserved. WCORD 25 2014101 The ACORD name and logo are registered arks of SWORD