15th Change Order 06/05/2017MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT
CONTRACT CHANGE ORDER
PROJECT TITLE
iu� :
TO CONTRACTOR
Pedro Falcon Electrical Contractors, Inc.
31160 Avenue C
Big Pine Key, FL 33043
The Contract is changed as follows:
City of Marathon Fire Marshal required Installation of exterior Alarms stem horn and strobe.
This change Order is 0.1 % of the origina contract orice/
Not valid until sinned by Owner. Architect (if applicable], and Contractor
ARCHITECT:
William qcrrj,-- E
CONTRACTOR:
qJ11 0 - 0 a I - I
I :: 111,;'110 023 to
If Yes, explanation: Inspector required additional strobe, knox box and modifications
contrary to what was approved.
r- •M
3v=
0 Change Order is correcting an error or omission in design document. Yes E:]No a
M 0 @
PEDRO FALCON
CONTRACTORS, INC.
31160 Avenue C, Big Pine Key, FL 33043-4516
(305) 872-2200 - Fax (305) 872-2219
EC 13003416 / CGC 1507617
www.pedrofalcon.com
M40=
Project: Crawl Key 1' Academy
� 11111111111;111 1111
11 0
1 1 1 917213 1111
Description: Additional work not covered under original Contract as directed by Fire
Department Inspector during the final inspection.
Sub-Contractors Work
Contractor Management Fee for Subcontractor's Work @ 5% .............................$ 71-66
TAL S WORK ............................................ $1,504.86
Contractors Work
Labor: $108.68
Materials: $26.
Others: 25.00 1
$
Contractor Total Cost ................................................................... $160.56
Overhead@ 5% .............................................................................. $8.03
Subtotal....................................... .......... ............. ........... $ 168.59
Profit@ 5% ................................................................................... $8.43
SUBTOTAL CONTRACTORS WORK ............................................. $177.02
TOTAL ALL OF THE ABOVE SUB-CONTRACTOR
AND CONTRACTOR ................................................................. $1,681.88
1111111111F I 1 1111111
6 1
This proposal only encompasses the item(s) specifically outlined above and does not
include any other items, whether stated or inferred, in any other documents. The
terms set forth in this proposals all have precedence over any other agreement and
this proposal shall be included in any modification agreement.
M=
Z MariToch
Systems
ED
Man"Bech Systarns, Inc.
2114 N Planned Rd #1146
Pembroke Pines, FL 33028
95 4-04 7 -1290 OKce
FROM: MariTech systems, Inc
2114 N Flamingo Rd #1146
Pembroke Pines, FL 33028
A. As directed by Fire Department Inspector during inspection
TO: Pedro Falcon Electric
1. Add a Horntstrobe to the exterior of the building
31160 Avenue C
DATE
13 q; IN el e KcZ, FI. 3304
JOB NAME
Atten: Bob
CONTRACT JOB NO.
PREPARED BY
WO TO BEGIN BY
No. 2
20-May-17
Crawl Fire Fire Trainin2 Academy
Steven Zucker
WORK TO BE COMPLETED BY
Uht: woik covufed iky this order shall be performed under the same terms and conditions as that included in the Original Contract, I Line Costs
1. Additional work not covered under the original Scope of Work:
A. As directed by Fire Department Inspector during inspection
1. Add a Horntstrobe to the exterior of the building
$103.20
a. Engineering for System Design, includes new floor plans, new Riser, New L
$250.00
b Technical work for wire, device installation, and commissioning,
$125.00
c. Sign and Sealed plans with Professional Engineer
$275.00
2, Swap heat detectors in the AHU closets with the Smoke Detectors in the vehicle Bay
3. Replace wrong Knox Box with proper one and wire the tamper switch
4. Raise the smoke detector installed in the compressor room to the beam.
5. Reinspection of the system, onsite labor
Changes Approved
13Y
(Printed Name) Date
13Y PREVIOUS CONTRACT AMOUNT ................ 19,702,02
Signature AMOUNT OF THIS ORDER $1 A3320
TOTAL CONTRACT AND EXTRAS $11,135.22
B, S tc,v. Z-4 Vicc Px idmt
TO:
Board of County Commissioners
From:
Assistant County Administrator
Date:
June 2, 2017
RE:
Change Orders
Attached is a proposed Change Order #15 Pedro Falcon Electrical Contractors, Inc.,
Construction of the Monroe County Fire Training Academy. The Contract Sum will be
increased $1,681.88. The date of Substantial Completion as of the date of this Change
Order is May 18, 2017.
According to Ordinance No. 004-1999 adopted by the Board of County Commissioners,
proposed change orders are to be presented to members • the Board • County
Commissioners at least 24 hours prior to approval, assuming they are within the
Administrator's prescribed limits. Change orders not within the Administrator's authority
2re placed on the BOCC agenda.
Signature
of