15th Change Order 06/05/2017MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE iu� : TO CONTRACTOR Pedro Falcon Electrical Contractors, Inc. 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: City of Marathon Fire Marshal required Installation of exterior Alarms stem horn and strobe. This change Order is 0.1 % of the origina contract orice/ Not valid until sinned by Owner. Architect (if applicable], and Contractor ARCHITECT: William qcrrj,-- E CONTRACTOR: qJ11 0 - 0 a I - I I :: 111,;'110 023 to If Yes, explanation: Inspector required additional strobe, knox box and modifications contrary to what was approved. r- •M 3v= 0 Change Order is correcting an error or omission in design document. Yes E:]No a M 0 @ PEDRO FALCON CONTRACTORS, INC. 31160 Avenue C, Big Pine Key, FL 33043-4516 (305) 872-2200 - Fax (305) 872-2219 EC 13003416 / CGC 1507617 www.pedrofalcon.com M40= Project: Crawl Key 1' Academy � 11111111111;111 1111 11 0 1 1 1 917213 1111 Description: Additional work not covered under original Contract as directed by Fire Department Inspector during the final inspection. Sub-Contractors Work Contractor Management Fee for Subcontractor's Work @ 5% .............................$ 71-66 TAL S WORK ............................................ $1,504.86 Contractors Work Labor: $108.68 Materials: $26. Others: 25.00 1 $ Contractor Total Cost ................................................................... $160.56 Overhead@ 5% .............................................................................. $8.03 Subtotal....................................... .......... ............. ........... $ 168.59 Profit@ 5% ................................................................................... $8.43 SUBTOTAL CONTRACTORS WORK ............................................. $177.02 TOTAL ALL OF THE ABOVE SUB-CONTRACTOR AND CONTRACTOR ................................................................. $1,681.88 1111111111F I 1 1111111 6 1 This proposal only encompasses the item(s) specifically outlined above and does not include any other items, whether stated or inferred, in any other documents. The terms set forth in this proposals all have precedence over any other agreement and this proposal shall be included in any modification agreement. M= Z MariToch Systems ED Man"Bech Systarns, Inc. 2114 N Planned Rd #1146 Pembroke Pines, FL 33028 95 4-04 7 -1290 OKce FROM: MariTech systems, Inc 2114 N Flamingo Rd #1146 Pembroke Pines, FL 33028 A. As directed by Fire Department Inspector during inspection TO: Pedro Falcon Electric 1. Add a Horntstrobe to the exterior of the building 31160 Avenue C DATE 13 q; IN el e KcZ, FI. 3304 JOB NAME Atten: Bob CONTRACT JOB NO. PREPARED BY WO TO BEGIN BY No. 2 20-May-17 Crawl Fire Fire Trainin2 Academy Steven Zucker WORK TO BE COMPLETED BY Uht: woik covufed iky this order shall be performed under the same terms and conditions as that included in the Original Contract, I Line Costs 1. Additional work not covered under the original Scope of Work: A. As directed by Fire Department Inspector during inspection 1. Add a Horntstrobe to the exterior of the building $103.20 a. Engineering for System Design, includes new floor plans, new Riser, New L $250.00 b Technical work for wire, device installation, and commissioning, $125.00 c. Sign and Sealed plans with Professional Engineer $275.00 2, Swap heat detectors in the AHU closets with the Smoke Detectors in the vehicle Bay 3. Replace wrong Knox Box with proper one and wire the tamper switch 4. Raise the smoke detector installed in the compressor room to the beam. 5. Reinspection of the system, onsite labor Changes Approved 13Y (Printed Name) Date 13Y PREVIOUS CONTRACT AMOUNT ................ 19,702,02 Signature AMOUNT OF THIS ORDER $1 A3320 TOTAL CONTRACT AND EXTRAS $11,135.22 B, S tc,v. Z-4 Vicc Px idmt TO: Board of County Commissioners From: Assistant County Administrator Date: June 2, 2017 RE: Change Orders Attached is a proposed Change Order #15 Pedro Falcon Electrical Contractors, Inc., Construction of the Monroe County Fire Training Academy. The Contract Sum will be increased $1,681.88. The date of Substantial Completion as of the date of this Change Order is May 18, 2017. According to Ordinance No. 004-1999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members • the Board • County Commissioners at least 24 hours prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority 2re placed on the BOCC agenda. Signature of