Loading...
Item J1 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: 2/17/10 Division: Administrator Bulk Item: Yes No X Department: Wastewater Staff Contact PersonlPhone #: Elizabeth W ood/292-4525 AGENDA ITEM WORDING: Wastewater status report. ITEM BACKGROUND: N/ A. PREVIOUS RELEVANT BOCC ACTION: N/ A. CONTRACT/AGREEMENT CHANGES:N/ A. STAFF RECOMMENDATIONS: N/A. TOTAL COST: INDIRECT COST: BUDGETED: Yes _No DIFFERENTIAL OF LOCAL PREFERENCE: COST TO COUNTY: SOURCE OF FUNDS: REVENUE PRODUCING: Yes AMOUNTPERMONTH_ Year No APPROVED BY: County Atty _ OMBIPurchasing _ Risk Management _ DOCUMENTATION: Included X Not Required_ DISPOSITION: AGENDA ITEM # Revised 7/09 En2ineerin2 Division - Wastewater Proiects - January 2010 Status Reoort - February 17.2010 Keys Wastewater Plan (KWP) Imolementation . Prepared and presented bi-annual update for Keys wastewater projects to Florida Keys National Marine Sanctuary Water Quality Protection Program Steering Committee. . FKAA finalizing Work Plan for Decentralized Wastewater Treatment Demonstration Grant for submittal to EP A for onsite system funding. DOH, FKAA, and County meeting held to continue coordination of this effort. N on-Ad Valorem Assessments . Conference call with GSG to discuss work remaining to finalize system development fee tax roll for collection on the 2010 tax bill. It was decided we would focus on finalizing EDU allocations with the intent of being prepared to adopt Final Assessment Resolution no later than July 21,2010 to facilitate notices and the longest prepayment period possible. . Managed system development fee assessment pay-offs, appeals, tax roll corrections and refunds for the Big Coppitt, Duck Key, and Stock Island Programs. Loaded Stock Island assessment data into database. Resolving EDU allocation correction request. Lateral Assistance . Prepared advertising and community participation schedule for hearings and advertisements required for CDBG Small Cities grant administration. . Requested schedule for rule hearing and grant application deadline following prior comment during CDBG Small Cities rule development workshop. . CDBG Disaster Recovery Grant Application prepared by grant consultant. Key Lar20 Wastewater Treatment District . Reviewing requirements for Park and Pool complex connection. . Key Largo Sewer - Monroe County site inspector overseeing construction on KLWTD projects to ensure compliance with County road restoration requirements, including attending pre- construction meetings with contractors, inspecting road repairs, meeting with contractors to determine repairs and replacement of county road signs in proj ect area. Duck Key/Conch Key . At January Board meeting, FKAA approved construction contract with Encore Construction for upgrade and expansion of the Duck Key WWTP. . Duck Key collection system design is complete and permitted. Working with FKAA and OMB to identify available funding to construct Phase 1 of the collection system. Cudjoe Regional expanded design suspended and budget shifted to construction. . 73% of 150 EDUs at Conch Key are connected to system. Wastewater Report - February 17,2010 BOCC meeting Page 1 of2 South Lower Keys Re2ional Wastewater Treatment Facility (Bi2 CODDitt) . Addressed property owner questions related to lateral connections and building permits. . FKAA reports 601 out of 704 EDUs connected. . Submitted FDEP Grant LP6803 final disbursement. . Revising Loan Draw #8 to include Giannetti Application #13. . Compiling contract close-out documents to facilitate final reimbursements. . Coordinating with FKAA to address property owner complaints. Cudioe Re2ional Wastewater Treatment Facility . Cudjoe Regional WWTP 60% design review complete. Easement, power, water, and transmission line routing issue being resolved. . Cudjoe transmission main 30% design review complete for entire Cudjoe Regional system. Feasibility of Niles Channel crossing established. Amendment 5 to reduce scope to central collection area only for final design executed. Permitting meeting held with DOT/Heritage Trail held to identify necessary coordination based on construction schedules for each project within the corridor. County will need to acquire DOT surplus property for Master Lift Station siting. Based on DOT overlay schedule for MM 16 through 19 and Heritage Trail construction from 16 to 24, State Grant Assistance availability in 2010 may warrant expansion of transmission main project to include Lower Sugarloaf. . Cudjoe Regional (central) collection system 90% design review complete. DEP and DOT permit applications to be submitted in April 2010. Draft Wastewater master Specifications in hand for reVl ew. . Cudjoe Regional (expanded) collection system 30% design drawings under review. Stock Island . Approximately 82% of the 2,672 EDUs served by the initial gravity collection system and Phases 1-3 of the expanded vacuum system are connected. Code enforcement meetings are held monthly and fines are being imposed if design, permitting, and connection deadlines are not met. . Reviewed deposition transcript and prepared Erratta Sheet for the Stock Island Assessment Program and Roy's Trailer Park. West Lon2 Key . The Outdoor Resorts wastewater treatment plant bid for upgrade to advanced wastewater treatment and the conceptual plan for the transmission system support proceeding with development of a funding plan to connect the adjacent residential properties to the OR plant. If the funding plan is feasible, this project has the potential to create a cost efficient and preferred environmental alternative to installation of single family residential on-site systems. Wastewater Report - February 17,2010 BOCC meeting Page 2 of2