Item C21BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: March 20, 2013 Division: County Administrator Bulk Item: Yes X No Department: Key West International Airport Staff Contact /Phone #: Peter Horton/809-5200 AGENDA ITEM WORDING: Approval of Supplemental Joint Participation Agreement Number One for Contract #AQE3 5 by and between the State of Florida Department of Transportation and Monroe County -Key West International Airport, to fund Terminal Expansion (Custom Project) at The Florida Keys Marathon Airport. ITEM BACKGROUND: This is a supplemental grant that provides a 50150 match for the planning, design, and construction of the Terminal Expansion (Customs Project) at The Florida Keys Marathon Airport. The total construction cost for the Marathon Customs Project is $1.3 million. This grant pays for half of that cost; the other half will be paid for by Passenger Facility Charges. PREVIOUS RELEVANT BOCC ACTION: The original grant was approved 11-16-2011, Item #F 10 by the Monroe County Board of County Commissioners. CONTRACT/AGREEMENT CHANGES: Supplement Number One. STAFF RECOMMENDATIONS: Approval. TOTAL COST: N/A INDIRECT COST: N/A BUDGETED: Yes X No DIFFERENTIAL OF LOCAL PREFERENCE: N/A COST TO COUNTY: None SOURCE OF FUNDS: FDOT/PFC/airport match COST TO AIRPORT: $650,000 (PFC) REVENUE PRODUCING: Yes No X AMOUNT PER MONTH Year APPROVED BY: County Atty OMB/Purchasing Risk Management DOCUMENTATION: Included X Not Required DISPOSITION: Revised 7/09 AGENDA ITEM # MONROE COUNTY BOARD OF COUNTY COMMISSIONERS CONTRACT SUMMARY Contract # Contract with: Florida Department of Transportation Effective Date: September 271h12011 Expiration Date: 6-30-2016 Contract Purpose/Description: Terminal Expansion at Marathon Airport Contract Manager: Peter Horton # 5200 Airports -Stop # 5 (name) (Ext.) (Department/ Stop) for BOCC meeting on: March 20, 2013 Agenda Deadline: March 5, 2013 CONTRACT COSTS Total Dollar Value of Contract: T 1 Milli 07k Current Year Portion: TBD �3 Budgeted? Account Codes: PFalArD-DrtA40r� — (172 5,0 v Grant: Yes Grant Accou t-TBD .¢D3 —TgD _ jp2.91 G0��County Match: 50% ADDITIONAL COSTS Estimated Ongoing Costs: For: . (not included in dollar value above) (eg. maintenance, utilities, janitorial, salaries, etc.) Date In Airports Director �/� //��7 Risk Management O.M.B./Purchasing 1� I AG / l� County Attorney Comments: CONTRACT REVIEW Changes Needed Reviewer Date Out Yes No 2 Ltt/ te4 r In f r Risk an;dgement 13 co "v A ft STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 725-030-07 PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT 061" Page t of 4 Number one Financial Project No.: Fund: DPTOtDS FLAIR Category: 088719 25426929401 Function: 637 Object Code: 750004 (item -segment -phase -sequence) Federal No.: Org. Code: 55062020629 Contract No.: AQE35 DUNS No.: Vendor No.: F596000749053 Catalog of Federal Domestic Assistance Number: Catalog of State Financial Assistance Number: 55.004 THIS AGREEMENT, made and entered into this day of by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida, hereinafter referred to as the Department, and Monroe County - Key West International Airport 3401 South Roosevelt Boulevard, Key (Nest, Florida 33040 hereinafter referred to as Agency. WITNESSETH: WHEREAS, the Department and the Agency heretofore on the 27th day of September 12011 entered into a Joint Participation Agreement; and WHEREAS, the Agency desires to accomplish certain project items as outlined in the Attachment "A" appended hereto; and WHEREAS, the Department desires to participate in all eligible items for this project as outlined in Attachment "A" for a total Department Share of $900,000.00 NOW, THEREFORE THIS INDENTURE WITNESSETH: that for and in consideration of the mutual benefits to flow from each to the other, the parties hereto agree that the above described Joint Participation Agreement is to be amended and supplemented as follows: 1.00 Project Description: The project description is amended This grant includes 50/50 match of the non-federal share for the Planning Studies conducted at both Monroe County Airports and 50150 match for the planning, design and construction of the terminal expansion at The Florida Key Marathon Airport. Funding allocation for this grant is as follows: $250,000 from FY 12 - Planning Study; $650,000 from FY 13 - Terminal Expansion at Marathon Airport. 2.00 Project Cost: Paragraph 3.00 of said Agreement is increased by bringing the revised total cost of the project to $1 ,800,000.00 Paragraph 4.00 of said Agreement is increased by bringing the Department's revised total cost of the project to 3.00 Amended Exhibits: Exhibit(s) B 725-030-07 PUBLIC TRANSPORTATION 05111 Page 2 of # $1,300,000.00 $650,000.00 $900,000.00 of said Agreement is amended by Attachment "A". 4.00 Contract Time: Paragraph 18.00 of said Agreement June 30th 12016 5.00 E-Verify Vend o rs/Contracto rs: 1. shall utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employees hired by the Vendor/Contractor during the term of the contract; and 2. shall expressly require any subcontractors performing work or providing services pursuant to the state contract to likewise utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term. 725-03M7 PUBLIC TRANSPORTATION 06111 Pap 3of4 Financial Project No. 25426929401 Contract No. AQE35 Agreement Date Except as hereby modified, amended or changed, all other terms of said Agreement dated September 27th 02011 and any subsequent supplements shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written. AGENCY Monroe County Key West International Airport AGENCY NAME SIGNATORY (PRINTED OR TYPED) SIGNATURE TITLE FDOT See attached Encumbrance Form for date of Funding Approval by Comptroller LEGAL REVIEW DEPARTMENT OF TRANSPORTATION District Secretary of Designee DEPARTMENT OF TRANSPORTATION TITLE 725-030•07 Pueuc TRANSPORTATION 06111 Page 4 of 4 Financial Project No. 25426929401 Contract No. AQE35 Agreement Date ATTACHMENT "A" SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT This Attachment forms an integral part of that certain Supplemental Joint Participation Agreement between the State of Florida, Department of Transportation and Monroe County - Key West International Airport 3401 South Roosevelt Boulevard, Key West, Florida 33040 dated . DESCRIPTION OF SUPPLEMENT (Include justification for cost change): This grant includes 50150 match of the non-federal share for the Planning Studies conducted at both Monroe County Airports and 50150 match for the planning, design and construction of the terminal expansion at The Florida Key Marathon Airport Funding allocation for this grant is as follows: $250,000 from FY 12 -- Planning Study; $650,000 from FY 13 - Terminal Expansion at Marathon Airport. !. Project Cost: As Approved As Amended Net Change $500,000.00 $1,800,000.00 $1,300,000.00 Total Project Cost $5003000.00 $1,800,000.00 $1,300,000.00 II. Fund Participation: As Approved As Amended Net Change Department: $2503000.00 $900,000.00 $6503000.00 Agency: $250,000.00 $900,000.00 $650,000.00 $0.00 Total Project Cost $500,000.00 $1,800,000.00 $1,300,000.00 Comments: This grant includes 50150 match of the non-federal share for the Planning Studies conducted at both Monroe County Airports and 50150 match for the planning, design and construction of the terminal expansion at The Florida Key Marathon Airport. Funding allocation for this grant is as follows: $250,000 from FY 12 - Planning Study; $650,000 from FY 13 - Terminal Expansion at Marathon Airport. 1001 WHITEHEAD STREET KEY WEST, FLORIDA 33040 M b 61 1<2m PHONE: 305-292.7722 FJ%X: 305.292.2162 ARCHITECTURE, INC. PROF. REG. NO. AA26001059 August 27, 2012 Monroe County 1100 Simonton Street Room 2-210 Ivey vilest, Florida 33040 Attn: Jerry Barnett, Director of Facilities Development - sent via email to Bameff-Jerry@MonroeCounty-FL.gov Re: MARATHON CUSTOMS TERMINAL-- PHASE I FEASIBILITY STUDY MARATHON AIRPORT, 9400 OVERSEAS HIGHWAY PROJECT NARRATIVE WITH COST ESTIMATE Dear Jerry, The following cost estimate and revised concept plan dated August 27, 2012 is in response to our various meetings in connection with the Marathon Customs Terminal Phase I Feasibility Study and conceptual plan approval from the Department of Homeland Security, dated July 5, 2012 with additional information provided August 8, 2012. The design Is based on the U.S. Customs and Border Protection Airport Technical Design Standards 2011, as directed by the Department of Homeland Security, and the various meetings with Monroe County, the City of Marathon, and the Department of Homeland Security. While this plan addresses all the items identified within the standards, our experience with the Department o` Homeland Security Identifies that additional design revisions may occur during the development of the project. These revisions may Increase or decrease the cost of the project The preliminary costs used for the new Marathon GAF are based on assumptions relating to square footage, local construction cost averages, soft costs, and acceptable contingencies. This amount is inclusive of soft costs such as design fees, reimbursable expenses, permitting, etc. Special Note: Evaluations of the preliminary estimate of the Cost of the Work prepared by the Architect represent the Architect's judgment as a design professional familiar with the construction industry. It is recognized, however, that neither the Architect nor the Owner has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, the Architect cannot and does not warrant or represent that bids or negotiated prices will not vary from any estimate of the Cost of the Work or evaluation prepared or agreed to by the Architect, MARATHON CUSTOMS TERMINAL - PHASE I FEASIBILITY [SPECIFICATION DIVISION NUMBER QUANTITY DIVISION 2 - EXISTING CONDITIONS (DEMOLITION) MEASUREMENT UNIT COST TOTAL Interior Demolition 2,000.00 E)tedor Demolition 800.00 SF SF $ 5.00 $ 5.00 $ 10,000.00 $ 4,000.00 DIVISION 03 - CONCRETE CMU Wall I nfill 118 SF $ 18.00 $ 2,124.00 DIVISION 06 -WOOD, PLASTICS, AND COMPOSITES Rough Carpentry 1 ALLOWANCE $ 5,000.00 $ 5,000.00 CLEVELAN❑ I KEY WEST CHARLOTTE SOUTHWEST FLORIDA I WASHINGTON DC mbai 1<2m ARCHITECTl1RE, INC. 1001 WHITEHEA❑ STREET KEY WEST, FLORIDA 33040 PHONE., 305,292.7722 FAX: 305.292,2162 PROF. REG. NO. AA26001OS9 Cabinetry - Base 58 LF $ 200.00 $ 1100.00 Cabinetry - Wall 27 LF $ 175,00 $ 41725.00 Countertop 139 SF $ 35.00 $ 41865.00 Storage Shelving -Adjustable and Melamine 41 LF $ 75.00 $ 31075.00 DIVISION 07 - THERMAL AND MOISTURE PROTECTION T� Building Sealant 1 ALLOWANCE $ 500.00 $ 500.00 Firestopping 1 ALLOWANCE $ 11500.00 $ 1,500.00 Metal Roofing Repair (for HVAC I Plumbing 1 ALLOWANCE $ 51000.00 $ 61000.00 DIVISION 08.OPENINGS I nterior Doors - Standard Frames and Hardware 1 EA $ 21500.00 $ 21,00.00 - Glass Interior Doors - Detention Grade Frames and 1 EA $ 31000.00 $ 31000.00 Hardware - Glass Interior Doors - Standard Frames and Hardware 6 EA $ 11000.00 $ U00.00 • Solid Interior Doors - Detention Grade Frames and 5 EA $ 1,500.00 $ 71500.00 Hardware - Solid I nterior Doors - Ballistic Resistant Frames and 2 EA $ 41000.00 $ 81000.00 Hardware Exterior Doors - Detention Grade Frames and 2 EA $ 21500.00 $ 50000.00 Hardware Interior Window - Ballistic Resistant Transaction ; EA $ 50000.00 $ 51000.00 (Will include drawer and speak through) Interior Window - Ballistic Resistant Fixed 4 EA $ 21500.00 $ 10,000.00 Interior Sidelight - Detention Grade 3 EA $ 11250.00 $ 31750.00 ExteriorDoor - Door to remain - new hardware 3 EA $ 500.00 IS 11500.00 DIVISION 09 -FINISHES Wall Type 1 - Standard Metal Stud T � 99 LF Wall Type 2 - Detention Grade 182 LF Wall Type 3 -- Ballistic Resistant 46 LF Wall Type 4 - Storefront 60 LF Ceiling Type 1- Existing - Vaulted 2166 SF Ceiling Type 2 - Ballistic Resistant 262 SF Ceiling Type 3 - Detention Grade EAsting 185 SF HVAC Ceiling Type 4 - Detention Grade New HVAC 339 SF Ceiling Type 5 - Suspended Acoustical Tile 839 SF Ceiling Type 6 - Suspended Gypsum 150 SF Floor Type 7 - Terrazzo Existing 2613 SF Floor Type 8 - Ceramic Tile 1328 SF Interior Painting - Doors and Frames 20 EA Interior Painting - Celiing 1328 SF Interior Painting - Walls 9924 SF Stucco 118 SF $ 4,455.00 $ 45.00 $ 90.00 $ 16, 380.00 $ 325.00 $ 14,950.00 $ 50.00 $ 3,000.00 $ 2.00 $ 4,332.00 $ 325.00 $ 811150.00 $ 90.00 $ 16, 650.00 $ 90.00 $ 30,510.00 $ 5.00 $ 4,195.00 $ 4.50 $ 675.00 $ 2.00 $ 5,226.00 $ 8.00 $ 10,624.00 $ 100.00 $ 21000,00 $ 2.00 $ 2,656.00 $ 2.00 $ 1%848.00 $ 12.00 $ 1,416.00 CLEVELAND I KEY WEST I CHARLOTTE SOUTHNEaT FLORIDA i WASHINGTON DC MbI 1<2m ARCHITECTURE, INC. 1001 W HITEHEA❑ STREET KEY WEST, FLORIDA 33040 PHONE: 305.292.7722 FAX: 305.292.2162 PROF. REG, NO. AA26001OS9 ❑IVISION 10 -SPECIALTIES Detention Toilet Accessories - 1 EA $ 575.00 $ 575.00 M i rror/So ap/Pa per To weVG arbage Commercial Toilet Accessories - 2 EA $ 475.00 $ 950.00 M i rror/Soa PIP aper Towe[IG a rbage Grab Bars - Standard 4 EA $ 200.00 $ 800.00 Grab Bars - Detention 2 EA $ 300.00 $ 600.00 Search Room - Bench (Stainless Steel 1 EA $ 600.00 $ 600.00 wlhandcuff rings) Search Room - Bag Exam table (360000 1 EA $ 500.00 $ 50000 Stainless Steel) Search Roam - Counter (24X18X42 Stainless 1 EA $ 500.00 $ 500.00 Steel) Interview Room - Table (36x3ax30) 1 EA $ 500.00 $ 500.00 Interview Room - Chairs 3 EA $ 200.00 $ 600.00 Break Roam - Table (24BX48) 2 EA $ 350,00 $ 700.00 Break Room - Chairs (8) 8 EA $ 200.00 $ 1s600,00 Break Room - Lockers (12 Full Height) 12 EA $ 150,00 $ 11800.00 Waiting - Chairs (37) 37 EA $ 150.00 $ 5,500.00 Waiting - Tables (5) 5 EA $ 150.00 $ 750.00 Waiting - Fors Processing counter (43x18) 1 EA $ 500.00 $ 500.00 Workstation - Chairs (6) 6 EA $ 250.00 $ 11500.00 Holding Cell Privacy Screen 1 EA $ 800.00 $ 800.00 Holding Cell Bench 1 EA $ 500.00 $ 500.00 Metal Detector Equipment 1 EA $ 7,000.00 $ 71000,00 Defib Equipment Cabinet 1 EA $ 19500.00 $ 1,500.00 First Aide Cabinet 1 EA $ 500.00 $ 500.00 Bag Scan Equipment 1 EA $ 30,000.00 $ 30,000.00 Interior 5ignage 1 ALLOWANCE $ 800.00 $ 800.00 Microwave 1 EA $ 250.00 $ 250.00 Undercounter Refrigerator 1 EA $ 500.00 $ 500.00 Undercounter Freezer 1 EA $ 500.00 $ 500.00 DIVISION 21- FIRE PROTECTION 1 ALLOWANCE $ 25,000.00 $ 25,000.00 DIVISION 22 -PLUMBING 1 ALLOWANCE $ 50,000.00 $ 50,000.00 DIVISION 23 -MECHANICAL 1 ALLOWANCE $ 100,000.00 $ 100,000.00 1--DIVISION 26 - ELECTRICAL 1 ALLOWANCE $ 801000.00 $ 751000.00 DIVISION 27 - TECHNOLOGY 1 ALLOWANCE 5 125,000.00 $ 120,000.00 Computer Allowance from DHS 1 EA $ 90,000.00 $ 90,000.00 CLEVELAND I KEY WEST CHARLOTTE SOUTHWEST FLORIDA I WASHINGTON DC mboi 1<2m ARCHITECTURE, INC. ioox WHITEHEAD STREET KEY WEST, FLORIDA 33040 PHONE: 305.292.7722 FAX: 305.292.2162 PROF. REG. NO. AA26001059 DIVISION 28 - ELECTRONIC SAFETY AND SECURITY 1 ALLOWANCE $ 50,000.00 $ 50,000-00 DIVISION 32 - EXTERIOR IMPROVEMENTS Concrete Walkway 684 SF $ 5.25 $ 30591.00 Concrete ADA Ramp 60 SF $ 5.25 $ 315.00 Subtotal $ 900,887.00 SOFT COSTS General Conditions 3 % $ 27,026.61 Contingency 10 % $ 90,088.70 CEI 5 % $ 45,044.35 A / E Fees 1 ALLOWANCE $ 80,000.00 $ 80,000.00 Permitting Fees 1 ALLOWANCE $ 51000,00 $ 5,000.00 Reimbursable Expenses 1 ALLOWANCE $ 5,000.00 $ 5,000.00 TOTAL CONSTRUCTION ESTIMATE $ 1,153,046.fi8 In summary, the project inclusive of design, engineering, permitting, and construction is estimated to cost $1,153,046.66 based on the concept plan and assumptions made. Once a design has been refined and approved by U.S. Customs and Border Protection and upon direction from the County, a more detailed and accurate cost estimate can be prepared to refine the associated costs with the project, This will include an in-depth existing conditions analysis to review and verify all existing mechanical, plumbing, electrical, and fire protection systems. At this preliminary concept phase with an unknown construction start date, assumptions have been made to create a worst case estimate for project budgeting purposes. We trust that the provided information is sufficient to make the necessary decisions to move the project forward; however please do not hesitate to contact us should you have any questions. Upon your direction, we will provide a detailed proposal for the Phase I I services, which include construction documents for permit and construction based on the required scope of work. Best Regards, el y 0 1 19, a CIN C)N ■ CLEVELAND KEY VEST CHARLOTTE SOUTHWEST FLORIDA I WASHINGTON QO 4 in Kile IL yw� flf ' tiffs tel _ �714-'%f- �S r x �i3r? =�1� i....• � � fr I • r. rF V � !i a y/ y ..►.....r,rw. {kr � A MIA It's all ww .-4 .v 4 M J Y jj < �'w ; � tit. M I pp m LL t �-- r i 92 1 1 1