5th Change Order 06/22/2017MONROE tIt PROJEC
MANAGEMENT
CHANGECONTRACT ORDER
PROJECTORDER N!
TorchSR 4A Little Boat Ramp Repairs
1200 Truman Ave, Key West, FL 33040 INITIATION DATE. June 2,201
CONTRACTOR:
TO April 2, 01
Sea Tech of the Florida Keys
131 Palomino Trail
Big PineKey, FL 33040
Net change by previously Change Orders
The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order ■. rrr
ContractThe (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased)
(Unchanged) by this Change Order ...... $35,293.20
The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is. .... $162.937.20
The .,will be(increased) (decreased) lei by231Days
The ate of Substantial Completion as of the date of this Change Order is. ............. ---- .... June 2, 201,01-1
Detailed scrition of change order and Justification:
The design of the rubble placed in the water to stabilize the bottom of the canal and the foundation of the
ramp was unable to stance up to the size of boats launching. The damage was primarily caused by users
powering off and onto trailers. The resulting damage required a more substantial installation to stabilize the
foundation of the ram and nd remove the navigational hazard that was created. This change order accounts
for the removal of the original rubble and fabric, removal of the navigational hazard created by the prop
wash, the re-establishment of the original canal depth per ACOE mandate, the installation of an articulating
block mat to stabilize the foundation of the ramp, and the labor associated with the action. The cost of this
work is $35.293.20. The original substantial completion of the project was October 14, 2016. The additional
231 days accounts for negotiating with ACOE for a project extension, design of solution and scheduling of
the contractor.
This change Order is 31 °36%a of the original contract price.
MR9 "I"
1-2
Keith and 5ars, P.A.
COUINTY/DEPUTY ADMINISTRATOR:
ch oft 'Flo
fkevin Wilson
Christine Hurley
zz•`0
Date
IM, =-I
a *jL*jjWjA[qjL4jj
& . L a I Iffill
Is=
= Change Order is correcting an error or omission in design document. Yes r-]No Z
1- Little Torch Boat Ramp Rip Rap Repairs
1.1 Mobilization - Trucking, Crane Etc. Marathon Seawall 6 hrs @ 150 $900.00
1.2 Mobilization - Additional Labor 3 men Marathon Seawall 6 hrs @ 225 $1,350.00
1.3 Remove/Redistribute Rubble/fabric from
pathway of boats with Crane with turbidity Marathon Seawall 1 day @ 2500 $2,500.00
controls - Crane Rental
1.4 Remove/Redistribute Rubble/fabric from
1--1 - .... ... Y.
controls - Additional Labor 5 men
otl101 011lVle 1-.011
0 111�
k-_
31J
?3,UUU.UV
1.5 Demobilization -Trucking, Crane, Etc.
Marathon Seawall
6 hrs
@
150
$900-00
1.6 Demobilization - Additional Labor 3 men
Marathon Seawall
6 hrs
@
225
$1,350.06
Procure Hydrotek Articulating Block Mat,
1.7 Geotextile and Sandbags
RH Moore
I Is
@
4832.29
$4,832.29
Set and anchor Hydrotek Articulating
1.8 Block Mat - Equipment & Material
I Is
@
1150
$1,150.00
Set Geotextile fabric with sand bags
1.9 - Labor 6-men
5 hrs
@
240
$1,200.00
Set and anchor Hydrotek Articulating
1.10 Block Mat - Labor 2-men
5 hrs
@
80
$400.00
Fill the Hydrotek Articulating Block Mat
1.11 with 24 Cubic Yards Concrete - Material
Monroe Concrete
24 yds
@
223.07
$5,353.50
Fill the Hydrotek Articulating Block Mat
1 1.12 with 24 Cubic Yards Concrete - Labor 4 men
6 hrs
@
160
$960.00
1.14 Concrete Pump Truck per Cement Truck
Conchrete Pumping
4 ea
@
137.5
$550.00
1.15 Concrete Testing
Concrete Analysis
1 ea
@
351.25
$351.25
1.16 Load Rubble into Dump Truck with bobcat
Summerland Rental
10 hrs
@
85
$850.00
1.17 Deliver Rubble to Palm Dr Park
Surnmerland Rental
10 hrs
@
85
$850.00
1.18 Equipment Operators
20 hrs
@
40
$800-00
1.19 Supervision
40 hrs
@
45
$1,800.00
1.20 Clean up site Labor Cost 2 men
4 hrs
@
80
$320.00
1.21 Construction Sign Labor Cost 2-men
1 hrs
@
80
$80.00
1.22 Temporary Toilet rental
Bees Honeypots
I wk
@
112.43
$112.41
1.23 Temporary Fence Rental
Florida Fence
I wk
@
450
$450.00
1.24 Permitting
MC Bldg. Dept.
I Is
@
1372.5
$1,372.50
1.25 Permitting -Labor
2 hrs
@
40
$80.00
1.26 Project Manager
10 hrs
@
so
$500.001
Subtotal
$32,011.97
O/H 5%
$1,6050-
Subtotal
$33,612.57
Profit 5%
--51680. 0
Subtotal
$35,293_20
Bond 2%
-- 470ssfi_
TOTAL
S35.999.06
Box 504316
Marathon, FL 33050
Sea Tech Inc.
P.O. Box 420529
Invoice
Terms
Jobsite
Permit #
Payment on Compl—
Little Torch
Description
Qty
Rate
Amount
Mobilization of all equipment necessary to complete your project.
4,500.00
4,500.00
Furnish and Install All Turbidity Controls
Crane Rental Plus Crew to Perform Excavation of Rocks and Debris
5.500.00
5,500.00
at Boat Ramp
i ) Crane Rental = $2,500.00 per day
2) Labor (5 Men per day) = $3,000.00
***Does NOT Include Trucking or Disposal of Materials. To be
Performed by Others.
MARATHON SEAWALLS & DOCKS CARRIES ALL
000
0.00
REQUIRED INSURANCE INCLUDING WC, GENERAL
LIABILITY, USL & H AND ZONES ACT (REQUIRED FOR
MARINE CONSTRUCTION)
All work is complete! Thank you For your business.
t
Total $10,000.00
Payments/Credits $0.00
Balance Due $10,000.00
R. H. Moore Associates
Soil ",t, bilir�tilon Erosion Control
:11 /
!;lj-� Little Torch Boat•
i .SeaTech of the Florida
Attention
Michael Nester
Quantity
Unit of
Measure
Description
Unit Price
Line Total
BlockHydrotex Articulating
average : with 27mm X 20mm polyester cables
running in longitudinal and lateral directions.
Panels are fabricated to meet shop drawings.
Please allow 2 Weeks A.R.O. for shop drawing
approval and fabrication from our manufacturer.
rr i - ! nonwoven
$960.00
r,
a, 9
geotextile foruse under S 1200.
! rr rr • r
Filled White Poly Sand Bags
50 per Pallet
EVEN
Florldajobsite based on a one-time shipment of all
the materials quoted via flatbed truck for easy off-
loading Trucking)
Monroe Countyi!
.1
Estimated Freight11
1/
ESTIMATED TOTAL
) 1
The above quantities are estimates only and final quantities are the responsibility of the purchaser
All prices are valid for 30 days from the date of the quotation
Changes in quantities will require creation of a new quote Terms: Net 30 Days (with an open account)
Above pricing is for materials only
Materials In stock may be picked up from our Tampa Warehouse location
Please call (800) 330.2333 if you need more information, technical support or to place your order
Invoice
(305)296-5606 Fax: (305)296-1207
SEA TECH
P.O. BOX 420529
SUITIVIETILAVID
item 7—Date
Description of Work
Units
Unit Cost
Amount
1
05/18/2017
#4000 CUSTOM GROUT MIX
24.00
205.00
4,920.00
TICKETNS 5842, 5843, 5844 & 5045
2
05118/2017
FUEL SURCHARGE
4.00
7.00
28.00,
3
05/18/2017
ENMROMENTAL FEE
4.00
8.00
32,00,
4
Sales Tax @ 7.50 %
373,50
Total Invoice Amount:
3
5L :3.50
a
Nle Xd
7
KEEP THIS SLIP FOR fl-E-FERE NCE
e5ay
Concrete Analysis & Testing Laboratories, Inc Invoice
PO Box 5O75
Marathon, FL 33050
(3 7 - 55 5/18/2017 14346
Sea Tech
O Box 420529
Surnmeriand Key, FL .,
One Set of Four Cast Cylinders 1 205M 205.00
Tech Time for Collecting Samples 1.5 65.00 81.25
Cylinder Pick -Up 1 65.00 65.00
Little Torch St. Rd.
Boat Ramp Report 3
i
Total
I
$351,25
REPORT OF CONCRETE CYLINDER TEST
Concrete Analysis & Testing Laboratories, Inc
Project Number Sea Tech Little Torch St. Road Report Number: 3
Project: Little Torch St. Road 4A
Client: Sea Tech, Inc
Address: P.O. Box 420529
Summerland Key, Florida 33042
Attn:
FIELD TEST CONDITIONS AND RESULTS
Date Placed: -9/18/2017
Time Sampled: NA
Location of Sample: Concrete for Anti Washout Bags
Supplier Monroe Concrete Products
Tnick Number NA
Ticket Number: 5 8 4 2
Mix Number. 4000 Grout
Time Placed: unloaded. 9:15
Design Strength: 4000
Time Batched: 8: ol
Batch Size: 6.0 cy
Slump: NA
Air Content: NA Unit Weight: NA
Concrete Temp: 8 9'
Ambient Temp: 82c
Water Added: NA
Technician: Mitch
Initial Curing: NA
Final Curing: NA
Max Initial Curing Temp.: NA
Min Initial Curing Temp.: NA
Test
Specimen Date
Age
-A I f-- f " 25 2 0 1 -1
7
B 163 .1 5 2 0 1, 71
28
C 6 15 2 (3 1,'/
28
D
Res
Fzr--M=
E=
Percent of Type of
Load Diameter Area Strength Design Fracture
41640 4.00 12.57 3310 83% 6
TYPES OFF
Inn
Type I Type 2 TYP*3
T T S
1
Reported by:
Invoice
PO Box 420529
iii v- Tr.
1-410
Sea Tech Inc
131 Palomino Horse Trail
Big Pine Key, FL 33043
P.O. No.
Terms
Project
Due on receipt
Quantity
Description
Rate
Amount
10
10
Bobcat Hourly
Dump Truck Hourly
85.00
85.00
850.00
850.00
It's been a pleasure working with you!
Total $1,700.00
BEE'&-AONEY POTS
P.O. BOX 430539
Big Pine Key, FL 33043
WAt&Uwi"12'1i A6
IMMLImagiolzmai
59224magwo
CUSTOMER
Sea Tech, Inc.
P.O. Box 420529
Surnmerland Key FIL 33042
0511512017 - 05120/2017 SgRoo
StateSalesTax 7,50%
Fuel Surcharge
TOTAL DUE NOW A-112.43 i
1111202122ftoomzn■
Florida Fence Corporation
P. 0. Box 227
Tavernier, FL 33070 US
(305) 852-4324
floridafenceC&aol.com
www.floridakeysfencing.com
BILL TO
Robin Szmansky
Sea Tech of the Florida Keys, Inc.
P.O.Box 420529
Surnmerland Key, FL 33042
(305) 872-0888
iNVOICE # DATE TOTAL DUE
209-2360 05/30/2017 $450.00
Mwu��
W911WIM
florida fence
c o r p o r a t I o111n11
11m111 W=11
..............
Temporary
Temporary Fencing
- Customer is responsible for making known to Florida Fence
and/or utilities, if they do exist, before work commences.
A 50 percent deposit is required to schedule work.
"-1W9v41A"-Q 21�-eamq vwtu-�t
as charged by the issuing authority.
M
TERMS ENCLOSED
Due on receipt
Q T v RATE AMOUNT
450.00 450.00
BALANCE DUE $450.011
Mav25 ID17 - I 1 01 PM "v Azea un t_J_Priva Cv_?LhC0J
Il
laWonroe County eGovPLUS
7 i
A_W_J x I i -�v Downtime Notice: System wilt be down for maintenance from May 30, 20117
PERMIT INFORMATION
PLEASE NOTE: FEES LISTED ARE ESTIMATES ONLY; FEES
ON PERMITS IN VOID STATUS ARE NOT
DUE FOR PAYMENT.
BEFORE WRITING ANY CHECKS, PLEASE
CALL THE
BUILDING DEPARTMENT TO CONFIRM.
Permit Number 171DIS75 RE
1=20841000060 -1
Permit Type 11-A Balance Due
IS0.00
Property Address 761 STATE ROAD 4A status
lClosed
Rroff 'ftA-&vWA
PERMIT INFORMATION
Application Date 03-D9.2017 Operator
chasee
Issued Date 05-10-2017 Operator
I(Ind
Master Number Project Number
C.O. Number Operator
C.O. Issued
C-404 Type Usage Class
I Com
Applied Value 1450DO Units
10
Calculated Value 0 Contractor ID
112431
PROPERTY ON PERMIT
RE 00220941000000
Unit
Address 761 STATE ROAD 4A
City/State/Zip LITTLE TORCH KEY, FL_
OWNER ON PERMIT
Name MONROE COUNTY
Address 500 WH MEAD STREET
City/State/Zip KEY WEST, FL 33M
Type "ta
A P P LIC A N T
No Applicant Information on file for this permit
MISCELLANEOUS INFORMATION NOTES
761 STATE RD 4A MATES BE LITTLE TORCH KEY
SEWALL/ DOCK REPAIR - COMMERCIAL
NOTICE OF COMMENCEMENT NOT REQUIRED
......... . .
PERMIT APPROVAL TO REPAIR MSTIN G BOAT RAMP, AS
PERAPPROVED PLANS.
BIOLOGIST APPROVAL 3/20/2017 BFWITH CONDITIONS:
1. PERMIT FOR BOAT RAMP REPAIR IN FOOTPRINT AS
SHOWN ON APPROVED PLANS ONLY. NO OTHER WORK NO
OTHER STRUCTURES AUTHORIZED
2. ALL CONDITIONS OF DEPIACOE PERMITS APPLY
3. TURBIDITY SCREENS REQUIRED FOR ALL IN -WATER
YORK
1. NO FILL EXCEPT FOR MINIMUM MOUNT NEEDED FOR THE
kCTUAL BOAT RAMP SURFACE
I. NO LANDCLEAR THIS PERMIT
I. FINAL BIOLOGICAL LNSPECTIION REQUIRED
)EP PERMIT A 44-0173335-002/003
ROWuNWIL DATE InF/iii2cH i
WASE PERMIT #SAj--2'61-5-0 1 0971( 1 GP�GGMN
APPROVAL DATE 07129/2019
-IRE MARSHAL AP PAOVAL -CM 0 312 3 t 17
31LANNING DEPARTMENT DID NOT REVIEWTHIS
APPLICATION.
THERE MAY BE DEVELOPMENT AND I OR LAND USE ISSUES
ON THE SITE THAT ARE NO LONGER I H COMPLIANCE WITH
A COUNTY REGULATION(S) OR ESTAII LISHED UNLAWFULLY
WITHOUT THE BENEFIT OF PROPER APPROVALS.
APPROVAL OF THIS PERMIT DOES NOT DEEM ALL
DEVELOPMENT AS CONFORMING OR DEEM UNLAWFUL
6 boMAiNfigii --'
THE GROWTH MANAGEMENT DIVISION RESERVES THE EIGHT
TO REQUIRE THAT SUCH DEVELOPMENT BE BROUGHT INTO
COMPLIANCE THROUGH THE PROPER APPROVAL PROCESS
OF TERMINATED UPON.FARE DISCOVERY.
ALL DEBRIS TO BE REMOVED To A LEGAL DumpsrrE,
INSPECIRONS REII QUIRED PER PERMIT CARD.
146PLAN DEN14fIbN ALLOWED OUT A REVISED
PERMIT.
No OTHER IRm THis PERMIT,
DEEOED NON-16EVELOP'MENT, DEO EXEMPT.
ku&
I
BIOLOGIST
I
p
03.20,2017
FRANC"
6
8tJJ L-D t N Q 5 1 RU CTU RAL i A DOf
I
03-2-2-2017
DENONS
0
F:NAL REV:-EW
2
P
04 12-2017
GRIFF:ND
a
F [JAL REY FW
I
L
01-23-2 al 7
GRIFF No
F I R7 MARM I&I-
I
A
03,21-2017
MARSTONC
M,WTHON 801ILDING DEPT
I
L
03.09-2017
CHASEE
0
(RALWNG OFFICIAL DESIGNtE
I
A
03-22-2017
DENONS
0
PERMIT READY TO ISSUE
I
L
05.10-2017
GPJFFND
0
in FAST% m M
0ABLD`IPR
VALUATION
45000L00
28D.00
29030
00 BLD 1 Pft
VALUATION
45000.00
24D.80
280.80
08ENVEGS
VALUATION
450
334.37
33437
0BFiREG5
VALUATION
450GOA0
115.19
115,19
OBPLNEG5
VALUATION
45000.00
301.50
301.50
8- 0 EDUC
FLAT RATE
1.00
2.00
2.0l)
6, BID EOU
FLAT RATE
1.00
toJua
10.00
CONT-INVES
FLAT RATE
1,00
11,00
ItIM
DRPR
uNUs
561.60
7.58
7.58
DSPR RE ED
UNITS
561.60
0.84
0.84
OCA
DOOR
561.60
7.511
7.15,8
DCA RE ED
UNITS
561.60
0.84
0.84
FIRE EDUC
FLAT IW*
too
10-00
10.00
PLAN ED
FLAT RATE
1.00
10.00
10.00
TOTAL FEE&
$1,372.501
TOTAL PAID TO DATE'
S1,372.50
PENDING PAYMENT:
$oml
BALANCE:j
50.001
General Contractor
SEA TECH OF THE FLOFUDA $MYS I
Contractor ID
112431
Address
P.O. SW 420529
City/State/Zip
SUMMERLAND ITY, FL 3 3 042 -05 29
Phone
J305) $72-0888
Work Comp Expires
03-011-2018
Insurance Expires
01-01-2018
License Expires
09.30-2017
status
A
VoLM,
FINAL BUILDING
I SHADYJ 05-24-2017
05-24-2017
P 20235202
FINAL BIOLOGICAL
I VASEPJSJ 05-23.2017
05-23.2017
P 20255034
Your privacy Is Important to us, for more information see our
CWright C 2007 -THE PLUS SERIES 0 - All Rights Romrved
I
TO:
Board of County Commissioners
From:
Assistant County Administrator
Date:
June 20, 2017
RE:
Change Orders
According to Ordinance No. 004-1999 adopted by the Board of County Commissioner,
proposed change orders are to be presented to members of the Board of Coun,
Commissioners at least 24 hours prior to approval, assuming they are within t
Administrator's prescribed limits. Change orders not within the Administrator's authori
are placed on the BOCC agenda. I
Signature
91