Loading...
3rd Change Order 10/06/2016MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECTTITLE: CHANGE ORDER SR 4A Little Torch Boat Ramp Repairs 1200 Truman Ave, Key West, FL 33040 INITIATION DATE: September 19, 201 TO CONTRACTOR: it The original (Guaranteed Maximum Price) .................................... ... _.$112,525.00 Net change by previously authorized Change Orders .............. .............................. $18,803.00 The (Q2akagL_SMm_) (Guaranteed Maximum Price) prior to this Change order was............ $131,328.00 The (Contract Sum) (Guaranteed Maximum Price) will 96in eased) (decreased) 'f(Uffghgo ) by this Change Order ...... $0 The new (g2njgLcL$yM) (Guaranteed Maximum PrIce)6cluding this Change Order is ...... $131,328.00 The Contract Time will be Cincrease A (decreased) (unchanged) by .............................. 25 Days The date of Substantial Completion as of the date of this Change Order is ..............October 14, 2016 Contractor is requesting a no cost time extension. Delays in deliveu of the coffer damn due -to winds from tropical disturbance L99 delayed dewatering of th"r rnp. Damage- to the ramp during installation of the coffer dam will reguire pqrmitted repairs. This change Order is no cost and 0% of the original contract grim. Not valid until sian2d by Owner, Architect fif applicablel, and Contractor UERM991 1122 12016 Kei s, P.A. Date CONTRACTOR: [ Se Te the Florida keys, —Inc. to Date � Dir. PROJECT MANAGEMENT: 10 Doug Spos Date COUNTY/DEPUTY ADMINISTRATOR: Wornlff&A"'tnty Ac11"T"sF1aTo—r Date Kevin Wilson Christine Hurley Change Order was not included in the original contract specifications. Yes E No Z' I I 11i III 1::: 11 111 11, 11 ill Em� Project architect approves the change order. Yes Z No F-1 k a X MEMMUMMUMM r-97 I 100 Simonton St Key West, FL 33040 Re: Repairs to Little Torch Boat Ramp Subject: Time Extension Dear Mr. Knight, Sea Tech is requesting a Twenty Five our contract. There have been delays in the procurement and installation of the cof'[e We made changes to the cofferdam and submitted a change order on 14JUL2016, which was approved on I AUG2016. Upon approval we ordered the cofferdam to be installed and had a scheduled date of I SEP2016. The ordered sheet piles were the sheet piles arrived on 9SEP2016. The cofferdam was then installed the following business day 12SEP2016; this resulted in an Eight (8) day delay. Once we were able to dewater, the engineering department found substantial damage to a portion of the boat ramp as a result of SeaTech lifting the slab during the installation of the cofferdam. This resulted in replacement of a 12' x 15' section of the concrete boat ramp. This work needed engineered drawings and pen-nitting. This will result in another Seventeen (17) days delay. This will give us a substantial completion date of 140CT2016. Sea Tech has every intention of accelerating the work progress to reduce the time indicated on the project schedule. Please advise if you need additional information. I may be reached at (305) 872-0888. Sincerely, Ryonl Z aChape&e,- 91/ you LaChapelle Project Manager r1r) ff:ffITjK*j;Y_I WiTINIIIIII J 07MMMOTIMT-76 =- From: County Administrator/Assistant County Administrator/Acting County Administrator According to Ordinance 026-1998 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners at least 24 hours prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. t01547-01b n!y Administraff-r- Signature County Administrator/Assistant County Administrator/Acting County Administrator A M