Loading...
4th Change Order 12/08/2016MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER -i-ROJECT TITLE: CHANGE ORDER T,R 4A Little Torch Boat Ramp Repairs 1200 Truman Ave, Key West, FL 33040 INITIATION DATE: October 25, 201 f TO CONTRACTOR: CONTRACT DATE: April 20,2016 Sea Tech of the Florida Keys 131 Palomino Trail Big Pine Key, FL 33040 ig-40161140 161wo kv%iorlf �--�Rvx I The (Contract Sum (Guaranteed Maximum Price) will be (increased) (decM=d) (Unchanged) by this Change Order ....... ;V5,684.00 rAs Tey (Cnit 7L #—Sur jig-0 ;4,QUA. QjQ jillogig J�is Cha 11MIQ fF5;4 All 144i60121-11"1-11L 101M Ms F =- =005 0 - - . Th= were thLep chang2s near the-end-o—fthis proiept, The firs was the addition of gravel to finish the Parking area and provide astable base in the North West area of the rking lot. This chpngg resulted in an Of oriainally anticipated Removal of gravel navigational hazard was completed with a clam bucket This change resulted in a credit of [R313,001 The final impact after all three changes resulted in a net credit to the t3roiect of 0,084-001 This Chan Order ir, -3.27% of the original contract orice. Not valid until sioned by Owner, Architect (If apolicable), and Contractor ARCHITECT: z 0 �,) ) 12 /06 IZ016 'Keith and SGhrrjei, P.A. Date CONTRACTOR: 0 S h of1hqj1orida Keys, Inc. r)ke Dir. PROJECT MANAGEMENT: Doug Spos COUNTY/DEPUTY ADMINISTRATOR: Roman Gastesi Date Kevin Wilson Christine Hurley e Change Order was not included in the original contract specifications. Yes 2 No El E3= 9 M ry rM 07 1 -Ti?-TzW- z: Change Order is correcting an error or omission in design document. Yes E]No 9 rki September 29, 2016 M01 M.-TSQ-07 III MII. M.- Attn: Cary Knight 110 ShrjoTtoT Sraet, 2-2 lk Key West, FL 33040 00099i�•� M. = irLvide and spread additional limestone gravel to parking lot. 1 - Additional Gravel for Parking Lot 1.1 Material Load #4 Rock 1 load @ 328.82 $328.82 1.2 Bobcat Labor spreading #4 Rock 3 111 @ 150 $450.00 1.3 Material Load Miami #57 Rock 2 load @ 913.75 $1,827.50 1.4 Bobcat Labor spreading #57 Rock 5 hrs @ 150 $750.00 Subtotal $3,356.32 O/H 5% $167.82 Subtotal $3,524.14 Profit 5% $176.21 TOTP [L $3.700 All material is guaranteed to be as specified and the above work to be performed in accordance with the manufacturer's specifications and completed in a substantial workmanlike manner for the sum of - Payment in full upon completion. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our control. Owner to carry fire, tornado and other necessary insurance upon above work. Workers Compensation and General Liability insurance on above work will be taken out by SEA TECH, INC. Note - This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to the work specified. Payment will be made as outlined above. I 07=1 Date ir I P. 0. BOX 787 KEY WEST, FL 33041 (305)296-5606 Fax: (305)296-1207 M11111no, Information; - SEA TECH, INC. PO. BOX 420529 SUMMERLAND KEY, FIL 33042-0529 im Invoice Invoice No: 39039 Date 0811612016 Page I of 1 Invoice Description: LOCAL 4 ROCK - TICKETS, 133661 Item Date Desciription of Wait Units Unit Cost Amount 1 08115/2016 #4 ROCLI E T .09 3100 290.86- TICKET# 133861 2 08/1512016 FUELSURCHARGE 1.00 7.00 7.00- 3 08/1 of 6 ENVIRONMENTAL FEE 8.00 8.00- 4 Sales Tax C 7.50 % 22.94 -��L Total Invoice Amount 328.82 013: 41 (*-yWHVULLUzbEaLW R 0. Box 430725 Big Pine Key, FL 33043 ---W�- --- 01 Ce (905)872-894-1 Bill- To: Sea Tech, Inc. 830 Crane Blvd. Sugarloaf Key, FL. 33042 Date Invoice No. 08/31/16 147700 Mobil (30511481 -.805-2- Fax (305) 872-2927 wwwhaackexcavating.com Due Date 08/31116 Location 11 Data Description 761 .8/30/16 (1) LOAD #57 MI ROCK DELIVERED St. Rd. 4 A I LittlBTorch... SALES TAX 0 7.5% P0# / Service Send Via Phone 02949 Email 305-872-0888 OTY Y Rate Amount 1 850.00 85W)OT 7,50% 63.75 Invoices are payable upon receipt unless otherwise stated. A 1.5% Finance Fee will be applied to any past due balance. Customer/Agent shall be responsible for any expenses Incurred in the collection of unpaid balances. Total $913.75 Payments $0.00 Balance Due $913.75 OF THE FLORIDA KEYS �.= =-.. M311M VAIMM"IM70"057MM—M Attn: Cary Knight Key West, FL 33040 2MNIRSMWZ�= �� Subject: Change Order #05 — Repair three concrete pilings We hereby propose to Rumish materials, equipment and perform the labor necessary to: -Repair concrete on three concrete pilings below dock. 1 - Repair three concrete pilings 1.1 Remove Damaged concrete 6 hrs @ 35 $210.00 1.2 Sika 110 Armetec Bonding Agent 1 ea @ 166.01 $166.01 1.3 Sika 223 Concrete Mix 3 ea @ 15.41 $46.23 1.4 Labor to repair 3 concrete Pilings 12 hrs; @ 35 $420.011, Subtotal $842.24 O/H 5% $42.11 Subtotal $884.35 Profit MAL $P29 ki manufacturer's specifications and completed in a substantial workmanlike manner for the sum of: Nine Hundred Twenty Nine Dollars ............................................... $929.00 Payment in full upon completion. Any alteration or deviation from above specifications involving extra costs will be executed only upon written zrders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, QrLVyLiL.q1ff n a ov ImAk i AM 414.0 w i nag 1. O"T's W111�116&001111' � I N i 'all ON 110�1011 1.1 il 1011111,11 E I I I,.,N'A 11all 111#�W �J 16 1 t11WV414q ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment will be made as outlined above. Signature Date RMOTIFIETWI t, i i,. I t 911 I ■ u �r i i 0 r T T T fr CL 03 V J Q J Y T ttyy V y V .6 (1) a: U rV, UQJ fir® V yy®®z L W cro 000 T pCL 1 n � J AI . 81 v 0, .UseT 16 2011 7� '� Y _ � r1yf. �r OF THE FLORIDA KEYS LICENSED BUILDING CONTRACTORS Attn: Cary Knight I 1100 SijkoirtoT Street, 2-2 Key West, FL 33040 1 - Credit for field changes to CO #02 - Remove Prop wash Shoal 1.1 Remove Shoal with Clam Bucket 2 hrs @ 300 $600.00 1.2 Credit for not driving additional sheet pilings -1 Is @ 6600 $6,600.00 1.3 Credit to not remove/grade gravel on in line item - hrs @ 35 -$840.00 1.2 of CO #02 24 1.4 Credit for equipment to remove gravel in line it 1.3 -2 days @ 350 -$700.00 of CO#02 Subtotal $7,540.00 O/H 5% -$377.00 Subtotal $7,917.00 Profit 5% -$395.85 TOTAL -"13 13 All material is guaranteed to be ass ecifie and the above work to be performed in accordance with the manufacturer's specifications and completed in a substantial workmanlike manner for the sum of: Payment In full upon completion. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our ork. Workers Com!2ensation and General Liability insurance on above work will be taken out by SEA TECH, INC. Note - This proposal may be withdrawn by us if not accepted wn 30 days. ACCEPTANCE • PROPOSAL TM-21rive- x4sssspsw—c specified. Payment will be made as outlined above. Signature ❑ate Z.-MEIR