08th Change Order 06/26/2017MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: The Redevelopment of Bernstein park CHANGE ORDER NO. 8 INITIATION DATE: June IY", 2017 TO CONTRACTOR: Burke Construction Group, Inc 10145 NVV le St Doral Fl. 33172 The Contract is changed as mllows CONTRACT DATE: April 20, 2016 This Change or der IS 0 Not valid — until sjqr1ed by Owner Davi DIRECTOR PROJECT MANAGEMENT ry COUNTY/ASSISTANT ADNIINISTRO( Rom Date rke Date st s)- Kevin Wilson, Christine Hu rley USE Construction Group Inc. Thursday February 23, 2017 BCG TRA: #: 1611-05 Via: Email / Mail Director of Project Management County Administrator Monroe County Engineering 1100 Simonton Street 1100 Simonton Street, 2-216 Key West, Florida 33040 Key West, FL 33040 Per the attached executed Change Order Directive Letter issued to Burke Construction on August 12 2016, Monroe County accepted the terms of the Proposal issued by Burke Construction for the Credit of County Stock Pile Material along with the additional time required ♦ provide the credit (see page #2 of the attached letter). % 11 a I a Sincerely, Armando L. Silveira Project Manager O N \k! 1 9 St, Dorad, FL 731 TZ, - P: 305,468,0604 - F: 305.468,6654 - A (,iknRVrz4I I DI;sm IL -Build Site DevtJ pnwnt I Gmen I:'onsonflon I tnleiior lmprovelnenf C (3 CA A 3 8 3 09 CONTRACTOR: Burke Construction Group, Inc. Not valid until signed by the Owner and Contractor F) URKE Construction Group Inc. CHANGE ORDER NUMBER Of DATE: 7118/2016 CONTRACTOR PROJECT #: 1611 Burke Construction Group, Inc. ARCHITECT CONTRACTOR 10145 Not 19th St, Address Address ❑ot•l, FL _77 GY By Architect DATE Monroe County Board of County Commissioner OWNER 500 Whithead Street Address Key West, FL 33040 By Aulocrized Signature - DATE GRAIN SIZE DISTRIBUTION TEST DATA Client; BLTRKX CONSTRUCTION F D20 G30 1 DOD 0 2042 I 0,2637 I 03 124 0 4080 01 6413 Project: Bornstein Park C, C, Modulus 3.89 Location: Stockpile Sample Number: 5-3-16 Material Description: Non Structual 1,imeRock and Lime Send Sample Date: 5-3-16 Date Received, 5 -3 -116 PL: NP LL NV USCS Classification: SP AASHTO Classification. A-I-b Testing Remarks: None Tested By. JCQ Test Date: 5 -3 -16 Checked By: WLM Title. Lab Staxaviow Dry Curnmative Cunrabitive Sample Pan Sieve Weight and Tare Tare Tare Weight Opening Retained Percent Igrams) (grams) (grams) Size (grams) Retained 39250.00 0,00 0,00 3-112" 6910,00 17.9 3' 13870.00 36-3 2-1/2 16435,00 43.0 T, 18020,00 47, 18520-00 49A V 20,00 0-1 314" 115.00 03 112" 465A0 I'l 318" 1015.00 23 #4 5800,00 15,2 508,90 0,00 0100 #10 72.60 27,2 #20 146,10 39,5 #40 318,60 6 9, 3 #60 426,60 863 #90 459,60 91.9 #140 494.90 973 #200 504,70 99 3 1111HUM Cobbles Gravel Sand i fines Coarse Fine Total sill Clad Total 32,0 72.1 0,7 13 10 F D20 G30 1 DOD 0 2042 I 0,2637 I 03 124 0 4080 01 6413 C, C, Modulus 3.89 4,10 0,97 DOD Dec D86 D 9 D96 0.8368 3,5978 Concrete Analysis & Testing Laboratories, Inc DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULEIMPACT. EXECUTED: No CONTRACT FOR: 1:Redevelopment of Bernstein Park TOTAL AMOUNT- $1,031.10 DESCRIPTION: Cost to supply and install 4 fire dampers With access doors in the 4 exhaust fans that are in the mechanical chase from the 4 rest rooms int he Community Building. ATTACHMENTS: POTENTIAL CIIANGE ORDERS IN THIS CIIANGE ORDER: I= Schedule Impact Add Fire Dampers in Mech Chase fflmffl��� Provide and install 4 as fire dampers with access doors In mechanical chase Overhead : 2.60% on all line Item types Grand Tiotfiiil: Burke Construction Group, Inc. page 1 of 2 Printed On: 6/5/ 2017 10:12 AM ra i i • p ti 1 Cog g LX() [ x A i N N � OLxLi : O�YS I�i I I I I 1. I I i � IMC &AND3 5 MECHMCAL C(MMACTOR • 10145 N.W. 191h Street DoralFlorida 33172 • rm 0 Si1v ir Attn: Armando Silveira 3070 Blending Boulevard P.O. Box 2039 Middleburg, Florida 32068 Middleburg, FL 32050 Office" (904)406,6100 - Facsimile: {004) 291,4510 wexv.1slandsMechanical.com hIT"IffiRIIII.: • - i. ; 111 a � E'll I 1 11 1 Armando, Kirk Ryberg TO: Board of County Commissioners From: Assistant County Administrator Date: June 22, 2017 RE: Change Orders M.1 ME some ------ According to Ordinance No. 004-1999 adopted by the Board of County Commissioners, proposed change orders are to • presented to members • the Board • County Commissioners at least 24 hours prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. ",-; ) — Ssistant County Administrator I ',' of