Loading...
Item M1BOARD OF COUNTY COMMISSIONERS C ounty of M onroe A(I Mayor George Neugent, District 2 T he Fl orida Keys 4� �� m Mayor Pro Tem David Rice, District 4 l Danny L. Kolhage, District 1 „ Y „; ° W Heather Carruthers, District 3 Sylvia J. Murphy, District 5 County Commission Meeting June 21, 2017 Agenda Item Number: M.1 Agenda Item Summary #3097 BULK ITEM: No DEPARTMENT: County Administrator TIME APPROXIMATE: STAFF CONTACT: Lindsey Ballard (305) 292 -4443 N/A AGENDA ITEM WORDING: County Administrator's Monthly Report. ITEM BACKGROUND: N/A PREVIOUS RELEVANT BOCC ACTION: N/A CONTRACT /AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: DOCUMENTATION: CAD 1 Monthly Report FINANCIAL IMPACT: Effective Date: Expiration Date: Total Dollar Value of Contract: Total Cost to County: Current Year Portion: Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: If yes, amount: Grant: County Match: Insurance Required: Additional Details: REVIEWED BY: Kathy Peters Completed 06/06/2017 7:14 PM Board of County Commissioners Pending 06/21/2017 9:00 AM MEMORANDUM Office of the County Administrator TO: Board of County Commissioners FROM: Roman Gastesi County Administrator DATE: June 6, 2017 SUBJECT: County Divisions' Monthly Activity Report for June 2017 MONTHLY ACTIVITY REPORT — JUNE 2017 Airports: Key West May 1 Ranked RFQ for Air Service Consultants — public meeting at EYW May 3 Airline Managers meeting, discussed ramp safety enhancements May 6 Started Tyler Bethel in new position as Airport Facilities Manager, overlapping with the retiring AFM until August. May 9 Discussed ramp airline parking plan with airlines related to ramp construction May 9 Performed Runway Rehabilitation Project (bid) pre -bid conference. May 9 Met with Mike Rice to discuss the proposed MCSO shooting range in MTH May 10 Attended MC budget meeting for FY 18. May 12 Meeting with Arts council on proposed art work installation at EYW. May 15 Attended meeting in Miami for FAC 2017 with MDAD and FAC leadership. May 16 Changed Bid opening date for the Noise Insulation Project bid till June, due to issues with Buy America First FAA waivers and funding. May 20 Attended Marathon Young Eagles day, 40 kids flew with 3 volunteer pilots and 25 ground support volunteers. May 21 Responded to emergency runway lighting failure at MTH, spent the day troubleshooting and repairing a fault in one of the 220 light fixtures at MTH. May 23 Attended 3 Technical Review Committee for the EYW airport master plan study. May 24 Coordinated a meeting with Airport, ATC and City of Key West related to drone flight requests in City of KW. May 25 Performed internal Hurricane preparedness meeting with airport staff. Marathon ...:....... May 3 Attended the Statewide Hurricane Exercise at the Marathon Govt. Center. May 25 Attended the Hurricane Preparedness meeting at EYW. May 26 Ken Lohlein's retirement party, celebrating 35 years of service with Monroe County, including 15 at Marathon Airport. Veterans Affairs: CLIENTS ASSISTED VA Phone Calls 942 Office Visits 602 New Clients 43 Field Visits 5 Benefits Delivery at Discharge TRANSPORTATION PROGRAM Transportation Calls 369 Veterans Transported 179 FINANCIAL DATA The financial data for the month of May totals $ 165.804.77 this indicates the amount of new revenue brought into Monroe County derived from claims filed by the entire Veterans Affairs department. The financial data captured monthly will vary due to the Veterans Administration's variable time frame in adjudicating awards. OTHER VETERANS AFFAIRS ACTIVITIES FOR MONTH: Attended yearly training /recertification conference Attended /participated in hurricane exercise Provided briefing to 24 military personnel being discharged Director was guest speaker at a meeting of the WestCare /Guidance Care Center Attended Memorial Day services in Key West (2), Big Coppitt and coordinated the service in Key Largo for 110 visitors Key Largo office provided coordination for 19 veterans from Miami for lunch in the Keys Guest on radio stations 96.9 Bradeen Radio Show and the Morning Mix to talk about veterans benefits Extension Services: • Number of services provided: 207 phone calls, 48 office visits, 36 visits to clients, 37 learning events with 468 participants, 5 media submissions, and 540 publications distributed. Total Budget for FY 16/17: $284,641.00; Year to Date Expenditures and Encumbrances: $221,166.26; Remaining Balance: $63,474.74; Percentage of budget spent and /or encumbered year -to -date: 77 %. The County Extension Director /Family & Community Development Agent accomplished the following activities: • Coordinated the May 16 Monroe County Climate Change Advisory Committee meeting to develop a recommendation to the County Commission to conduct solar feasibility for the new Cudjoe Key fire station. Worked with county staff to ensure that solar will be an option in the bid process for both the fire station and all future projects. This effort will help the County to meet the greenhouse gas emissions reduction of 40% by 2030 that was adopted last year. { ...:....... Worked as a Subject Matter Expert on regional climate change frameworks on behalf of the Southeast Florida Climate Change Compact. The meetings were held online in "Resilience Dialogues" with members from across the nation contributing to the learning environment. Worked with board members of Green Living & Energy Education (GLEE) to plan the annual meeting scheduled for June 19 and to begin planning the 2018 GLEE Energy Expo which will be held on February 10. The Environmental Horticulture Agent accomplished the following activities: • Participated in the Arbor Day event at Bayview Park in Key West to teach proper tree planting and rainbarrel construction. Three Master Gardeners and 20 volunteers helped to plant multiple trees. A rainbarrel education and construction workshop was taught to 20 attendees. • Held a Green Industries -Best Management Practices (GI -BMP) workshop for City of Key West and Monroe County Public Works employees. The course educated 18 attendees about environmentally friendly landscaping practices to lessen non -point source pollution due to inappropriate fertilizer and pesticide applications. • Held four Regional Plant Clinics with ten Master Gardeners assisting 18 clients. The Florida Sea Grant Marine Extension Agent accomplished the following activities: • Was invited to Treasure Village Montessori for "Meet the Scientist" night for students and their parents and brought microscopes to teach the students about the miniature world of plankton. • As a member of the Florida Sea Grant Fisheries Work Action group, they are developing a voluntary program to promote ethical angling, decrease mortality for caught and released fish and how to handle sea animal interactions. • Is assisting in organizing the regional Sea Grant Gulf of Mexico meeting on Dauphin Island, AL in December. The Economic Resource Development Agent accomplished the following activities: • Met with commercial fisherman to help them form a nonprofit co -op association. Constructed a business plan for the co -op. Completed a management plan checklist in support of Monroe County's grant application to the Florida Dept. of Environmental Protection. • Met with executives of the Marine Resources Development Foundation and First State Bank of the Florida Keys in Key Largo to discuss funding strategies for a new dormitory and a classroom building. • Held a meeting with architects from Clemson University's Center for Architecture in Charleston, SC to discuss the possible development of a seafood processing facility in the Florida Keys and possibly Cuba. Libraries: • E- visits made to the Library's web resources in April came in at 512,659, 17% above the previous month and 15% higher than April of 2016. These e- visits were logged to our website, our online catalog, and our digital exhibit of historical images. • Circulation of e -books in March showed an increase of 6% over that from a year ago with a total of 2,309 check outs. Those still- rising totals are evidence that e -books are very much alive and thriving, as we continue to expand our digital collection to meet the increasing demand. • Our wireless public access sessions logged in at 8,997 for the month, 50% above last April and 22% over last month. PC usage remains strong due to requirements by government agencies for benefit recipients, and to the many businesses that now require online job applications. • We welcomed 26,956 visitors to our libraries in April and 197 new cardholders were added to our roster, as the winter seasonal visitors began their return flights to the north. • To continue evidence that our services are also valued post- season, our librarians answered 11,743 questions in April, 30% higher than the previous year. Questions were presented via chat, text, e -mail, social media, telephone and in- person. Our expanded reference services continue to be well- received by the public. • Programs and special events continue to draw appreciative audiences — Library programs drew in 2,728 attendees in April, 9% over the previous month. All five branches featured displays and events for National Library Week, with the Islamorada Branch leading the way with their Edible Books Contest, which drew a wide assortment of entries and many curious patrons. • As highway and supermarket traffic has indicated, this has been a busy season for Library staff and patrons— Library services continue to draw in long -time and new patrons, and our staff members continue to explore new ideas for expansion of these services. Social Services: OAA, Older Americans Act Programs • Nutrition (Information in this section is for the period 4/21/2017 - 5/20/2017: • C -1 Congregate Meals totaled 1389 units during this period. • C -2 Home Delivered Meals Hots totaled 262 units, and Home Delivered Meals Frozen totaled 2585 • units. In -Home Services (Information in this section is for the period 4/21/2017 - 5/20/2017): • III -B Chore: 143.75 units this period, 263 unit's year -to -date • III -B Screening and Assessment: 4 units this period, 39 units year -to -date • III -B Homemaking/Personal Care: 243 units this period, 1815 units year -to -date • III -E Screening and Assessment: 9 units this period, 24.5 units year to date • III -E Chore: 72.75 units this period, 177.25 units year -to -date • III -E In -Home Respite: 103units this period,345.25 units year -to -date • III -E Facility Respite: 636.75 units this period, 3299.75 units year to date Non -OAA Programs CCDA (Community Care for Disabled Adults) for April 2017: • Case Management: 8 units for the month were produced • Homemaking: 62.75 units for the month were produced • Home - Delivered Meals: 20 meals for the month were provided • Personal Care: 23.5 units for the monthly were produced CCE (Community Care for the Elderly) for the period 3/21/2017- 4/20/2017: • Case Management: 34.5 units for the period and 425 unit's year -to -date • Case Aide: 9.5 units achieved and 96.25 unit year -to -date • Companionship: 64.75 units achieved and 424 units year -to -date 4 • Home Modification: 0 units achieved 2 units year -to -date • Enhanced Chore: 0 units achieved and 97 units year -to -date • Chore: 0 units achieved 126.75 units year -to -date • Homemaking: 623 units for the period and 6186.50 units year -to -date • Specialized Medical Equipment: 0 unit for the period and 5 unit year -to -date • Personal Care: 570.50 units for the period and 5626.75 units year -to -date • Respite: 0 units for the period and 2445 units year -to -date ADI (Alzheimer's Disease Initiative) for the period 3/21/2017- 4/20/2017: 321 units were produced for IN HOME RESPITE and 2049.50 units year to date. 4205.75 units for this period for FACILITY RESPITE and 9117.75 year to date HCE (Home Care for the Elderly Program) for the period 3/16/17- 4/15/17: 6 billable units this period 178.75 billable units year -to -date at the beginning of the contract year. Monroe County Transit Department Activity for May 2017 • One -way trips provided: 1991 • Unduplicated clients served: 244 • Special Needs Clients registered: 538 • Deposited Revenue: $578.00 • Periods Expenditures: $83,652.38 • Percentage Spent Fiscal YTD: 60.5% Social Services Department — May 2017 Community Support Services Offices in: Key West, Marathon, Plantation Key Incoming calls, provision of information and referrals 553 Staff responded to incoming calls providing information and referrals to callers based on specific inquiries and /or needs. These inquiries range from how and where to apply for Food Stam benefits, where the closest food bank is located, how to report suspected abuse, or to find out what availabl services there are at the time. Other callers are scheduled for intake by Social Services case management staff to cover Possible programs such as LIHEAP, ESG rent assistance, prescription drug assistance, and welfare assistance. Info and Written Referrals 238 Unduplicated Welfare client households that received service 64 New Welfare cases receiving service 27 Low Income Home Energy Assistance Program cases- 32 $8,211.80 SHIP Cases 24 Home and field visits 32 Home and field visits cover visits to In -Home, Nutrition, WAP, and ESG rent clients. Case Managers make these visits to perform annual or semi - annual updates for In -Home and Nutrition clients. WAP clients are visited for testing for possible Weatherization services to their homes. ESG rent clients are visited for the Habitability Study required prior to receiving rental assistance through this grant. Office visits 171 Office visits reflects the number of visitors that come into to all three locations of our Social Services offices throughout the month. BAYSHORE MANOR Bayshore Manor's current census is fourteen residents. The current census is five private pay, eight subsidized and one short term resident. Bayshore Manor provided 402.75 hours of OA3E respite care and 0 hours of CCE and ADI care this month. Bayshore Manor has six OA3E clients. There are two clients on the waiting list. Revenue for May 2017 $34,595.53 Expenditures for the same period $67,802.31 Percentage of the budget spent year to date 55.60 Emeruency Services: FIRE RESCUE • Fire Training Academy remediation work ongoing with inspections scheduled to acquire certificate of occupancy as soon as possible. • Conducted two special details totaling $2,600 in fees collected for Monroe County Fire Rescue reserve account. • All supplies received, and approval granted from FKEC and Keys Electric to mount Stop the Bleed boxes to power poles. Grant funded project through the Florida Keys Health Ready Coalition for a "Stop the Bleed" program, which will place a supply of tourniquets and Quick -clot dressings in fourteen county -wide locations, where large assemblies occur. EMERGENCY MANAGEMENT • Hosted two day Executive Hurricane Response Training for Mayor Neugent, Mayor Pro Tem Rice, Sheriff Ramsay, Chief Callahan, Bob Shillinger, and Roman Gastesi. • Held our Statewide Hurricane Exercise with over 120 attendees. • Met with Mr. Orr of the Nuclear Regulatory Commission regarding Turkey Point and the NRC role. • Taught a three day course on ICS 300 to Islamorada Senior Leadership. • EM staff participated in a Capabilities Assessment with Regional Coordinator for FDEM. • Met with Sheriff Ramsay for our monthly EM update. • Martin Senterfitt attended the week long Governor's Hurricane Conference in West Palm Beach. • Participated in the Mainland Media Tour with Roman, Andy Newman, and Cammy Clarke. • Shannon presented at the TDC Hurricane Conference in Marathon. • EM participated in the Debris Management scoring process. r� EMS /TRAUMA STAR • Trauma Star flew sixty -nine (69) Patients to mainland hospitals for definitive care in the month of May. • All equipment, staffing and 2.0 Trauma Star program is on course for June 15, 2017 kick -off. • Two (2) Nurses completed our Flight Nurse Training and orientation program. • One (1) Paramedic completed our Flight Medic Training and orientation program. • Two (2) Charge Paramedics were successful in the completion of our comprehensive provisional paramedic program. • Finalized Trauma Star Dispatch procedures for Key West Fire and inter - facility transport procedures utilizing Miami Dade Air Rescue for mutual aid. • Completed trial of i -Stat handheld blood analyzers, two units purchased for Trauma Star through an EMS award grant. • Completed set up and configuration of second Critical care ground transport unit for the Key West Trauma Star base to be used by Flight Crew for time sensitive hospital transfers when weather will not permit air transport. 0 • Three (3) Trauma Star personnel attended the Aeromedical Safety Summit. • One (1) person attended MECA's Air Medical Crew Core Curriculum course. • Attended EMS week recognition ceremony at Lower Keys Medical Center. _ • Two (2) personnel attend Zoll ePCR Summit to learn implementation procedures for new federal 0 requirements on patient care reports. • Provided training for newly promoted Lieutenants on Trauma Star procedures, landing zone requirements, flight criteria, patient packaging, provisional paramedic program and ePCR documentation. C' CD • Conducted interagency training with Trauma Star and the Naval Air Station Search and Rescue team. m- (NAS SAR) Drill included patient transfers of critically injured pilots. • Coordinated and hosted an Advanced EKG and 12 lead interpretation course, thirty-three (33) personnel attended, including members from the NAS SAR team and Key West Fire department. • To continue our compliance with our established strategic objectives for fire rescue, we have received patient follow up data from receiving facilities on nineteen (19) patients for the month of May. • Continued with field training of paramedics on quality assurance/billing issues of ePCR reports. KWIA (EYW) • Participated in the pre -build teleconference on new 4 x 4 Striker ARFF Vehicle (crash truck). • Attended grand opening ofNASFD new Boca Chica Fire Station. • ARFF personnel attended one day ARFF Live Fire Training at NAS Boca Chica. . • Attended and participated with NAS Active Shooter Drill held at the Naval Branch Medical Clinic. w • Attended and assisted Sarasota County Fire Department with their Battalion Chief Promotional < Process. • On -duty personnel completed special detail for Family Picnic in the Park at East Martello. • Re- inspection of mobile fuelers and fuel farm addressing discrepancies found during quarterly inspection in April, 2017. FIRE MARSHAL • Reviewed, providing comment for two (2) Development Committee Review applications. • Conducted twelve life and fire safety inspections for construction or renovation, two preliminary inspections for transient units, and one hundred ten residential mobile home units. • Conducted one Daycare; Life and Fire Safety inspection. • Provided three Assembly Occupancy Load certifications. • Responded to four requests for ISO Fire Protection Class coordination letters. • Reviewed one fireworks application, providing comments for approval. • Received BOCC approval for revised Fireworks application for compliance with Monroe County Ordinance and Florida Fire Prevention Code. • Revised proposed fire hydrant locations with Florida Keys Aqueduct Authority. • Reviewing County Code of Ordinances for compliance with current Florida Statutes, Administrative Code, and Florida Fire Prevention Code. • Introduced Firefighter Health and Safety Plan, in compliance with State Fire Marshal, Firefighter Safety and Health Section, state statute and Florida Administrative Code. • Completed thirty five submitted construction plans for permitting in the Lower Keys. • Completed forty two submitted construction plans for permitting in the Upper Keys. FIRE ACADEMY /TRAINING • New Hire testing performed on nine firefighter applicants, which includes written, PAT (physical ability testing), MAT (medical ability testing), and interviews. • Lieutenant interviews held on five potential Monroe County Fire Rescue candidates. • Mutual Aid training with Islamorada and Key Largo hosted in Key Largo; topic: post disaster grid searches. • Mutual Aid training with City of Key West and NAS hosted in Key West; topic: catching water supplies from a hydrant. Employee Services: { ...:....... HUMAN RESOURCES 5 Salary Increase requests reviewed for new hire or promotions. May 2017 report: • Meeting on practice ICP presentation • Meeting to review on project objectives • Hurricane Exercise in Marathon • Attended a Seminar in Alexandria VA on Internal Investigations • Met with Laura DeLoach on Phase 1 of Personnel Records Team Meeting • Attended several ADA Self Evaluation Plan Conference Calls • Met With Mike Russell and Mark Gongre on claim of "Hostile Work Environment" against Bill Rieck • Finalized SLP Committee Election • Met with Mike Russell and Mark Gongre for Mike to give more information regarding his Hostile Work Environment claim. • Conference call with Alicia Betancourt and Shannon Weiner on ICP survey • Attended ADA Public Meeting at the Harvey Govt. Center • Attended ADA Public Meeting at the Marathon Govt. Center • Attended ADA Public Meeting at the Key Largo Public Library • Attended IAFF Union Meeting in Fire Rescue Headquarters — 0 meeting was on 05/26, 2" d meeting was on 05/30/17 • Tried to view webinar on Competitive Pay thru the ICMA site but it was not available to view. WORKERS COMPENSATION I Monthly Cases FY17 Oct -16 Nov -16 Dec -16 Jan -17 Feb -17 Mar -17 q r -17 May-16 Jun -16 Jul -16 Aug-16 Sep-16 New Medical 7 10 11 10 11 8 4 8 6 7 11 11 New Non- 6 1 2 5 2 5 3 3 3 5 0 5 Total Closed 15 5 13 7 23 10 11 24 0 11 8 8 Total Current 95 101 91 99 89 92 88 79 88 85 89 97 Open Litigation 12 12 12 12 12 12 12 13 13 13 13 12 Closed /Settled 0 0 0 0 0 0 0 0 0 1 1 0 New Litigation 0 0 0 0 0 0 0 0 0 0 0 0 Total Current 12 12 12 12 12 12 1 12 13 13 14 12 12 Fund 501 Workers' Comp Account Description Budget FY17 FY2013 FY2014 FY2015 FY2016 FY2017 YTD 07501 Admin Expense $163,600 $193,028 $185,888 $182,849 $223,135 $86,200 07502 Operating Expense $364,912 $489,153 $603,918 $476,711 $627,900 $400,092 07503 1 Claim Expense $1,566,173 $1,624,022 $1,861,532 $1,473,324 $2,562,363 $808,832 07504 Asserted Claim Exp ($ 742 , 13 $141,035 1 ($495,964)1 ($317,145) $1,000,000 $0 07505 1 Catastrohic Exp $0 1 $35,177 1 $1,467,370 1 $829,344 $1,000,000 • Process daily First Notice of Injury reports, direct initial treatment, and provide claim management for all open cases. • Facilitate field case management services with employers. • Manage return to work and temporary job assignments for injured workers. • Work with TPA, field case management and IT to develop telephonic case management program. • Conduct litigation case conferences. • Attend ICP meeting(s). • Complete Q2 departmental billing — no cost factor applied. ...:....... ...:....... 10 Growth Management: REVENUE vs. EXPENSES FISCAL YEARS 2014, 2015, 2016 and CURRENT FY 2017 FY2017' Adopted FY2016 YTD- FY2017 YTD- Difference FY16 % [FY2014Actual FY2015 Actual FY2016 Actual Budget April April to FY17 Change BUILDING DEPARTMENT Expenses $ 2,629,967 $ 3,389,568 $ 3,577,235 4,560,499 $ 1,814,764 $ 2,301,599 $ 486,835 26.833, Revenue $ 3,509,337 $ 4,009,252 $ 4,973,159 $ 4,560,499 $ 2,552,156 $ 2,804,814 $ 252,658 9.903, Difference $ 879,370 $ 619,685 $ 1,395,924 $ $ 737,392 $ 503,215 $ (234,177) CODE COMPLIANCE Expenses $ 1,308,545 $ 1,360,117 $ 1,227,999 $ 1,416,346 $ 651,730 $ 652,376 $ 646 0.10% Revenue $ 504,251 $ 647,999 $ 1,214,818 $ 1,416,346 $ 754,339 $ 1,123,602 $ 369,263 48.95% Difference $ (804,294) $ (712,118) $ (13,182) $ $ 102,609 $ 471,226 $ 368,617 PLANNING DEPARTMENT Expenses $ 3,515,337 $ 3,909,219 $ 3,411,131 $ 5,881,689 $ 1,814,262 $ 1,856,872 $ 42,610 2.35% Revenue $ 2,648,770 $ 3,012,230 $ 3,602,852 $ 5,881,689 $ 1,810,446 $ 2,323,173 $ 512,727 28.32% Difference $ (1,466,567) $ (896,990) $ 191,721 $ $ (3,816) $ 466,301 $ 470,117 OVERALL SUMMARY Expenses $ 7,453,848 $ 8,658,904 $ 8,216,365 $ 11,858,534 $ 4,280,756 $ 4,810,847 $ 530,091 12.381 Revenue $ 6,062,358 $ 7,669,481 $ 9,790,828 $ 11,858,534 $ 5,116,941 $ 6,251,589 $ 1,134,648 22.17% Difference $ (1,391,490) $ (989,423) $ 1,574,463 " $ 836,185 $ 1,440,742 $ 604,557 a 11 Note: Revenue and expense numbers reflect amounts mFnnePl rmy 12 PLANNING & ENVIRONMENTAL RESOURCES, BUILDING AND CODE COMPLIANCE DEPARTMENTS Monroe County issues permits to ensure compliance with Federal, State and local laws. The following charts represent the main services provided: Permits; Job Value; Plan Review; and Inspections that guide development in Monroe County. Note: Total permits have hit an all -time high over the past decade. Apr 2017 Total Issued Permits by Fiscal Year Apr 2017 a 13 Office =l {Area =Lower Keys: Stock I'slland up to 7 mile bridge. Office =2 rea= MWdieKeys: Starts at Duck Key to Hesta Key Channel #5, . Excludes- Marathon„ Grassy Key, Cty of Layton„ I'sllarnorada„ and Lower Matecurnbe. Office =3 {Area =Upper Keys: Borth of Tavernier Creek Bridge up to Ocean Reef. 25,000,000 1 11! 11! p ONLIAIIII!] 6�1I 4 Et i ISSU PERMIT.'' B Y P E R MIT " W OR K" Comparison by office e Q ......... ,,, „- ,.,,.,,. ......... ................................. Apr -2016 Apr - 2017 Lower Keys $4,367,396.00 $9,344,552.00 M1ddIe Keys $703,083.00 $1,138,237.00 Ocean Reef = $1,058,601,00 $2,335,832,00 Upper Keys $5,833,340.00 $6,606,663.00 TOTAL $11,962,420 $19,425,284 PERMIT ACTIVITY BY OFFICE Includes all Reviewing /inspecting Departments: Building, Fire, Planning and Environmental ISSUED PERMITS PLAN REVIEWS INSPECTIONS 4,500 - irict:onty "PASSorF 4,000 -. 3,500 3,000 2,500 2,000 -. 942 1,500 -. 6 ... - 1,000 - 790 500 - ® „w„w„w Apr -2016 Apr -2017 Apr -2016 Apr -2017 Apr -2016 Apr -2017 ISSUE PlanReviews inspections 'Lower Keys 582 501 914 , 1,018 1,983 2,017 I� Middle Keys 25 26 139 143 169 141 ocean Reef 32 32 197 220 162 218 Upper Keys 151 137 692 837 1502 1,381 TOTAL 790 696 1,942 2,218 3,816 3,757 Does not mdude "Boat Improvement Fund'' Revenue. Office =1 /A,c —Lower Keys: Stock Island up to 7 mile bridge. Office= 2/Area= Midd9e Keys: Starts at Duck Key to Fiesta Key Channel N5, exciudes- Marathcn, Grassy Key, CRyof Layton, Psllamorada, and Lower Matecumbe. Offnce =3 /Area =Upper Keys: North of Tavernier Creek Bridge up to Ocean Reef. a: r a 14 Apr 2017 ,r(T rwp.mkm rr00 NM NW PLAN REVIEW ACTIVITY BY PERMIT "WORK" LOCATION Comparison by Office W*r,�.,M' "M NOM PRI r W R F "AM N"! 0 Nlf C H rMN 1 MCI 'Wk "xAll ,)0D6q[r," NNN llkl a . a . 15 Apr 2017 INSPECTION ACTIVITY BY PERMIT "WORK" LOCATION Comparison by Office INVIII tXAM Ul"I N114 li Vt.4N I'lIPAH k NVIR Xw lm,l ImEul bqM PIWAU E NVK fXAlA I, 19 ( I ME ( I I nqM HIM INV III f MW iItIf A NI H, ' I mm Pluw L—, Lo- 1 W-, w— Lo,- Nfiddl, VWM, Misddle %QW1, Mdll, M,ddW 0—, f 0, C,-- (xe- 0'.— 0,0- I uIpper upper Vpp , upper Upper Upper K-, K,-,, 0- K-, K,-,, K— Av"f z R,.f R,,-f R—f K,-,, W,- i K,v, K,v, Kl, 0, 101 TAXI , PLANNING AND ENVIRONMENTAL RESOURCES PLAN REVIEW ACTIVITY .r •� t - . r ,i .,6,,ara BY PERMIT "WORK" LOCATION Comparison by Office TAXI , �..... �. .. . au — — — -- - -- 100 sr ' 60 " 20 ,. P10 P11 RR 1 06 Sk. SIO X10 RtA RW F40(; SR- 6') Stn IA PkP SR �TC� $1C7 PIA AkR yFC4C9 SR FTC7 N rQ 610 RMi N 0 B10 RM�� '� N :51C) (RM _ N C7 8 1 �4iM LK N M MK M MK MK MK 1 UH K UK UK nyr 2U1Y 1 LK iK 1 24 14 1 t 35 1N iR b 1J3 y y K w jK ExclJdes "N/W axod Logped CSR L resulEod wiesws r.: r.: a, 17 PLANNING AND ENVIRONMENTAL RESOURCES DEPARMENT The goal of the Monroe County Planning and Environmental Resources Department is to foster sustainable, quality development in the county while conserving and promoting stewardship of the county's fragile environment and the unique character of its diverse island communities. The functions of this department are implemented by the following offices: The Planning Office is responsible for the administration of the adopted Monroe County Comprehensive Plan and Land Development Regulations. The Department processes amendments to the Comprehensive Plan and Land Development Regulations. Additionally, the department reviews development proposals for compliance with the Comprehensive Plan and Land Development Regulations, including community character, growth management provisions and environmental compliance. The Environmental Resources Office services include the review of applications for compliance with environmental regulations, such as: clearing limits, wetland delineation, landscaping, stormwater, land clearing and FEMA required review of potential endangered species impacts under the Permit Referral Process (PRP). The Environmental Restoration Office manages the County's habitat restoration and improvement projects to enhance and preserve county -owned lands and partners with State and Federal agencies on maintaining conservation lands, specifically covering the removal of invasive exotic species and planting of native species. The Geographical Information Systems (GIS) Office develops, maintains, and disseminates geographic data and GIS resources to enhance county functions and provides resources making geographic data available to the public and preparing maps depicting various data. The Marine Resources Office provides a variety of services focusing on protection of the marine environment, the provision of maritime infrastructure, and the preservation of public water access, including: (1) vessel pump -out services are provided throughout unincorporated Monroe County; (2) the removal and disposal of derelict and abandoned vessels that have become an environmental or navigational hazard; and (3) working with FWC funded projects to replace regulatory buoys, channel markers, and other waterway management needs to improve recreational boating access and safety. 18 Planning & Environmental Resources Applications (A -P) February 2017 - April 2017 Alcoholic Beverage Appeals & Settlements Development Agreements Environmental Resources FLUM Amendments Historic Preservation Home Occupation LDRD LUD Amendments Major Conditional Use Minor Conditional Use NROGO Plats Pre -App IW 2017 Feb 2017 Mar W 2017 Apr Planning & Environmental Resources Applications (P -Z) February 2017 - April 2017 Public Assembly Road Abandonment ROGO Shoreline Approvals TDR Temp Const Staging Text Amendments Tier Amendment Time Extensions THE Vacation Rentals Variance Variance - Dock (Long) Variance - PC 92017 Feb 2017 Mar 'd 2017 Apr r a r a 19 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 # of applications 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 # of applications 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 L C Q� aP p� ;toctc Q�J Vie` Sa o \c o t b o a fi r ° �e� Jat �a Planning & Environmental Resources April 2016 - Applications 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 5 0 � . o c O , S , �� ea O 5 Q c` O a O c r taaO e� e� h �c O Q Q p m c a o t o �° to to o to �a e �a az ay ca a t °JQ c oc . ° C Qt 5� oc Q Q e� a QI coc JQ �° Pp a c e h oc � atQ ta \ F a`a �` a 4 J a a to Q P QQa �� °Q � toc Q\ 2\y d al � •c Q � r ` J ai 20 Planning & Environmental Resources April 2017 - Applications 21 Planning & Environmental Resources Comparison of Total Annual Applications 450 400 350 I 300 250 200 ------- � i 1 150 _m m m m. m,m,m,m,m,m.m m— 100 -mmm r If„ Eli ��f , �� o -_ BOOM 50 . 2010 2011 2012 2013 2014 2015 2016* 2017* *Includes ROGO Allocation Applications Mar 21 GIS Accomplishments GIS Projects - Data/Map Requests/Technical/Programming - Historic Aerials Mapping — In progress - RLAA Mapping — Floodplain Management - Elevation Certificates & LiDAR Points — Mapping (in progress) - MCLA -MLS — Web Map Application — Planning - Boating Impact Mapping — Marine Resources — Curtis Kruer - Voting Precinct Mapping — Supervisor of Elections — Joyce Griffin - GIS Data Support — RLAA - AMEC - Plat Book Mapping — Planning (in progress) GIS Addressing - 22 New physical address assignments Public Planning & Environmental Map App Usage — April 2017 22 MARINE RESOURCES OFFICE Channel Marker Program: Total annual costs for marker /buoy replacements for the past twelve month period were approximately 26% lower than the same timeframe in 2016 ($52,912). Numerous marker replacement /repair jobs will occur over the next several months with the completion of an FWC channel marker grant. 23 May 2016 $2,500.00 June $2,844.00 July $0.00 August $609.00 September $2,156.00 October $0.00 November $0.00 December $0.00 January 2017 $19,544.01 February $4,281.00 March $4,240.00 April $3,000.00 Total $39,174.01 Total annual costs for marker /buoy replacements for the past twelve month period were approximately 26% lower than the same timeframe in 2016 ($52,912). Numerous marker replacement /repair jobs will occur over the next several months with the completion of an FWC channel marker grant. 23 Channel Marker Program (cont.): An FWC Florida Boating Improvement Program (FBIP) grant for $70,278 for channel marker repairs was approved by the Board in August 2016, providing for additional marker repairs and replacements that will be performed throughout the spring. Derelict Vessel Program a 24 Derelict vessel removal costs for the past twelve month period were approximately 90% higher than the same timeframe in 2016 ($257,916). Note that the County received an FWC Florida Boating Improvement Program (FBIP) derelict vessel removal grant in April 2016, affording additional removals which began in July and were completed in August. Numerous additional .. removals occurred in April 2017 utilizing a grant from the FWC Derelict Vessel Program. CL Another 24 derelict vessels were removed during the Marquesas chug removal project completed in April 2017. Note that the level of effort to seek out, identify and process derelict vessels was significantly increased over the past 6 -9 months, providing an extensive cleanup of derelict vessels throughout the Keys. It is anticipated that the number of derelict vessel removals in the next year will more closely reflect past yearly averages or slightly higher. as 25 May 2016 $16,377.00 June $26,642.00 July $17,769.00 August $50,857.00 September $5,600.00 October $28,946.00 November $49,548.00 December $0.00 January 2017 $15,677.00 February $2,300.00 March $82,104.00 April $195,821.00 Total $491,641.00 Derelict vessel removal costs for the past twelve month period were approximately 90% higher than the same timeframe in 2016 ($257,916). Note that the County received an FWC Florida Boating Improvement Program (FBIP) derelict vessel removal grant in April 2016, affording additional removals which began in July and were completed in August. Numerous additional .. removals occurred in April 2017 utilizing a grant from the FWC Derelict Vessel Program. CL Another 24 derelict vessels were removed during the Marquesas chug removal project completed in April 2017. Note that the level of effort to seek out, identify and process derelict vessels was significantly increased over the past 6 -9 months, providing an extensive cleanup of derelict vessels throughout the Keys. It is anticipated that the number of derelict vessel removals in the next year will more closely reflect past yearly averages or slightly higher. as 25 Derelict Vessel Program (cont.) An FWC Florida Boating Improvement Program (FBIP) grant in the amount of $74,943 was executed in April 2016 for removal of sixteen derelict vessels. The removals were completed in August 2016. An FWC Derelict Vessel Grant for $165,183 was executed in January 2017 for the removal of fifty derelict vessels which began in March and were completed in April. W11 VeslPumpnu Pr l am: 27 Vessel Pumpout Program (cont.): Pumpout numbers have exceeded the current quota of 1500 per month nearly every month since the quota was established April 1, 2015 (October 2016 pumpout numbers dipped just below 1500 due to preparation for possible storm conditions early in the month), and Pumpout USA performed its one millionth gallon pumpout in early December 2016. State funding for the pumpout program was transferred from Pumpout USA to the County in November 2015. Total State funding increased in July 2016 to $672,350, covering approximately 92% of the County's program total annual cost of $729,800. { ...:....... 28 CODE COMPLIANCE DEPARTMENT 29 The Code Compliance Department responds to complaints received from various sources, walk -ins, phone calls, e- mails, staff and other outside agencies and departments. Staff also, is proactive identifying code violations while conducting routine field inspections. GRANT, 11 ELL ARD, 4 BOELLARD 4 LINK 8 CUTIE 38 MCPHERSON 11 DOWLING 7 MEREDITH 5 GRANT ll RO DRIGU EZ —FITO 7 JONES 1 WINDSOR 2 a kill 31 Enuineerins!• ENGINEERING / ROADS • Card Sound Bridge Repair Project — Repairs to bridge fender system ongoing. Concrete deck cleaning and sealing nearly complete. Spall repairs nearly complete. Project is approximately 94% complete. Expected completion date is the end of July 2017. • Card Sound Toll Conversion Project — A project kickoff/coordination meeting was held on June 2 "d 2017. The attendees included HDR Engineering, Inc. (design of the design build RFP), Keith & Schnars (construction engineering and inspection (CEI) services), Transcore (All Electronic Tolling (AET) contractor /consultant), Florida Power and Light (FPL), Halley Engineering Contractors, Inc. (design/build firm) including their design team of EAC Consulting, Inc., their electrical subcontractors, Sandra Walters Consulting for environmental concerns and County staff. Tentative demolition of existing tolling structures to begin first week of August. Design/Build proposals underway. • Lake Surprise Estates Roadway and Drainage Improvement Project- Final reconciliation Change Order 3 is a credit amount of ($129,733.97). CEI is preparing job closeout files. 0 • Stock Island I Roadway and Drainage Improvement Project — Approval to award bid and approve a contract for construction with Charley Toppino and Sons, Inc. as the lowest >% responsible bidder is on the June 2017 BOCC meeting agenda. The contract is for $3,953,134.47. Approval of a task order with RS &H, Inc. for construction engineering and 0 inspection (CEI) services is on the June 2017 BOCC meeting agenda. The task order is for a not to exceed amount of $232,705.24. • Stock Island H (Maloney & McDonald Ave) Roadway Improvement Project — Staff received the Wetland Assessment Report from EAC consulting and it was determined that Cn there are no existing wetlands within project limits. EAC Consulting has completed the CD Topographic and Geotechnical work in accordance with the design schedule. • Key Largo I Roadway and Drainage Improvement Project — Three construction bids were received on May 16, 2017; a contract with General Asphalt, Inc. is on June agenda. °3 • Key Largo H (Bay Harbor, Sunset Point, Sunrise Point, Lime Grove Estates and Rays Cuda Canal) Roadway and Drainage Improvement Project — SFWMD site visit held on May 18"'. 90% design progress meeting held on May 25"'. 100% plans and specifications due mid July. ' Pigeon Key Ramp Repair Project — Consultant provided 60% design plans on June 5"' for county and FDOT review. Plans include two alternatives: homogeneous wood members and engineered wood design. • Sexton Cove Roadway and Drainage Improvement Project — Grading and road base E work underway, paving to be complete by end of June. Project is 80% complete. • Duck Key Security District Cameras — Camera installation completed by TYCO Security. The TYCO representative for this project has been replaced. A new representative is on board and will conduct training on new system once cable modem installation is completed by Comcast and the system is online. Staff received three work orders scheduled for the first 2 weeks in June 2017 for new cable drops and modem installations by Comcast. • Garrison Bight Bridge Repair Project— Approval to award bid and approve a contract for construction with Southern Road & Bridge, LLC. as the lowest responsible bidder is on the June 2017 BOCC meeting agenda. The contract is for $1,392,483.60. Approval of a task order with T.Y. Lin International/H.J. Ross, for construction engineering and inspection (CEI) services is on the June 2017 BOCC meeting agenda. The task order is for a not to exceed amount of $263,328.00. • Sugarloaf Boulevard Bridge Replacement Project — Consultant is preparing responses to comments received from FDOT ERC system BOCC approved an amendment to the design contract for the consultant to develop a cost estimate to raise the proposed bridge 32 an additional 12" above current design to account for additional sea level rise at the May BOCC meeting. Consultant will begin work. • Duck Key Bridge Study — Consultant is working on the Effects Case Study Report and incorporating comments and input from the second Cultural Resource Committee (CRC) meeting. • Community Aesthetic Feature Big Pine Key — Consultant met with FDOT on April 20"' to discuss project conceptual and is currently addressing FDOT comments before proceeding with60% design. • Cudjoe Connection to Florida Keys Overseas Heritage Trail (FKOHT) - FDOT 2017 TAP application s (Transportation Alternatives Program) were scored by technical committee on May 12 "' On May 25 "', the project was approved in FDOT final ranking process and recommended for funding in the 2019 to 2023 work program. • Monroe County Hurricane Debris Management — The contract with Tetra Tech, Inc. for debris monitoring was approved at the May BOCC meeting. Eight responses to the Hurricane Debris and Disaster Services RFP were received on May 4"'. The ranking meeting was held on May 31S A contract with Ashbritt Inc. will be on the June agenda. • Bahia Shores Road (No Name Key) Culvert Repair — Staff was unable to locate an existing easement with private property owners adjacent to the right of way that would allow staff to access the culvert for replacement. Staff will work with county attorney to get executed easements prior to issuing a task order for design. • Card Sound Road Pavement Marking — Staff drafting bid documents for restriping approximately 5 miles from east of Card Sound bridge to triangle at County Road 905. • V Street/Bertha Street Drainage Improvement Project — Staff drafting an RFQ for design services for roadway improvements to 1s Street and Bertha Street (county maintained roads) in Key West. Project will include coordination with the City of Key West and FDOT. • Engineering Continuing Services Contract — Current contracts expire in January. Staff drafting an RFQ for Continuing Engineering On Call Service contracts. • Drainage Maintenance Program /Community Rating System — staff is working to geo- locate all drainage structures on unincorporated Monroe County roads so that data may be entered into the GIS system. Maps and maintenance schedules will be created in order to meet the requirements of the drainage maintenance portion of the Community Rating System program. ROAD DEPARTMENT Lower Keys • Mulch deliveries 8 loads with a total of 28 tons of mulch and a savings of $3,440.00. • Sign Technician -70 signs,33 poles,38 locates • Buzz -bar chipping operation -15 miles • Mowing operation -22 miles • Weed eating operation -12 miles • Sweeping operation -10 miles • Pot hole repair -1/2 ton • Drain cleaning operation -stock island,key haven,big coppitt,sugarloaf,summerland. • Install French drain on allamanda west sugarloaf. • SPECIAL PROJECTS • Replace a broken drain grate on stock island • Haul 17 loads of fill from Bernstein park to rockland property. • Haul 150 tons of sand to higgs beach and spread for parks and beachs. ...:....... 33 • Sweep higgs beach for holiday. • Emergency call back for a clean up from a car accident on Hagler avenue - Saturday. Upper Keys 04/21/2017 - -- 05/19/2017 Buzz Bar / Chipper Operation ------------------------ 12.70 miles • Mowing Operation -------------------------------------- 69.85 miles • Sweeping Operation ------------------------------------ 25.11 miles • Shoulder Work ------------------------------------------- 1.69 miles, 10.5 tons of material used • Pot Hole Repair-------------------------------------- - - - - -1 subdivision, 500 lbs of cold patch used. • Thurmo — Plastic stop bars installed---------- - - - - -- -311 pieces of Thurmo used. • Coconut Removal for Hurricane season-------- - - - -53 subdivisions, 18.3 tons of Coconuts removed. • Signs Installed----------------------------------------- - - - -13 new signs installed, 8 new posts installed, 15 locates performed, 3 new 9 button delineators installed. • Weed Control on SUP ------------------------------------- 5.9 miles • Weed Eat operation --------------------------------------- 1.2 miles • Material Pick Up -------------------------------------------- 17.86 tons of Cold Patch. • TRASH PICKUP --------------------------------------------- 191 BAGS approx. 3,247 lbs Special Projects / Other Work • Sea Weed removal for Parks Department--- - - - - -- -19.36 tons • Move all tools and equipment and old toll tickets from toll plaza to Magnolia yard. • Wash and Degrease Driveway at toil plaza • Install 230 RPM's, 18 Delineators, and repaint gore area using 10 gallons of paint at the US and 905 merge area at MM 106 • INMATE RE- TRAINING 05/17/2017 • Safety Meeting----- - - - - -- 05/01/2017 Card Sound Report Tolls Not Collected • Tolls lifted because of heavy traffic money not collected $ 4,766.00 for April. PROJECT MANAGEMENT / FACILITIES Senior Nutrition Center- Notice to proceed was issued to Sea Tech on May 16th. A pre - construction meeting is scheduled for June 6th or 7th pending concurrence from Manual Castillo, KWHA; Construction 90 days; Anticipated substantial completion is August 15th. MCSO Property Locker- Advertising for construction bids, bid opening set for June 29"' Crawl Key Fire Academy- Contractor is working on Final Punch -list items. Project final completion is Monday June 19"' Higgs Beach Atlantic Boulevard Relocation- Contract Amendment 4 with TY Lin for the Conversion process and additional Landscaping is being requested at the June BOCC Meeting. 34 Bernstein Park- Contractor is completing site work at the park and past 50% completion on the building. Contractor will be installing interior mechanical systems, plumbing and electrical. Cudjoe Fire Station- 60% review complete. 90% construction documents expected by late June. Plantation Key Government Center- Individual meetings continue; finalizing floorplan. Marathon Library- Project Management directed AE staff to provide all changes in design requested by library staff Changes are expected to delay the design schedule 5 -8 weeks. Transfer Stations- Bids opened May 3 d . Anticipated Schedule: construction 180 days; anticipated completion is Fall of 2017. Key West Customs Border Patrol Facility- Contractor has returned to work. All defects have been repaired and first floor block work has been completed. Project will most likely Rowell's Water Front Park- Signed Contract from Architect for design services is on the BOCC May June agenda. Higgs Beach Sand Re- nourishment- FDEP is reviewing the sand - sample analysis report. ...:....... 35 JO B BOARD(FUNDEDJOBS2017) v x -. IR a Attachment: CAD 1 Monthly Report (3097 : CAD Monthly Report) N - DESCRIPTION CONSTRUCTION LEGAL AE FUNDING # TASK PM ALT PM LOCATION STATUS BUDGET LAWYER FIRM TYPE ACCOUNT 1 2 3 4 5 6 7 8 Big Coppitt Ramp Repairs East Martello Parking 4a Ramp Repairs CudjoeFS Harvey FAR Key West CBP Key West NDB Marathon EOC- Programming CK CK CK CK CK CK CK CK CR CR CR DT RS RS RS RS LOWER LOWER MIDDLE LOWER LOWER LOWER LOWER MIDDLE FBIP Grant Delayed until July Topographical Survey Complete Ramp closure signage posted - Begin Design 60% design review complete Draft Report Received All Defects Repaired - Block Work Done FAA Draft Proposal Expected Late July On Hold until Const funding Identified $ 184,000 $ 400,000 $ 110,000 $ 4,500,000 $ 106,000 $ 1,488,000 $ 41,908 $ 98,000 AMB EAB EAB AMB EAB MER MER MER Kieth &Sch Bender Kieth &Sch CPH AMEC K2M FAA GRANT GRANT CAP CAP CAP OTH GEN CAP FBIF TDC CAPITAL PLAN CAPITAL PLAN CAPITAL PLAN AIRPORT GEN -FUND CAPITAL PLAN 9 MCSO Hanger CK RS MIDDLE On Hold for funding $ 375,000 MER GEN GEN -FUND 10 RCAG Site Marathon CK RS MIDDLE Site Review Complete - Cst July 2018 $ 500,000 MER FAA OTH FAA 11 12 13 MTH- Hangers Sugarloaf Fire Dorm Harry Harris Shed CK CK CR RS CK CK UPPER LOWER UPPER Phase 1 Comp. Phase 2 Under Construction Community /Tower negotiations Contract on BOCC June Agenda $ 3,100,000 $ 25,000 MER AMB AMR Jacobs Horn OTH CAP GEN AIRPORT CAPITAL PLAN GEN -FUND 14 Palm Villa Dog Park Ordinance CR CR LOWER Contract on BOCC June Agenda AMB OTH OTHER 15 East Martello ADA upgrades CR JY LOWER ADA Ramp Added will be complete Early Aug $ 300,000 EAB MBI GRANT TDC 16 17 18 19 20 21 KW Animal Shelter Demo Old Court House Gutters JB Parapet Removal Veterans Park RR /Gate /Flagpole Blue Heron Pickle Ball Courts Big Pine Swim Hole CR CR CR CR CR CR JY RS RS SS SS SS LOWER LOWER LOWER LOWER LOWER LOWER Planning complete 90% Construction Design Received Need to relocate Evidence locker before start Scoping for TDC application Scope changed re- bidding 90% Construction Design Received $ 100,000 $ 25,000 $ 250,000 $ 75,000 $ 25,000 $ 1,000,000 EAB EAB EAB AMB AMB EAB Bender CPH TBD Little John GEN CAP CAP GRANT GEN GRANT GEN -FUND CAPITAL PLAN CAPITAL PLAN TDC GEN -FUND FDOT /CAPITAL PLAN 22 Marathon Library CR SS MIDDLE 60% Construction Design Received $ 6,000,000 EAB SRS CAP CAPITAL PLAN 23 Murray Nelson Paint CR SS UPPER RFP Complete, Pre -bid 6/9, Contract on July BOCC $ 175,000 AMB GEN GEN -FUND 24 Rowells Marina Design CR SS UPPER FDOTapproval BOCC on June Agenda $ 130,000 AMB Little John GRANT TDC 25 Rowells Design and Demo CR SS UPPER Received no bids. Divided project - re- bidding $ 247,725 AMB Little John GRANT TDC 26 Rowells Landscaping CR SS UPPER Complete - In Closeout $ 46,000 AMB Other OTH OTHER 27 Key Largo Park Residence CR SS UPPER Closeout - Final Pay Application Submitted $ 50,000 EAB Horn CAP CAPITAL PLAN 28 MCSO Chillers DB DT LOWER Under Construction on schedule $ 1,350,000 EAB Seatech CAP CAPITAL PLAN 29 Roth Mold Repairs DB DT UPPER Closeout $ 35,000 EAB County FAC FACILITIES MAINTENANCE 30 MM 30 DB JY LOWER FOOT to relocate to Pigeon Key Museum AMB State OTH FOOT 31 Conservation study DB JY UPPER Final Review $ 80,000 EAB Horn CAP CAPITAL PLAN 32 PK- Magnolia Fuel Station Relocation DT CK UPPER Monroe County Working on Unity of Title $ 250,000 AMB CSA CAP CAPITAL PLAN 33 MEN Marquee DT CK Contract to BOCC inJune $ 50,000 EAB MC GRANT TDC 34 Roth WW Decomm DT CK Submitted to DEP $ 150,000 EAB CSA CAP CAPITAL PLAN 35 PK WW Decomm DT CK Revise and re- submit to Village $ 225,000 EAB CSA CAP CAPITAL PLAN 36 37 38 PK Court House Gato Fitness Center Big Pine Road Prison DT DT DT DS JY JY 11D Negotiating Space Scoping Following Progress $ 16,000,000 $ 100,000 AMB -EAB EAB AMB CSA Pike State CAP OTH OTH CAPITAL PLAN FOOT 39 Transfer Stations Office DT JY Contract to BOCC in June $ 1,000,000 EAB Pike OTH SOLID WASTE 40 Ellis Renovations DT JY 90% Schematic design $ 250,000 AMB Horn CAP CAPITAL PLAN 41 Old Tavernier School Renovation DT JY Submitted for Historical Review $ 400,000 AMB Horn CAP CAPITAL PLAN 42 Big Pine Various Sewer Hook up DT SS under construction $ 150,000j AMB County CAP ICAPITAL PLAN Attachment: CAD 1 Monthly Report (3097 : CAD Monthly Report) N - M JO B BOARD(FUNDEDJOBS2017) v x m ►i r r $ 62,463,781 Attachment: CAD 1 Monthly Report (3097 : CAD Monthly Report) 3 - - • d DESCRIPTION CONSTRUCTION LEGAL AE FUNDING # TASK PM ALT PM LOCATION STATUS BUDGET LAWYER FIRM TYPE ACCOUNT 43 44 45 Pigeon Key Sewer hookup Vet Park Sewer hookup Jobber Remediation DT DT DT SS SS SS MIDDLE MIDDLE UPPER n FKAA design In Permitting Monitoring $ 150,000 $ 75,000 AMB AMB MER FKAA FKAA GHD GRANT GRANT OTH FKAA GRANT FKAA GRANT DEP 46 47 48 Stock Island Repairs DJJ Evidence Locker Renovations MCSO Windows JY JY JY CR DB DB LOWER LOWER LOWER Work to resume Mid June Bid opening 6/28 Seeking Task Order Proposal $ 38,000 $ 200,000 $ 250,000 AMB AMB EAB TYEC Horn CAP CAP CAP CAPITAL PLAN CAPITAL PLAN CAPITAL PLAN 49 MCSO Fence Replacement JY DB Bid opening 6/27 $ 200,000 AMB Pike CAP CAPITAL PLAN 50 MCSO Roof JY DT LOWER Task Order Under Review For Approval $ 158,000 AMB CAP CAPITAL PLAN 51 FKSPCA JY DT LOWER Under Construction $ 1,500,000 LIM CAP CAPITAL PLAN 52 Crawl Key Fire Training JY DT MIDDLE Working on Punch List Items $ 2,100,000 AMB Horn CAP CAPITAL PLAN 53 Bernstein Park JY RS LOWER Under Construction - Late Summer Completion $ 7,900,000 AMB Horn CAP CAPITAL PLAN 54 55 56 57 58 Pigeon Key Misc. Roofing Pigeon Key Fire Sprinklers Alarm Systems RFP Jefferson Brown Chillers Jefferson Brown Comm Tower JY JY JY RS RS SS SS CK CK MIDDLE MIDDLE LOWER LOWER LOWER 60% Construction Design Received 60% Construction Design Received Adding scope will rebid in June Variance application being revised MCSO reviewing possible location - FAA study $ 300,000 $ 500,500 $ 110,000 $ 158,000 $ 150,000 AMB AMB EAB AMB EAB TYEC County TYLinn TYLinn GRANT GRANT FAC CAP CAP TDC TDC FACILITIES MAINTENANCE CAPITAL PLAN CAPITAL PLAN 59 Senior Nutrition Center /Kitchen RS CK LOWER Construction Conference 6/7 NTP Issued $ 660,000 EAB Horn CAP CAPITAL PLAN 60 Blimp Rd Accessory Pier RS CR LOWER Requested Task Order Proposal $ 150,000 AMB TYLinn OTH MC MARINE RESOURCES 61 Big Pine FS Paint RS CR LOWER Facilities Requested Hold $ 150,000 AMB I GEN GEN -FUND 62 East Martello Brick and Mortar RS CR LOWER Bid opening 6/13 $ 500,000 EAB Bender GRANT TDC 63 East Martello Roofing RS CR LOWER In Design $ 989,648 EAB GRANT TDC 64 65 66 67 68 Parking Study Atlantic Blvd Relocation KW Light House Ticket counter Reynolds St. Vista Higgs Beach Sand RS RS RS RS RS JY JY JY SS SS LOWER LOWER LOWER LOWER LOWER Reviewing alternate proposals Negotiating Conversion Process Bid awarded. Construction Scheduled RFQ & RFP at FOOT for approval Sand sample report under review at DEP $ 85,000 $ 4,600,000 $ 70,000 $ 500,000 $ 100,000 AMB EAB EAB AMB EAB TYLinn Bender Stantec TYLinn GEN CAP GRANT GRANT GRANT GEN -FUND CAPITAL PLAN TDC FOOT TDC 69 BPK Docks SS CK LOWER 60% design review complete $ 18,000 AMB. Kieth &Sch CAP CAPITAL PLAN 70 KW Senior Center Demo SS CK LOWER Demo begins after renovations $ 75,000 EAB GEN GEN -FUND 71 Harry Harris Ramp Repairs SS CK UPPER FBIP Grant Delayed to July $ 50,000 AMB Kieth &Sch GRANT FBIF /CAP 72 BPCP Improvements SS CR LOWER Construction Started - Est Completion Late Aug $ 175,000 EAB CPH GEN GEN -FUND 73 Habitat Demo SS CR LOWER RFP for Demo On July Agenda $ 75,000 EAB CAP CAPITAL PLAN 74 KW Library HVAC SS JY LOWER Contract Award on BOCC June Agenda $ 100,000 EAB TYEC CAP CAPITAL PLAN 75 KW Library Misc. repairs SS JY LOWER 90% review complete $ 150,000 EAB Horn CAP CAPITAL PLAN 76 MGC Misc. Repairs SS JY LOWER Segmented Project. Landscaping Solicited $ 190,000 EAB CAP CAPITAL PLAN 77 Pigeon Key Siding SS JY MIDDLE Final Inspection 6/10 - Closing Project $ 45,000 EAB County OTH PIGEON KEY FOUND 78 MG HVAC SS JY MIDDLE Contract Award on BOCC June Agenda $ 100,000 EAB TYEC CAP CAPITAL PLAN 79 Big Pine Park Vista SS RS LOWER ja RFQ & RFP at FOOT for approval $ 500,000 AMB Stantec GRANT IFDOT v x m ►i r r $ 62,463,781 Attachment: CAD 1 Monthly Report (3097 : CAD Monthly Report) 3 - - • d JO B BOARD(FUNDEDJOBS2017) DESCRIPTION I CONSTRUCTION I LEGAL AE I FUNDING # I TASK I PM JALTPMILOCATIONI STATUS BUDGET I LAWYER FIRM I TYPE ACCOUNT Lawyer Total Jobs 79 Total Funded Projects Total Contracts Amount 78% 35 35 7 0 1 On Schedule On budget 19,670,648 19,690,225 5,602,908 1,500,000 19%1 j�ME ISlightly delayed Schedule or Budget Changes 3% Total # Off Schedule Off Budget Total Contracts Amount PM Total Jobs Total Contracts Amount $ $ $ $ $ CK 12 15 4 14 11 12 11 $ $ $ $ $ $ $ 10,902,908 8,448,725 1,465,000 18,800,000 13,256,500 8,112,648 1,478,000 CR DB DT JY RS SS Lawyer Total Jobs Total Contracts Amount EAB 35 35 7 0 1 $ $ $ $ $ 19,670,648 19,690,225 5,602,908 1,500,000 j�ME LIM Account Total # Total Contracts Amount Grants 19 10 36 2 12 $ $ $ $ $ 6,121,873 1,226,908 48,541,000 145,000 6,429,000 Ad -Val Capital Facilities Other v x m ° Attachment: CAD 1 Monthly Report (3097: CAD Monthly Report) Correction Facilities • Contractor repaired Security Gate MR Jail Stock Island Detention Center • Contractor continued installation of new Chillers. • Contractor replaced Grille for the Sally Port loading dock. • Contractor installed new Intercom system. • Upgraded electrical outlets on the Animal Farm. Facilities Maintenance/Parks & Beaches Lower Keys • Breakroom Renovation — Property Appraiser • Refurbish Cabinets for MCSO @ Cudjoe Substation • Install new water heater @ Blue Heron Park • Install new shelving and AC @ Big Pine AARP • Secure windows / Prevent leaks @ Harvey Nutrition Site • AC and chiller repairs @ Gato • Install new AC in Jackson Square Telephone Room • Seal African Memorial Mural • Repairs to floor in Historic Courthouse • Relocate Electrical Panel @ Stock Island Fire Station • Replenish Sand behind seawall @ Higgs Beach • Secure Turtle Nest @ Higgs Beach • Continue renovations to Bocce Courts @ Big Pine Community Park • Pump Out Sewage @ Veteran's Park • Installed Air & Electrical Hook Up Station @ Big Pine Fire Station till Monroe County Detention Center - Stock Island Percentage of customer requested work orders completed within 3 days with KPI 67°% of 119 Customer requested work orders were completed within 3 days during May 2017 t ' td l Complete 0 KPI W WO_ Completed_3days 150.00 125.00 ,S II 100.00 y i g g g g g q 75.00 \ 1 W1 f t Sr F { 5000 tt i 25.00 � 0.00 € Bell 16May I 16Jtine f 161uly 16Aug f 16-Sep f 16-Oct f 16-Nov f 16 -Dec 17 -Jan 17 -Fe's 17 -Mar f 17 -Apr f 17 May { W %Complete 74% 78% � 61! 659e. � 44% 1 68% � 569K � 51% 44% � 42% 48% � 55% i 6 r W KPI ` D.63 1.79 ` 1.49 ; 1.82 ` 1.69 ` 1.23 ` 1.12 ` 1.25 ; 1.35 ` 9.60 1.14 W�leted 3days1 120 1 139 1 91 118 1 74 1 84 1 63 1 64 60 1 40 55 1 73 1 80 Facilities Maintenance/Parks & Beaches Lower Keys • Breakroom Renovation — Property Appraiser • Refurbish Cabinets for MCSO @ Cudjoe Substation • Install new water heater @ Blue Heron Park • Install new shelving and AC @ Big Pine AARP • Secure windows / Prevent leaks @ Harvey Nutrition Site • AC and chiller repairs @ Gato • Install new AC in Jackson Square Telephone Room • Seal African Memorial Mural • Repairs to floor in Historic Courthouse • Relocate Electrical Panel @ Stock Island Fire Station • Replenish Sand behind seawall @ Higgs Beach • Secure Turtle Nest @ Higgs Beach • Continue renovations to Bocce Courts @ Big Pine Community Park • Pump Out Sewage @ Veteran's Park • Installed Air & Electrical Hook Up Station @ Big Pine Fire Station till Upper Keys Murray Nelson Government Center: • Provided Assistance for nineteen events in the auditorium • Fix (2) toilets Men's Restroom 0 Floor • Fix Faucet 0 Floor Men's Restroom • Build Chair for Building Department Room 124 • Move Old Desk out Install New Desk & Install Cork Board Room 227 • Install White Board for Cammy • Fixed A/C Unit in Green Room • Continue Changing Lighting in Lobby, Front Desk Building Department, Ladies Room 2 Floor, Men's Room 2 Floor, Room 212 and Theater Plantation Key Courthouse: • Fixed A/C Unit Sgt. Torrez Office • Fixed A/C Unit in Judge Hamilton Office • Fixed A/C Unit in Clerk Office Jennifer • Courtroom B — Add 1 inch Riser to Computer Bracket • Replace Ceiling Fans in Sgt. Jennifer Office • Fixed Back Door from not Shutting Properly 2nd Floor State Attorney Office • Fixed Roof Leak in Court Room A • Install / Change (10) Toilet Tanks • Trim Right Side of Front Entrance • Change Lights in Lobby and 2nd Floor Men's Restroom (4) QTY 4 ft. Fluorescent Bulbs and Install New Exterior Light Ellis Building: • Paint Arrows in Parking Lot • Fix A/C Unit in the Property Appraiser Office • Install New Lock on Custodian Closet • Reinforce Time Clock to Wall at Property Appraiser Office • Replace Ceiling Tiles for Isis Majeska • Tile Work Letter P • Pressure Wash Sidewalk to Remove Berry's — Safety Issue Key Largo Tax Collector: • Fixed A/C Unit • Inspect Fire Alarm 37 Key Largo Library: • Install Soap Dispenser and Mirror in Restroom • Power Wash Entrance and Exterior of Building • Fixed Water Fountain • Fixed A/C Unit Library and Community Room • Install LED Lights and Lamp at outside Fire Closet Spottswood Building: • Fixed Toilet • Move Hospital Bed From MM 100 to MM 88 Social Service • Change Lights (4) bulbs at Social Service and Senior Center Islamorada Library: • Removed Plywood Cathouse attached to Fence • Replace (5) Spotlights in the Library Hallway • Fixed Ladies Handicap Toilet • Fixed Weather Stripping around Front Door • Fixed A/C Unit • Fixed Leak in Comer of Lobby • Snaked Women's Bathroom to Unclog Magnolia Public Works: • Fixed A/C Unit • Fixed Exhaust Fan in Crew Restroom • Install Side Walls on Flat Trailer • Received Supplies at Magnolia PW then disperse to other Facilities • Repair Front Gate — Wheel Came Off • Installed Receptacles for Containers in Work Area PK Garage: • Change Lights in Hallway (4) Bulbs and (1) Ballast • Fixed Toilet • Repair and Coat Roof PK Crew Room & Storage: • Clean Carpenter Shop ...:....... ...:....... 38 PARKS & BEACHES: Key Largo Community Park: • Replace (1) Wind Screen at Tennis Court • Stencil Traffic Cones • Replace Basketball Hoop • Cleaned Graffiti in Men's Bathroom Stall • Build Benches • Fix (2) Faucets in Ladies Restroom • Replace Volleyball Net Old Settlers Park: • Fixed Water Leak in Pipe • Reattach Brick To Rock • Remove Spike from Ground — Safety Issue Harry Harris Park: • Baseball Field Build Structure — (Roof) over Dug Outs • Install Dug Out Benches and Shade Screen • Fixed Ice Maker • Repair Concrete on Sidewalk • Paint and Caulk Interior door at Concession Stand • Remove Seaweed • Repair Fence in Front of Park • Paint Floor in the Office • Stencil Traffic Cones Friendship Park: • Cut Down Tree that fell onto County Fence, Incident Happened After Work Hours • Repair Leak in Men's Restroom • Remove Debri in Memorial Garden Notes: 1. Preventive Maintenance completed for some HVAC units. 2. Performed a safety inspection at the Skate Park in Key Largo Community Park. 3. Performed playground high frequency inspection for all Upper Keys Parks with Playgrounds. 4. Harry Harris Park was scheduled for softball and baseball practices and tournaments. 5. Rowell's Waterfront Park hosted Ocean Reef Public Safety Fire Trucks to Train for their Pump Testing 6. Made one trip with 134 Fluorescent bulbs to the transfer station ...:....... ...:....... 39 7. Facility Dude Training on May 2,2017 8. Trustee Training May 11, 2017 for Facilities and Parks 9. Facilities Supervisor Meeting May 16, 2017 10. Hard Surface Courts and Sand Volleyball Courts Inspection May, 2017 11. Park Common Areas Inspection May, 2017 12. Parking Lot and Sidewalk Inspection May, 2017 13. Exercise trails Inspections May, 2017 FLEET MANAGEMENT • Garage staff completed monthly safety training and reviewed actual incident which occurred along with reporting procedures for all to follow. • Completed (SWPPP) Storm Water Pollution Prevention Plan inspections, documentation and training. • Began 2nd round inspection of all County Fire Rescue apparatus. • Completed annual vehicle lift inspections (Key West lift is out of service repairs pending) Other repairs from inspections — Ongoing • Front end machine /lift inspection — Pending • Completed Major repairs on Road Department HD Bucket truck. • Completed minor fuel eak at Key West diesel fuel fill port. • Emergency oil spill clean -up kits — On Order • Ordered and received new wheel chocks for Key West garage. • Upper Keys and Key West automated fuel facility repairs - Ongoing • Completed renewal agreement with generator repair contractor. • Replaced 25 ton jack at Marathon garage; new jack for Key West - Pending • 2 new mobile lifts replaced under warranty for Fire Rescue Department. • Providing vehicle computer access for Fire Rescue liaison - Ongoing • Marathon fuel island canopy welding and repairs — Ongoing • Completed corrosion control and painting on Medical Examiners generator fuel tank. • Assisted Facilities Maintenance Department with FDEP inspection at Harvey Center. • Posted new updated certificates of liability insurance at all registered fuel sites. • Processed paperwork for new FDEP tank registrations. • Seeking permanent installation of emergency power generator at Upper Keys Magnolia Street Fuel Facilities. • Reviewed funding opportunity from VW Settlement - Pending • Annual pre - hurricane season generator oil changes - Ongoing • Annual pre - hurricane season generator fueling — Ongoing • Completed annual diesel fuel tank interior cleaning. • Completed all minor repairs from pre - hurricane season generator inspections. • Miscellaneous pre - hurricane season prep activities — Ongoing • Big Pine Fire Dept. generator fuel tank corrosion control and painting - Ongoing • Communications Department; command post generator repairs - Ongoing • Cudjoe substation generator electrical repairs - Ongoing • Mechanics voluntarily working overtime to keep up with workload while multiple mechanic positions remain unfilled. • Preparation of SOP's for vehicle procurement and vehicle surplus — Ongoing • Safety certification of Key West garage chain hoist — Pending • Seeking availability of contract front end alignment services in Key West. ...:....... Ell] • Received new fuel fill port boxes for Marathon fuel facilities — Installation Pending • Seeking new State Contract tire dealers - Pending • Three garages combined processed and distributed approximately (8700) gallons of gasoline and (2800) gallons of diesel fuel. • Three garages combined provided preventative maintenance, and completed approximately (13 0) unit/safety inspections. • Three garages combined opened and /or completed approximately (285) work orders. • Professional accounting assistance for updating Fleet budget and billing processes - Ongoing • Seeking quotes for corrosion control and painting of Marathon fuel facilities. • Replacement of 4 emergency generator exhaust systems - Ongoing • In -house CDL drivers training - Pending • 2 Fleet employees receiving fuel management billing training. • 2 Fleet employees waiting for rescheduled word intermediate training - Pending • Corrosion control and painting of Marathon drive on lift - Pending • 1 new Nissan pick -up truck for Building Department - On Order • 1 new Ford Escape for OMB - On Order • 1 new Ford Explorer for Airport Marathon - On Order • 8 new Ford pickup trucks for Public Works Departments - On Order • Received 1 new crew cab '/4 ton pickup truck for Road Department • 2 new clam grapple trucks for Road Department - On Order • 2 new chip body dump trucks for Road Department - On Order • 1 new compact wheel loader for Solid Waste Department - On Order • 1 new fork lift for Solid Waste department - On Order • 1 new tractor brush cutter for Solid Waste Department - On Order • 1 new plug -in hybrid for Extension Services Department - On Order • 1 new ARFF Fire Rescue Truck - Order Pending • 1 new Ford crew cab special for Airport Key West - On Order • 1 new Ford pickup truck for Airport Key West - On Order • 1 new Ford extended cab pickup truck for Airport Marathon - Pending • 1 new zero turn mower for Big Pine Park - Pending • New off road utility vehicle for Airport Sheriff - Pending • Updating contents labels for garage hazardous waste drums - Pending • 3 County units remain out of service due to airbag safety recall. • Processed monthly safety and PMI due reports for County, Sheriff, and Health Department. • Processed monthly fuel billing accounts receivables for all County Departments. • Processed monthly fuel billing, School Board accounts payables. • Processed monthly invoices for not in- program unit agencies. • Processed daily /monthly parts and supply accounts payable invoices. • Processed accident repairs for Risk Management and various Departments. • Processed factory safety recalls for various Departments. • Verified Florida Turnpike toll by plate invoices for various Departments. • Standardization of garage oil/lubes - Pending • Submitted paperwork to hire Mechanic 1 Key West - Pending • Submitted paperwork to hire Mechanic 2 Upper Keys - Pending • Filled Mechanic 2 Key West position with in -house applicant. • Seeking applicants for Lead Mechanic Marathon - Pending • Seeking applicants for Mechanic 1 Marathon - Pending • Seeking applicants for Mechanic 2 Upper Keys - Pending ...:....... 41 • Emergency Management issues; Emergency Fuel and Ground Support - Ongoing • Corrosion control and painting of HD bucket truck — Ongoing • Corrosion control and painting of Key west garage shop truck - Pending • Completed Marathon Garage second floor clean -up • Surplus vehicle bids received; Sales - Ongoing • Garage Facility improvements; Key West, Marathon and Upper Keys - Ongoing • Disposal of obsolete and defective inventory - Ongoing • Prepping Fleet supply delivery and storage truck - Ongoing • Prepping Fleet Fire Technicians service truck - Ongoing • New employee training, cross training, and refresher training - Ongoing SOLID WASTE MANAGEMENT Recycling Department Hazardous Material Department Household Hazardous Waste and E- Waste: Scope of work: During the month of May, staff held seven household hazardous collections for Monroe county residents and one Saturday Collection at Marathon Public works department also for residents. During the special Saturday collection, the HHW department service approximately 50 residents and accepted over 1,940 IBS of hazardous material and 1,480 IBS of electronic wastes. The residents dropped off household chemicals including solvents, paints, batteries, light bulbs, and various cleaning products. The staff segregates and handles the material properly onsite at each transfer station. Below is the detailed information of the material collected throughout the month. • Staff accepted material from 145 Monroe County residents and 8 businesses. • Staff accepted Hazardous and Electronic Wastes from the following commercial participants: • Salvation Army • Big Pine Boat Rental • Big Pine Park • Monroe County School Department • Boat Bottom Express • John Pennecamp State Park • Monroe County Facilities Department • Staff shipped 14,502 Ibs and filled 19 galore boxes of electronic waste containing both televisions and miscellaneous outdated electronics through the county's subcontractor, Electronics Recycling Center, Inc. (ERC). • Staff recycled over 1,540 lbs. of lead sealed batteries with Interstate • Staff recycled 460 gal of contaminated fluids with EMC Oil Corporation. • Staff bulked 440 gal. of latex paint and 220 gal. of oil based paints. • Staff crushed and released the vapors of 300 aerosol cans. • Staff crushed 800 fluorescent and mercury containing bulbs in house accumulating two 55- gal drums. 42