Loading...
Item M5M C ounty of f Monroe ELj » °o � BOARD OF COUNTY COMMISSIONERS /� r i � �� Mayor George Neugent, District 2 The Florida. Ke Se y I Mayor Pro Tern David Rice, District 4 Danny L. Kolhage, District I Heather Carruthers, District 3 Sylvia J. Murphy, District 5 County Commission Meeting July 19, 2017 Agenda Item Number: M.5 Agenda Item Summary #3134 BULK ITEM: Yes DEPARTMENT: Sustainability TIME APPROXIMATE: STAFF CONTACT: Rhonda Haag (305) 453 -8774 N/A AGENDA ITEM WORDING: Approval to enter into a $60,403.40 Task Order #4 for procurement and permitting services for the Canal 75 backfilling project in Key Largo, under the on- call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services, which extends services authorized under Amendment No. 12 under a previous AMEC contract. Remaining funds are carried over from Amendment No. 12 and no new funds are required. ITEM BACKGROUND: The BOCC previously approved and funded Amendment No. 12 for $60,403.40, under the previous AMEC contract for Design of the Demonstration Canals, for permitting and procurement services for the Canal 75 backfilling project in Key Largo. The permitting and procurement services were delayed until the funds for construction were finalized under the Stewardship grant with DEP, to avoid expenditure of funds on design services before construction funds were located. Therefore the services were not completed within the original time frame. The new on -call Category B AMEC contract is now active, and this Task Order 4 will extend services originally approved under the previous Amendment No. 12. Funds remaining under the old Amendment No. 12 will be used to fund this Task Order #4, and no new funds are required. The work performed shall not exceed a total of $60,403.40 for Amendment 12 and Task Order 4 combined. It shall be retroactive to July 1, 2017. PREVIOUS RELEVANT BOCC ACTION: 08/17/16: Approval to advertise on call professional engineering services for the canal restoration program, including Category A — Canal Master Plan Program Planning Services, Category B —Canal Infrastructure Engineering Services for Projects and Category C — Environmental Engineering Services. 11/22/16: Approval of Amendment No. 13 to the contract for Engineering, Design and Permitting Services of the Demonstration Projects, with AMEC Foster Wheeler Environment and Infrastructure, Inc. to provide Construction Engineering, Environmental Inspections And Construction Administration Services in the amount of $88,612, related to Canal #83 muck removal, backfilling and air curtain project in Key Largo, Monroe County, Florida. 12/14/16: Approval to negotiate on -call contracts with Amec Foster Wheeler, Inc. and Tetra Tech Inc, the two highest ranked respondents for Category B - canal infrastructure engineering services. 03/15/17: Approval to enter into a $0 on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services. 03/15/17: Approval to enter into a $21,499 Task Order 1 for CEI and construction administration services for the 290 air curtain installation, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services. 03/15/17: Approval to enter into a $87,762 Task Order 2 for CEI and construction administration services for the canal 83 muck removal / backfilling/ air curtain installation, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services. 05/17/17: Approval to enter into a $99,596.10 Task Order #3 for procurement and permitting services for the 4 canals for augmented aeration, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services, which extends services authorized under Amendment No. 8 under a previous AMEC contract. Remaining funds are carried over from Amendment No. 8 and no new funds are required. CONTRACT /AGREEMENT CHANGES: Task Order 4 for Canal 75 Backfilling - Permitting and Procurement Services STAFF RECOMMENDATION: Approval DOCUMENTATION: AMEC Task Order 4 - Category B FINANCIAL IMPACT: Effective Date: July 1, 2017 Expiration Date: Upon completion of the Task Order Dollar Value of Task Order 4: $60,403.40 Total Dollar Value of Contract: $269,260.40 Total Cost to County: $60,403.40 Current Year Portion: NTE $60,403.40 Budgeted: Yes Source of Funds: 304 Infrastructure Funds previously budgeted and carried over from Amendment No. 12 CPI: No Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: O &M Costs Revenue Producing: No If yes, amount: N/A Grant: No County Match: N/A Insurance Required: Yes Additional Details: 03/15/17 304 -23000 - PHYSICAL ENVIRONMENT $21,499.00 I to] WTI i X1171" Rhonda Haag Completed 06/26/2017 3:35 PM Pedro Mercado Completed 06/26/2017 3:57 PM Budget and Finance Completed 06/26/2017 4:15 PM Maria Slavik Completed 06/27/2017 7:23 AM Kathy Peters Completed 06/28/2017 11:43 AM Board of County Commissioners Pending 07/19/2017 9:00 AM 13017JGPJ0 ) lsei33WV - 13;eDSOASile:D - U0 leUeD:Vt�t) SAJOBG;e:D Canal #75 Backfill Procurement, Design, And Permitting Services Amec Foster Wheeler Environment & Infrastructure, Inc. July 19, 2017 Page I of 2 13017JGPJ0 ) lsei33WV - 13;eDSOASile:D - U0 leUeD:Vt�t) SAJOBG;e:D . . . . . . . . . ........ .... A - - - - - - - U - - set • be utilized by the contractor for construction. Urservices De Faia u Mer MITs i as roar 4 anTA7Z remains tne same from the previous Contract for Engineering, Design and Permitting Services and will not exceed $60,403.40. YM 11 L--/[ , �Vldl LY Udl.16tjU L CX0 V� Test authorized representative. . ..... .... &INFRASTRUCTUREINC, - -d6- ( ? 15 • V. P. M MAGGIE PROENZA-KANAKIT Notary Public - Slate of Florida My Comm. Expires Mar 20, 2019 Commission # IFF 179176 0t 'I %TO Bonded through National NDlafy As.r, F .2 TV 1 .111111M on R L a JA Lei 0 1 1 01:1 1 11 4 1 1 1110 1 WN211111[91:1 by Mayor/Chairman Canal #75 Backfill Procurement, Design, And Permitting Services Amec Foster Wheeler Environment & Infrastructure, Inc, July 19, 2017 Page 2 of 2