Loading...
1st Change Order 08/21/2017MONROE COUNTY / ENGINEERING / PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Senior Center Kitchen Renovation INITIATION DATE: 08/01/2017 CHANGE ORDER NO: 1 TO CONTRACTOR: Sea Tech of the Florida Keys, Inc. The Contract is changed as follows: CONTRACT DATE: 04/12/2017 The original ( Contract Sum (Guaranteed Maximum Price) ........................ ....................$150,794.00 Net change by previously authorized Change Orders .................... ..............................$ 0 The ( Contract Sum? (Guaranteed Maximum Price) prior to this Change order was ........... ..$150,794.00 The (Contract Sum) (Guaranteed Maximum Price) will be ( increased) (decreased) (unchanged) by this Change Order. ...$5,186.37 ✓ The new ( Contract Sum )_(Guaranteed Maximum Price) including this Change Order is. .....$155,980.37►° The Contract Time will be ( increased ) (decreased) (unchanged) by ... ............................... 3 days The date of Substantial Completion as of the date of this Change Order is ..................... ... 8/18/2017 Detailed description of change order and justification: Asbestos was identified under the ceramic the during the renovation of the senior center a /aza kitchen. All of the the in the section of the kitchen containing asbestos was removed as a part of the asbestos abatement. This change order is to replace the additional tile removed during the asbestos abatement and results in an increased cost of 5 ?86.37 and requires 3 additional day thus adiusting the substantial completion date from Auqust 15, 2017 to Auqust 18, 2017. This change Order is 3.44% of the orivinal contract price. / Not val ARCHITECT: 51 M -4- CONTRACTOR: DIRECTOR PROJECT MANAGEMENT COUNTY /ASSISTANT ADMINISTRATOR: Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004 -1999 * Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Asbestos was identified under the ceramic tile in the Senior Center Kitchen. All the tile in this section of the kitchen was removed as a part of the asbestos abatement. This change order is to replace the additional tile removed during the asbestos abatement. • Change Order was included in the original specifications. Yes ❑ No ® ' If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No ® -' If Yes, explanation as to why it is not subject for a calling for bids: J • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No ® 1 Explain: leaTech PN inc. OF THE FLORIDA KEYS DESIGN BUILD CONTRACTORS August 01, 2017 Monroe County Engineering Attn: Ray Sanders 1100 Simonton Street, 2 -216 Key West, FL 33040 Re: Senior Center Kitchen Renovation Subject: Change Order #01 — Replace 240 SF Floor Tile We hereby propose to furnish materials, equipment and perform the labor necessary to: 1— Replace 240 SF Floor Tile 1.1 266 SF Americraft Sienna Quarry Tlle 1 LS @ 1599.23 $1,599.23 1.2 Thinset, Grout, Etc 1 Is @ 104.96 $104.96 1.3 Labor to install the 2 men 24 hrs @ 80.00 $1,920.00 1.4 Superintendent 24 hrs @ 45.00 $1,080.00 Subtotal $4,704.19 O/H 5% $235.21 Subtotal $4,939.40 Profit 5% $246.97 TOTAL $5,186.37 All material is guaranteed to be as specified and the above work to be performed in accordance with the manufacturer's specifications and completed in a substantial workmanlike manner for the sum of: Five Thousand, One Hundred Eighty Six Dollars ....... ....................$5,186.37° This additional work will add 3 days to the duration of the contract. Payment in full upon completion. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our control. Owner to carry fire, tornado and other necessary insurance upon above work. Workers Compensation and General Liability insurance on above work will be taken out by SEA TECH, INC. Note - This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment will be made as outlined above. Signature Date Page 1 of 1 FI <.E1= IN -STCRF PICK UP c;ve, a t.iini''n ";'dl me Shopping Cart FREE Shipping on eligible items. , Item QEP 7 -1/2 in. x 5 -1/2 in. x 1 -7/8 in. Extra Large Grouting, Cleaning and Washing... Model #70005Q -3VP Free Shipping on Most Orders See Details How To Get It j:� Ship To Home FREE Estimated Arrival: Aug. 07 8 Pick Up In Store Today FREE Express Delivery From Store Get Bulk Pricing of $13.02 on this item when you purchase at least 6.0 units Custom Building Products Polyblend #122 O Ship To Home Linen 25 lb. Sanded Grout 0 Pick Up In Store Today FREE µ, Model #PBG12225 16 in stock today at: Key West #6313 Key West, FL 33040 Change O Express Delivery From Store Get Bulk Pricing of $13.02 on this item when you purchase at least 20.0 units. Custom Building Products VersaBond Gray O Pick Up In Store Today FREE 50 lb. Fortified Thin -Set Mortar 206 in stock today at: Model #MTSG50 Key West #6313 Key West, FL 33040 4I' "�, O Express Delivery From Store Unit Qty Item Price Total M cc $4.88 $4.88 u 1 � J 51 m v a v Add to List I Remove ( B $14.47 $28.94 2 $14.47 $57.88 4 Add to List I Remove QEP 3/16 in. Original Job -Tough Tombstone- Style Tile Spacers (200- Pack) Model #10316Q O Ship To Home k Pick Up In Store Today FREE 9 in stock today at: Key West #6313 Key West, FL 33040 Change 0 Express Delivery From $2.97 $5.94 MEMORANDUM TO: Board of County Commissioners From: Assistant County Administrator Date: August 16, 2017 RE: Change Orders Attached is a proposed Change Order #1 Sea Tech of the Florida Keys, Inc., Senior Center Kitchen Renovation. The Contract Sum will be increased $5,186.37. The date of Substantial Completion as of the date of this Change Order is August 18, 2017. According to Ordinance No. 004 -1999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners at least 24 hours prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. Signature Acting County Administrator Sheryl Graham Print Name of