Loading...
Item C40BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: March 21, 2012 Division: County Administrator Bulk Item: Yes Department: Airports Staff Contact Person/Phone: Pedro Mercado ext. 3173 AGENDA ITEM WORDING: Ratification of Task Order No. 12/14-04 for professional services with Jacobs Project Management Co. for modifications and renovation of the existing baggage claim / arrivals facility at the Key West International Airport. ITEM BACKGROUND: Task order 12/14-04 was approved at the regularly scheduled January 19, 2012 board meeting however, the back-up documents omitted the task order's effective date as well as the Engineer Project number. The task order is being placed back on the agenda for ratification of the omitted information. PREVIOUS RELEVANT BOCC ACTION: Approved PSO 12/14 — 04 on the January agenda, item C-21 . CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: Approval. TOTAL COST: $75,000 BUDGETED: Yes X No COST TO COUNTY:N/A SOURCE OF FUNDS: FAA 95%/Airport Operating 5% REVENUE PRODUCING: Yes No X AMOUNT PER MONTH Year APPROVED BY: Count Att — OMB/Purchasing Risk Management Y Y� g g DOCUMENTATION: Included X Not Required DISPOSITION: AGENDA ITEM # NC) Revised 2105 MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date . _March 2, 20 2 Task Order No. 12/14-04 Client Project No. 630159-GAKA145 Engineer Project No. E9Y17704 . This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client') and JACOBS PROJECT MANAGEMENT CO. ("Consultant'), dated November 16, 2011 ("Agreement'). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized: Arrivals Building Modifications and New Baggage Belt Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 13 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of $ 127,350.00 N/A Other (Describe): Schedule Services may commence on Execution Services will cease by 365 days Other (SEAL) BOARD OF COUNTY COMMISSIONERS ATTEST: DANNY L. KOLHAGE, CLERK OF MONROE COUNTY, FLORIDA By Mayor/Chairman CONSULTANT: JACOBS Pxoaecr MANAGEMENT Witness �' [ = J�� Tit10% i,, -JA-t 4 .r3 .�/I,d i7J -t File: AISTR APS Monroe County Page I of I Exhibit A — Scope of Work Monroe County Key West International Airport (EYW) Baggage Claim Modifications SCOPE OF WORK Jacobs will provide architectural interiors, structural and MEP engineering contract docwnents for the renovation of the existing baggage claim / arrival facility at Key West International Airport. The scope will include the following per the proposed baggage claim modifications schematic design drawings provided by the client. • Demolition of the existing exterior wall to accommodate a new baggage claim carousel. • Relocate the existing Hertz rental car counter within the existing facility. Relocate the existing vacant rental car counter within the facility to become the new baggage claim desk (to accommodate five airlines). • Remove partial or all of the existing exterior aluminum canopy at the proposed baggage carousel location. • Redesign passenger arrival fencing at exterior of facility. Renovate and expand the existing restrooms within column line EB (see attached URS drawings dated March 2011 for column line location). • Remove the existing baggage service counters and provide to the owner. • Provide new floor finishes within the interior of the baggage claim area as determined by owner. • Demolition of the existing janitor closet. • Demolition of the existing ATM closet. • Relocate the existing ATM machine. • Relocate the existing vending machines as determined by owner. • Relocate or remove the existing food/beverage vendor as determined by owner. Demolition of the existing baggage storage room. • Provide new CMU infill at all exterior windows facing airside. In addition, Jacobs will provide the following general services for this project: • Management of the project from data collection to the bid opening and award of the contract • Coordination with EYW and the FAA/FDOT as required. • Preparation of minutes of meetings and phone conversations • Program verification and site investigations • Preparation of the construction and incorporation of Monroe County's front-end contract documents • Preparation of an order of magnitude construction cost estimate. • Bidding and award assistance. WORK PHASES Based on the above description of the scope of work we propose to perform the following tasks. ARTICLE A — DATA COLLECTION: Visit and inspect the site to determine if existing conditions conform to those portrayed on information provided by the Owner. Take photographs and make written documentation, sketches, notes or reports to confirm aid record the general conditions of the existing site. Within this initial phase we will review all applicable code requirements in detail. Review with owner alternative approaches to design and constriction of the project; site use and improvements; selection ofmaterials, building systems .and equipment; potential construction methods; and, if requested, make a. rccommendation among such alternatives. A preliminary project description comprised of a narrative discussion of preliminary material selections, components, assemblies, and systems (including proposed mechanical, and electrical design elements, components and systems) to be used in the project. Provide mechanical and electrical requirements specific to the project. Coordinate with the Owner to determine the municipal or other jurisdictional agency coordination is required for the project. ARTICLE B — DESIGN (DRAWINGS AND SPECIFICATIONS) Based on the information collected under Article A, the 30%, 90%, and final contract documents design will be developed for all elements identified in this scope of work. After written authorization to proceed from Owner and based on the approved Schematic Design documents and any adjustments in the scope or quality of the project by the Owner, Jacobs will prepare the Final Contract Documents setting forth in detail the requirements for the constriction of the Project. During this work please, Jacobs will prepare required construction documents for Owner's use to secure pennits and for construction. Jacobs will provide all detailing for the completion of the building's interiors. This work effort will include interior architectural, civil, plumbing, HVAC and electrical plans. Coordinate and incorporate EYW provided contract document/front-end specifications into the final contract bid documents. (i.e. Notice to Bidders, Invitation to Bidders, Instruction to Bidders, Bid Proposal, Contact, Contract Articles, General Specifications) Devclop a construction schedule for use in determining constriction phasing and duration. Prepare for and attend two (2) meeting with EYW to discuss project progress and review the design submittals. Prepare for and attend one (1) meeting at the Airport to discuss construction phasing with Airport Staff and Tenants. Develop detailed construction quantities and cost estimate at the. 30%, 900/0 and at final contract document design levels. Develop the following anticipated plans: • Title Sheet (1) • General Plan (1) • General Notes and Abbreviations (1) • General Phasing and Safety/Operations Plan (1) • Fire Protection / Alarm Plans (2) • Foundation Plan (1) • Schedules and Structural Details (1) • Typical Sections (1) • Phunbing Plans (4) • Building Sections (1) • Electrical Plan (2) • Electrical Details (2) • Mechanical Plans (1) • Architectural Plans (5) • Architectural Elevations (4) • Architectural Details (2) • BHS Design Details (2) • Misc. Details 0 Total: 34 Sheets Copies of the contract documents will be provided to the Owner for review. Signed and sealed sets for building permitting agencies will be provided to the contractor for permitting. Once the plans are submitted for permit by the contractor, Jacobs will provide plan revisions required to address plan review comments. Coordinate, distribute and print the following copies of the preliminary construction documents (plans, specifications, and construction cost estimate) for review by the EYW, FAA, and FDOT: Preliminary Submission (30%, 90%, Final Contract Documents) FAA: 2 half size copies of plans and a CD containing the drawings, specifications, and engineer's estimate for each submission. FDOT: 2 half size copies of plans; and a CD contianing the drawings, specifications, and engineer's estimate for the 90% submission only. EYW: 2 copies of plans (I full size; 1 half size); 2 copies of specifications; 2 copies of estimate for each submission. Conduct an in-house QA/QC prior to each submission. The in-house QA/QC check wilt involve an experienced independent individual, depending on each discipline, to conduct a comprehensive check on all docuunents to be submitted (e.g. plans, specifications, estimates). Time will be required for engineers and Cadd technicians/designers to correct items listed under the in-house QA/QC checks. Address final comments from 30%, 90% design for final contract documents. ARTICLE C—ADVERTISING AND BIDDING Prepare compact discs containing contract plans and specifications for bidding to be provided to interested bidders. Prepare an "Invitation to Bid", all forms for advertisement, bid proposals, contract bonds, labor and DBE requirements and other contract documents needed to solicit public bids for the construction of the project. The Owner shall be responsible for the cost and placement of all public advertisements required including all newspapers in which the advertisement is placed. Prepare for and attend the Pre -Bid Conference (one (1) day) and Bid Opening (one (1) day). Prepare and Respond to Bidders Questions. Issue necessary Addenda and Directives to Bidders. One (1) addendum is asstuned. Review the bids received, prepare the final bid tabulation, and make recommendations/rejcctions of award of the Contract to the Owner. Prepare conformed contract drawings and specifications. QUALIFICATIONS / CLARIFICATIONS The following Qualifications and Clarifications are a part of our scope of work: • All design requirements from the relocated rental car facility to be provided upon commencement of the design. • All design requirements from the airlines regarding the new baggage counter to be provide upon commencement of the design. • All existing as built drawings to be provided in electronic (AutoCad) format and hard copy (printed) fonuat. ■ Design will include interior design & specification of interior materials / finish boards. • Jacobs will provide electrical coordination of Voice / Data & Communications systems for the facility. (Voice / Data & communications system designs by others.) • Fire Protection (suppression and fire alarm) design shall be based on performance specifications. Fire Protection Subcontractor shall provide complete fire sprinkler piping layout and calculations, sign and sealed, for permit submittal. • As -built drawings for the fire suppression and fire alarm systems will be provided by the owner. • Hydraulic calculations and design analysis of the existing fire suppression system is not required due to the minor nature of the system modifications. • Project will be designed to meet the new 2010 Florida Building Code requirements. • Water supply data will be provided by the client. it is assumed the water supply and sanitary lines are adequate to accommodate the new restroom loads. • Water supply information will be provided by the owner. • It is assumed that the existing HVAC units are to be utilized and are adequate to accommodate the new heat loads associates with the renovation. • Owner to provide operation schedules for all vendorstoperators of the facility. • Provide configuration of the proposed new or re -configured pre- engineered canopy structure. Final design by specialty engineer retained by the contractor to be approved by the owner prior to construction. ADDITIONAL SERVICES Services not included in our scope of work include, but are not limited to, the following: • Geotechnical engineering. ■ Preparation of renderings and/or marketing brochures. ■ Detailed cost estimating. • Architect/Engincer construction and /or delegated (special or threshold) engineer inspections. ■ Attendance and/or presentation to public hearings and/or other meetings with municipal agencies. ■ Permitting. • Fees for Municipal and permit agencies. • LEED Design, Registration and Certification fees. ■ Environmental Engineering. ■ Environmental Graphic (way finding) Design. • Topographic Survey of the area within the scope of work. ■ SUE (subsurface utility engineering). ■ Off Site Improvements (Design of Facilities outside of the building area are not included in the Design Fees) Roads —Coordinate any offsite access, required to be constructed. Coordinate any offsite Traffic signalization/ signing and Traffic markings of existing roadways / driveways as required for this project. Utilities —Coordinate any offsite Utilities required to be constructed or relocated. ■ Life Cycle Cost Analysis ■ Other services not described in our scope of work. ■ Construction phase services. PROJECT SCHEDULE: The tentative complete project schedule (design and construction) is as follows: Item Architecture / Engineering Service Purchase Order Preliminary Design (30%) EY W Review Comments Preliminary Design (90%) EY W Review Comments Final Bid Documents Advertisement Bid Opening Start Construction Finish Construction Date 02/01/2012 02/24/2012 03/09/2012 03/23/2012 04/06/2012 04/20/2012 05/01/2012 06/01 /2012 07/01/2012 10/19/2012 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Airport: Monroe County Project: Key West International Airport Baggage Claim Modifications FEE SUMMARY BASIC SERVICES Hours Fee DBE AMOUNT Article A: Data Collection 56 $ 6,000 Article B: Design, Speclficatons and Meetings 1,037 $ 88,750 S. Article C: Blciding Phase Services 80 S 8.000 Article D: Pro ect Management 56 S 12.000 IToiai 'uasic Sorvicea 'Lump Sum Fee 1,209 $ 114,7S0 $ SPMAL SERVICES Hours Fee Article E: Baggage Handling Systems 82 $ 12,600 Total S eclat Services Lump Sum Fee 82 S 12,608 S TOTAL LUMP SUM PROJECT FEE 1,291 $ 127,350 $ DBE Pamentage 0.00% I J.pcM rµa,��CC +:l ivip'!%Qtt kY.l N.�y6 > 1—w7�Ct ifta C"F-59. 1 -SDC Y, 1 JACOBS ENGINEERING GROUP Monroe County Airport: Key West International Airport Project; Baggage Claim Modifications Article A: Data Calitcdon JOB HOUR AND FEE ESTIMATE WORK ITEaI Sr. Project Arehitect Project Architect be. Structural Engineer 5r. I1lechaalcol Engineer Engineer hr. fir I Electrical P.ngineer CADD Tech Clerical TOTAL 1 2 Coardwatc with F.YW Restarch and review record drawings. 2 2 12 16 2 8 12 " 22 2 6 - 0 0 S ., 110.00 S - 12 12 S 90.00 S I Ago 0 5 130.00 S - 0 S 60.00 S 2 2 6 S 58.00 S 348 12 38 3 Perform site visit for walk through Survey TOTALROUR5 - S6 RATE $ 130.00 $ 100.00 S l I3.00 --- S . 708 PAYROLL ESTIMATE S Z080 S 2,200 S - Task Subeonsuliants TOTALPAVROLL S 5,708 S Overhead O.00S6 S S Subtuial S 5.703 S Profit 0% S S. Payroll free 7 5,708 Total Subcunsultants S Subconsult3uts S - Eapenses S 292 Lump Sum Fee Total S 6,000 Task Expenses: hilleage (120mi{es round trip S0.555lmi)12 S 131.20 Airfare S - TOTAL FEE S 6,000 Meals and Per Diem S 50.00 ReproductionAllsc. S 109.00 Total Expenses S 292.20 . "'I, e.rt2'_'LCOJnr,I ,'S�--s •a ,.,.r;fA ).'.a L.K. \rs, E+'N F+9 A.. ----, I.X— 2 JACOBS ENGINEERING GROUP Airport: Project: Artkle B; Design, Specifcations and dlectings Monroe County Key West Internationai Airport Baggage Claim Modifications JOB HOUR AND FEE ESTIMATE WORK ITEM Sr. Project Archileet Project -Manager Sr. Structural Engineer Sr. Mtehaalcal Eu (eecr Earjacer Sr. PP / Electrical Engineer CADD Tech Clerical TOTAL 1 Develop Technical Specifications 24 8 6 4 8 2 52 2 Set up CARD drawingsiliks 8 a 3 Develop construction schedule and phasing 8 4 2 14 4 Prepare for and attend meeting to discuss submittals and project progress 16 8 2 4 30 S Prepare for and attend one (1) meeting to discuss construction phasing 4 4 6 Structural Analysis and Calculations to t0 7 Attend (2) Design Coordination meetings 16 4 20 8 Develop the following plans a. Title Sheet (1) 1 2 4 7 It. General Plan (1) 1 2 8 11 o. General Notes and Ab6raviations(1) 1 2 4 18 75 d. General Phasing and Salty Ops (1) 2 2 16 20 e. Fire Proteetioa /Alarm Plans (2) 12 4 16 f. Foundation Plan (1) 8 10 is g. Schedules and Structural Details (1) 14 20 34 It. Typical Sections (1) --- 1 2 16 19 i Plumbing Plans (4) 11 39 28 78 J. Building sWioas(1) 1 2 16 L9 k. Electrical Plans (2) 24 8 32 1. Electrical Detsils(2) 16 4 10 cat. Mcchanical Plans (1) 2 6 g n. Architectural Plaits (3) 8 40 160 20111 o. Architectural Elevations (4) 4 40 t30 164 it. ArehitectecturalDetails (2) 4 B SO 92 q. DNS Design Details (2) 24 24 9 Coordinate and distribute plans and specifications (ju :. gun, and final) 6 S 3 4 3 6 2 32 10 QA/QC 24 4 5 2 35 11 Address 30". and 90: design cotmnents rot final contract does. g S 2 1 5 8 1 37 rOTAL IIOUItS R•1rE PAYROLL ESTEMATF 129 S 130.00 S 16,770 00 128 S I(Nit S 12 NW.tN) 63 S 113.W S t 119.Ott 32 S 11000 5 3.520.W 1291 S 90.U0 S 11,610mo 30 S I3U.W S 3,70o.W 518 S 60.00 S 3t,U8O.00 8 S 58.00 S 464.00 1037 S 87,263.U0 JACOBS ENGINEERING GROUP Airport: Project: Article B: llrslen.Sutrigcalloas end dleellmel Monroe County Key West International Airport Baggage Claim Modif csifor s JOB HOUR AND FFE ESTIMATE Sr. FP/ Sr. Pro)" Project I Sr.Strueturat Sr—Mcchaaicali I Electrical I I WORK rfEill Architect Manager Engineer Engineer Engineer i Engineer CADDTcth Clerical TOTAL b)iieage (160 miles round trip a S.555/ini) as S 444.00 Afitcage (30 mitts round trip Q S 5551m7:c 2 S Printing 3WR atal 90% mitunbsion Plans- 12 sell Q 5501sd S 600.00 Specifications - 3 seta d S501set) $ 150.00 Mice S 293.00 Total Expenses S 1,481.00 Task Suhconsultants S .V1A1..IArr{VLL a 87,263 O%vFhcad 0.01)% S Subtotal S 87,263 Profit ON. s Payroll Fee S 87,263 Subconsultants S Expenses 5 IAV Gump Sum Fee Total 5 88,750 TOTAL FEE 5 S 750 JACOBS ENGINEERING GROUP Airport: Project: Article Ce Riddin. Ph...c..•..r... Monroe County Key West International Airport Baggage Claim Mocilgcatlons JOB HOUR AND FEE ESTIMATE sr. Sr. FP I WORK ITEM Sr. Project Architect Project Architect Structural Engineer Sr. Afeehoakat Engineer Liagineer Electrical Engineer CARD Tech Clerical TOTAL 1 Prepare documents for bidding 0 2 Prepare Invitation to Did 3 4 Prepare and attend pte-bid conference and bid opening 24 m 2 26 4 Prepare and Respond to Bidders Questions 8 2 10 s Issue necessary addendum and directives to bidders (Assume 1) 8 —� 2 to Review bids received. prepared bid 6 tabulation and make recominnendation ofawnrd 2 2 4 7 Prepare conformed contract drawings 8 S 130.00 S 6 0 $ 100.00 $- p S 113.00 S -S 0 00 1TR TOTAL HOURS50 ESTIMATE 0 LS7 S 11to $ 90.0o S - S 130.00 S S 60.00 S - S 58.00AVROI.L S 580 Tot Vxnenseu Printing 30% and 900/. submission Plans 6 sets ® S50/cot S 600.00 Specifications - 3 sets (a) SSWut) S 150.00 Mileage (30 miles round trip $0.555/mi) x 2 S Reproduction/Misc. S 170.00 Total Expenses: S 920.00 TOTAL PAYROLL S 7,000 Overhead 0.W/d S Subtotal $ 7,080 Profit pye $ Payroll Fee $ 7,p80 Subconsulisuls S Expenses S 920 Lump Sum Fee Total g$.000 TOTAL FEE S $000 1'1:•_M C,,1tf Cm,Nf'.OSY..O�tflC/M „r 0.bry!•:<Q ' .Si Arse E.Nt'-I RH:.:n F<i ($M 11. •j., ­s%.'a. 5 JACOBS ENGINEERING GROUP Airport: Project. .a.n.r. n. ear__...---------• Monroe County Kay West International Airport Baggage Claim Modifications JOB HOUR AND FEE i Sr. Sr. Sr. FPI Sr.Projrel ProJed Structural Mechanical Electrical CARD WORK irut Architect ArchBed Engineer Eu Meer rnziBeer En into Tech CYertral TOTAL 1 Attend Pre -Bid Meeting 9 3 2 Atkal Su6miu.d Renew Meetings 16 16 3 Projett iianaseurcn4 32 32 — — -- 0 56 0 0 0 0 RATE ATE S 130.00 S 16300 S 113.0o S 110.000 S 90" 1130.00 S 6n.00 S 33.00 g �9240 PAYROLLFAndtArE Is . S 9240 I S -is -is - S S TOTALPAVROLL S 9,240 S Overhead 0.00% S Subtotal S 9,240 S Nora OS: S 1.396 Payroll Fee 5 10.626 Subconsultmts S - rNpenscs S 1.374 Tn1L Nmemes: Cost Plus Fee Total S 12,OW Renal Car (3 visits @ S651vis0) 5 195 Gas for Car Rental On's1te - S 10 Lodging (3 visits (D 51201visio S 360 Alrrara(3visits@S250/visil) S 750 disc S S9 Total Expenses S 1,374 w.„. ,.am*n.ao., r..o,'•,. -> ^..,u par..c.n.µ�.a .p. iiv e.•r. .,.t... 9 JACOBS ENGINEERING GROUP JOB HOUR AND FEE I Airport: Monroe County Project; Key West International Airport Baggage Claim Modllloalions Artletr Et Baa.,e. sl.wen... C.—. 1 1tiORK1TE61 sptiifications Specialty En near $ Specialty Ee ter g CADD Tech Clerical 2 Cost Ellimate g tl 3 DtiS Did Rccicw Submittal Renew --- IM1131Trip tosxrifycxistingconditions 5 S 4 12 t6 12 0 33 — 5 TOTAL 1IOURS _ 49 1L1TE PAYROLLESTIb1AT£ S 135.00 S 6615 S 129,00 5 4224 S it).OD S S t10.00 S .$ S 9D.00 $ 130.00 $ 60.00 S S 5&00 TOTAL 16 16 to 24 16 62 S 1ogS9 TOTAL PAYROLL S 10.89 Os ahead 0.009E 5 Tg k Expenses: Subtotal S 10.879 6likage(150rni@.51/mix1) S Profit 0A S 1.616 Dtikagc(15o ni @ .511mi x 1) S Pay7e11 Fee S 12.465 hfikage (150mi @ .51/mi a 2) S Record Drassialp 100 Subeonndtants S Misc. S Expen c S 135 —t600 lump Sum Fee Total 7-1 Tent Expenses $ 135 — •sIM-1(I]Y.Jfalal— .• P. ..;::.3 , '.— ...... 7