Loading...
05/21/2014 AgreementAMY NEAVILIN, CPA CLERK OF CIRCUIT COURT &COMPTROLLER NNROE COUNTY, FLORIDA DATE: June 19, 2014 TO: Judy Clarke, PE Director of Engineering ATTN. Pamela Hancock FROM. Lindsey Ballard, D. C IV I At the May 21 2014 Board of County Commissioner's meeting the Board granted approval and authorized execution of Items C39 Task Order with EAC Consulting, Inc. for engineering design and permitting services for Key Largo (Lake Surprise Estates) Roadway and Drainage Improvements Project. The task order is being awarded under the On Call contract for Professional Services. Enclosed is a duplicate original executed on behalf of Monroe County, for your handling. Should you have any questions, please feel free to contact me. Cc: County Attorney Finance File J 500 Whitehead Street Suite 101, PO Box 1980, Key West, FL 33040 Phone: 305- 295 -3130 Fax. 305- 295 -3663 3117 Overseas Highway, Marathon, FL 33050 Phone: 305 - 289 -6027 Fax: 305- 289 -6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852 -7145 Fax: 305 - 852 -7146 TASK ORDER FOR ON CALL PROFESSIONAL SERVICES BETWEEN MONROE COUNTY AND EAC CONSULTING, INC. FOR KEY LARGO (LAKE SURPRISE ESTATES) ROADWAY AND DRAINAGE IMPROVEMENTS PROJECT In accordance with the Continuing Contract for On Call Professional Engineering Services made and entered on the 16th day of January 2014 between Monroe County hereinafter referred to as the "County" and EAC Consulting, Inc. hereinafter referred to as "Consultant" where design services are allowed if construction costs do not exceed $2,000,000. All terms and conditions of the referenced Contract For On Call Professional Engineering Services apply to the Task Order, unless the Task Order modifies an Article of the Agreement of which will be specifically referenced in this Task Order and the modification shall be precisely described. This Task Order is effective on the 21" Day of May, 2014. Article II Scope of Basic Services, Paragraph 2.1.1 is amended as follows: The scope of services for the Key Largo (Lake Surprise Estates) Roadway And Drainage Improvements project will include completion of design for construction and any required permitting for the asphalt overlay, milling and resurfacing, roadway reconstruction including establishing roadway crowns and the installation of french drains for the roads in the Lake Surprise Estates subdivision of Key Largo. The Design for Construction shall include, but shall not necessarily be limited to, plans and specifications which describe all systems, elements, details, components, materials, equipment, and other information necessary for construction. The Design for Construction shall be accurate, coordinated and in all respects adequate for construction and shall be in conformity, and comply, with all applicable law, codes, permits, and regulations. Products, equipment and materials specified for use shall be readily available unless written authorization to the contrary is given by the County. Details of the scope of services are outlined below and included in the Consultant's proposal that is attached to this task order as Exhibit A. 1.0 DESIGN DEVELOPMENT The Consultant will evaluate existing adjacent environment and habitat and provide a design that eliminates or minimizes impacts to the surrounding environment and habitat. 2.0 CONSTRUCTION DOCUMENTS PHASE 2.1 The Consultant shall prepare, for approval by the County, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the project. Construction documents shall conform to the standards contained in the following: Lake Surprise Estates EAC Consulting, Inc. May 21, 2014 Page 1 of 6 Florida Department of Transportation Roadway Plans Preparation Manuals http: / /www. dot. state. fl .us /rddesign /PPMManual /PPM.shtm 2. Florida Department of Transportation Design Standards http: / /www. dot. state. fl. us / rddesiqn /DesignStandards /Standards.shtm 3. Florida Department of Transportation Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Streets and Highways http: / /www. dot. state. fl. us / rddesign /FloridaGreenbook/FGB,shtm 4. Florida Department of Transportation Surveying Procedure 5. Florida Department of Transportation Drainage Manual http: / /www.dot.state.fl.us /rddesign /dr /files /2008DrainageManual.pdf 6. MUTCD http: / /mutcd.fhwa.dot.gov/ 7. American Disabilities Act http: / /www2.dot.state.fl. us /proced uraldocuments /procedures /bin/6250200 15. pd 8. Florida Department of Transportation Flexible Pavement Design Manual http: / /www. dot. state. fl. us / pavementmanagement /PUBLICATIONS.shtm 9. Florida Statutes http: / /www.Ieg.state.fl. us/ Statutes /index.cfm ?Mode= View %2OStatutes &Su bmenu =1 & Tab = statutes &CFID = 14677574 &CFTOKEN = 80981948 2.2. The Consultant shall provide Drawings and applicable Technical Specifications for the County's review. 2.3 Upon completion of the Construction Documents Phase, the Consultant shall provide Construction Documents for the County's approval. Upon approval by the County the Consultant shall provide the County up to 5 sets of Construction Documents that have been signed and sealed by the Engineer. The Consultant shall also provide an electronic version of the construction documents. The Consultant shall provide an estimate of anticipated construction cost in accordance with the construction development phase. 2.4 The Consultant shall assist the County in the preparation of the necessary bidding information for the production of bidding forms, the Conditions of the Contracts, and the forms of Agreements between the County and the Contractors by providing supporting information as to the projects scope, bid items, estimated quantities and construction duration. The County shall prepare all Bidding Forms, Conditions of the Contract, and Forms of Agreement. 2.5 The Consultant's construction documents (plans, specifications, etc) will conform to all codes and regulations of the federal government, county, state, municipalities, agencies and state departments, in effect at the date of this Agreement, and shall be of such completion as to be acceptable for review and ruling by said agencies when permits are applied for. The Consultant shall use due care in determining permit Lake Surprise Estates EAC Consulting, Inc. May 21, 2014 Page 2 of 6 requirements and shall meet with regulatory agencies as necessary to coordinate specific permit requirements. The Consultant shall document all meetings and conversations with said regulatory agencies. If permits are denied for incompleteness or for lack of following said codes or regulations, or permit requirements, then the Engineer will conform the construction documents in such manner to receive permits upon such plans. Work required by the Consultant to conform documents to federal, state, city, county, or agency specifications to allow them to be approved shall be completed at no charge or cost to the County, unless said requirements are changed during the course of the project. 2.6 The County shall be responsible for the timely submittal of all permit application fees. 2.7 At the 60% and 100% design phases the Consultant shall provide drawings and other documents which depict the current status of design for the County's review and information. The Consultant shall provide an estimate of anticipated construction costs and construction schedule. 2.8 As needed, the Engineer will provide clarification and answers to questions from prospective bidders during the construction bid process. Answers will be provided in a timely manner in order to facilitate bidding. 3.0 CONSTRUCTION DOCUMENTS PHASE REQUIREMENTS To satisfactorily perform the Construction Documents phase requirement, the Engineer must complete the tasks set forth in items 3.1 through 3.4. 3.1 Construction Plans — This consists of, at a minimum, Key Sheet, Summary of Pay Items and Quantities, Drainage Map, Project Layout, Plan and Profile sheets, Typical Sections, Detail sheets, General Notes, Traffic Control Plan. Construction plans shall be in accordance with FDOT Plans Preparation Manual. 3.2 Specifications — For general specifications, FDOT Specifications will be used. Comprehensive, abbreviated methods, materials and systems descriptions in tune with the drawings will be developed as necessary with Technical Special Provisions. 3.3 Schedules — Prepare an estimate of the Construction Time. 3.4 Estimate of Construction Cost — Estimate of anticipated cost in accordance with the Construction Documents. 4.0 CONSTRUCTION COST Contemporaneously with the submission of the Design, the Consultant shall submit to the County in writing its final estimate of the contractor's anticipated bid price for constructing the Project. Once submitted, the final anticipated price estimate shall be adjusted by the Consultant to reflect any increase or decrease in anticipated price resulting from a change in Design. Lake Surprise Estates EAC Consulting, Inc. May 21, 2014 Page 3 of 6 4.1 The Construction Cost shall be the total estimated bid cost to the County of all elements of the Project designed or specified by the Engineer. 4.2 The Construction Cost shall include the cost at current market rates of labor and materials and Equipment designed, specified, selected or specially provided for by the Engineer, plus a reasonable allowance for Contractor's overhead and profit. 4.3 Construction cost does not include the compensation of the Consultant and the sub - consultants, the costs of land, rights -of -way, financing or other costs which are the responsibility of the County. 4.4 The Engineer agrees that, should the bid for construction of the project exceed its estimate by ten percent (10 %) or more, it will redesign, redraw or rebid, at no additional cost or expense to the County, until the bids are within the stated limits. Construction Phase services will be included in future task orders. Article VII, Paragraph 7.1 is amended to include the following: The Consultant shall be paid monthly; the following lump sum amounts will apply for each task (except where noted): Task 1: Pre - Design Services $ 24,205.00 Task 2: 60% Construction Documents $ 38,909.00 Task 3: 100% Construction Documents $ 59,148.00 Task 4: Permitting (Not to Exceed) $ 11,893.00 Task 5: Bid and Award & Construction Support Services $ 13,440.00 Surveying and Mapping $ 49,652.48 Subsurface Utility Engineering (Not to Exceed) $ 26,300.00 Geotechnical Engineering $ 19,882.09 Environmental Investigations $ 4,000.00 Reimbursables (Not to Exceed) $ 3,000.00 Total $ 250,429.00 Article IX Miscellaneous, Paragraph 9.21 is amended as follows: Pursuant to F.S. 119.0701, Contractor and its subcontractors shall comply with all public records laws of the State of Florida, including but not limited to: (a) Keep and maintain public records that ordinarily and necessarily would be required by Monroe County in order to perform the service. (b) Provide the public with access to public records on the terms and conditions that Monroe County would provide the records and at a cost that does not exceed the cost provided in Florida Statutes, Chapter 119 or as otherwise provided by law. (c) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law. Lake Surprise Estates EAC Consulting, Inc. May 21, 2014 Page 4 of 6 (d) Meet all requirements for retaining public records and transfer, at no cost, to Monroe County all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to Monroe County in a format that is compatible with the information technology systems of Monroe County. Paragraph 9.29 Federal Highway Administration Requirements do not apply to this project. REMAINDER OF PAGE LEFT BLANK Lake Surprise Estates EAC Consulting, Inc. May 21, 2014 Page 5 of 6 IN WITNESS WHEREOF, each party caused the Task Order to be executed by its duly authorized representative. Consultant EAC Consulting, Inc. Witness: s 1� A-a -i � Signature Date Sig t Date ',ZZ Vice Pr es i de n t, Civil Engineering uCNuty %-'1U1 r% Date: 19g A I I a 01 BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA by: May r /Chairman MONROE COUNTY ATTORNEY APPR AS TO FORM: ck u" n t 1.1 f rit, 9 CHRISTINE M. I_IMBERT- BARROWS ASSISTANT COUNTY ATTORNEY Date 5llflll`1 Lake Surprise Estates EAC Consulting, Inc. May 21, 2014 Page 6 of 6