Resolution 079-2014RESOLUTION NO. 079 -2014
WHEREAS, the DEPARTMENT has jurisdiction over State Road (S.R.)
-51US-1/Overseas Highway from Bay Drive (MM 99.9) to 1850 feet north of Linda
Drive (MM 106.25) on the Bayside, which is located within the limits of the COUNTY;
and
TMIA - MITTIVIR3 U11 LIM DUYSIUC QTTA.'T7r'T-'7/uversc77 n7gaway Trurnday Tinve Eo I 6:)V
feet north of Linda Drive,
WHEREAS, the COUNTY will construct a Shared Use Path with the associated
pavement markings, landscaping, drainage and signage systems in accordance with dri
design plans referenced in Contract # ARA97(the "Project"); and
WHEREAS, the PARTIES to this AGREEMENT mutually recognize the need
For entering into an agreement designating and setting forth the responsibilities of each
party with regards to the maintenance of the Shared Use Path, pavement markings,
flandscaping, drainage and signage systems installed pursuant to the Project; and
WHEREAS, the recitals set forth above are true and correct and are deemed to be
restated herein.
The Shared Use Path, Pavement Markings, Landscaping, Drainage and Signage
Maintenance Memorandum of Agreement between the State of Florida Department of
Transportation and Monroe County, Florida is hereby approved.
I
1111MM101D.Py 11 site PMU12�
' AL 10 0
Mayor Sylvia Murphy
Yes
Mayor Pro To Danny Kolhage
Yes
Commissioner George Ne ent
Yes
Commissioner Heather Carruthers
Yes
Commissioner David Rice
— Te - — s
gm
BOARD
BEAVILIN, Clerk OF MOD
a
, / y 14
MONROT-- COUNTY AT"ORNEY
APPROVED AS TO FORM:
2Ls tt t QL�1—
CHRISTINE M. LIMBERT-BA-IROWS
ASSISTANT COUNTY ATTORNEY
I i 'AIN00i 30SNOW
1:) *811 V111
4
7 1 z wd 13 udv 410Z
' C
0603A 803 0311A
FD;nT-
Florida Department of Transportation
FUCK SCOTT 1000 NW 111 Avenue ANANTH PR Asp D, P.E.
GOVERNOR Miami, FL 33172 SECRETARY
SE321M
Ms. Judith S. Clarke, P.E.
Director of Engineering Services
County of Monroe
1100 Simonton Street
Key West, Florida 33040
Re: Maintenance Memorandum of Agreement Notice of Execution
S.R. 5/Overseas Highway from Bay Drive to 1850 feet north of Linda .f r!
on the Bayside I
Thank you on behalf of the Department for your assistance in expediting the
,-,Xecution of the Agreement. If you have questions or concerns, please feel free to
-470-5285.
ntact me at 305
Pablo Valin
Contract Manager
cc: Kenneth Jeffries; File
collectively referred to as the PARTIES.
RECITALS:
A. The DEPARTMENT has jurisdiction over State Road (S.R.)
5 /US -1 /Overseas Highway from Bay Drive (MM 99.9) to 1850
feet north of Linda Drive (MM 106.25) on the Bayside, which
is located within the limits of the COUNTY; and
B. The DEPARTMENT, pursuant to Contract
# ARA97, has agreed
to
have the COUNTY design and construct
a Shared Use Path
and
beautification improvements
on the
Bayside of S.R.5/US-
I/overseas Highway from Bay
Drive to 1850 feet north
of
Linda Drive, the limits of
which
are described in
the
attached Exhibit 'A' (the
PROJECT LIMITS), which
by
reference shall become a part
of this
AGREEMENT; and
C. The COUNTY will construct a Shared Use Path with the
associated pavement markings, landscaping, drainage and
signage systems in accordance with the design plans
referenced in Contract # ARA97(the "Project"); and
E- The COUNTY, by Resolution No. 0 -101 - V 014 , dated
AWil Abts L?14, attached hereto as Exhibit IBI, which by
reference shall become a part of this AGREEMENT, desires to
enter into this AGREEMENT and authorizes its officers to do
SO.
F To the extent permitted by law, the COUNTY shall
Maintenance Memorandum of k-regiment between Florida Department of Transportation and Monroe County
Page 1. of 13
appropriate in its annual budget, for each Fiscal Year,
funds lawfully available to satisfy its maintenance
responsibilities under this AGREEMENT.
NOW, THEREFORE, for and in consideration of the mutual
benefits contained herein and other good and valuable
consideration, the PARTIES covenant and agree as follows:
1. RECITALS
The recitals in this AGREEMENT are true and correct, and
are incorporated herein by reference and made a part
hereof.
a) The following term, as used in this AGREEMENT, is defined
as follows:
i. "SHARED USE PATH" - Asphalt shared used path,
including all other construction elements
such as stabilization, base, detectable
warning surfaces, concrete approaches, new
drainage features including French drains,
landscaping, new signs, new pavement markings
and Raised Pavement Markers (RPMs). The
limits of the path are further defined to
extend horizontally 5 feet on either side
and extend vertically 10 feet over the path
within the PROJECT LIMITS.
b) Assignment
3.00 Y'3 MAINTENANCE RESPONSIBILITIES
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Page 2 of 13
3.1 Landscape:
a) Pruning all plant materials, which include trees, shrubs
and ground covers, and parts thereof. This requirement
is applicable to all new landscaped areas and all
existing landscaped areas adjacent to the Shared Use
Path, per the MRP Handbook.
b) Removing and properly disposing of dead, diseased or
otherwise deteriorated plants in their entirety, and
replacing those that fall below the standards set forth
in the Project Plans and in the Project Specifications,
incorporated herein by reference, and all applicable
DEPARTMENT guidelines, standards and procedures, as may
be amended from time to time. All replacement materials
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Page 3 of 13
shall be in accordance with the Project Plans and the
Project Specifications and Special Provisions.
c) Mulching all plant beds and tree rings.
Removing and disposing of all undesirable vegetation
including but not limited to weeding of plant beds and
removal of invasive exotic plant materials.
e) Watering and fertilizing all plants as needed to maintain
the plant materials in a healthy and vigorous growing
condition.
f) Paying for all water use and all costs associated
therewith.
g) Removing and disposing of all trimmings, roots, branches,
litter, and any other debris resulting from the
activities described by 3.1A through 3.1G,
h) Activities described by 3.1A through 3.1G are also
required for any relocated trees.
a) Performing routine and regular inspections of the Shared
Use Path surface to ensure that the surface is fully
functional; identifying damage and /or malfunctions in the
surfaces; and repairing and /or replacing damaged areas to
ensure surfaces are maintained and that they do not pose
safety hazards for those using or intending to use the
Shared Use Path.
b) The COUNTY shall conduct annual condition surveys of the
surfaces for gaps, settlement, drop -offs, rutting,
raveling, pot holes, delamination, cracking and other
deficiencies described in this AGREEMENT for the life of
the Shared Use Path.
c) Gaps within the surfaces shall not exceed three quarters
(3/4) of an inch. Differential settlement within the
concrete /asphalt surfaces shall not exceed a quarter
(1/4) of an inch in depth.
d) Maintenance and reparation (when needed) of proposed
asphalt aprons around proposed drainage inlets.
e) Paint and reparation (when needed) of proposed security
bollards.
f) Maintenance and reparation (when needed) of proposed
Maintenance Memorandum of Agreement bm een Florida Department of Transportation and Monroe County
Page 4 of 13
de warning surface as specified in the PLANS and
the latest STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION
g) Repairing and/or replacing damaged concrete/asphalt
slabs/flags shall be in kind (texture, geometry, color,
strength, etc.) and in accordance with all applicable
DEPARTMENT guidelines, standards, and all applicable
American with Disabilities Act (ADA) requirements, as
amended from time to time.
h) When remedial action is required in accordance with the
above requirements, the COUNTY at its own expense shall
complete all necessary repairs within ninety (90) days of
the date the deficiency is identified.
3.3 Pavement Markings, RPMs and Signage:
a) Sweep the pavement marking surfaces periodically to keep
them free of debris and to maintain an aesthetically
pleasing condition. A light pressure washing may be
necessary for heavy stain removal or cleaning.
b) Re-move and properly dispose of litter from the pavement
marking surfaces.
c) For any routine repairs or replacement due to noticeable
color scarring or surface deterioration of the pavement
markings, the product authorized installer should be
contacted.
d) maintenance of all proposed signage including sign panels
and supports (posts) and thermoplastic pavement markings
(including RPMs) within project limits per the MRP
Handbook.
e) When remedial. action is required in accordance with the
above requirements, the COUNTY shall complete all
necessary repairs at its own expense within ninety (90)
days of the date the deficiency is identified.
a) The proposed Shared Use Path will reduce the pervious
swale areas. As such, the COUNTY shall maintain all
drainage features constructed under this project.
b) Maintain the drainage system operating as designed by
cleaning and desilting the drainage system, including
pipes, structures, and French drains, from debris and
other material that can accumulate throughout the life of
the system. Fix all damaged drainage systems.
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Pap 5 of 13
c) Performing routine and regular inspection of the drainage
features to assure that the systems are fully functional;
identifying damage and/or malfunctions to the system(s)
and repairing and/or replacing broken components.
d) The COUNTY shall conduct annual condition surveys of the
drainage features for deficiencies described in this
AGREEMENT for the life of the Shared Use Path.
e) When remedial action is required in accordance with the
above requirements, the COUNTY at its own expense shall
complete all necessary repairs within twenty (20) days of
the date the deficiency is identified.
The DEPARTMENT may, at its sole discretion, perform periodic
inspection of the Shared Use Path, signage, drainage,
pavement markings and landscape to ensure that the COUNTY is
performing its duties pursuant to this AGREEMENT. The
DEPARTMENT shall share with the COUNTY its inspection
findings, and may use those findings as the basis of its
decisions regarding maintenance deficiencies, as set forth
in Section 4 of this AGREEMENT. The COUNTY is responsible
for obtaining copies of all applicable rules, regulations,
policies, procedures, guidelines, and manuals, and the
Project Specification and Special Provisions, as may be
amended from time to time.
remove any or all the Shared Use Path, pavement
markings, signage and landscape located within the
PROJECT LIMITS, and charge the COUNTY the reasonable
cost of such removal.
To the DEPARTMENT: Florida Department of Transportation
1000 Northwest 111 Avenue, Room 6205
Miami, Florida 33172-5800
Attn: District Maintenance Engineer
To the COUNTY: Monroe County
County Administrator's office
1100 Simonton Street
Key West, Florida 33040
Attention: County Administrator
Notices shall be deemed to have been received by the end of
five (5) business days from the proper sending thereof
unless proof of prior actual receipt is provided.
Z4 0
a. The PARTIES agree that the Shared Use Path, pavement
markings, signage, drainage and landscape addressed by
this AGREEMENT may be removed, relocated or adjusted at
any time in the future, at the DEPARTMENT's sole
discretion. In the event that the DEPARTMENT relocates
or adjusts the Shared Use Path, pavement markings,
signage and Landscape, the COUNTY I s maintenance
responsibilities will survive the relocation or
adjustment, as long as the materials remain within the
Project Limits,
7. TERMINATION
This AGREEMENT is subject to termination under any one of
the following conditions:
a. By the DEPARTMENT, if the COUNTY fails to perform its
duties under Section 3 of this AGREEMENT, following the
thirty (30) days written notice, as specified in
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Page 7 of 13
Section 4 of this AGREEMENT.
C. If mutually agreed to by both parties, upon thirty (30)
days advance notice. An agreement to terminate shall
be valid only if made in writing and executed with the
same formalities as this AGREEMENT.
a. The effective date of this AGREEMENT shall commence
upon execution by the PARTIES. This AGREEMENT shall
continue in perpetuity or until termination as set
forth in Section 7-
b. E-Verify
The COUNTY / Contractors or Vendors:
i. shall utilize the U.S. Department of
Homeland Security's E-Verify system to
verify the employment eligibility of all new
employees hired by the Vendor/Contractor
during the term of the contract; and
ii- shall expressly require any subcontractors
performing work or providing services
pursuant to the state contract to likewise
utilize the U.S. Department of Homeland
Security's E-Verify system to verify the
employment eligibility of all new employees
hired by the subcontractor during the
contract term.
The COUNTY shall insert the above clause into any
contract entered into by the COUNTY with vendors or
contractors hired by the COUNTY for purposes of
performing its duties under this AGREEMENT.
C, This writing embodies the entire AGREEMENT and
understanding between the PARTIES hereto and there are
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Page 8 of 13
no other agreements and understanding, oral or written,
with reference to the subject matter hereof that are
not merged herein and superseded hereby.
f. venue for any and all actions arising out of or in
connection to the interpretation, validity, performance
or breach of this AGREEMENT shall lie exclusively in a
state court of proper jurisdiction in Leon County,
Florida.
9- A modification or waiver of any of the provisions of
this AGREE14ENT shall be effective only if made in
writing and executed with the same formality as this
AGREEMENT.
i. The section headings contained in this AG E. are
for reference purposes only and shall not affect the
meaning or interpretation hereof.
Subject to Section 768.28, Florida Statutes, as may be
amended from time to time, the COUNTY shall promptly
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Page 9 of 13
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Page 10 of 13
this provision by the COUNTY.
IN WITNESS WHEREOF, the parties hereto have caused these
presents to be executed the day and year first above written,
CIO of COUNTY:
STATE OF FLORADA
DEPARTMENT OF TRANSPORTATION:
I
..
BY
C0=Y Attorney
s
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Page I I of 3 3
District Chief",ICounsel
EXHXB X T " A -r
wwga���
Below are the limits of the Shared Use Path, pavement markings,
signage, drainage and landscape to be maintained under this
AGREEMENT.
Agreement Limits: From Bay Drive DIN 99-9) to
1850 feet north of Linda Drive (MM 106.25) on
the dayside
co%=ty; Konroe
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Page 1 2 of 13
EXHXBXT " B "
MONROE COUNTY RESOLUTION
To be herein incorporated once ratified by the COUNTY Board of
Cornissioners.
Maintenance Memorandum of Agreement between Florida Department of Transportation and Monroe County
Page 13 of 13