Loading...
3 PSO 09/27/2017PURCHASE / SERVICE ORDER FOR MONROE COUNTY To: THC, Inc. Re: PSO Agreement, Dated 8 -30 -2017 Purchase Service Order No. 3 Project Name: Implementation of Noise Insulation Program (FY 2017 -18 PSO 3A Bid Process & PSO 3B Construction Management Administration) KWBTS "Pilot Project" Building B, Floors 1 & 2 and Two (2) SF Homes Description of Services: (See attached Scope of Services) Days to Complete 600 Lump Sum Fee $1,026,155.85 Payment for Services shall be in their entirety as per PSO. Prepared by: Jo A. Carroll, President Date: 8 -30 -2017 Recommended by: 3 N ° �'t �- 0 C)n o n O z?� a Date: :7 o Accepted by: J e A. Carroll, President Date: Approved by: An� 5 George Neugent, Mayor Monroe Counter -,RQ rd of County Commissioners Key West International Airport Noise Insulation Program (NIP) Phase 1 (FY 2017 -18) PSO 3 BUDGET NARRATIVE PSO 3A BID PROCESS KWBTS "PILOT PROJECT" BUILDING B, FLOORS 1 & 2 AND TWO (2) SINGLE FAMILY HOMES KWBTS BUILDING B FLOORS 3 -6 PSO 3B CONSTRUCTION MANAGEMENT & ADMINISTRATION KWBTS "PILOT PROJECT" BUILDING B, FLOORS 1 & 2 AND TWO (2) SINGLE FAMILY HOMES KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 1 of 23 Key West International Airport Noise Insulation Program (NIP) Phase 1 (FY 2017 -18) PSO 3 BUDGET NARRATIVE INTRODUCTION KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 2 of 23 Project Overview Based on Key West International Airport's 2013 & 2018 Noise Exposure Maps (NEMs), the properties within the DNL 65 decibel boundary have been grouped into three (3) phases for potential eligibility in the Key West Noise Insulation Program (NIP): PHASE 1 Key West by the Sea Condominiums (KWBTS) 206 units Single Family Homes (DNL 70 -75 dB) 4 units PHASE 2 Single Family Homes (DNL 65 -70) 73 units Low Density Multi - Family Residential 15 units Lime Grove House 1 unit PHASE 3 Flagler Court Townhomes 26 units Grace Lutheran Church and School 5 units Parsonages 2 units Phase 1 NIP Implementation Plan and Completion Status FY 2015 -16 PSO 1 (Completed) In the first year of the NIP Phase 1 implementation, the THC consultant team completed all primary eligibility tasks including: - Property Surveys — KWBTS Buildings A, B, C and 4 SF homes - Acoustical Test Plan - KWBTS Buildings A, B, C and 4 SF homes - Eligibility Noise Testing - KWBTS Buildings A, B, C and 3 SF homes - NIP Eligibility Determination - KWBTS Buildings A, B, C and 3 SF homes In April 2016, as a result of eligibility noise testing, a total of two hundred nine (209) Phase 1 properties were deeded eligible to participate in the Key West NIP including KWBTS Building A (65 condominium units), KWBTS Building B (65 condominium units), KWBTS Building C (76 condominium units), 2827 Venetian Drive, 2929 Venetian Drive, and 1717 Jamaica Drive. Due to the funding level required to complete the design and construction process for all 209 eligible NIP Phase 1 properties, it was decided to divide the NIP implementation into four (4) fiscal years 2016- 17, 2017 -18, 2018 -19, 2019 -2020. FY 2016 -17 PSO 2 (Completed) In the second year of the NIP Phase 1 implementation, the THC consultant team completed all primary design development tasks and bid tasks including: Phase 1A - Design Surveys — KWBTS Buildings A, B, C, and 3 SF homes Phase 1A - Design Documents - KWBTS Buildings A, B, C, and 3 SF homes Phase 1A - Preparation of Final Bid Documents & Bid Process — KWBTS Building B and 3 SF homes KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 3 of 23 FY 2017 -18 PSO 3 (Current Year) In the third year of the NIP Phase 1 implementation, the THC consultant team will complete the following bid and construction tasks which will be described in this narrative: Phase 1A - Preparation of Final Bid Documents & Bid Process — KWBTS "Pilot Project' (Building B, Floors 1 & 2) and Two (2) SF homes Phase 1A - Construction Management of KWBTS "Pilot Project" and Two (2) SF Homes (21 units) Phase 1A - Preparation of Final Bid Documents & Bid Process - KWBTS Building B Floors 3 -6 (35 units) FY 2018 -19 PSO 4 (Future Year) In the fourth year of the NIP Phase 1 implementation, the THC consultant team will complete the following bid and construction tasks: Phase 1A - Construction Management of KWBTS B Floors 3 -6 (35 units) Phase 1 B - Preparation of Final Bid Documents & Bid Process - KWBTS Building C FY 2019 -20 PSO 5 (Future Year) In the fifth year of the NIP Phase 1 implementation, the THC consultant team will complete the following design, bid and construction tasks: Phase 1 B - Construction Management — KWBTS Building C (76 units) Phase 1 C - Preparation of Final Bid Documents & Bid Process — KWBTS Building A FY 20 -21 PSO 6 (Future Year) In the sixth year of the NIP Phase 1 implementation, the THC consultant team will complete the following design and construction tasks: Phase 1 C - Construction Management — KWBTS Building A (65 units) Phase 2A - Property Survey — Phase 2 Properties Phase 2A - Acoustical Test Plan and Eligibility Noise Testing for Phase 2 Properties Phase 2A - Design Document Development - Phase 2 - Group 1 Phase 2A - Preparation of Final Bid Documents & Bid Process — Phase 2 - Group 1 NIP PSO Background Information Uniqueness of Noise Insulation Program (NIP) Management Requirements Given the specialization of the noise insulation program management process and budget development, it is more difficult for an outside party to review annual noise insulation Professional Services Authorization (PSO) budgets compared to a traditional airport airside / landside project. In addition, there are a limited number of firms and individuals who possess the high level of NIP program management experience that will be required for this Key West NIP PSO 3A. Given the unique project demands, THC has formed a team of senior staff individuals with a high level of NIP experience. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 4 of 23 Steve Vecchi, THC 27 years NIP experience Alan Hass, L &B 27 years NIP experience Richard Sun, Sun Group 19 years NIP experience Eric Seavey, L &B 18 years NIP experience Heather Faubert, THC 18 years NIP experience In addition, many of the NIP processes are much different than the processes used in typical airport planning, design and environmental projects. Unlike a typical airside /landside project, a NIP involves making extensive modifications to private property, requiring unique architectural design documents, a high level of property owner interaction, and numerous legal documents and liability controls. As shown above, the THC team consists of mostly senior staff with higher hourly rates. Over the many years of NIP program management experience, THC has learned that it is better to have a smaller team of highly experienced, senior staff than a large team of staff with limited NIP experience. This team composition strategy has resulted in a much higher program success throughout the U.S. with less errors, design issues, contractor failures, and sponsor liability issues. Property Owner Challenges Most KWBTS property owners do not reside in Key West on a full -time basis, which will require much more time for communicating and coordinating with property owners in order to prepare the final bid documents. PSO 3A tasks will require the coordination of 65 individual condominium owners in Building B. Therefore, the property owner tasks will be considerably more involved than a typical residential NIP. These tasks will include all property owner communication (letters, emails, phone calls, conference calls), property owner scheduling, individual meetings with property owners to finalize proposed acoustical modifications, and processing of required legal documents. Since many of the KWBTS condominium property owners only live in Key West for a limited number of months, these tasks will require a much higher number of consultant hours to accomplish. Simultaneous Processes During the PSO 3 budget year, there will be many independent tasks occurring simultaneously between the PSO 3A and PSO 3B tasks: There are six (6) primary PSO 3A tasks that will occur simultaneously within a 12 -month period (October 1, 2017 to September 30, 2018) to include: Project Management, Update Bid Documents — KWBTS Pilot, Bid Process — KWBTS Pilot, Asbestos Testing (176 units), Update Bid Documents — KWBTS Building B Floors 3 -6 and Bid Process — KWBTS Building B Floors 3 -6. There are seven (7) primary PSO 3B tasks that will occur simultaneously within an 8 -month period (October 1, 2017 to May 31, 2018) to include: Project Management, Manage Contractor Asbestos Testing Process & Review All Findings, Pre - Construction Tasks, Daily Construction Management, Analysis of Asbestos Sample Test Results, Post - Construction Noise Testing and Construction Close -out. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 5 of 23 Construction Management Staffing The KWBTS "Pilot Project" construction will be performed for a total of 21 properties (19 KWBTS Building B Floors 1,2 condominiums and 2 single family homes), where both Building B floors will be constructed, individually, within a three (3) calendar month period. In addition, construction of the 2 single family homes will occur simultaneously to the KWBTS Building B construction, to be scheduled after the award of the KWBTS Pilot construction contract. Depending on the contractor's final approved construction schedule, multiple condominium units will be opened by the contractor simultaneously on Floors 1 and 2, which will result in a greater concentration of construction activity that will need to be managed simultaneously. Therefore, given this method and the complication associated with required asbestos remediation that will be required to be sequenced with the other NIP scope of work, PSO 3B will require a higher number of required construction management tasks compared to a typical NIP. To provide proper oversight and to ensure that all work on a floor is being performed in conformance with NIP design documents, one (1) full -time professional construction manager will be required. Consultant Team Overview The PSO 3A Scope of Services will require an array of tasks to be completed by THC and their sub - consultants (the "Consultant "). The THC Director of Acoustical Services will act as the Project Manager of the THC Consultant Team and will provide all daily project management responsibilities throughout the 12 -month period, and will report directly to the Key West International Airport's Noise Program Coordinator. The THC Project Manager will be supported by an Assistant Project Manager from the THC Atlanta headquarters office. The Consultant Team is composed of the following disciplines. THC, Inc. - The Project Manager, THC, Inc. (THC) will provide overall program management services and support to the Airport Noise Program Coordinator as necessary. THC will provide database services and project scheduling, along with interaction with all participating property owners and tenants. The Director of Acoustical Services ($256.39) will act as Project Manager and will have overall responsibility for all daily project tasks and activities. THC will also utilize the services of an Assistant Project Manager ($110.34) for both management and administrative support from the Atlanta headquarters office. The Construction Manager will assist the Project Manager and Assistant Project Manager when required. The THC Principal will have minimal involvement in this project, but will review monthly status reports, sign and review all sub - consultant contracts, and consult with the client and Project Managers as needed. Finally, THC will utilize the Director of Administrative Services to process all sub - consultant payments and invoices, and prepare all invoices from THC to the client. The Sun Group — The local Project Architect, The Sun Group, will provide all required architectural services for this project. The Sun Group will be responsible for developing all proposed acoustical modification documents for each property, reviewing draft acoustical modification documents with each property owner, developing final construction drawings and acoustical modification documents for each property, preparing the bid package, leading the pre -bid conference, attending all contractor outreach sessions and workshops where necessary, tabulating the bids for construction services, and making the final award recommendation to THC. The Sun Group will utilize the services of the Principal Architect, Senior Architect, and an Architectural Drafter. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 6 of 23 Jones & Conde. LLC - The local Project Mechanical and Electrical Engineer, Jones & Conde, LLC, will provide all required mechanical and electrical design support to the Sun Group. Jones & Conde, LLC will be responsible for developing the mechanical /electrical scope of work for each property, assisting The Sun Group by reviewing the draft acoustical modification documents with each property owner, developing final mechanical /electrical construction drawings and documents for each property, assisting The Sun Group in the preparation of the bid package, and attending the pre -bid conference. Jones & Conde, LLC will utilize the services of the Principal Engineer, Senior Engineer and Engineering Drafter. • Landrum & Brown - The Acoustical Engineer, Landrum & Brown (L &B) will provide all required pre- modification noise analysis, and will utilize an Associate Vice President, senior Consultant and Senior Project Administrator. • EE &G — The Environmental Consultant will provide all services associated the development of the NIP Volume 3 — Asbestos Abatement Specification, asbestos sample collection, laboratory analysis, analysis of test findings and development of final ACM scope of work for each condominium. EE &G will utilize the services of the Principal, Senior Technical Advisor, Senior Project Professional and Administrative Assistant. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 7 of 23 Key West International Airport Noise Insulation Program (NIP) Phase 1 (FY 2017 -18) PSO 3A BUDGET NARRATIVE BID PROCESS KWBTS "PILOT PROJECT" BUILDING B, FLOORS 1 & 2 AND TWO (2) SINGLE FAMILY HOMES KWBTS BUILDING B FLOORS 3 -6 KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 8 of 23 PSO 3A — Scope of Work Tasks The following sections will provide a detailed review of all required consultant tasks for the NIP PSO 3A — Bid Process which include the following seven (7) key tasks: Task 1 Project Management Task 2 Update Bid Documents — KWBTS "Pilot Project" and Two (2) Single Family Homes Task 3 Bid Process — KWBTS "Pilot Project" and Two (2) SF Homes Task 4 Asbestos Testing of 176 KWBTS Condominiums Task 5 Update Bid Documents — KWBTS Building B Floors 3 -6 Task 6 Bid Process — KWBTS Building B Floors 3 -6 TASK 1 PROJECT MANAGEMENT October 1, 2017 - September 30, 2018 The Consultant will perform the following general project management tasks for PSO 3A during a twelve (12) month period, in coordination with the Airport Noise Program Coordinator: Set up Project The Consultant will set up the project in the corporate financial system, as required by corporate policy to manage the project. Manage Sub - Consultants The Consultant will be responsible for the daily management of all sub - consultants in their completion of all project tasks. This process includes all phone / conference call / email communication and review of their task implementation plan and all document deliverables. The Consultant will also be responsible for managing their budget expenditures and reviewing their monthly invoices. Participate in Weekly Coordination / Progress Conference Calls The Consultant will participate in weekly coordination / progress telephone conference calls with KWIA's Airport Noise Program Coordinator. The calls will be hosted by KWIA's Airport Noise Program Coordinator, and the duration of each call will be approximately 60 minutes. The FAA ADO will be invited to participate in these calls. KWIA's Airport Noise Program Coordinator will provide the Consultant with the call -in number and conference code, and will dial -in as the leader. Attend KWIA Ad -Hoc Committee Meetings The Consultant will attend KWIA Ad -Hoc Committee meetings, as directed by KWIA's Airport Noise Program Coordinator, to present information on the status of the project. The FAA ADO will be invited to attend these meetings. The Ad -Hoc Committee typically meets four times per year (e.g., December 2017, March, June, and September 2018). KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 9 of 23 Attend KWBTS Board Meetings The Consultant will attend KWBTS monthly Board Meetings to present information on the status of the project. The KWBTS Board typically meets the second Monday of each month. Communicate with Property Owners and Others The Consultant will be responsible for all general communication requirements with the public, NIP participating property owners, City of Key West, Monroe County, FAA, product manufacturers and general contractors. Manage Property Files The Consultant will provide the management of all property files (76 for Building C) containing all letters, emails, phone calls, legal documents, proposed acoustical modification documents and schedules. Prepare Project Invoicing The Consultant will prepare monthly invoices to Monroe County, as required to manage the project. Distribute Property Owner Satisfaction Questionnaire Upon completion of the NIP construction, the Consultant will distribute, collect, and record Property Owner Satisfaction Questionnaire surveys to evaluate the performance of the Consultant team and contractor. Develop 2018 -19 Budget and Scope (PSO 4A, 4B) The Consultant will develop the KWIA NIP 2018 -19 Consultant budget and scope of work narrative for two (2) independent budgets: PSO 4A (Design Review & Finalization of Designs — Building C, Preparation of Final Bid Documents and Bid Process — Building C) and PSO 4B (Construction Management of Building B Floors 3 -6). The Consultant will coordinate and review all sub - consultant budgets, as well as the coordination of FAA pre - application and grant application processes. Conduct Pre - Construction Noise Analysis Although the pre- construction noise testing (i.e., data collection) was conducted on Building B as part of PSO 2, the analysis, computer modeling and documentation of the data for Building B still needs to be completed. Close Out Project The Consultant will provide information / documentation to KWIA's Airport Noise Program Coordinator as needed to facilitate close -out of the AIP grant. The Consultant will conduct administrative tasks, as required by corporate policy to close out the project. Task 1 Reimbursable Expenses Notes: Task 1 will occur over a twelve (12) month period. The Consultant will be required to include office costs required to manage all above tasks and required communication for all KWBTS property owners and the public, including costs for duplication, certified mailings and letters. The Project Manager will need to budget costs for 6 trips for KWBTS Board Meetings. The Assistant Project Manager will need to budget costs for 5 trips for KWBTS KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 10 of 23 Board Meetings. All trip costs need to include related airfare, auto rental, per diem, fuel and parking costs for each Consultant staff. TASK 2 UPDATE BID DOCUMENTS — KWBTS "PILOT PROJECT" In preparation for the bid of the KWBTS "Pilot Project," the Consultant will be required to complete several tasks: Update Bidding Documents (Project Manual Volume 1 of 3) The Consultant will review and update the Bidding Documents developed for the original KWBTS Building B (55 units) project and incorporate changes based on the Phase 1A bid and construction (to -date) experience (e.g., contractor minimum qualification requirements, Unit Prices, Special Provisions). The Bidding Documents for the KWBTS "Pilot Project" will meet all FAA requirements and the requirements of the local authorities, and will contain all information necessary for the formal bid process, including Bidding Requirements and Contract Forms. Update Technical Specifications (Project Manual Volume 2 of 3) The Consultant will review and update the Technical Specifications developed for the original Building B (55 units) project and incorporate changes that reflect the modified KWBTS "Pilot Project" (e.g., contractor minimum requirements, construction scheduling, construction staging requirements, construction safety plan, construction manager staffing plan). Update Asbestos & Lead Based Paint Inspection Reports and Asbestos Remediation Specifications (Project Manual Volume 3 of 3) The Consultant will review and update the Asbestos & Lead Based Paint Inspection Reports and Asbestos Remediation Specifications_developed for Phase 1A, and incorporate changes based on requires asbestos abatement testing & processes, laboratory testing, analysis of findings, development of required ACM abatement plan for each condominium and required on -site asbestos remediation procedures during construction. Revise Construction Drawings (Volume 1 of 1) Using the final Acoustical Modification Packages for the 19 KWBTS "Pilot Project" units and the Two (2) Single Family Homes, the Consultant will prepare the Construction Drawings for the KWBTS "Pilot Project" and develop a revised engineer's estimate of anticipate construction costs. Task 2 Reimbursable Expenses Notes: In Task 2, the Consultant will be required production, duplication, and shipping. to include all costs related to bid document KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 11 of 23 TASK 3 BID PROCESS — KWBTS "PILOT PROJECT" The Consultant will complete the following bid process tasks for the KWBTS "Pilot Project ": Prepare Bid Advertisement After conducting outreach for Contractors who may be interested in bidding the project, the Consultant will develop a bid advertisement notice for the KWBTS "Pilot Project" (21 units) and provide it to Monroe County Purchasing Department for advertising. Contractor Request for Information During the bid process, Monroe County will be responsible for all communication from contractors who are interested in bidding the project. The Consultant will assist Monroe County as requested. The Consultant will provide answers to bidder's questions pertaining to the project relating to the design documents, schedule, specification and /or contractor requirements. Conduct Pre -Bid Meeting Consistent with the formal bid advertisement, the Consultant will schedule and conduct a mandatory pre -bid meeting in Key West for contractors who are interested in bidding the project. At the pre -bid meeting, the Consultant will review all aspects of the project including contractor minimum experience requirements, design documents, safety plan, unit prices, contractor deficiency point system, construction scheduling, and contractor expectations. Attend Bid Opening The Consultant will coordinate with the Key West International Airport and Monroe County to be available at the bid opening, as described in the bid advertisement. Review Bids and Prepare Award Recommendation Upon the opening of the bids, the Consultant will conduct a detailed review of all contractor bids received. After this review, the Consultant will provide an official letter of contract award recommendation to Key West International Airport and Monroe County, to the lowest, most responsive and most responsible bidder. Coordinate Contract Award The Consultant will coordinate with the recommended General Contractor (GC) to make sure the GC submits their completed contract documents to Monroe County Department of Airports in a timely manner, such that the Board of County Commissioners (BOCC) can schedule the award of contract on the same monthly agenda as acceptance of the FAA grant. Task 3 Reimbursable Expenses Notes: In Task 3, the Consultant (Project Manager, Assistant Project Manager, and Architect will need to budget costs for 1 trip to conduct KWBTS "Pilot Project" Pre -Bid Meeting. All trip costs need to include related airfare, auto rental, per diem, fuel and parking costs for each Consultant staff. In addition, the Consultant will need to include all costs related to the bid process including specification production, duplication, shipping, letters and postage. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 12 of 23 TASK 4 ASBESTOS TESTING OF 176 KWBTS CONDOMINIUMS In this task, the Consultant will be required to complete asbestos testing in 176 KWBTS condominiums (Building B — 35 units, Building C — 76 units, Building A — 65 units) which will require several individual tasks: Scheduling of Asbestos Surveys The Consultant will schedule appointments for each of the 176 KWBTS condominiums, to allow for the collection of require number of asbestos samples. Collection of Asbestos Samples During the scheduled Asbestos Survey, the Consultant will collect between 6 to 11 asbestos samples in each of the 176 KWBTS condominiums. Laboratory Testing After the collection of samples for each of the 176 KWBTS condominiums, the Consultant will ship them to an accredited scientific laboratory for analysis and presence of asbestos containing materials (ACM). Analysis of Laboratory Findings The Consultant will review and analyze sample test findings for each of the 176 KWBTS condominiums. This analysis will provide a summary of ACM presence in all 176 condominiums. Development of ACM Scope of Work Based on the analysis of laboratory findings, when sample results show the presence of ACM, the Consultant will develop a custom ACM Scope of Work for each condominium that can be included in the future bid documents. Task 4 Reimbursable Expenses Notes: In Task 4, the Consultant (Project Manager) will need to budget costs for six 1 -week trips and the Environmental Consultant will need to budget costs for three 1 -week trips to conduct Asbestos Testing in all 176 KWBTS condominiums. All trip costs need to include related airfare, auto rental, per diem, fuel and parking costs for each Consultant staff. In addition, the Consultant will need to include all costs related laboratory fees, shipping and duplication. TASK 5 UPDATE BID DOCUMENTS — KWBTS BUILDING B FLOORS 3 -6 In preparation for the bid of KWBTS Building B Floors 3 -6 (35 units), the Consultant will be required to complete several tasks to include: Update Bidding Documents ( Proiect Manual Volume 1 of 3) The Consultant will review and update the Bidding Documents developed for the KWBTS "Pilot Project ", and incorporate changes based on the KWBTS "Pilot Project" experience (e.g., contractor minimum qualification requirements, Unit Prices, Special Provisions). The Bidding Documents for KWBTS Building B Floors 3 -6 will meet all FAA requirements and the requirements of the local authorities, and will contain all information necessary for the formal bid process, including Bidding Requirements and Contract Forms. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 13 of 23 Update Technical Specifications (Project Manual Volume 2 of 3) The Consultant will review and update the Technical Specifications developed for the KWBTS "Pilot Project ", and incorporate changes based on the KWBTS "Pilot Project" bid and construction (to -date) experience (e.g., construction phasing methodologies, construction schedules, construction staging requirements, construction lift requirements, construction methodologies, construction safety plan, construction manager staffing plan). Update Asbestos & Lead Based Paint Inspection Reports and Asbestos Remediation Specifications (Project Manual Volume 3 of 3) The Consultant will review and update the Asbestos & Lead Based Paint Inspection Reports and Asbestos Remediation Specifications developed for the KWBTS "Pilot Project ", and incorporate changes based on the KWBTS "Pilot Project" bid and construction (to -date) experience (e.g., asbestos testing process, asbestos analysis process, required asbestos remediation procedures and asbestos abatement executive management). Revise Construction Drawings (Volume 1 of 1) Using the final Acoustical Modification Packages developed for KWBTS Building B Floors 3 -6 (35 units), the Consultant will prepare the Construction Drawings for KWBTS Building B Floors 3 -6 and develop a revised engineer's estimate of anticipate construction costs. Task 5 Reimbursable Expenses Notes: In Task 5, the Consultant will be required to include all costs related to bid document production, duplication, and shipping. TASK 6 BID PROCESS — KWBTS BUILDING B FLOORS 3 -6 The bid process for KWBTS Building B Floor 3 -6 (35 units) will require that the Consultant complete several tasks to include: Prepare Bid Advertisement After conducting outreach for Contractors who may be interested in bidding the project, the Consultant will develop a bid advertisement notice for the Construction of KWBTS Building B Floors 3 -6 and provide it to Monroe County Purchasing Department for advertising. Contractor Request for Information During the bid process, Monroe County will be responsible for all communication from contractors who are interested in bidding the project. The Consultant will assist Monroe County as requested. The Consultant will provide answers to bidder's questions pertaining to the project relating to the design documents, schedule, specification and /or contractor requirements. Conduct Pre -Bid Meeting Consistent with the formal bid advertisement, the Consultant will schedule and conduct a mandatory pre -bid meeting in Key West for contractors who are interested in bidding the project. At the pre -bid meeting, the Consultant will review all aspects of the project including contractor minimum experience requirements, design documents, safety plan, unit prices, contractor deficiency point system, construction scheduling, and contractor expectations. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 14 of 23 Attend Bid Opening The Consultant will coordinate with the Key West International Airport and Monroe County to be available at the bid opening, as described in the bid advertisement. Review Bids and Prepare Award Recommendation Upon the opening of the bids, the Consultant will conduct a detailed review of all contractor bids received. After this review, the Consultant will provide an official letter of contract award recommendation to Key West International Airport and Monroe County, to the lowest, most responsive and most responsible bidder. Coordinate Contract Award The Consultant will coordinate with the recommended General Contractor (GC) to make sure the GC submits their completed contract documents to Monroe County Department of Airports in a timely manner, such that the Board of County Commissioners (BOCC) can schedule the award of contract on the same monthly agenda as acceptance of the FAA grant. Task 6 Reimbursable Expenses Notes: In Task 6, the Consultant (Project Manager, Assistant Project Manager, and Architect will need to budget costs for 1 trip to conduct KINBTS Building B Floors 3 -6 Pre -Bid Meeting. All trip costs need to include related airfare, auto rental, per diem, fuel and parking costs for each Consultant staff. In addition, the Consultant will need to include all costs related to the bid process including specification production, duplication, shipping, letters and postage. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 15 of 23 Key West International Airport Noise Insulation Program (NIP) Phase 1 (FY 2017 -18) PSO 3B BUDGET NARRATIVE CONSTRUCTION MANAGEMENT & ADMINISTRATION KWBTS "PILOT PROJECT" BUILDING B, FLOORS 1 & 2 AND TWO (2) SINGLE FAMILY HOMES KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 16 of 23 PSO 3B — Scope of Work Tasks The following sections will provide a detailed review of all required consultant tasks for the NIP PSO 3B — Bid Process which include the following seven (7) key tasks: Task 1 Program Management Task 2 Management of Contractor Asbestos Abatement Testing Process Task 3 Pre - Construction Tasks Task 4 Daily Construction Management Task 5 Analysis of Asbestos Sample Test Results Task 6 Post - Construction Noise Testing and Analysis Task 7 Construction Closeout TASK 1 PROGRAM MANAGEMENT October 2017 — May 2018 Given the commercial nature of the KWBTS construction, the Consultant will be required to conduct several Property Owner and Contractor tasks during an eight (8) month period to properly prepare for the NIP KWBTS "Pilot Project" Construction process to include: Conduct NIP Construction Orientation Sessions The Consultant will schedule and conduct NIP Construction Orientation Sessions for all 21 participating property owners (19 Building B, 2 single family) to ensure they clearly understand all NIP Construction processes to include construction requirements, procedures, site layout, safety requirements, and anticipated schedules. Review Contractor Criminal Background Reports After submission by the awarded contractor, the Consultant will review and approve all Criminal background reports for all Contractor staff to include employees, 1099 workers, subcontractors and suppliers. Review Contractor 12 -Panel Drug Testing Reports After submission by the awarded contractor, the Consultant will review and approve all 12 -Panel Drug Testing reports for all Contractor staff to include employees, 1099 workers, subcontractors and suppliers. Develop and Issue ID Badging for all Contractor Staff After successful review and approval of Criminal Background and 12 -Panel Drug Test Reports, the Consultant will create and issue NIP Construction site ID badges for all Contractor staff to include employees, 1099 workers, subcontractors and suppliers. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 17 of 23 Property Owner Communication The Consultant will provide all required written and verbal communication to all 21 property owners as required to prepare for construction, relating to construction processes, property owner requirements, and scheduling. Task 1 Reimbursable Expenses Notes: Task 1 will occur over an 8 -month period. The Consultant will be required to include all costs related to Property Owner and Contractor tasks including document production, duplication, shipping, letters, postage and ID Badge production. The Consultant (Project Assistant Project Manager) need to budget costs for two (2) trips for on -site badging and property owner pre- construction meetings. All trip costs need to include related airfare, auto rental, per diem, fuel and parking costs for each Consultant staff. TASK 2 MANAGEMENT OF CONTRACTOR'S ASBESTOS TESTING PROCESS When the Contractor performs the asbestos testing of the 19 KWBTS Building B condominiums, the Consultant (Project Manager, Assistant Project Manager, Environmental Consultant) will be required to complete several management tasks to include: Schedulinq of Asbestos Surveys The Consultant will schedule appointments for each of the 19 Building B condominiums, to allow for the collection of required number of asbestos samples. Collection of Asbestos Samples During the scheduled Asbestos Survey, the Consultant will observe and direct the Contractor's collection of the required asbestos samples (ranging from 6 — 11 samples) in each of the 19 Building B condominiums. Analysis of Laboratory Findings The Consultant will perform an independent review of the Contractor's Laboratory test findings of the samples collected at the 19 Building B condominiums. This analysis will provide a summary of ACM presence in the collected samples. Development of ACM Scope of Work Based on the analysis of laboratory findings, the Consultant will develop a custom ACM Scope of Work for each condominium for the Contractor that will define their final Asbestos Abatement scope of work in each of the 19 Building B condominiums and will allow for the development of the Contractor's final NIP KWBTS "Pilot Project" construction schedule. Task 2 Reimbursable Expenses Notes. In Task 2, the Consultant (Project Manager) will need to budget costs for 1 trip to conduct Asbestos Testing in all 99 Building B condominiums. All trip costs need to include related airfare, auto rental, per diem, fuel and parking costs for Consultant staff. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 18 of 23 TASK 3 PRE - CONSTRUCTION TASKS In preparation for the Construction of 21 properties (KWBTS Building B - 19 units and 2 Single Family Homes), the Consultant will be required to complete several pre- construction tasks to include: Conduct Final Measurement Walk- Through Inspections The Consultant will conduct Final Measurement Walk- Through Inspections with the Contractor and Product Manufacturers in all 19 participating condominiums. This 60- minute visit at each condominium will include final measurements of all windows and doors, review of ERV & ductless AC installation process, review of asbestos abatement containment and staging plan, verification of property owner "pre- work" requirements and verification of finishes, colors and styles. In addition to the KWBTS Building B Final Measurement Visit, the Consultant will perform a Final Measurement Walk- Through Inspection at the 2 single family homes for window & door measurement confirmation. Conduct Pre - Construction Conference The Consultant will schedule and conduct a Pre - Construction Conference with the Contractor, subcontractors, and suppliers to review the NIP KWBTS "Pilot Project" construction of 21 properties, discussing contractor requirements, sequencing plans, construction schedule, asbestos abatement plan, safety requirements and construction staging plans. In addition, the Pre - Construction Conference will include project goals, property owner communication plan, review of acoustic scope of work, submittal requirements, scheduling and phasing of trades, workmanship requirements, progress payments, asbestos remediation unit prices, and final closeout documentation requirements Perform Review and Approval of Contractor Final Construction Schedule The Consultant will review and approve the Contractor's final proposed construction schedule for NIP KWBTS "Pilot Project." Conduct Product Inspections The Consultant will conduct inspections of all windows and door products to ensure compliance with specification requirements. Conduct Lift Inspections The Consultant will conduct inspections of all proposed lift sites to ensure compliance with specification requirements. Review Contractor Deficiency Point System The Consultant will develop a Contractor Deficiency Notice that will define the construction site deficiency areas that could be utilized by the Construction Manager if contractor performance failures occur during the construction period. Areas of contractor deficiency will include failure relating to: project specifications, window / door installations, contract completion time requirements, worker safety and project safety plan, property owner communication, and /or subcontractor payments. Each specified deficiency area will be assigned points which, when tallied, could lead to disqualification to participate in future NIP construction projects. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 19 of 23 City of Key West Permitting Process The Consultant will provide to the Contractor, two sets of signed and sealed final design drawings of each of the 19 KWBTS Building B condominium units and 2 single family homes to assist in obtaining a building permit from the City of Key West Building Department. The Consultant will respond in writing to any comments issued by the City of Key West Building Department during its plan review. Task 3 Reimbursable Expense Notes In Task 3, the Consultant will be required to include all costs related to the Building B and single- family Pre - Construction tasks including document production, duplication, shipping, letters and postage. The Consultant (Project Manager, Architect, and Construction Manager) will need to budget costs for a one (1) 1 -week trip to perform the NIP Final Measurement and Walk Through Inspections. The Consultant (Project Manager, Architect, and Construction Manager) will need to budget costs for a trip to conduct the Pre - Construction Conferences and related activities. All trip costs need to include related airfare, auto rental, per diem, fuel and parking costs for each Consultant staff. TASK 4 DAILY CONSTRUCTION MANAGEMENT TASKS The Consultant (Construction Manager, Project Manager, Principal Architect, Principal Engineer, Environmental Engineer, Assistant Project Manager) will perform all daily construction management tasks during a three (3) month construction period for the 19 Building B condominiums and two (2) Single - Family Homes. These tasks will include the following: Perform Daily Site Visits The Consultant will provide daily construction observation services and conduct field inspections to help ensure quality control. The Consultant will utilize the Project Architect to assist in the administration and completion of all necessary change orders, review and approval of shop drawings, and review and approval of materials and products. Daily site visit tasks include review and processing of all submittals and shop drawings, review materials before they are installed to ensure that they comply with the approved submittals, review work covered by shop drawings to ensure that it complies with the Contract Documents, coordinate with the Contractor to insure that all appropriate building permits have been secured, observe the work in progress to verify that it meets the requirements and intent of the Contract Documents, issuance of Deficiency Points, review all work to ensure all safety practices are in place and ensure that the Contractor is adhering to the written safety plan. Conduct Weekly Progress Meetings with Contractor The Consultant will attend, conduct and document weekly construction progress meetings with the Contractor and Subcontractors. These meetings will help to notify the General Contractor of any part of the work in progress that does not conform to approved submittals, shop drawings, or Contract Documents, review and evaluate any Contractor's suggestions for modifications to the Contract Documents, review Contractor's Request for Information (RFI), Asbestos Remediation change orders, change order requests and update issued Deficiency Points. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 313 Page 20 of 23 Provide Proper Property Owner Communication The Consultant will provide all required daily communication as required with the 21 participating property owners with respect to schedules, work progress, and the scheduling of substantial and final inspections. Provide Safety Escort Services for Non - Participating Property Owners The Consultant will provide all required safety escort services on the active construction floor for non - participating KWBTS Building B property owners. This will include all required communication and sequencing of their movements on the construction floor walkway when they enter and /or leave their condominium. Monitor Adherence to Construction Safety & Phasing Plan The Consultant will review and monitor the Contractor's assigned safety procedures (as determined by the Contractor's assigned Construction Safety Manager) on a daily basis to ensure conformance with the approved Construction Safety & Phasing Plan. Asbestos Remediation Unit Price Approval Based on the Contractor's request, the Consultant will review, approve /disapprove and process the issuance of additional funds related to Unit Prices via Change Orders. This task also includes coordination with the FAA, airport, as well as weekly conference calls with the Consultant Team and related documentation. Maintain Construction Files The Consultant will establish and maintain files and records of all pertinent documents including submittals, shop drawings, addenda, meeting minutes and reports. Contractor Payment Review and Processing The Consultant will perform general project - related coordination with the preparation of monthly invoices and progress reports and schedule updates. The Consultant will review applications for payments from the General Contractor to ensure that they agree with the work done and materials received. Conduct Substantial Completion Inspections The Consultant will conduct Substantial Completion Inspections at all 19 condominiums and 2 single family homes and will prepare punch lists at the appropriate time for each property. The Consultant will distribute the punch lists to the General Contractor for execution, verify that punch list items are complete, and then verify the General Contractor's final invoice for payment. Conduct Completion Inspections The Consultant will conduct Final Inspections upon completion of all outstanding punch list items for a condominium or single - family home. The Consultant will also verify that all items identified on the punch list have been addressed, that all work has been performed in accordance with the Contract Documents and Specifications, and that the work meets project standards for workmanship and quality. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 21 of 23 Task 4 Reimbursable Expenses Notes Task 4 will occur over a three (3) month period. The Consultant will be required to include all costs related to the Building B and 2 single- family Construction tasks including document production, duplication, shipping, letters and postage. The Consultant will need to budget costs associated for 1 construction manager to be on -site for a total of 3 months, including condo rental & all related fees pertaining to monthly utility /technology costs, per diem, car rental and fuel and internet service. To provide proper construction oversight, the Project Manager has budgeted six (6) trips during the 3 -month period, rotating every other week with the Architect and Engineer. All trip costs need to include related airfare, auto rental, per diem, fuel and parking costs for each Consultant staff. TASK 5 ANALYSIS OF ASBESTOS SAMPLE TEST RESULTS The Consultant's Environmental sub - consultant (EE &G) will provide executive oversight to the Program Manager during the analysis of the Contractor's asbestos sample test results for the 19 Building B condominiums. Based on the laboratory test findings, the Consultant's Environmental sub - consultant will also assist the Program Manager in the development of the final asbestos abatement required scope of work for each of the 19 Building B condominiums. NOTE: The Consultant's "original" NIP Pilot Project 3B Budget assumed that the second assigned on- site construction manager would perform daily observation and oversight of all asbestos abatement tasks. However, given that the FAA ADO directed the Consultant to delete one of their on -site Construction Managers, the Consultant will now require the services of EE &G to provide daily executive oversite of all required contractor asbestos remediation tasks. When Task 5 has been completed, the Consultant's Environmental sub - consultant (EE &G) will develop and submit a budget to the Consultant which will provide the required on -site observation services during the Pilot Project construction period, to effectively monitor and ensure that the Contractor performs all asbestos abatement consistent with the Pilot Project Specifications — Volume 3. These on -site tasks will include observation and oversight of numerous asbestos abatement activities to include construction and inspection of containments, air sampling, containment clearances, asbestos remediation, waste bagging and labeling, decontamination and disposal of ACM. This EE &G budget will be submitted to the FAA ADO for approval and development of a Change Order to the Consultants budget prior to the initiation of construction. It should be noted that the Pilot Project construction will not be initiated until the Consultant receives an approved Change order from the FAA ADO. Task 5 Reimbursable Expenses Notes There are no reimbursable expenses associated with this task. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 22 of 23 TASK 6 POST - MODIFICATION NOISE TESTING AND ANALYSIS Post - Modification Noise Testing of Building B Condominium Units Upon completion of the NIP KWBTS "Pilot Project' Construction, the Consultant will conduct post - modification noise tests of the preselected Building B condominium units (units where pre - modification noise testing was accomplished) and 2 single family homes. The post- modification noise measurements will be used to verify the noise level reduction achieved by the acoustical modifications. Pre - modification data will be compared with post- modification measurements to document the achieved increase in noise reduction, and as a check on quality control. This data will assist the Consultant in assuring that the acoustic modification treatments provide a minimum 5- decibel reduction. The noise level reduction (NLR) measurements essentially consist of placing a loudspeaker outside each condominium unit that will be measured. The electrical signal of a pink noise source is fed through the amplification /loudspeaker system and is filtered to simulate aircraft noise. The technician will measure the average interior sound level within the room and the sound level directly outside each exterior element (i.e., doors, windows, and walls). An overall NLR will be mathematically computed based on the measured test data and the acoustical conditions of each room. The Consultant will also be responsible for scheduling all post - modification noise testing appointments. Task 6 Reimbursable Expense Notes: Task 6 will occur at the end of the KWBTS "Pilot Project' construction. The Consultant will be required to include costs that include on -site noise testing, analysis of data and development of the Final Report of Findings. TASK 7 CONSTRUCTION CLOSE -OUT TASKS The Consultant will provide KWBTS "Pilot Project' construction close -out tasks to include: Final Assessment of "Pilot Proiect' Construction Process The THC Construction Manager will prepare a full technical assessment of performance and achievements, including the adequacy of technical specifications, required specification revisions, construction process evaluation of asbestos remediation process and sequencing and methodology, evaluation of the predicted versus the actual costs for modifications, contract schedule compliance and full cost accounting including bid cost and Unit Price request evaluation. Task 7 Reimbursable Expense Notes In Task 7, expenses will include document production, duplication, shipping, letters and postage. The Consultant (Construction Manager) will need to budget costs for a 2 -night trip to conduct on -site construction closeout tasks. All trip costs need to include related airfare, auto rental, per diem, fuel and parking costs for each Consultant staff. KW NIP PSO 3 BUDGET NARRATIVE — PSO 3A and PSO 3B Page 23 of 23 Key West International Airport Noise Insulation Program (NIP) PSO 3 TOTAL BUDGET PSO 3A - BID PROCESS and PSO 3B - CONSTRUCTION MANAGEMENT ADMINISTRATION TOTAL TEAM BUDGET PSO 3A PSO 3A PSO 3A Fe es Expenses TOTALS THC, Inc. $314,462.95 $51,686.00 $366,148.95 The Sun Group, Inc. $43,560.00 $4,370.00 $47,930.00 Jones & Conde, LLC $8,195.00 $0.00 $8,195.00 EE &G $52,261.00 $9,690.00 $61,951.00 Landrum & Brown $0.00 $0.00 $0.00 Total PSO 3A Budget $418,478.95 $65,746.00 5484,224.95 PSO 38 PSO 3B PSO 3B F ees Expenses TOTALS THC, Inc. $286,921.40 $68,358.50 $355,279.90 The Sun Group, Inc. $88,990.00 $11,115.00 $100,105.00 Jones & Conde, LLC $54,285.00 $9,370.00 $63,655.00 EE &G $1,892.00 $0.00 $1,892.00 Landrum & Brown $16,489.00 $4,510.00 $20,999.00 Total PSO 38 Budget $448,577.40 $93,353.50 $541,930.90 Total Fees Total Expenses PSO 3 TOTALS THC, Inc. $601,384.35 $120,044.50 $721,428.85 The Sun Group, Inc. $132,550.00 $15,485.00 $148,035.00 Jones & Conde, LLC $62,480.00 $9,370.00 $71,850.00 EE &G $54,153.00 $9,690.00 $63,643.00 Landrum & Brown $16,489.00 $4,510.00 $20,999.00 Total 2017 -18 Budget $867,056.35 $159,099.50 $1,026,155.85 SUMMARY OF PSO SA BUDBET BID PROCESS FOR RWBTS "PLOT PROJECT" BURMO B. FLOORS 1 S 2 MID TWO I]I SIWU FAMLT MDMES MID RWBTS BULOWO B, FLOORS 1 SUMMARY OF KO 2B BUDGET CONSTRUCT*N MANAGEMENT 6 AOMWISTMTSJN -TS "PLOT PROJECT" BULOINO B, FLOORS 16 2 MO TWO (2) SWOLE FAMLY HOMES Key West Noise Insulation Program PSO 3A • BID PROCESS KWBTS Pilot THC, Inc. SI56.39 He 5110 J+ Bonntr Bxry S+N ]9 Jos Cand s150.00 Toni T+ »GYI MOIfCT MANAO[tlEMT FfgWGMS NWky +rP➢Nna.p. Canmun:amn (Prtl c. KH9 TS ProusN pmw,. Sxgw F+m BO TO— ws f331,177.0 we ux,w {.w a nAa o w.00 sauw.w RENASYRSNLE FXMNS[b Ognlg a+l COtl Owtlry +u Te»IGtl A e 1111 211 "=) T 311.600.00 fe.J00 Hob101a5.00 pr,gw) 59.55500 1) f9t650D nYl�3]500 grmYl 50 13,]50.00 y ParDwm �S]000 qr M, 50 33,50000 14 31,.. 00 -1 n]O . OO m m . wM.00 nnsparown ($N4 00 qr — p." ro s➢pr0 11 5] 658 P 9 e 5uppea �Lemm+ u p+, Pagr, TOnernnl0 5100000 MeilmO SugwNSnippryPOStrOe 3500000 fJ35e10UH - 5191+500 NC 11" TOTAL+ w1.Aa1.w ENC REM _ABLE EXPENSES+ 161,.{... THC TOTAL- $366,148.85 $10511 10 500 355.1)0. tIfM1.w na,.cr sxup.N.n+p sueCan,wnb, vrwpwn wxeycmenaepl NAOPSN Oxmr+l. Pmp.» CPnar.rlo. Gw. AmphNeA Aa -Hoc KNB TS Bme Mxerya. CommunuaM1 w10 ProprN Uvmra a,m 01Ma, Narwp. Rvuxry Fw,. �q.ro gOAmw ,p Gv.bpni.nl 430,161 ➢Bw➢el am Srop rySO ane Gmpl A�COn,rvrom MOOe AnaMv KNers Pbl PmN01 f9 Caewnnum, SYS TOTAL FOR TA{K1 130 111.30 i3S 1]O.w PhST[Sb OOCYSIENT3 -kNTTE xOT'MOORAN rNWers SUSYr»•- Fle.r. l,t »Mt 3F....E+wMb] Pmbmalwn M 80 3]0511.10 w f8.8H1..0 f1).tJ1w »nYewu b al NwB rS BaWepA B bC AoO.rNOan+n bRweu N. Mvvea MrPKWBrs 1mw «�i.mn Pwn. up.w eea.� oaL.,n.nw rP,rf,.r M.n„w vwm. r alA �:. r.am�usP.vF�mn. poor N.m,.f m.3 alf.mupx. c➢n..v,6en n.w.ro, lxemro r a r). O.veKG Fn.f Paa A,m,m, R.meewan awv.Npnn,m Few Vaem.3 A,m+Aw AOaYmmf Se.cECalen, TOTAL FOR TASK w fw.S11.t0 w wA30A0 {i]A11.w ] -so MOCl6E -KWeTi xoT•PROORNI pIWE SWwmle- Pmw. 1,3 AMlSF MNR.. -H UrNY) 1p 3J07ww w Cwepl NPmbrgeon Maxwnw b KN13 158u.f,gB -Fbua 1.lap2 S➢pN F+mM»RPNNC P»PM. Be w 630 +0 sl]38]30 AhwlAxgnl Rxpreb Been➢ Cmxcb, RxwN bmp m,rar(RF1)Cw,ewl wo9e Nxti0. Arw ee Opnn➢. Revww Bie,+m R.qn CmrsrAwNe RCarrvnsMamnm BOCC. Cowobaro Cphg Awre flM» roT,n roR TAbK f wo na.{e a xobo w]A{].x N— TOSTa3Tfa 0F1]{ R SCONOOSNN (8YSONOS -35 YNRS."tE C -)a YMR3,BYlONOA- w YNOS) J85 fw, 11015 100 st1A3..Op S<nwu Y imam, amMwnlwanp. Oo.en on.w +amPwa. muw eapyrl0.ne e.dKCaron a,+mpwa. On,mnpivl +mpb Mam,,. Y➢aa+ry.dMA »mare. »vw+am awMan ofaeaatay mY. Oewmpnnra. a+mnq amYm.nt 5109.IU.1s ,.mdlyw nx.n cP�wwnmm m,xq »mw wes.mr m+w. 4 FOR TASK wS,]I0.13 f11Aw.00 {Im,]».3s T+.h { -UFWTE NO DOCYILMS BOYers SUYiy • -Fban 3,.,3.3.13 MNro) w 1.51130 60 up.tr Bee.Na><vmmn rv,.Ncr w.m,r wwm. r IN R.w» rxnnb.l sPxE�.mn. rF]P,«r N.xe va➢m. ] a]), Upaw A+Oxro, 3 L»e PNn1 In+P,cmn R.00rb wie Upab Cq+buclim Q9weq, LbY.bp FuW A,WOa Smq a NW 38810.0 12. 1.SO ,ebe. Gown Amnm.msoq.m Rw ➢mmmb m n. a ww OTAL fOR TASK 3 tae 1 f3 w0A4 w),Ilt.w S 19(WSrs WMrp S- FI..,. l.aAa- 33 +1 T+. S ean 130 f30,)ww R+,xYOav b K" TS B—a B- Fbw,)+. S 3Pm pvns,, Regn BC A—— Reaoorm m Bee➢O Cam.cmO Rwwtl b lnbmarm (RF1l—f Re Be -FU,O Amm Be G.nM Revww Bea am Pnpv. Gnrxl AF R­ m BOCC. Ca F — CpI3N1 Aware —, w w,e1U..0 fJ)38I 30 {YS TOTAL FOR TASK{ w0,]6Ew fI,w0A0 w],1w.N TO— ws f331,177.0 we ux,w {.w a nAa o w.00 sauw.w RENASYRSNLE FXMNS[b Ognlg a+l COtl Owtlry +u Te»IGtl A e 1111 211 "=) T 311.600.00 fe.J00 Hob101a5.00 pr,gw) 59.55500 1) f9t650D nYl�3]500 grmYl 50 13,]50.00 y ParDwm �S]000 qr M, 50 33,50000 14 31,.. 00 -1 n]O . OO m m . wM.00 nnsparown ($N4 00 qr — p." ro s➢pr0 11 5] 658 P 9 e 5uppea �Lemm+ u p+, Pagr, TOnernnl0 5100000 MeilmO SugwNSnippryPOStrOe 3500000 fJ35e10UH - 5191+500 NC 11" TOTAL+ w1.Aa1.w ENC REM _ABLE EXPENSES+ 161,.{... THC TOTAL- $366,148.85 Key West Noise Insulation Program (NIP) PSO 3B BUDGET - CONSTRUCTION MANAGEMENT AND ADMINISTRATION KWBTS Pilot THC, Inc. 660 $143,579.10 650 660 738 692,866.00 6286,921,40 Cormroaon Steve V—K1 $2W N Heather Faubert $11034 Manager 1 $112.00 Total Task COst TAK 1- PROGRAM MANAGEMENT C;!. m NIP ConsOUCfion Ortenfa0ons Sesgona. Re New Contractor Cmranal Background Reports, Re New Contractor 60 $15.383.40 350 $38,819.00 $51,002 40 f2 -Penal Clog Testing Reports. Contractor ID Badping for s,9 Employees. S0. w coed— and 1099 Workers. Property Qvnar Comnurs"Von for the entire Pn- xnsduoli and 3-mons, Com —son Period SUB TOTAL FOR TASK 1 60 $16 363.10 360 $38.619.00 $64 002.40 TASK 2 - MANAGEMENTOF CONTRACTOR ASBESTOS TESTING PROCESS (19 Unies) Sdww- Asbefsos resew Appo+mments. Observe and prat( the On-Ste Asbsfsos Sample Collecoon Process. 110 $28.202.90 SO $6,620.4(3 $34.823.30 RsNaw NI Laboratory Test Fmdogs Review sm, Appove Comraot0e- Required Asbestos Abafament Scope of Work each of the 19 xndpmniuml. SUB TOTAL FOR TASK 2 110 $26,202.90 80 i6,620A0 1131923.30 TASK 3- PRE CONSTRUCTION TASKS (KWBTS Building B - Ft— 1, 262 SF HOmes) Perform Pre- Construcbon Ste Inspection. PwConsoucYron Conference. PsCooshucoon Watk- Through Inspectons, IN $25,639.00 40 $4,41340 ISO $18,800.00 S46,852.60 Product Inspections, Lift Inspeclion, Construction Schedule Approval, RsNaw of Da6dency Fein! System, Re New of Asbestos Abatement Plan/ each of me 19 COobnastons and City of Key West Perm98ng SUB TOTAL FOR TASK 3 100 $25 M OO 40 $4,413060 160 $18 600.00 $46,862.80 TASK 4 - DAILY CONSTRUCTION MANAGEMENT (KWBTS Building 8 Floors 1, 2 A 2 SF Haines) 3 months 226 Perform Daily SRI Viets, CIWW Weekly Progress, Meetings with Contractor, Provide Property Owner Communixtlon, 557,944.14 60 $6,620.40 528 $59.136.00 $123,700.54 Provide Escort San-. for Non -P mboif a ing Property Owners, Unit Prix Approvale, Maintain Construction Files, ConraWr Payment Review and Processing, Conduct Substantial Completion Inspection. Conduct Final Completion Inap -on, Provide Daily Site Observation of Contradoes Asbestos Remediation Work 10 Ensure Coneieency with Volume 3 Spec SUB TOTAL FOR TASK 4 226 f6] 9/4.11 s0 $6,420,40 528 $69,1N.0 $123,700.84 TASK 5 - ANALYSIS OF ASBESTOS SAMPLE TEST RESULTS (19 units) The ConWeanfa Prolecaional Emu b - c onmental Suonsultant will assist the Program Manager in the review of asbestos sample test eauf and development of a final required asbestos abatement scope of vmrk for each of Hre 19 KWBTS condominiums SUB TOTAL FOR TASK 4 TASK 6 - POSTCONSTRUCTKIN NOISE TESTING AND ANALYSIS On -site Post- ConatruGgn Nor. Testing (10% of Building B Pilot condominiums on Floors 1 8 2 and 2 single family homes), 24 $6 1 S3 W $S 15336 Data ve is — dlopment of Poet- Construction Final Report of Test Findings SUB TOTAL FOR TASK 6 21 68 16136 f6 163.38 TASK 7 - CONSTRUCTION CLOSEOUT TASKS (I(WBTS Building B S 2 SF Homes) PS03 2017 -18 Closeout Tasks and! Frail Assessm i m of Construction Process 40 $10,255.60 40 $4,41160 80 $6,72000 $21,389.20 SUB TOTAL FOR TASK 7 b f 10 266.80 10 34,117.80 BO 118 720.00 521,389.30 660 $143,579.10 650 660 738 692,866.00 6286,921,40 Key West Noise Insulation Program (NIP) PSO 3B BUDGET - CONSTRUCTION MANAGEMENT AND ADMINISTRATION KWBTS Pilot THC, Inc. Con, Condo Condo Into Cor Tlansportatlon($204. Mdage 7 Printing Supple. (LeOerheah Me Homeovaer Con R—.0 Notice of Commenc Recording atldaiohal pages of NO( REIMBURSABLE EXPENSES Quantity Total Cost Quantit Total Cog 0-Aw .—, Total CO Airfare ($" 00 per round trip) 10 59,000.00 2 51,50000 0 53,60000 Hotel ($245.00 per night) 35 $8,575.00 6 $1,470.00 10 $2,450.00 Rental ($4,00000 per month) 3 $12,000.00 Ulildy Fee ($300.00 per month) 3 5900.00 net Service (550.00 par rrgnN) 3 5750.00 do Cleaning Fee ($5000 each) 3 $150.00 Auto Rental ($7500 53,375.00 5 $37 500 r Rental ($1,000.00 per month) 3 $3,000.00 Weeldy Per Oiem($3W 00 14 54,90000 airy per Diem ($70.00 per day) Fuel ($25.00 per hip) 45 10 $3,15000 $250.00 8 $58000 10 $700.00 Fuel($250.00 per month) 3 $750.00 III per roundtrip to/horn airport) 10 $2,040.00 5 $260.00 / From alrpcd ($70 murotrip) 4 $280.00 Envelopes, Paler, Toner /Ink) 32,000.00 ing Supplies/Shippinp/Postage $450000 Conlraclor Badge Supplies $1.00000 9mclon Notebooks ISM each) 21 5830,00 'rents (let page $1000 each) 21 521000 (2 addt'I pages at $B.50 each) 21 $178.50 Notary Fees ($500 each) 21 510500 S. Vecchl Total • $26,3W.00 1 H. Foubed Total - MAMAS CM7 Total • $29,516.00 THC LABOR TOTAL • $286,921.40 THC REIMBURSABLE EXPENSES • $68,358.60 THC TOTAL= $355,279.90 Key West Noise Insulation Program PSO 3A - BID PROCESS KWBTS Pilot The Sun Group, Inc. Tasks 28 3- UPDATE BID DOCUMENTS, BID PROCESS - Building B Plot (21 units) r.:iynr rvcnrrec� >1r[..0 benior Architect $13750 . Arch Drafter $82.50 Tdal Task Coat ocumen Prepare Bid Dfs wNh #_ Play, winWw 6 door schedules. HVAC upgrades 4 $770.00 12 $7,600.00 Printing I Postage ($250.00. -h) 1 $250.00 Prepare sfeNment.{probabl. cost Expense Total- $4,370.00 51,650.00 16 51,32000 $3,740.00 Incnponte M.nrca Country Front -End Spacificatbn Bid Document 4 $77000 12 $1,650.00 52,02000 Tx Mica/ Spa cificetbnsectionupdate forpogrom,Mmr County, sabesfw8 mde chang es 2 $38500 8 $7,700 .00 2 $765.00 $1'650.00 I— Porata Final Envirorana t l Report inf—.( -into Bid Spacdioaaons Provide SP— roW— final Bid Documents and incorporate changes 2 4 $330.00 $330.00 $ 00 Friit and dlstnbufe Final Bid Documanfs to Sponsor and Client 2 3385.00 $0.00 PnPrl responses t .Conn. — RF1's and Prepare Bid Addarri— $38500 $0.00 0 50.00 $38500 C.hdxtPni-Bd COnfererrca and Ste Via# (wifh bevel) 16 $3,080,00 8 $1,10).0) $4,180.00 RaviswsubmXled bids {oar —lo-an. with Bid Ox—I. and determine lowest raapowibldroaponsive bidder 20 12 $3.850.00 $2,310.00 $3 85000 Provide okafl Bid AwardRecanmenda(ron to THC 8 $1,540.00 $2,310.00 $1,540.00 SUB TOTALS FOR TASKS 2 S 3 70 $13 40 $5,500.00 22 $1,815.00 $20,790.00 Task S 8 9 - UPDATE BID DOCUMENTS, BID PROCESS - Building B (35 units) Prepare Be Documents with floor Plan. window B door schedules, HVAC upgrades 8 Prepare statement ofpobable cos! $1,540.00 16 $2,200.00 24 $1,980.00 35,72000 la o.c., M-1- County Front -End Specification Bid Document 4 $77000 12 51,650.00 52,420.00 TscMncal Sp— fi..A,n sxtion update for Program. Mane County , asbestos 8 code changes 2 $38500 8 31,10000 2 $165.00 /1,650.00 Incorporate Final En —ental Report intonation into Bid Specifications Pmwdr Spowor roWew of final Bid Documents and incorporate Merges 4 $330 W $33000 Pnnt and distribute Final Bid Doconwnts to Sponwr end Client 2 $ $38500 Prep" responses to Contractors RF1's endpapers Bid Addendum 2 2 $3 $38500 so ac Conduct Pre -Bid Conh enro and Site Visit (w M bevel) 16 $ 80.00 8 31,11000 $4,18000 Review submlted bids for confonence wkh 8d Doo unants and detenine 1—f h sponsiblNnaponsive bidder 20 12 $3850 00 $3 85000 Provide CW Bid Award Recommendation to THC $2,370.00 $2,310.00 $2.310.00 8 $1,540.00 SUB TOTALS FOR TASKS 588 74 $14,245.00 44 $6,030.00 30 (2,475.00 $22,770.00 TOTALS 144 $27,720.00 84 $11,550.00 52 $4,290.00 $43,560.00 REIMBURSABLE EXPENSES Sun Grou . ti Tolal Cwt Ibtel($245.00 per night) 8 $1,960.00 Daily Per Dkm ($70.00 par day) 8 $560.00 Auto ?ravel (3400.00 per tnp) 4 $7,600.00 Printing I Postage ($250.00. -h) 1 $250.00 Expense Total- $4,370.00 SUN GROUP LABOR TOTAL • $43,560.00 SUN GROUP REIMBURSABLE EXPENSE TOTAL $4,370.00 SUN GROUP TOTAL = $47,930.00 Key West Noise Insulation Program (NIP) PSO 3B BUDGET - CONSTRUCTION MANAGEMENT AND ADMINISTRATION KWBTS Pilot The Sun Group, Inc. TOTALS 304 $58,520.00 152 $20,900.00 116 $9,570.00 $88,990.00 REIMBURSABLE EXPENSES Sun Grou Principal Architect - Total Coat Hotel ($245.00 per night) Architect Drafter E5, 145.00 Daily Per Diem($70,00perday) 21 $1,470.00 $192.50 Senior Architect $137.50 Printing I Postage ($250.00 each) $82.50 Total Task Cost TASK 3 - PRE - CONSTRUCTION TASKS PILOT -KWBTS Building Band 2 Single Family Homes (21 units) nse Total - $11,115.00 Attend Contracts Measurement Walk -Thru of all Properties and Sample Installations - Single Family Homes 4 $770.00 Travel Time fd Measurement Wilif(12 h.) $770.00 Attend Contractor Measurement Walk -Thru of all 19 KW mi KWBTS Building B Condoniums 12 $2,310.00 $2,310.00 32 $8,160.00 $8,160.00 SUB TOTAL FOR TASK 3 48 $9,240400 $9,240.00 TASK 4 -DAILY CONSTRUCTION MANAGEMENT (KWBTS Building 8 Pilot -19 Units) 3 months Review of Construction Shop Drawings and Submittals Conform Drawings and issue S &S Construction Permit Drawings 12 $2,310.00 48 $6,600.00 24 $1,980.00 $10,890.00 Review end Respond to Construction Meneger &Contractor RFI's and Change Orders 8 $1,540.00 8 $1,100.00 24 $1,980.00 $4,620.00 Provide Response to Permit Comments and Issue Revised Permit Drawings 16 $3,080.00 $3,08000 24 $3,300.00 16 $1,320.00 $7,700.00 Attend Weekly COnsttuctlon Meetings by Telecommunication 4 8770.00 16 82,200.00 24 $1,980.00 $4,950.00 Periodic On -site Construction Observation Obser 20 83,850.00 $3,850.00 160 $30,800.00 $30,800.00 TASK 4 -DAILY CONSTRUCTION MANAGEMENT (Single Family Homes) 3 months Review of Construction Shop Drawings and Submittals Conform Drawings and issue S &S Construction Permit Drawings 12 $2,310.00 48 56,600.00 12 $990.00 $9,900.00 Review and Respond to Construction Manager & Contractor RFI's and Change Orders 2 $381 8 $660.00 $1,045.00 Provide Response to Permit Comments and Issue Revised Permit Drawings 2 $385.00 4 $550.00 $935.00 Attend WeeWy Construction Progress Meetings by Te /ecommunication $385.00 4 $550.00 8 $660.00 $1,595.00 Periodic 0—te Construction Observation 2 $385.00 $385.00 16 $3,080.00 $3,080.00 SUB TOTAL FOR TASK 4 256 $49,280.00 152 520,900.00 116 $9,570.00 $79,750.00 TOTALS 304 $58,520.00 152 $20,900.00 116 $9,570.00 $88,990.00 REIMBURSABLE EXPENSES Sun Grou uanti Total Coat Hotel ($245.00 per night) 21 E5, 145.00 Daily Per Diem($70,00perday) 21 $1,470.00 Auto/Travel ($400.00 per trip) 10 $4,000.00 Printing I Postage ($250.00 each) 2 $500.00 Ex nse Total - $11,115.00 SUN GROUP LABOR TOTAL - $88,990.00 SUN GROUP REIMBURSABLE EXPENSE TOTAL $11,115.00 SUN GROUP TOTAL = $100,105.00 Key West Noise Insulation Program PSO 3A - BID PROCESS KWBTS Pilot Jones & Conde iviASa 18 12,970.00 20 $2,750.00 30 82475.00 $8,195.00 REIMBURSABLE EXPENSES Jones& Conde Quan6N Total Cost Hotel ($245.00 per night) 0 80.00 Daily Per Diem ($70,00 per day) 0 $0.00 AutolTravel ($400.00 per trip) 0 $0.00 Printing / Postage ($250.00 each) 0 $0.00 Expense Total • $0.00 JONES & CONDE LABOR TOTAL • $8,195.00 JONES & CONDE REIMBURSABLE EXPENSE TOTAL • $0.00 JONES & CONDE TOTAL = $8,195.00 Principal Engineer $165.00 Senior Engineer $137.50 Engineer Drafter $82950 Total Task Cast Tasks 2 8 3 - UPDATE BID DOCUMENTS, BID PROCESS - Bullofng B Pilot (21 unite) Preparo Bid D-mnas with #-pan, window d door schedules. HVAC upgrades 2 5330900 4 emm Prepare statent of probable Croat IrKOrpwate Monroe County Front -End Spmhc*,m Bid Dowm ent 0 OO 0 55 ..00 6 0 $495.00 $0 $1. 7eNaeca1 Specification section update for program, Monroe Courtly, asbestos 8 code changes 0 WOO 0 $ $ 000 0.00 0 $0.00 $ 0.00 10.00 Incnrporeta Final En --rfe/ Report inbrmetion into Bid Specifications 1 $165.00 0 &0.00 0 &0900 1165.00 PnNids Spoh -Mwew of final Bid Documents and incorporate changes 0 0 $0.00 0 $0.00 0 $0.00 $0.00 Print and disribute Final &'d Documents to Sponsor and Client $0.00 0 $0900 0 $0.00 50.00 Prepare responses to Contractors RFI's and prepare Bid Addendum 0 3 50.00 0 $0.00 0 $0.00 $0.00 Conduct Pre -Bid Conference and Site V30 (with travel) 5495.00 0 $0.00 0 $0.00 $495.00 Review submitted dds forcon /om�enca with Bid Doco 43 and determine lowest responsffiIafresponslve bidder 0 0 $0.00 0 $O. DO 0 $0.00 $0.00 Provo- draft Bid Award Recommendation to THC $0.00 0 $0.00 0 $0.00 $0.00 0 $0.00 0 50.00 0 50 00 $0.00 SUB TOTAL FOR TASKS 2 & 3 6 $990.00 4 1550.00 6 $495.00 $2,035.00 Task 5 66 - UPDATE BID DOCUMENTS, BID PROCESS - Bulding B (35 units) PMParo&it Docurnam with 5o011o'an, window& doorschedWea, HVAC upgrades a Prepare statement olprobab/e cost $1,320.00 16 $2,200.00 24 $1,980.00 $5,500.00 In- Ponite Monroe County Front -End Specification Bid Document 0 $0.00 0 $0.00 0 $0.00 0.00 Technical Specification section update brProgram, Monroe County, asbestos B code changes 0 .o0 0 0.00 0 $0.00 $000 Incorporate Final Environmental ental Report chlorination into Bid Specifications $O .00 0 $0.00 $ 0 $0.00 $0.00 ns Provide Spoor review al final &'O DOCUmenfa and incorporate changes 0 $ 0 $0.00 0 0.00 $000 Prat and distribute Final &'d Lbcumenfs to Sponsor and Client 0 50.00 0 $0 .00 0 10.00 $ $0.00 Prepare responses to Contractors RFI'S and prepare &'d Addendum 4 $0.00 0 $0.00 0 $0.00 $000 Conduct Phl Conference and Site Visit (with be 0 $660.00 0 $0.00 0 $0.00 $660.00 Review submitted bids for cOnfomrence with &'d Do t mrks and determine lowest respans/b /e/respori- bidder 0 $0.00 $0.00 0 0 $0900 0 $0.00 $0.00 PMV69 draft &o war Ad Recanmardalion to THC 0 &0.00 0 $0.00 &0.00 0 0 $0.00 $0.00 &0.00 $0.00 SUB TOTAL FOR TASKS 588 12 $1,980.00 is $2,200.00 24 $1,980.00 f8, 180.00 iviASa 18 12,970.00 20 $2,750.00 30 82475.00 $8,195.00 REIMBURSABLE EXPENSES Jones& Conde Quan6N Total Cost Hotel ($245.00 per night) 0 80.00 Daily Per Diem ($70,00 per day) 0 $0.00 AutolTravel ($400.00 per trip) 0 $0.00 Printing / Postage ($250.00 each) 0 $0.00 Expense Total • $0.00 JONES & CONDE LABOR TOTAL • $8,195.00 JONES & CONDE REIMBURSABLE EXPENSE TOTAL • $0.00 JONES & CONDE TOTAL = $8,195.00 Key West Noise Insulation Program (NIP) PSO 3B BUDGET - CONSTRUCTION MANAGEMENT AND ADMINISTRATION KWBTS Pilot Jones & Conde TOTALS 250 $41,250.00 60 $8,250.00 58 $4,785.00 $54,285.00 REIMBURSABLE EXPENSES Principal Engineer & Conde Senior Engineer Quantity TOGI Cost Engineer 11 $4,41000 Daily Per Diem ($70.00 per day) 18 $165600 Auto/Travel ($400.00 per trip) $137.50 Drafter $82.50 Total Task Cost TASK 3 ' PRE-CONSTRUCTION TASKS (KWBTS Building B Pilot -19 Units) - Expense Total - $9,370.00 Attend n d Cnector Measurement Walk -Thru of all Properties end Sample Installations - Single Family Homes Attend Contractor Measurement Walk -Thor of all Properties and Sample Installations - KWBTS Building B 32 $5,280.00 Travel Time for Measurement Walk- Thm (12 hours) 12 51,980600 $5,280.00 $1,980600 SUB TOTAL FOR TASK 3 44 $7,260.00 $7,260.00 TASK 4- DAILY CONSTRUCTION MANAGEMENT (KWBTS Building B Pilot -19 Units) 3monthe Re New of Construction Shop Dre—gs and Submittals 8 $1,320.00 Conform Orawings and issue S&S Construction Permit Drawings 31 $4,262.50 16 $1,320.00 $6,902.50 Reviawand Respondto Construction Manager B Contractor RFI's and Change Orders 3 12 $495.00 $1,980.00 3 $412.50 10 $825.00 $1,732.50 Provide Response to Permit Comments and Issue Revised Permit Drawings 3 16 $2,200.00 16 $1,320.00 $5,500.00 Attend Weekly Construction Progress Meetings by Te lecommunication $495.00 10 $1,375600 16 $1,320600 $3,190.00 On -site Conshuction Observation 20 $3,300.00 $3,300.00 180 $26,400.00 528,400600 TASK 4 - DAILY CONSTRUCTION MANAGEMENT (Single Family Homes) 3 months Review of Construction Shop Drawings and Submittals Conform Drewings and issue S &S Construction Permit Drawings Review and Respond to Construction Manager & Confractor RFI's and Change Orders Provide Response to Permit Comments and Issue Revised Permit Drawings Attend Weekly Construction Progress Meetings by Telecommunication On -site Construction Observation and Construction Observation SUB TOTAL FOR TASK 4 206 $33,990.00 60 $8,250.00 58 $4,785.00 $47,025.00 TOTALS 250 $41,250.00 60 $8,250.00 58 $4,785.00 $54,285.00 REIMBURSABLE EXPENSES Jones & Conde Quantity TOGI Cost Hotel ($245.00 per night) 11 $4,41000 Daily Per Diem ($70.00 per day) 18 $1,260.00 Auto/Travel ($400.00 per trip) 8 $3,200.00 Printing I Postage ($250.00 each) 2 $500.00 - Expense Total - $9,370.00 JONES 8 CONDE LABOR TOTAL $54,285.00 JONES E CONDE REIMBURSABLE EXPENSE TOTAL$9,370.00 JONES & CONDE TOTAL = $63,655.00 Key West Noise Insulation Program PSO 3A - BID PROCESS KWBTS Pilot EEBG TnE a - AS —03 TESONO OF 15 KMM CONOOMW (vU;OINO B - % UNITS, BU—NO C -TS U1BT3. BUILOWO A - %U.-, COExe anab °s^ybx. a +vN 0 x88 8 b Rb IM'bcffim dtmnpb. mvbrepand nmpb bcffiBna. ra00'ffiaY sWyvx daV aampbx. �.�b� »s alam.rar mb. mix ao� asmrn aear..mrswwdxo- xlvas�n cda.s..wa mrvUwa PoMiwV.vb.'x alaa0mtmcorOgrBrU mffiaeix (ACMJ 6U0 TOTAL FOR TASKS e TOTALS Prirupal '193.50 Sr. Tec0 A0amr 5159.50 E P1 p PrdesvurRi ft1fi.50 AemiMaraw. vaiabM EC9.50 aaN COK 5851.% %180.00 E)5 f5T,6N.p0 11 f5M %;151.00 MO.% b 5],180.00 STS n1,WA0 11 RMMURBABLE EXPENSES EESO 5 J Mal 5 -NPor gem(E]O M per I. %580.00 EESO— TOTAL. % ;b1.00 EElO RE— URSABLE —. TOTAL. :.-. EEBG TOTAL = S61,951.00 Key West Noise Insulation Program (NIP) PSO 3B BUDGET - CONSTRUCTION MANAGEMENT AND ADMINISTRATION KWBTS Pilot EE &G Sr. Tech Acleiaor Sr. Project AclmaistratNe PrindOal 5192.50 515950 Prokasionel f12fi50 Assiskr8 849.50 Total Tesu C i - ANALYSIS OF ASBESTOS SAMPLE TEST RESULTS (18 units) MExecuOVe Assafanro P,ogm Manaprfn Oromw&, /asbestos leaf arM tleve/opwnf ola 0nsl nquiretl asbestos abafemenfswp of aroM for each o /fha 19 KWBTSCOntlomniums 1 5192.50 4 $838.00 8 $1,012.00 1 $49.50 $1,89200 TOTALS 1 $102.00 4 $038.00 It $1.012.00 1 $40.50 $1,002.00 REIMBURSABLE EXPENSES EEBG Re esentatiw 9 uantity Total Coat Airfare (5500.00 Per round trip) $0.00 Notel (5245.00 pr mIl $0.00 Auto Remal($75.00 percay) S0, 00 Daily Per Diem ($70.00 pr clay) 50.00 EEBG Total $0.00 EE &G LABOR TOTAL • $1,882.00 EE6G REIMBURSABLE EXPENSES • $0.00 EE &G TOTAL = $1,892.00 Key West Noise Insulation Program PSO 3A - BID PROCESS KWBTS Pilot Landrum & Brown TOTALS 0 $0.00 0 $0.00 $0.00 L&B TOTAL= $0.00 Key West Noise Insulation Program (NIP) PSO 3B BUDGET - CONSTRUCTION MANAGEMENT AND ADMINISTRATION KWBTS Pilot Landrum & Brown TASK 6 • POST CONSTRUCTION NOISE TESTING & ANALYSIS Quantity Total Cost 1 $800.00 Post —t—ti" noise testing (20% of Building B condominiums 8 100% of Single Family homes) 24 $6,600.00 26 $5,720.00 2 $209.00 $12,529.00 Data Analysis $490.00 8 $1,760.00 $150.00 $1,760.00 Post Construction Final Report of Test Findings 8 $2,200.00 2 $140.00 $2,200.00 SUB TOTAL FOR TASK 6 32 $8 34 $7,480.00 2 $209.00 '16,489.00 TOTALS 32 $8,800.08 34 $7,480.00 2 $209.00 $16,489.00 REIMBURSABLE EXPENSES Associate VP Sr, Airfare ($800.00 per round trip) Hotel ($245.00 per night) Auto Rental ($75.00 per day) Daily Per Diem ($70.00 per day) Misc. (3200.00 per trip) SLM (LD824) ($100.00 per day) SIL System ($100.00 per day) Shipping ($500.00 per trip) Total Cost Quantity Total Cost 1 $800.00 1 $800.00 2 $490.00 2 $490.00 2 $150.00 2 $140.00 2 $140.00 1 $200.00 1 $100.00 1 $100.00 1 $100.00 / $500.00 1 $500.00 TOTAL $2,180.00 TOTAL $2,330.00 L&B LABOR TOTAL: $16,489.00 LSB REIMBURSABLE EXPENSE TOTAL $4,810.00 L&B TOTAL = $20,999.00