Loading...
10th Change Order 10/17/2017MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: TO CONTRACTOR: Burke Construction Group, Inc. 10145 NW 19 Sr Dural FL 33172 III 1,1111iiii I !I . - 0 0 I, 1 111 2 11 i Hill III 111 11 Detailed description of change order and justification: Delays Caused by Hurricane I rma Impact, extension is just,for the time which county offices were shut down and work was not authorized on the Emperly. Additional Rubber surface in the playground, relocated sprinklerpipe, and cleanable neillno tiles in the kitchen. This Chan On Not valld until E ARCHITECT: CONTRACTOR� ,31nal contract pf �c rchitect If ao c WililaFx P,A. Davi"pffinez, Tony Date I d ,OL/0/0 Date (��ght /&-, I / /Daft. ' COUNTYIASSISTANT ADMINISTRATOR: 17 OCT 2017 Roman Gaste j, Kevin Wilson, Christine Hurley Date MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: The Redevelopment of Bernstein Park CHANGE ORDER Na 10 INITIATION DATE- Sept 26, 2017 TO CONTRACTOR: Burke Construction Group, Inc. 10145 NW 19"' St Boost Fl. 33172 The Contract is changed as follows: CONTRACT DATE: April 20, 2016 IIFTITUM "I, If Yes, explanation: Playground expanded requiring more rubber surface, sprinkler pipe conflicted with headroom under building, kitchen ceiling had to be made moisture resistant. Lost a month due to hurricane evacuations ME �A •- ir lil!��11111 :�11�pji;; MEMO E M 0 1 0 Change Order is correcting an error • omission in design document. YesE]No IK64 M IRS 0 =0 Change OWNER x Burke Construction Group, Inc. Order 1100 Simonton Street 10145 NW 19th Street Request ARCHITECT Miami Florida 33172 DATE CREATED: CONTRACTOR x Armando Silveira (Burke Construction Group, FIELD Inc.) AIA Document G710 Pending - In Review REVISION: 0 DESIGNATED REVIEWER: Armando SlIveira (Burke Construction SUBCONTRACTOR PROJECT Bernstein Park CHANGE ORDER NUMBER: DUE DATE: 6751 5th Street DATE: Stock Island< Florida 33040 CONTRRACTOR PROJECT: CONTRACTOR: Burke Construction Group, Inc. 10145 N.W. 19th Street Dural, Florida 33172 I LJ RISE Construction Group Inc. 023 6/29/2017 1611 Prime Contract Change Order #023: Relocate Sprinkler Main Per Owners Request TO: Monroe County Engineering FROM: Burke Construction Group, Inc. 1100 Simonton Street 10145 NW 19th Street Key West, Florida 33040 Miami Florida 33172 DATE CREATED: 612912017 CREATED BY. Armando Silveira (Burke Construction Group, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: Armando SlIveira (Burke Construction REVIEWED BY: Group, Inc.) DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDUCE PCT: EXECUTED: No CONTRACT FOR: 1:Redevelopment of Bernstein Park TOTAL AMOUNT $3,294.50 DESCRIPTION: Cost to relocate sprinkler main on ground floor due to conflicts with beams and door openings. ATTACHMENTS: Fire sprinkler CO.pA Schedule Impact CHANGE ORDER LINE ITEMS: PCO Is 023: Relocate Sprinkler Main Per Owners Request Lower and move sprinkler pipes on first floor due to beams and door issues, My, . �z� Overhead : 6.00% on all line Item types Profit: 5.00% on all line Item types Burke Construction Group, Inc. page 1 of 2 Printed On: 712012017 09:49AM CHANGE ORDER LINE ITEMS: PCO Is 023: Relocate Sprinkler Main Per Owners Request Lower and move sprinkler pipes on first floor due to beams and door issues, My, . �z� Overhead : 6.00% on all line Item types Profit: 5.00% on all line Item types Burke Construction Group, Inc. page 1 of 2 Printed On: 712012017 09:49AM Change OWNER The original (Contract Sum) $ 7,921,975.00 . IMVr74, -awi—awfam for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, acceleration and or impact costs, unless speciffically stated. The right is expressly reseved to amend and make claim fo d all of these related RZT51710TEITAIT r.: !!Wl Bill Horn (Architect) 915 Eaton Street 1100 Simonton Street Key West Florida 33040 10145 NW 19th Street Miami Florida 33172 SIGNATURE DATE SlGkL4TJJ".LE M. Burke Construction Group, Inc. page 2 of 2 Printed On: 712012017 09:49 AM R 11811 S.W. 10th Street A" FIOEFOOTIOVIag Miami, FL 33184 I III Scope of work: ze.g MOWN I A I I I IIIIIII I Ua 11:4 a • I IQ • W11 Included: Plan revision: $ 450.00 Material $ 745.00 Labor : $ 1800.00 Change OWNER X PAID DATE: Order EXECUTED: No CONTRACT FOR: 1:Redevelopment of Bernstein Park TOTAL AMOUNT: $2,884.20 Request ARCHITECT Additional Flexi Pave in children's playground area when the fence was moved to the back of walk. see attached. ATTACHMENTS: CONTRACTOR X 11 -730 - RUBBER SURFACE FIELD AIA Document G710 11-730- RUBBER SURFACE SUBCONTRACTOR PROJECT. Bernstein Park CHANGE ORDER NUMBER: 6751 5th Street DATE: Stock Island< Florida 33040 CONTRACTOR PROJECT: CONTRACTOR: Burke Construction Group, Inc. 10145 N.W. 19th Street Coral, Florida 33172 0 ,01 uRKE Construction GI-OUP Inc, 028 8/15/2017 1611 DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 0 days EXECUTED: No CONTRACT FOR: 1:Redevelopment of Bernstein Park TOTAL AMOUNT: $2,884.20 DESCRIPTION: $2,884.20 Additional Flexi Pave in children's playground area when the fence was moved to the back of walk. see attached. ATTACHMENTS: Burke Construction Group, Inc, page 1 of 2 Printed On: 8/15/ 2017 02 :03 PM Schedule Impact Additional Flexi-Pave Installation of additinal Fiexi-Pave $2,884.20 Burke Construction Group, Inc, page 1 of 2 Printed On: 8/15/ 2017 02 :03 PM Installation of additinal Fiexi-Pave Material for additional Flex]-Pave 11 -730 - RUBBER SURFACE 11-730- RUBBER SURFACE Profit: 5.00% on all line Item types Grand t.� To Burke Construction Group, Inc, page 1 of 2 Printed On: 8/15/ 2017 02 :03 PM Change OWNER F - x A I - IT.-M 0 F-IT 0=1 1111, 7 r-J-171 =#- Reservations: This proposal is based solely on the usual cost elements such as labor material and normal markups, and does not include any amount for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, acceleration and or impact costs, unless speciffically stated. The right is expressly reseved to amend and make claim for any and all of these related items prior to final settlement of this contract. Bill or (Architect) 915 Eaton Street Key West Florida 33040 =I Monroe County Engineering 1100 Simonton Street Key West Florida 33040 Burke Construction Group, Inc. 10145 NW 19th Street Miami Florida 33172 SIGNATURE DATE SIGNATURE M. Burke Construction Group, Inc. page 2 of 2 Printed On: 8/15/ 2017 02 :03 PM FLEXf-POM art Generation Intrastructurs" PROPOSAL iii K.B. Industries, Inc. 7300 Bryan Dairy Road, Suite 400 Largo, FL 33777-1544 Attn. Darren Whiteside Burke Construction Group Inc 6751 5th Street Stock Island, EL 33040 Phone: (305) 586-1844 Email: 0-�Rwiww Date: August 15, 301 Proposal#: 17.306 Install Date: TAN ED] Contact: Jamie Cabral Kill Contact Number: (727) 723-3300 Berstein Park Additional Area 6751 SIR Street Stock Island, FL 33040 County all Monroe 1. Supply and install KBI Fund " -Pave P2000. 2. Kill Flex! 0 -Pave P2000 meets the ASTM 8 FT Critical Fail Requirement in temperatures up to 120 degrees. For temperatures 121 degrees or higher, KBI phodid-Pave P2000 meets a 7 FT Critical Fall Requirement. not warranty any haselsub-grade work which is performed by others. no KBI Flexil-Pave Installation Vim• � 2 240 P2000 Grass I I I Kill Flexi Material $ 5.50 $ 1,320.00 Green 3 1 Freight $ - $ 495.00 4 1 Corporaw Mobilization $ No Charge Upon acceptance of this proposal with your signature lnstalLafion/Laho• $ 708.00 below, it is acknowledged you have read the Product Materials $ 1,320.00 Specification Sheet for the FBI Flexi product Monroe County Surtax 1.5 $ 19.80 quoted in this proposal. Florida State Sal"Tax 6.0 In $ 79.20 Mobilization No Charge Signature Title Sub-Total $ 2,127.00 Fral $ 495.00 1 Printed Nome; Date: Grand Total [t 2,62Z00 1 I PAYMENT TERMS St PROPOSAL NOTES 1, Payment Terms STANDARD: 100% due upon placement of the order. 2. Warranty 100% a"Proporall(din tract MUST be PAID IN FULL prior to SRI issuing warranty. 3. Ground morklHate Prep Yground work is being performed or other materials are being supplied or installed by others prior to balk work, it it agreed between all parties that SRI reserves the right to charge an additional rate, up to a maximum of $2,0001dailyfor Idn's down time, should the a is not satisfactory before the mediations of FBI nexua)- Process materials, 4. Proposal & Freight Rates This Proposal is valid for 90-days (excluding freight rates, which are valid for 30-days and are subject to choose) from the date of this Proposal. I r1w Nl7kc M o l ' l l p ' •l k,plu. —p-,k by die n x iimillilll; 4 u l l r l c l l J i l l $ I N 1-d by lier l l l l x s " l l l 1 ' 1 1 r . I E-Ki. I [ii•, miry ni ; i c X. 11 llifl i i al ri - i I I L A Iltilil W I I %i il tC. it A l•4 11111 • . i l. I Ly. , - r -i—, n r i, u P. nT] I I L I j , #9100.20/23-Feb-20151Rev6 DUE DATE: REVIEW DATE:I INVOICED DATE: PAID DATE: SCHEDULEIMPACT 0 days EXECUTED: No CONTRACT FOR: 1:1yedevelopment of Bernstein Park TOTAL AMOUNT- $688.18 DESCRIPTIOhL Provide and install ceiling the in Kitchen area per owners request. Credit is being provided f o r d rywafl hanging and finishing. ATTACHMENTS: FffM ��, M PCO # 029: Ceiling Tile in Kitchen Schedule Impact Ceiling Tile in Kitchen Wills FffM ��, M PCO # 029: Ceiling Tile in Kitchen Overhead :6.00% on all line item types Profit: 6.00% on all line item types Burke Construction Group, Inc. page 1 of 2 Printed On: 8117/ 2017 63 :35 PM 09-510 -ACOUSTICAL CEILINGS Subcontract r 09-260 - DRYWALL Credit hanging and finishing ceilings in Kitchen, Overhead :6.00% on all line item types Profit: 6.00% on all line item types Burke Construction Group, Inc. page 1 of 2 Printed On: 8117/ 2017 63 :35 PM The original (Contract Sum) $ 7,9211,975.00 Wri for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, items prior to final settlement of this contract. Bill Horn (Architect) 4 15 Eaton Street M 1100 Simonton Street Xey West Florida 33040 ff i i M.TMFM 10 145 NW 1 9th Street Miami Florida 33172 SIGNATURE DATE SIGNATURE TM Burke Construction Group, Inc. page 2 of 2 Printed On: 811712017 03 :35 PM JECHNOLOGY ACOUSTIC PROPOSAL No. 20170721L Bernstein Park Stock Island Monroe County X, a I & T-"% t4:1WIVS 9m= mmu■. = (7861499.707ly Mx"h.11VQLOGVACCIUS`rlr 5E1�11ICF_S., INC Ez� Proposal Submitted to: Date: 7-10-17 Burke Construction Job Name: Bernstein Park Redevelopment 10145 NW 19"' Street Stock Island, FL Doral, FL 33172 Architect: William P Horn, PA Date of Plans: 10-05-15 Bidding Set CHANGE ORDER REQUEST #1 Credit for hanging and finishing kitchen ceiling: flanging $350 Finishing $350 Total CO cost ........... ..........................$700. Note: This proposal may be withdrawn by us if not accepted within fifteen (15) days, Our prices are based on our material prices currently charged to us by our suppliers. After a thirty (30) day grace period, any increase in price on materials given to us will be passed on to the general contractor, ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. This proposal will be incorporated in the contract documents. Date of Acceptance: Company: Burke Construction Group, Inc MM RM 1390 SI)MM [I M`V 42103, COlUkL CABLES, F1, 33146 P 304.970.9520