5th Task Order 10/18/2017C' .,
Kevin Madok, CPA
Clerk of the Circuit Court & Comptroller — Monroe County, Florida
DATE: October 27, 2017
TO: Rhonda Haag, Director
Director Sustainability and Projects
VIA: Gabriella Gonzalez
Executive Administrator
FROM: Pamela G. Hancock, D.C.
SUBJECT: October 18th BOCC Meeting
Enclosed is duplicate original of Item M6, a $57,402.00 Task Order #5 for construction,
engineering, inspection and administration services for the Canal 75 backfilling project in Key
Largo, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal
infrastructure engineering services, funded in full by the $1.5 million Department of
Environmental Protection Stewardship Grant LP44073, for your handling.
Should you have any questions, please feel free to contact me at ext. 3130. Thank you.
cc: County Attorney vla e-mail
Finance vla email
File
KEY WEST
500 Whitehead Street
Key West, Florida 33040
305 - 294 -4641
MARATHON
3117 Overseas Highway
Marathon, Florida 33050
305 - 289 -6027
PLANTATION KEY
88820 Overseas Highway
Plantation Key, Florida 33070
305 - 852 -7145
PK/ROTH BUILDING
50 High Point Road
Plantation Key, Florida 33070
305 - 852 -7145
TASK ORDER #5 FOR CATERGORY B ON CALL PROFESSIONAL
ENGINEERING SERVICES FOR CANAL RESTORATION SERVICES
BETWEEN
MONROE COUNTY AND
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC.
FOR CANAL #75 CONSTRUCTION ENGINEERING INSPECTION AND
ADMINSTRATION SERVICES IN KEY LARGO, MONROE COUNTY, FLORIDA
In accordance with the Continuing Contract for On Call Professional Engineering
Services made and entered on the 15th day of March, 2017 between Monroe County,
hereinafter referred to as the "County" and Amec Foster Wheeler Environment &
Infrastructure, Inc. hereinafter referred to as "Consultant" where design services are
allowed if construction costs do not exceed $2,000,000.
All terms and conditions of the referenced Contract for On Call Professional Engineering
Services apply to the Task Order, unless the Task Order modifies an Article of the
Agreement of which will be specifically referenced in this Task Order and the
modification shall be precisely described.
This Task Order is effective September 20, 2017 and shall expire 60 days after the final
deliverable to the County is submitted.
Article II Scope of Basic Services, Paragraph 2.1.1 is amended as follows:
Task 1: Construction Inspections and Administration
The Consultant will provide construction engineering and environmental site inspections
and construction administration services for the Canal #75 (Between Ocean Drive and
Coral Way) Backfilling Project at 59 Ocean Drive, Key Largo, Florida 33037. Adventure
Environmental Inc. was selected as the construction contractor for the Canal #75
Backfilling Project and provided a 90 day construction schedule for completion. Below
are the services to be provided:
Site Inspections: The Consultant will provide up to seven hours daily site inspections
for the 90 day construction schedule Monday through Friday during field construction
activities and prepare daily work reports showing contractors activities, equipment,
maintenance of traffic and environmental compliance. The environmental compliance
activities include daily turbidity readings outside the turbidity curtains to ensure 0 NTU
exceedances and Threatened & Endangered species monitoring.
Construction Administration —The Consultant will provide consultation and advice to
County regarding the Contractor's performance of the Contract. The Consultant will
liaise with the County, homeowners, and other stakeholders as necessary to administer
the construction contract through the project completion date. The Consultant shall hold
weekly conference call meetings with the County and Contractor to discuss project
status. The Consultant shall be responsible for attending a pre- construction meeting and
submitting permit construction commencement notifications. The Consultant shall
provide final as- builts (provided by the Contractor) certification documentation to the
agencies upon completion. The Consultant shall prepare a detailed report upon
Canal #75 Backfill Construction Engineering
Inspection and Administration Services
Amec Foster Wheeler Environment & Infrastructure, Inc.
September 20, 2017
Page 1 of 2
completion of construction outlining the construction activities and information detailing
successful completion of the project.
Article VII, Paragraph 7.1.1 is amended to include the following:
The Consultant shall be paid monthly for time and expenses based on hourly rates and
the following not to exceed amounts (except where noted):
Task 1: Construction Inspections and Administration $ 57,402.00
Total (not to exceed) $ 57,402.00
IN WITNESS WHEREOF, each party caused the Task Order to be executed by its duly
authorized representative.
CONSULTANT:
AMEC FOSTER WHEELER ENVIRONMENT
& INFRASTRUCTURE INC.
17
Si nature ADat
Title
(SEAL)
ATTEST: KEVIN MADOK, CLERK
MAGGIE PROENZA - KANAKIS
otarylublic - State of Florida
Lrr o m. Expires Mark 201!
re
BOARD OF COUNTY COMMISSIONERS
OF MONROE COUNTY, FLORIDA
By:
Deputy Clerk
Date: ad'p-&� to z- 1- 7
by Z. �) t tr s �
Mayor /Chairman
Canal #75 Bac)fill Construction Engineering
Inspection and Administration Services
Amec Foster Wheeler Environment & Infrastructure, Inc.
September 20, 2017
Page 2 of 2
��
cc
o
..
.
CJ
Cr.
c.3 a
r
ts..
ta.
c
cv
xM
by Z. �) t tr s �
Mayor /Chairman
Canal #75 Bac)fill Construction Engineering
Inspection and Administration Services
Amec Foster Wheeler Environment & Infrastructure, Inc.
September 20, 2017
Page 2 of 2
EXHIBIT A
CONSULTANT'S PROPOSAL
August 3, 2017
amec
Rhonda Haag foster
Monroe County Sustainability/Projects Director
102050 Overseas Highway, Ste. 246 wheeler
Key Largo, Florida 33037
Re: Proposal for Construction Engineering Inspections and Administration Services
related to Canal #75 Backfilling Project in Key Largo, Monroe County, Florida
Dear Ms. Haag:
Amec Foster Wheeler is pleased to provide you a proposal to assist the County with construction
engineering inspections and administration for the Canal #75 Backfilling Project in Key Largo.
Details of the proposed scope of services are provided below. A cost estimate to perform these
services under Amec Foster Wheeler's existing contract rate schedule is also included.
SCOPE OF SERVICES
Task 1: Construction Inspections and Administration
Amec Foster Wheeler will provide construction engineering and environmental site inspections and
construction administration services for the Canal #75 (Between Ocean Drive and Coral Way)
Backfilling Project at 59 Ocean Drive, Key Largo, Florida 33037. Adventure Environmental Inc. was
selected as the construction contractor for the Canal #75 Backfilling Project and provided a 90 day
construction schedule for completion. Below are the services to be provided:
a) Site Inspections: Amec Foster Wheeler will provide up to seven hours daily site inspections
for the 90 day construction schedule Monday through Friday during field construction
activities and prepare daily work reports showing contractors activities, equipment,
maintenance of traffic and environmental compliance. The environmental compliance
activities include daily turbidity readings outside the turbidity curtains to ensure 0 NTU
exceedances and Threatened & Endangered species monitoring.
b) Construction Administration —Amec Foster Wheeler will provide consultation and advice to
County regarding the Contractor's performance of the Contract. Amec Foster Wheeler will
liaise with the County, homeowners, and other stakeholders as necessary to administer the
construction contract through the project completion date. Amec Foster Wheeler shall hold
weekly conference call meetings with the County and Contractor to discuss project status.
Amec Foster Wheeler shall be responsible for attending a pre- construction meeting and
submitting permit construction commencement notifications. Amec Foster Wheeler shall
provide final as- builts (provided by the Contractor) certification documentation to the
agencies upon completion. Amec Foster Wheeler shall prepare a detailed report upon
completion of construction outlining the construction activities and information detailing
successful completion of the project.
11Page
Scope of Work for CEI & CA Services
For Canal #75 Backfilling Project
Key Largo, Florida
COST ESTIMATE
Amec Foster Wheeler has prepared a cost spreadsheet which provides details of the labor and
expense by task. The total project cost estimate will be performed on a Time and Materials (T &M)
basis not to exceed $ 57,402, unless approved by Monroe County.
CLOSING
Amec Foster Wheeler appreciates the opportunity to assist Monroe County with this exciting project.
Should you have any questions regarding this proposal or need additional information, please contact
Greg Corning at (314) 920 -8359 or via email at grea.corning0amecfw.com
Sincerely
Amec Foster Wheeler Environment & Infrastructure, Inc.
Ricardo Fraxedas, PE
Chief Engineer
Direct Tel: + 1 305 525 0079
Direct Fax: + 1 305 826 1799
E -mail: ricardo.fraxedas @amecfw.com
1 t
Greg Inning, PE
Technical Professi nal III - Engineer
Direct Tel: + 1 314 920 8359
Direct Fax: + 1 305 826 1799
E -mail: area.corning0amecfw.com
Attachments: Cost Spreadsheet
Amec Foster Wheeler Rate Schedule
21Page
Cm 0
00
\LOO
$
6
OR
�
/
&
§ C q
0
§
§
■ e � �
■
�
-
U% k
k
)
~as
/a
/k
5
B
$ &
°
r2 2
L
I
Mm
CL
Q
ui
2
2
o
u
CO) ■ M
°
C
c
C 0
)
K
v
2$ g
C
@ in
LU
v B
kk kk �
a
/
w
k S
CL
§§
0
o
E
I
�
t
2
k3�w�
a) '
m
j{$kk
wua_
o«
d
�
�
§
§
E
~
06
..
w
%
/
k
0
E
C
))fz
]
`
§
OE3�
K
\
7
))
0
��
§/,
t=
««
§
a
}X
�
Ca
/
§
k
o
■
Q(
D �
-
o
�
_�
��
fo
LL
@
. L a =gag
m
a
*+
fo
LL
LO
(L
CL
c ;
-i
))k\t
'
Ik
o
Q
$$$2«
�
.
��
Amec Foster Wheeler Environment & Infrastructure, Inc.
2017 Schedule of Fees
Personnel
A. Professional (Engineer, Geologist, Scientist and Project Management)
Staff I
$71.00 /hour
Staff II
$77.00 /hour
Project
$86.00 /hour
Senior
$109.00 /hour
Principal /Project Manager
$155.00 /hour
Senior Principal /Senior Project Manager
$159.00 /hour
Chief Engineer /Scientist
$194.00 /hour
B. Technical Services (Engineering and Science)
Technician I
$45.00 /hour
Technician II
$55.00 /hour
Senior Technician I
$60.00 /hour
Senior Technician II
$70.00 /hour
Project Administrator /Project
Coordinator /Subcontract Administrator /Project
Accountant
$75.00 /hour
Technical Writer /Document Production
$ 78.00 /hour
CADD /Draftsperson (includes PC /CAD) I
$66.00 /hour
CADD /Draftsperson (includes PC /CAD) II
$101.00.hour
Admin I
$40.00 /hour
Admin II
$52.00 /hour
C. Surveying Services
Field Surveyor I
$43.00 /hour
Field Surveyor II
$47.00 /hour
Survey Technician I
$67.00 /hour
Survey Technician II
$72.00 /hour
Survey Chief
$75.00 /hour
D. Information Management
Software Engineer
$92.00 /hour
Data Technician
$132.00 /hour
Senior Software Engineer
$162.00 /hour
Business Analyst
$132.00 /hour
E. Contract Labor
From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a
temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup.
II. Expenses
A. Travel Expenses
1. Transportation: Company pickup truck /personal vehicle, per mile —current allowable rate per
County and Florida State Statutes
a. Common carrier or car rental multiplies by (to be the amounts authorized by Section
112.062, Florida Statutes
2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes
B. Disposal of Hazardous Waste Samples
Samples of waste will be disposed by permitted methods after a determination is made that the waste is
defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal
and invoicing of incurred expenses may take place after invoicing of the originally contracted work.
C. Equipment / Other Expenses
(Does not include personnel)
Digital Field Documentation Equipment (cameras,
$75.00 /day (min 2 days
water level & measuring tape, GPS units, etc.)
Geophysical Equipment (GPR Equipment)
$1,000.00 /day (min 2 days)
Underwater Camera Equipment /Video up to 50
$1,900.00 /day
feet depth and low turbidity
Environmental Monitoring & Sampling
$100.00 to $450.00 /day
Equipment (dust, OVA, Air monitoring, Noise
Depending upon the equipment and scale
Meter, Light Meter)
required
Special equipment or supplies, permits, shipping
Actual cost x 1.15
charges, special printing or other items not
customarily provided by Amec
D. Communications
In -house costs for long distance phone, telex, telecopier, postage — project labor charges x 5%
III. Subcontract
Subcontract services will be invoiced at a cost multiplied by 1.15