5th Task Order 10/18/2017C' ., Kevin Madok, CPA Clerk of the Circuit Court & Comptroller — Monroe County, Florida DATE: October 27, 2017 TO: Rhonda Haag, Director Director Sustainability and Projects VIA: Gabriella Gonzalez Executive Administrator FROM: Pamela G. Hancock, D.C. SUBJECT: October 18th BOCC Meeting Enclosed is duplicate original of Item M6, a $57,402.00 Task Order #5 for construction, engineering, inspection and administration services for the Canal 75 backfilling project in Key Largo, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services, funded in full by the $1.5 million Department of Environmental Protection Stewardship Grant LP44073, for your handling. Should you have any questions, please feel free to contact me at ext. 3130. Thank you. cc: County Attorney vla e-mail Finance vla email File KEY WEST 500 Whitehead Street Key West, Florida 33040 305 - 294 -4641 MARATHON 3117 Overseas Highway Marathon, Florida 33050 305 - 289 -6027 PLANTATION KEY 88820 Overseas Highway Plantation Key, Florida 33070 305 - 852 -7145 PK/ROTH BUILDING 50 High Point Road Plantation Key, Florida 33070 305 - 852 -7145 TASK ORDER #5 FOR CATERGORY B ON CALL PROFESSIONAL ENGINEERING SERVICES FOR CANAL RESTORATION SERVICES BETWEEN MONROE COUNTY AND AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR CANAL #75 CONSTRUCTION ENGINEERING INSPECTION AND ADMINSTRATION SERVICES IN KEY LARGO, MONROE COUNTY, FLORIDA In accordance with the Continuing Contract for On Call Professional Engineering Services made and entered on the 15th day of March, 2017 between Monroe County, hereinafter referred to as the "County" and Amec Foster Wheeler Environment & Infrastructure, Inc. hereinafter referred to as "Consultant" where design services are allowed if construction costs do not exceed $2,000,000. All terms and conditions of the referenced Contract for On Call Professional Engineering Services apply to the Task Order, unless the Task Order modifies an Article of the Agreement of which will be specifically referenced in this Task Order and the modification shall be precisely described. This Task Order is effective September 20, 2017 and shall expire 60 days after the final deliverable to the County is submitted. Article II Scope of Basic Services, Paragraph 2.1.1 is amended as follows: Task 1: Construction Inspections and Administration The Consultant will provide construction engineering and environmental site inspections and construction administration services for the Canal #75 (Between Ocean Drive and Coral Way) Backfilling Project at 59 Ocean Drive, Key Largo, Florida 33037. Adventure Environmental Inc. was selected as the construction contractor for the Canal #75 Backfilling Project and provided a 90 day construction schedule for completion. Below are the services to be provided: Site Inspections: The Consultant will provide up to seven hours daily site inspections for the 90 day construction schedule Monday through Friday during field construction activities and prepare daily work reports showing contractors activities, equipment, maintenance of traffic and environmental compliance. The environmental compliance activities include daily turbidity readings outside the turbidity curtains to ensure 0 NTU exceedances and Threatened & Endangered species monitoring. Construction Administration —The Consultant will provide consultation and advice to County regarding the Contractor's performance of the Contract. The Consultant will liaise with the County, homeowners, and other stakeholders as necessary to administer the construction contract through the project completion date. The Consultant shall hold weekly conference call meetings with the County and Contractor to discuss project status. The Consultant shall be responsible for attending a pre- construction meeting and submitting permit construction commencement notifications. The Consultant shall provide final as- builts (provided by the Contractor) certification documentation to the agencies upon completion. The Consultant shall prepare a detailed report upon Canal #75 Backfill Construction Engineering Inspection and Administration Services Amec Foster Wheeler Environment & Infrastructure, Inc. September 20, 2017 Page 1 of 2 completion of construction outlining the construction activities and information detailing successful completion of the project. Article VII, Paragraph 7.1.1 is amended to include the following: The Consultant shall be paid monthly for time and expenses based on hourly rates and the following not to exceed amounts (except where noted): Task 1: Construction Inspections and Administration $ 57,402.00 Total (not to exceed) $ 57,402.00 IN WITNESS WHEREOF, each party caused the Task Order to be executed by its duly authorized representative. CONSULTANT: AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE INC. 17 Si nature ADat Title (SEAL) ATTEST: KEVIN MADOK, CLERK MAGGIE PROENZA - KANAKIS otarylublic - State of Florida Lrr o m. Expires Mark 201! re BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA By: Deputy Clerk Date: ad'p-&� to z- 1- 7 by Z. �) t tr s � Mayor /Chairman Canal #75 Bac)fill Construction Engineering Inspection and Administration Services Amec Foster Wheeler Environment & Infrastructure, Inc. September 20, 2017 Page 2 of 2 �� cc o .. . CJ Cr. c.3 a r ts.. ta. c cv xM by Z. �) t tr s � Mayor /Chairman Canal #75 Bac)fill Construction Engineering Inspection and Administration Services Amec Foster Wheeler Environment & Infrastructure, Inc. September 20, 2017 Page 2 of 2 EXHIBIT A CONSULTANT'S PROPOSAL August 3, 2017 amec Rhonda Haag foster Monroe County Sustainability/Projects Director 102050 Overseas Highway, Ste. 246 wheeler Key Largo, Florida 33037 Re: Proposal for Construction Engineering Inspections and Administration Services related to Canal #75 Backfilling Project in Key Largo, Monroe County, Florida Dear Ms. Haag: Amec Foster Wheeler is pleased to provide you a proposal to assist the County with construction engineering inspections and administration for the Canal #75 Backfilling Project in Key Largo. Details of the proposed scope of services are provided below. A cost estimate to perform these services under Amec Foster Wheeler's existing contract rate schedule is also included. SCOPE OF SERVICES Task 1: Construction Inspections and Administration Amec Foster Wheeler will provide construction engineering and environmental site inspections and construction administration services for the Canal #75 (Between Ocean Drive and Coral Way) Backfilling Project at 59 Ocean Drive, Key Largo, Florida 33037. Adventure Environmental Inc. was selected as the construction contractor for the Canal #75 Backfilling Project and provided a 90 day construction schedule for completion. Below are the services to be provided: a) Site Inspections: Amec Foster Wheeler will provide up to seven hours daily site inspections for the 90 day construction schedule Monday through Friday during field construction activities and prepare daily work reports showing contractors activities, equipment, maintenance of traffic and environmental compliance. The environmental compliance activities include daily turbidity readings outside the turbidity curtains to ensure 0 NTU exceedances and Threatened & Endangered species monitoring. b) Construction Administration —Amec Foster Wheeler will provide consultation and advice to County regarding the Contractor's performance of the Contract. Amec Foster Wheeler will liaise with the County, homeowners, and other stakeholders as necessary to administer the construction contract through the project completion date. Amec Foster Wheeler shall hold weekly conference call meetings with the County and Contractor to discuss project status. Amec Foster Wheeler shall be responsible for attending a pre- construction meeting and submitting permit construction commencement notifications. Amec Foster Wheeler shall provide final as- builts (provided by the Contractor) certification documentation to the agencies upon completion. Amec Foster Wheeler shall prepare a detailed report upon completion of construction outlining the construction activities and information detailing successful completion of the project. 11Page Scope of Work for CEI & CA Services For Canal #75 Backfilling Project Key Largo, Florida COST ESTIMATE Amec Foster Wheeler has prepared a cost spreadsheet which provides details of the labor and expense by task. The total project cost estimate will be performed on a Time and Materials (T &M) basis not to exceed $ 57,402, unless approved by Monroe County. CLOSING Amec Foster Wheeler appreciates the opportunity to assist Monroe County with this exciting project. Should you have any questions regarding this proposal or need additional information, please contact Greg Corning at (314) 920 -8359 or via email at grea.corning0amecfw.com Sincerely Amec Foster Wheeler Environment & Infrastructure, Inc. Ricardo Fraxedas, PE Chief Engineer Direct Tel: + 1 305 525 0079 Direct Fax: + 1 305 826 1799 E -mail: ricardo.fraxedas @amecfw.com 1 t Greg Inning, PE Technical Professi nal III - Engineer Direct Tel: + 1 314 920 8359 Direct Fax: + 1 305 826 1799 E -mail: area.corning0amecfw.com Attachments: Cost Spreadsheet Amec Foster Wheeler Rate Schedule 21Page Cm 0 00 \LOO $ 6 OR � / & § C q 0 § § ■ e � � ■ � - U% k k ) ~as /a /k 5 B $ & ° r2 2 L I Mm CL Q ui 2 2 o u CO) ■ M ° C c C 0 ) K v 2$ g C @ in LU v B kk kk � a / w k S CL §§ 0 o E I � t 2 k3�w� a) ' m j{$kk wua_ o« d � � § § E ~ 06 .. w % / k 0 E C ))fz ] ` § OE3� K \ 7 )) 0 �� §/, t= «« § a }X � Ca / § k o ■ Q( D � - o � _� �� fo LL @ . L a =gag m a *+ fo LL LO (L CL c ; -i ))k\t ' Ik o Q $$$2« � . �� Amec Foster Wheeler Environment & Infrastructure, Inc. 2017 Schedule of Fees Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00 /hour Staff II $77.00 /hour Project $86.00 /hour Senior $109.00 /hour Principal /Project Manager $155.00 /hour Senior Principal /Senior Project Manager $159.00 /hour Chief Engineer /Scientist $194.00 /hour B. Technical Services (Engineering and Science) Technician I $45.00 /hour Technician II $55.00 /hour Senior Technician I $60.00 /hour Senior Technician II $70.00 /hour Project Administrator /Project Coordinator /Subcontract Administrator /Project Accountant $75.00 /hour Technical Writer /Document Production $ 78.00 /hour CADD /Draftsperson (includes PC /CAD) I $66.00 /hour CADD /Draftsperson (includes PC /CAD) II $101.00.hour Admin I $40.00 /hour Admin II $52.00 /hour C. Surveying Services Field Surveyor I $43.00 /hour Field Surveyor II $47.00 /hour Survey Technician I $67.00 /hour Survey Technician II $72.00 /hour Survey Chief $75.00 /hour D. Information Management Software Engineer $92.00 /hour Data Technician $132.00 /hour Senior Software Engineer $162.00 /hour Business Analyst $132.00 /hour E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. II. Expenses A. Travel Expenses 1. Transportation: Company pickup truck /personal vehicle, per mile —current allowable rate per County and Florida State Statutes a. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00 /day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00 /day (min 2 days) Underwater Camera Equipment /Video up to 50 $1,900.00 /day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00 /day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In -house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% III. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15