Loading...
2017-01 Car Wash DesignC ,-, Kevin Madok, CPA Clerk of the Circuit Court & Comptroller — Monroe County, Florida DATE: October 30, 2017 TO: Beth Leto, Airports Business Manager FROM: Pamela G. Hancock, D.C. SUBJECT: October 18th BOCC Meeting Attached is an electronic copy of the following Items: B23 Task Order No. 2017 -01, with McFarland Johnson, Inc., in the amount of $116,800.00 for Engineering Design Services consisting of design, environmental, permitting and bid phase for the construction of a four (4) Bay Car Wash Facility at the Florida Keys Marathon International Airport to be used by the Airport's rental car companies and Monroe County Public Works. B24 Lease Agreement with Monroe County Sheriffs Office (MCSO) for a vacant parcel of property at the Florida Keys Marathon International Airport in the amount of $21,600.00 /year, for MCSO to construct a 7,200 sf shooting range facility for law enforcement /qualification purposes. Should you have any questions, please feel free to contact me at ext. 3130. Thank you. cc: County Attorney via e-mail Finance via email File KEY WEST 500 Whitehead Street Key West, Florida 33040 305 - 294 -4641 MARATHON 3117 Overseas Highway Marathon, Florida 33050 305 - 289 -6027 PLANTATION KEY 88820 Overseas Highway Plantation Key, Florida 33070 305 - 852 -7145 PK/ROTH BUILDING 50 High Point Road Plantation Key, Florida 33070 305 - 852 -7145 MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date V4 Coat 0 n Task Order No. 2017 -01 4'b3- 3sl %c - ��� Client Project No. `M�4 " 53b,� lb Engineer Project No. 18221.01 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ( "Client ") and McFarland- Johnson Inc. ( "Consultant'), dated February 15, 2017 ( "Agreement "). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized: Rental Car Wash Facility Design at Florida Keys/Marathon Airport (MTH) Client authorizes Consultant to perform the _Engineering_ Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 10 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price Not to Exceed $ 116,800.00 N/A Other (Describe): Schedule Services may commence on Execution ' Other TE 11 cease by 365 calendar das Z a ZZ CD r - n CD r" -�—t rrs x on ^rq Z -a � N CD � r � c BOARD OF COUNTY COMMISSIONERS -7 VIN MADOK, CLERK OF MONROE COUNTY, FLORIDA 0; By Deputy Clerk Mayor /Chairman Witness Title A� /� File: CONSULTANT: MCFA RLAND'3OHNSON INC. By V jwoq�e-s -W- W7* -5�0Y 1-9A Page 1 of 1 EXHIBIT A TASK ORDER No. 01 SCOPE OF SERVICES FOR MONROE COUNTY FLORIDA KEYS MARATHON AIRPORT ENGINEERING DESIGN SERVICES FOR THE CAR WASH FACILITY PROJECT PROJECT DESCRIPTION This project consists of design, environmental, permitting and bidding phase services associated with the construction of a car wash facility at the Florida Keys Marathon Airport (AIRPORT). The project will consist of the construction of a building measuring approximately 80' x 30' that will be utilized by the airport's rental car companies to provide light service activities for their on- airport rental car fleets (see attached conceptual layout). The car wash will also be utilized by the Monroe County Department of Public Works for washing cars, trucks and vans. The facility is not designed for washing of large, moving - style, rental trucks or construction vehicles. Additional project considerations will include: ➢ The wash facility will be located on an approximately 0.5 -acre parcel currently utilized by the rental agencies. ➢ An existing washing structure will be removed. ➢ The building will include four wash bays and a mechanical space to house wash equipment, the facility electrical service, and a single occupancy toilet room. ➢ The site will not be enclosed with a security fence. ➢ Wash activities will be permission -based with time -out features. ➢ On site lighting will be provided to illuminate the site as requested by AIRPORT. ➢ Utilities will be extended to service the site. Water and electrical will be served from US -1. Sanitary sewer will connect to a County -Owned pump station on the adjacent airport parcel (FedEx). Design efforts will include the implementation of a Geotechnical Investigation Program to evaluate the existing soils, presence of groundwater, and the ability of the existing soils to support the anticipated design loads. It is anticipated that the entire site will be available to the contractor for construction, therefore a minimal amount of maintenance and protection of traffic will be required, with control of the access and egress points being required to be addressed. The construction site is not located on the airfield and can be barricaded from public -side traffic. Florida Keys Marathon Airport Car wash Facility McFarland Johnson Design — Scope of Services 1 0 SCOPE OF WORK The CONSULTANT (McFarland- Johnson, Inc.) shall provide the following professional services under this contract as related to the above described project including the preparation of a topographic survey, subsurface investigation, preliminary and final design, specifications, assistance in bidding, and opinion of probable construction cost. The project will be completed by the SPONSOR (MONROE COUNTY), with funding provided through a Florida Department of Transportation Aviation Grant (80 %) and Monroe County Public Works (20 %). The existing car rental companies, Enterprise, and Avis/Budget, as well as Monroe County Public Works will be included in the discussions related to programming of space for the new facility, however the SPONSOR shall be responsible for the final decisions in regards to programming, costs, and plan details. 1. ADMINISTRATION/PROJECT MANAGEMENT The following items of work shall be accomplished on behalf of the SPONSOR under the category of Administration/Project Management: A. Telephone Conferences and meetings with the rental car companies to review their programming and design standards. B. The coordination with the AIRPORT Operations and the Utility Company personnel regarding owned and/or operated facilities that may be impacted by the project. C. Procurement of special services such as topographical survey and mapping, and subsurface investigations, architectural design services, and structural design services necessary for completion of the work to be done under this contract. This includes the preparation of the necessary subcontract documents, negotiation, and/or bid solicitation and award. D. Submission of construction documents to SPONSOR for a code review, allowing the contractor to obtain a building permit. E. Attend up to six (6) meetings with the SPONSOR, car rental agency representatives, and Monroe County Public Works representatives to facilitate coordination and project reviews. 2. CONCEPTUAL DESIGN /SCOPING A. Conduct a pre - design meeting/conference call with the SPONSOR's representatives, the funding agency and other appropriate agencies such as the Monroe County Department of Public Works. B. Develop two alternative concepts including; site layout/location, floor plans, elevations and order of magnitude cost estimates. The two concepts will be reviewed with Airport management and a preferred concept selected for design. Florida Keys Marathon Airport Car Wash Facility , McFarland Johnson Design — Scope of Services 2 C. Engineer will develop a proposed plan for the site for submission to Monroe County Building Department for review by a County Planner. A meeting will take place with the County Planner to determine the level of site plan approval required by the County. D. Complete an investigation to gather the necessary data for design of project. The investigation will consist of a review of the existing data such as survey information, geotechnical data, as-built utility drawings and other existing data, as it is readily available. E. A sub - consultant to CONSULTANT will conduct a topographic and boundary field survey of the proposed project's property. The field work will include survey documentation of project features including pavement edges, drainage features, lighting, signage and grading within the project limits as well as boundary survey information and obtaining the Property Record Card from the County. F. A sub - consultant to CONSULTANT will obtain the necessary soils investigation data, including borings, as well as field and laboratory testing to identify existing soil conditions and subsurface characteristics. G. Develop conceptual site designs of proposed car wash facility site layout including grading and drainage concepts and construction sequencing. The information to be included will be: ➢ Layout Plan (1 sheet). ➢ Grading Plans & Drainage Plans (1 Sheet). H. Sub - consultants to CONSULTANT will develop conceptual building plans and elevations incorporating space and equipment requirements as agreed to at the pre - design meeting, including: ➢ Initial selection of building systems and materials. ➢ Development of approximate dimensions, areas, volumes, and finishes. ➢ Evaluation of load requirements and foundation type. ➢ Conduct initial building and life safety code analysis. Develop conceptual mechanical plans for the building including: ➢ Exhaust system for toilet room. ➢ Ventilation system for equipment room. Develop conceptual plumbing plans for the building: ➢ Domestic water service. ➢ Domestic water heater for toilet room. ➢ Car wash equipment layouts provided by the vendor selected for the basis of design ➢ Car wash recycling equipment locations including recycled water collection and pumping, drain back systems, water softening, water heating, and wastewater outlets. ➢ Water service and booster pump. K. Develop conceptual electrical plans for the building and site including: ➢ Electric service including meter and transformer. ➢ Panelboard in building ➢ Interior lighting ➢ Site lighting ➢ Power for vehicle wash and recycling equipment. Florida Keys Marathon Airport Car Wash Facility { McFarland Johnson Design — Scope of Services 3 L. Develop a conceptual phase opinion of probable cost based upon unit costs per square foot. This estimate will be compared to the SPONSOR's budget to determine if portions of the bid plans should be presented as alternative or add -on bids in order to bring the project within established budget. M. Meet with the Authority Having Jurisdiction (AHJ) to review initial building and life safety code analysis. N. Schedule and conduct a meeting with the SPONSOR and other stakeholders to review the Conceptual Design results. O. Submit Site Plan Approval Application and Conceptual Plans to the Town for Zoning Board and Planning Board for preliminary review 3. PRELIMINARY DESIGN (50 %) A. Based upon the Conceptual Site Plans, the CONSULTANT will prepare a preliminary site layout depicting the existing conditions, the proposed building, parking lot, and vehicle drive paths. The preliminary site plan will be submitted to the SPONSOR, rental car agencies, and Monroe County Public Works for review and approval prior to developing the Final Design documents. B. Based upon the Conceptual Plans and facility programming requirements the CONSULTANT will further develop the conceptual building floor plan depicting the building dimensions, sections and elevations, as well as programmed space for the mechanical and electrical systems, building structural systems, exterior and interior materials, restrooms, equipment room, car wash bays, other service areas, and vehicle circulation routing. The preliminary floor plan will be submitted to the SPONSOR for review and approval prior to completing the final design. C. Meet with the SPONSOWs representatives, the rental car companies, and other appropriate parties to finalize the building floor plan and site plan and address any outstanding comments prior to moving into the final design phase of the project. D. Prepare preliminary plans and details based upon site plan submission requirements from Monroe County Building Department. The information to be included will be: • Cover Sheet • General Notes and Quantities Tables • Construction Phasing/Erosion Control Plans and Notes • Demolition Plan • Layout Plan • Grading, Drainage • Drainage & ESC Details • Utility Plan • Pavement Marking and Signage Plans • Misc Details • Misc Tables • Building Foundation Plan and Structural Details • Building Floor Plan Florida Keys Marathon Airport Car Wash Facility McFarland Johnson Design — Scope of Services 4 01 • Building Elevations • Building Sections • Building Architectural Details • Building Mechanical Plans • Building Electrical Plans • Building Plumbing Plans • Car Wash System Layout and Plans • Site Lighting Plans E. Prepare a Stormwater Prevention Plan and submit to Monroe County for review /approval. F. Prepare preliminary set of specifications (project manual). Construction Specification Institute (CSI) specifications will be used when possible for the building systems, while FDOT specifications will be utilized for site work improvements. When special specifications are required, they will be prepared in the same format as the other technical specifications, and will be assigned an individual identifier that distinguishes them from the standard specifications. G. Prepare and submit an Airspace Determination on FAA Form 7460 -1, Notice of Proposed Construction or Alteration, for FAA review. This will provide the building location and elevation on the form to verify that the building will not be an obstruction to navigable airspace. H. Prepare a Preliminary Engineer's Opinion of Probable Costs for each major element in the project. This estimate will be compared to the SPONSOR's budget to determine if portions of the bid plans should be presented as alternate or add -on bids in order to bring the project within the current budget. I. Submit preliminary plans and specifications to the SPONSOR for review. Building Plans and Specifications will be provided to the SPONSOR's Code Review Department. J. Submit Preliminary plans and specifications to Monroe County Building Department for Final site plan review. K. Meet with SPONSOR's representatives to discuss review comments. L. Attend/Present at a County Planning Board meeting to obtain site plan approval for the project, if required by the County Planners. Requirement of this item will not be determined until Conceptual Phase is complete. 4. FINAL DESIGN (100 %) A. Prepare a bid package, incorporating comments received during the preliminary design phase, to reflect the specific requirements of the SPONSOR. This will include the Notice to Bidders, the standard contract form, the bidding forms, contractor assurances and questionnaire, the standard provisions and conditions, and the specifications. B. The bid set drawings will be stamped and signed by an engineer /architect registered to practice in the State of Florida. C. Prepare final quantity take -offs from the various design documents, by type of material or other Florida Keys Marathon Airport Car Wash Facility McFarland Johnson Design — Scope of Services 5 0 specification identifier. An updated opinion of probable construction costs will be generated and compared with the available budget for the project. D. Obtain permits, as required, to allow construction of the project. At this time, the anticipated permits required for this project are as follows: Site Plan approval from Monroe County for the proposed improvements on the site. Stormwater Prevention Plan and Operational Phase Pollution Prevention Plan approvals from Monroe County. General Permit for Car Wash Systems — Florida DEP Section 62.660 -803. E. Attend a final project meeting with the SPONSOR's representatives to review the final construction documents and determine a project bidding schedule. F. Provide copies of the bid set to the SPONSOR in sufficient quantities as required for distribution to prospective bidders (25 sets anticipated). 5. BIDDING AND AWARD ASSISTANCE A. Attend and facilitate a project pre -bid meeting to discuss specific project requirements with prospective bidders, and answer any questions. Document the meeting proceedings in a formal set of meeting minutes. B. Provide responses to questions received from potential bidders through the SPONSOR, and issue formal contract addendums as required. C. Prepare and compile bid results, contact the selected contractor, and draft award letters preliminary to the start of construction. The CONSULTANT will also assist the SPONSOR in reviewing and forwarding contracts for execution by the selected construction contractor. Design Assumptions - The estimated project budget (design and construction) based upon discussions with the SPONSOR is $625,000. - Bidding for the project is anticipated to occur in the Winter of 2017/2018. - Application, review and permit fees will be the responsibility of the SPONSOR. - Adequate capacity is available in the existing utilities and they are accessible in the adjacent right -of -ways. - Car wash water recycling systems will be floor mounted without floor pits. - An oil /water separator will be provided as part of the wash water recycling system. - Monroe County Building Codes require that structural foundations extend deeper than the Florida Building Code standards. - Rental car representatives will be available in a timely manner for all review meetings. - This contract provides services only through the bidding and award process. A separate contract will be executed for the construction phase. - Preparation of Short Environmental Assessment not included in scope. - NPDES Industrial Discharge Permit not included in scope. Florida Keys Marathon Airport Car Wash Facility McFarland Johnson Design — Scope of Services 6 0 PROPOSED SCHEDULE OF COMPLETION The CONSULTANT agrees to complete the work under this phase of the Agreement in a manner satisfactory to the SPONSOR within 6 months after receiving an executed copy of this contract from the SPONSOR accompanied by a resolution from its governing body authorizing said execution or within such extended periods as agreed to by the SPONSOR. Schedule breakdown below: • Notice to Proceed: • Conceptual Design (6 weeks): NTP + 6 weeks • Conceptual Review and mtg (1 week): NTP + 7 weeks • Preliminary Design (4 weeks): NTP + 11 weeks • Preliminary Review and Mtg (1 week): NTP + 12 weeks • Final Design (4 weeks): NTP + 16 weeks • Final Review and Mtg (1 week): NTP + 20 weeks • Address final review comments (1 week): NTP + 21 weeks • Bid (45 days — 6.5 weeks): NTP + 27.5 weeks Florida Keys Marathon Airport Car Wash Facility Design — Scope of Services 7 0 McFarland Johnson Marathon Airport Rental Car Wash Facility Design Monroe County August 2017 FEE SUMMARY 1. DIRECT TECHNICAL LABOR 2. DIRECT EXPENSES 3. SUBCONSULTANT COSTS Cartaya - Architecture AVCON - Structural Tierra - Geotech Avirom - Survey 4. TOTAL FEE ESTIMATE McFarland Johnson DESIGN / PLANNING SERVICES $53,750.00 $1,827.00 $61,223.00 $32,820 $12,500 $8,130 $7,773 $116,800.00 5. TOTAL LUMP SUM NOT TO EXCEED FEE FOR ALL SERVICES $116,800 Marathon Airport Rental Car Wash Facility Design Monroe County August 2017 DIRECT COSTS DESIGN / PLANNING SERVICES Travel Related Costs: �,► McFarland Johnson Vehicle Cost Plus Fuel Lodging and Meals Per Diem Reproduction CADD Plots Prints Photocopies Photo Costs Telephone /Fax: Postage /Delivery Miscellaneous (air, meeting materials, land- use /forecasts $165 $662 $1,000 $1,827 $1,827 0 0 0 b e� e� W r V C . d M �U IL L y l0 3 L U m c d a Q c C o L_ m N 7 L Im � O � Q a a a a � v t 2 88 'm Im e c c c e c a a as c e 0 00 a m O O a w � o O V = C a a O J r 10 0 r