Loading...
Item M06M C ounty of f Monroe ELj » °o � BOARD OF COUNTY COMMISSIONERS /� r i � �� Mayor George Neugent, District 2 The Florida. Ke Se y I Mayor Pro Tern David Rice, District 4 Danny L. Kolhage, District I Heather Carruthers, District 3 Sylvia J. Murphy, District 5 County Commission Meeting October 18, 2017 Agenda Item Number: M.6 Agenda Item Summary #3340 BULK ITEM: Yes DEPARTMENT: Sustainability TIME APPROXIMATE: STAFF CONTACT: Rhonda Haag (305) 453 -8774 N/A AGENDA ITEM WORDING: Approval to enter into a $57,402.00 Task Order #5 for construction, engineering, inspection and administration services for the Canal 75 backfilling project in Key Largo, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services, funded in full by the $1.5M DEP Stewardship Grant LP44073. ITEM BACKGROUND: AMEC will provide full -time CEI and construction administration services during the construction of the Canal #75 Backfilling project, which is the second project to be conducted after the initial set of the Canal Restoration Demonstration Projects. It is designed to eliminate the anoxic deep zones to enhance natural flushing and promote a viable benthic community which will help to restore the canal waters to Florida Department of Environmental Protection Dissolved Oxygen standards. The project will entail the placement of approximately 26,000 cubic yards of material to raise bottom from 30 feet to 8 feet. Canal #75 in Rock Harbor between Ocean Drive and Coral Way is a Poor rated canal and selected utilizing the Canal Management Master Plan ranking criteria. PREVIOUS RELEVANT BOCC ACTION: 08/17/16: Approval to advertise on call professional engineering services for the canal restoration program, including Category A — Canal Master Plan Program Planning Services, Category B —Canal Infrastructure Engineering Services for Projects and Category C — Environmental Engineering Services. 11/22/16: Approval of Amendment No. 13 to the contract for Engineering, Design and Permitting Services of the Demonstration Projects, with AMEC Foster Wheeler Environment and Infrastructure, Inc. to provide Construction Engineering, Environmental Inspections And Construction Administration Services in the amount of $88,612, related to Canal #83 muck removal, backfilling and air curtain project in Key Largo, Monroe County, Florida. 12/14/16: Approval to negotiate on -call contracts with Amec Foster Wheeler, Inc. and Tetra Tech Inc, the two highest ranked respondents for Category B - canal infrastructure engineering services. 03/15/17: Approval to enter into a $0 on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services. 03/15/17: Approval to enter into a $21,499 Task Order 1 for CEI and construction administration services for the 290 air curtain installation, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services. 03/15/17: Approval to enter into a $87,762 Task Order 2 for CEI and construction administration services for the canal 83 muck removal / backfilling/ air curtain installation, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services. 05/17/17: Approval to enter into a $99,596.10 Task Order #3 for procurement and permitting services for the 4 canals for augmented aeration, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services, which extends services authorized under Amendment No. 8 under a previous AMEC contract. Remaining funds are carried over from Amendment No. 8 and no new funds are required. 07/19/17: Approval to enter into a $60,403.40 Task Order #4 for procurement and permitting services for the Canal 75 backfilling project in Key Largo, under the on -call contract with Amec Foster Wheeler, Inc. for Category B canal infrastructure engineering services, which extends services authorized under Amendment No. 12 under a previous AMEC contract. Remaining funds are carried over from Amendment No. 12 and no new funds are required. CONTRACT /AGREEMENT CHANGES: Task Order 5 for Canal 75 Backfilling - CEI Services STAFF RECOMMENDATION: Approval DOCUMENTATION: Task Order #5 Category B for CEI Services for Canal #75 - signed by AMEC FINANCIAL IMPACT: Effective Date: September 20, 2017 Expiration Date: Upon completion of Task Order Dollar Value of Task Order 4: $57,402.00 Total Dollar Value of Contract: $326,662.40 Total Cost to County: $0 Current Year Portion: NTE $57,402. Budgeted: No Source of Funds: Funded in full by the $1.5M DEP Stewardship Grant LP44073 CPI: No Indirect Costs: None Estimated Ongoing Costs Not Included in above dollar amounts: None. Revenue Producing: No If yes, amount: N/A Grant: No County Match: N/A Insurance Required: Yes Additional Details: 09/20/17 NEW COST CENTER ADDED $57,402.00 REVIEWED BY: Rhonda Haag Completed 08/30/2017 9:23 AM Pedro Mercado Completed 09/05/2017 3:40 PM Budget and Finance Completed 09/05/2017 4:02 PM Maria Slavik Completed 09/06/2017 11:02 AM Kathy Peters Completed 09/06/2017 11:03 AM Board of County Commissioners Completed 09/20/2017 9:00 AM TASK ORDER #5 FOR CATERGORY B ON CALL PROFESSIONAL ENGINEERING SERVICES FOR CANAL RESTORATION SERVICES BETWEEN MONROE COUNTY AND AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR CANAL #75 CONSTRUCTION ENGINEERING INSPECTION AND ADMINSTRATION SERVICES IN KEY LARGO, MONROE COUNTY, FLORIDA In accordance with the Continuing Contract for On Call Professional Engineering Services made and entered on the 15th day of March, 2017 between Monroe County, hereinafter referred to as the "County" and Amec Foster Wheeler Environment & Infrastructure, Inc. hereinafter referred to as "Consultant" where design services are allowed if construction costs do not exceed $2,000,000. All terms and conditions of the referenced Contract for On Call Professional Engineering Services apply to the Task Order, unless the Task Order modifies an Article of the Agreement of which will be specifically referenced in this Task Order and the modification shall be precisely described. This Task Order is effective September 20, 2017 and shall expire 60 days after the final deliverable to the County is submitted. Article II Scope of Basic Services, Paragraph 2.1.1 is amended as follows: Task 1: Construction Inspections and Administration The Consultant will provide construction engineering and environmental site inspections and construction administration services for the Canal #75 (Between Ocean Drive and Coral Way) Backfilling Project at 59 Ocean Drive, Key Largo, Florida 33037. Adventure Environmental Inc. was selected as the construction contractor for the Canal #75 Backfilling Project and provided a 90 day construction schedule for completion. Below are the services to be provided: Site Inspections: The Consultant will provide up to seven hours daily site inspections for the 90 day construction schedule Monday through Friday during field construction activities and prepare daily work reports showing contractors activities, equipment, maintenance of traffic and environmental compliance. The environmental compliance activities include daily turbidity readings outside the turbidity curtains to ensure 0 NTU exceedances and Threatened & Endangered species monitoring. Construction Administration —The Consultant will provide consultation and advice to County regarding the Contractor's performance of the Contract. The Consultant will liaise with the County, homeowners, and other stakeholders as necessary to administer the construction contract through the project completion date. The Consultant shall hold weekly conference call meetings with the County and Contractor to discuss project status. The Consultant shall be responsible for attending a pre- construction meeting and submitting permit construction commencement notifications. The Consultant shall provide final as- builts (provided by the Contractor) certification documentation to the agencies upon completion. The Consultant shall prepare a detailed report upon Canal #75 Backfill Construction Engineering Inspection and Administration Services Amec Foster Wheeler Environment & Infrastructure, Inc. September 20, 2017 Page 1 of 2 completion of construction outlining the construction activities and information detailing successful completion of the project. Article VII, Paragraph 7.1.1 is amended to include the following: The Consultant shall be paid monthly for time and expenses based on hourly rates and the following not to exceed amounts (except where noted): Task 1: Construction Inspections and Administration $ 57,402.00 Total (not to exceed) $ 57,402.00 IN WITNESS WHEREOF, each party caused the Task Order to be executed by its duly authorized representative. CONSULTANT: AMEC FOSTER WHEELER ENVIRONMENT & IN INC. a'; �®? d Si nature Dat 1 'tm 0Q /4' e "6'e Title (SEAL) ATTEST: KEVIN MADOK, CLERK By: Deputy Clerk Date: WITNESS: MAGGIE f RQENZA- KANAKIS J Notary uhlic -State of Florida U � o m. Expires Mar 0, 209 a / •�UFi tt„•`•�� C mission # 9 7g d ugh Nat n !a s rw nature Date BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA bv: Mayor /Chairman Canal #75 Backtill Construction Engineering Inspection and Administration Services Amec Foster Wheeler Environment & Infrastructure, Inc. September 20, 2017 Page 2 of 2 EXHIBIT A CONSULTANT'S PROPOSAL to U August 3, 2017 amec Rhonda Haag fo ster Monroe County Sustainability /Projects Director 102050 Overseas Highway, Ste. 246 wheeler Key Largo, Florida 33037 U Re: Proposal for Construction Engineering Inspections and Administration Services related to Canal #75 Backfilling Project in Key Largo, Monroe County, Florida Dear Ms. Haag: t) �a c� Amec Foster Wheeler is pleased to provide you a proposal to assist the County with construction engineering inspections and administration for the Canal #75 Backfilling Project in Key Largo. Y 8 Details of the proposed scope of services are provided below. A cost estimate to perform these services under Amec Foster Wheeler's existing contract rate schedule is also included. E SCOPE OF SERVICES Task 1: Construction Inspections and Administration Amec Foster Wheeler will provide construction engineering and environmental site inspections and construction administration services for the Canal #75 (Between Ocean Drive and Coral Way) Backfilling Project at 59 Ocean Drive, Key Largo, Florida 33037. Adventure Environmental Inc. was selected as the construction contractor for the Canal #75 Backfilling Project and provided a 90 day construction schedule for completion. Below are the services to be provided: a) Site Inspections: Amec Foster Wheeler will provide up to seven hours daily site inspections for the 90 day construction schedule Monday through Friday during field construction activities and prepare daily work reports showing contractors activities, equipment, maintenance of traffic and environmental compliance. The environmental compliance activities include daily turbidity readings outside the turbidity curtains to ensure 0 NTU exceedances and Threatened & Endangered species monitoring. b) Construction Administration —Amec Foster Wheeler will provide consultation and advice to County regarding the Contractor's performance of the Contract. Amec Foster Wheeler will liaise with the County, homeowners, and other stakeholders as necessary to administer the construction contract through the project completion date. Amec Foster Wheeler shall hold weekly conference call meetings with the County and Contractor to discuss project status. Amec Foster Wheeler shall be responsible for attending a pre- construction meeting and submitting permit construction commencement notifications. Amec Foster Wheeler shall provide final as- builts (provided by the Contractor) certification documentation to the agencies upon completion. Amec Foster Wheeler shall prepare a detailed report upon completion of construction outlining the construction activities and information detailing successful completion of the project. 11 Scope of Work for CEI & CA Services For Canal #75 Backfilling Project Key Largo, Florida COST ESTIMATE Amec Foster Wheeler has prepared a cost spreadsheet which provides details of the labor and expense by task. The total project cost estimate will be performed on a Time and Materials (T &M) basis not to exceed $ 57,402, unless approved by Monroe County. CLOSING Amec Foster Wheeler appreciates the opportunity to assist Monroe County with this exciting project. Should you have any questions regarding this proposal or need additional information, please contact Greg Corning at (314) 920 -8359 or via email at grec. Sincerely Amec Foster Wheeler Environment & Infrastructure, Inc. Ricardo Fraxedas, PE Chief Engineer Direct Tel: + 1 305 525 0079 Direct Fax: + 1 305 826 1799 E -mail: ricardo.fraxedas @amecfw.com Attachments: Cost Spreadsheet Amec Foster Wheeler Rate Schedule Greg _ rning, PE Technical Professional III - Engineer Direct Tel: + 1 314 920 8359 Direct Fax: + 1 305 826 1799 E -mail: greq.corninq @amecfw.com 21 M L) L} 0 cu L) LLJ cu L) Et7 U U) Y r _ 0 L) L) LLJ Qd Lo p X68 U) m L) L- 0 p Qt Eta Ca Qt E 0 tI8 O C N W cm OD co 000 C G W W CO N N N N CO O CO N T Im O ER H} L EPr : EH C LO Lo O Cfl W C C I-M Ln U T a% 0 tm C i = N W p� L 00 r-- C G L7 N NOD VN m OM � V m O1 y Ln / /� N r O ci O n ~ I C C 0 Ld Q O. 7 7 'C 0. V d co 1, v N Q a c c c cn O p y = F Z ' U U 7 Q O V! y a W �= tm D ui .__ d 0 m is v > d U G N G m 0 0 0 0 0 d O o CO 0) N O 0 0 Cn r O 0 CV uj o m ° O O i61 6% Lo oC 01 r» d F Cl) a Z N 7 3 o p U 0 . N c O c_ E N _ ¢ C G .� C O - O y � U i w O - N C U w _ m c W � C O C O C c C5 O N C_ C � N y W W a U Q m E U m = C _ y G Q N � W a w o (L CL E= a m U � U m E CS) U m p Co m c U mF 0 O• as 0 s 2 = .0 Q cn c U Cl) O 'S 1 r- m 0- O w m c LL as ,U o U Ca ? a 'E W U a c(q �� m F �� U w LL• d d = m o tl! J Q W 0 E c c s E m y O. O �inco J _ 3 c7 F W r M L) L} 0 cu L) LLJ cu L) Et7 U U) Y r _ 0 L) L) LLJ Qd Lo p X68 U) m L) L- 0 p Qt Eta Ca Qt E 0 tI8 O Amec Foster Wheeler Environment & Infrastructure, Inc. 2017 Schedule of Fees Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00 /hour Staff II $77.00 /hour Project $86.00 /hour Senior $109.00 /hour Principal /Project Manager $155.00 /hour Senior Principal /Senior Project Manager $159.00 /hour Chief Engineer /Scientist $194.00 /hour B. Technical Services (Engineering and Science) Technician I $45.00 /hour Technician II $55.00 /hour Senior Technician I $60.00 /hour Senior Technician II $70.00 /hour Project Administrator /Project Coordinator /Subcontract Administrator /Project Accountant $75.00 /hour Technical Writer /Document Production $ 78.00 /hour CADD /Draftsperson (includes PC /CAD) I $66.00 /hour CADD /Draftsperson (includes PC /CAD) II $101.00.hour Admin I $40.00 /hour Admin II $52.00 /hour C. Surveying Services Field Surveyor I $43.00 /hour Field Surveyor II $47.00 /hour Survey Technician I $67.00 /hour Survey Technician II $72.00 /hour Survey Chief $75.00 /hour D. Information Management Software Engineer $92.00 /hour Data Technician $132.00 /hour Senior Software Engineer $162.00 /hour Business Analyst $132.00 /hour E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. II. Expenses A. Travel Expenses 1. Transportation: Company pickup truck /personal vehicle, per mile— current allowable rate per County and Florida State Statutes a. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00 /day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00 /day (min 2 days) Underwater Camera Equipment /Video up to 50 $1,900.00 /day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00 /day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In -house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% III. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15