11th Change Order 11/16/2017MONROE N 1 P ROJECT MAN AG EMENT CONTRACT CHANGEORDER PRO TITLE; The Redevelopment of Bernstein Park TO CONTRACTOR: B urke Construction Group, Inc. 90945 TAW IG" t Blood FL 33972 The Contract is changed as follows: C HANGE ORDER a 91 INITIATION DATE: Febru 2, 2097 CONTRAC DAT ApHl 20, 2016 Detailed description of change order and justification Contrac needs additiona3 lime: to handle replacement of instal €a ncl t� storm. I?ravili�ri ar3 was cx�ande0 to accom for actual manuFa cturc:ti t a7yiiion d imensions. IiIs Chan or der is 4. ° Io ref t he art irtai cuntracA price If Yes, explanation: Pad was expanded as per the drawings to accommodate for exact ,tavilion size. Contractor needs additional time to replace installations damaged by Hurricane Irma. 1111 , M a FOR I nii�gpgi E3m= MGMUMP �-* A • 1 ANI M���K MOMS O I: M01 M-2 Change OWNER Order Request ARCHITECT CONTRACTOR AIA Document G710 PROJECT: Bernstein Park 6761 5th Street Stock Island< Florida 33040 CONTRACTOR: Burke Construction Group, Inc. 10145 N.W. 19th Street Doral, Florida 33172 ■ Ll 0 0 Burke Construction Group, Inc. page 1of2 Printed On: 10/25/ 2017 03 :12 PM Change OWNER The original (Contract Sum) $ 7,921,975.00 Net change by previously authorized Change Orders The contract sum prior to this Change Order The new contract sum including this Change Order will be The Contract Time will be • (decreased) . -« ($106,585.01) $ 7,815,389.99 $ 14,656.27 $ 7,830,046.26 Reservations: This proposal is based solely on the usual cost elements such as labor material and normal markups, and does not include any amount for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, acceleration and or impact costs, unless speciffically stated. The right is expressly reseved to amend and make claim for any and all of these related items prior to final settlement of this contract. III Horn (Architect) 915 Eaton Street Key West Florida 33040 Monroe County Engineering 1100 Simonton Street Key West Florida 33040 Burke Construction Group, Inc. 10145 NW 19th Street Miami Florida 33172 SIGNATURE DATE SIGNATURE DATE SIGNATURE Burke Construction Group, Inc. page 2 of 2 Printed On: 10/25/ 2017 03 :12 PM r%111H C7 BLAB ABOVE EXIST, A"R POUNOATION (TYP.) 7 .7 7 r A c FL —77 LL A. EXIST. AUGER FOWDATION (Typ.) OF SLAB ABOVE — I ; Q , F59 compAcTEP r-ILL PER PRojECTapEr-r-icATioNs mETUIEEN PILE CAPS N M" Sa PILE CAP ABOVE ExisTiNa. AUGERS (TYP-; SEE SECTION p IN - QK A 2 1, 6 MIL. 3 11 -- VAPOR BARRIISSR COMPACTED PILL BELOW SLAB PrE SPECIFICATION 36" Sa x S" MIN. DEPTH A15OVE A R REINF. - 4-S EA ULAY AT Ea SPACIW-%-CENTER IN PILE CAP EXIST. AUGER TO ACCOMPANY PLANS AND SPECfFICATIONS FOR THE PROJECT BY VNWAM P. HORNkROMECT . P.A. REVISIONS TO SWEET 814 OF THE APPROVED PLANS SHEET TIMMINS ENGINEERING, LLC C.A. M. No. 2B994 BE RNSTEI PARK N THOMAS M. TIMMINS, P.E. I FL. P.E. No. 45406 PH. 305-872-4060 STOCK ISLAND P.O. BOX 639 MONROE COUNTY, FL. OF I BIG PINE KEY, FLORIDA 33043 Cattle Construction of Key West, Inc. CC 1518284 35 Diamond Drive Key West, FL 33040 Office (305) 292.9888 Fax 9880 WMAIS—Z SwUh—pt li!= SMMTR�M= Date: Augustl7,2017 Change Order I'll To: Burke Construction From: Bella Construction of Key West Attn: Armando Slivelra Project Title: Bornstein Park Email: net I nitlotlon Date: 10?2812016 The Contract is changed as follows: Detailed description of Change Order and justification: Supply and installation of additional concrete, rebar, and formwork for the increased size of the shade pavilion per the shop drawings received Work also includes excavation of existing subgrade to revised subgrade elevation, compaction of subgrade, removal of concrete on existing auger cast piles to revised elevation, Date IDUCH~. Shieft P&WOW Labor INAfAdMil iEqid~ Irbil I 1 12. E%navaie sub q�adeapdcdm, ! ?22-501 1 Is 7.50 U t i Remove con cro to al du cast pies to yewsed erevalmn. n)tc at (9) 91 0 d * W 3. - 3:2 11 1271 Dend off leading of racer 1 45. 4514 �Ei , 7 ,U_iZ C o nstruct formwork for pile caps 865.00 5 86500 3.31.17 lComanu ct formwork for al le caps. Mace ffiM1W(1(k. and tie rats of 2.467501 1. 12SMI I S 'n"'ric ho 1�111stalnfiion Wadditional rebaron mundation mat a RM a a wm� Eivmtoi. Park • lihicid Pay,Ilr*h Mackay, March 27, 20171 1 1 1 Thourdew March 30, 2017 21 171 $53,03 Friday, March 31, 2017 7 415 4 Monday, April 3, 2017 ,abet Tuesday April 4, 2017 2 pile Ag.. fts_P1 :I I ' . — J I E Friday, April 7, 2017 1,12500 3,5 Shal &a'P Ilella C. 5 h J2. h,, a b) and 'P-p,.' $ —A� 11 : SET 4/812017 6 Im.e.s. i flrflsdm far A to and T I.e., for 4 net The co.prown, -.,ae is his She 1' -rouse. 221 ftedismay, leaders 12, 20111 This is he on- 1. 10 tins the forms around the 15 pile cap, and ba fill unmeM the pit.. It ths libiricafty, January 19, 201) 2 hilowitighirseach and li labor / Ohns) This cast is to install formwork and r tharfs, the malfifus sink Time is to splice every ,oboe ¢o 14.5, the new slab size Splices where done in both directors (North to South & East to West) and 165 O—fini. Hours 6 22 jj i carpenter For 7 hr}. tabors far 10 5 hrs { 3 labors Fora 5 hrs ea) wafflZROMMM Amaral Tooiaj Equipment This I ft� hours In chIcal the new radar for the pavilion slab Including the robot $53,03 tar the a , M This is for f.,Tlrg 15 sw pli Work task 2 days to do onto fischurg and neffifing ,abet 1h.1 11 for �1-mg W ­4 1 . 11r[hK i— --d pffes A:ri Rod gu%ir is theq,bar in the pile Ag.. fts_P1 :I I ' . — J chat I I a a A L th, had go [3 .- it 1,12500 Shal &a'P Ilella C. 5 h J2. h,, a b) and 'P-p,.' $ —A� 11 : T his is for quote concrete anto . the 15 pile cap, hisloder time to set up and clean up concrete Im.e.s. i flrflsdm far A to and T I.e., for 4 net The co.prown, -.,ae is his She 1' -rouse. 4 $ 89388 burnic This is he on- 1. 10 tins the forms around the 15 pile cap, and ba fill unmeM the pit.. It me is 3 ho for she operate, to back fill The labor to trip the far. hours . total of 26 hoa ( 2 [ 2 hilowitighirseach and li labor / Ohns) This cast is to install formwork and r tharfs, the malfifus sink Time is to splice every ,oboe ¢o the new slab size Splices where done in both directors (North to South & East to West) and top and lyaRsom Mf5 jj i carpenter For 7 hr}. tabors far 10 5 hrs { 3 labors Fora 5 hrs ea) Th is cost 11 to instal formwork and .beef., the sea line slab Time Is to splice every she, to the new slab cou Splices h ..e duee in birth directors (Nunn to druid & East to West) and up and bottom 22 hu, for Rod Busters (4 Rod B.,orry Far 5 5 hot -) Laiww for 11 mc (2 li labor, for 5 5 m, as). This cost laid dig down an addibloreP 9" deep for (15 as) 36,36 pile caps The original slab design did not meet the required wind loads structurally for the uplift of the new pavilion The Pavilion Engineer needed he increase the Nine of the original slab dramatically To Wants the cast from the anginal quote of a 5' x18" deep slab aIi the way around the pavilion that the wingession, of record took the respowilblifty id'dedi anew slab The Pavilion Engineer gone thoThe FOR the Werfiran lead, far the columns cofthe ponflum and she ECAS redesigned the slab The FOR took into consideration the old auger cast piles that where rejected by &S Murray County to help add dead w eight to the pokillime foun dation. This is the cast to chip out the rejected a uger cast Pit. caps that the FOR is .,!he in the new slab design below finish down That vil 10" k d o.badetti" O rn- pil.raq, The wniculst.1b was l thick ao this trigle:1 9 anger pile' where installed at 10" below the Finish Fla., o1scmd- like the struct plans showed. Agai these a the 9 pile the M .... a County rejected that the enginee is co noting on for he uplift cal a i gal S Z4 ' 17 .97 . 11 OT F..— @ $90,/h, 5 540.00 lamomr @ 3,60000 Of Cu pmt., @ W.W/hc 5 1465 W ow-I. P 54 sf� 5 74250 C—e� FwO- 1 p $4wj" 5 leanrnr IT, W& 1 $ 2,520,00 Of $ 2471,91 T ?2 1 i— h — C Q IL P IIW. 1.25.94 _ l TaW 13,952.15 . — — r FIBER MESH .. $16.00 per CY HIGH RANGE WATER REDUCER Add $12.00 per CY RUST INHIBITOR (Calcium Nitrite) Add $35.00 per CY (@ 3 GAL CYD DOSAGE) SILICA FUME Add $60.00 per CY* 11 1 i 1 1' Mix Designs on Request. SHORT LOAD CHARGE $99.01 Saturday Deliveries upon Request. 'Prices are subject to change without notice. ASTM #57 ASTM #89 ASTM #57 ASTM #89 3/4" ROCK 3/8" P -ROCK 3/4" ROCK 3/8" P -ROCK PUMP MIX PUMP MIX 2000 PSI $178.75 $181.75 $183.75 $186.75 2500 PSI $180.25 $183.25 $185.25 $188.25 3000 PSI $181.75 $184.75 $186.75 $189.75 3500 PSI $183.25 $186.25 $188.25 $191.25 4000 PSI $184.75 $187.75 $189.75 $192.75 < 4500 PSI $186.25 $189.25 $191.25 $194.25 5000 PSI $187.75 $190.75 $192.75 $195.75 5500 PSI $189.25 $192.25 $194.25 $197.25 6000 PSI $190.75 $193.75 $195.75 $198.75 SHOT -CRETE / GUNITE MIX FLOWABLE FILL $195.50 250 PSI $145.00 500 PSI $155.00 FIBER MESH .. $16.00 per CY HIGH RANGE WATER REDUCER Add $12.00 per CY RUST INHIBITOR (Calcium Nitrite) Add $35.00 per CY (@ 3 GAL CYD DOSAGE) SILICA FUME Add $60.00 per CY* 11 1 i 1 1' Mix Designs on Request. SHORT LOAD CHARGE $99.01 Saturday Deliveries upon Request. 'Prices are subject to change without notice. YOUR ORDER NO RATE OF ORDER WILIA43A 03/24/17 PIECES UM TH W 734 LB 16MM x DELIVERY DATE ORDER NO i SHIP BY 03/27/17 114963 OUR TRUCK L DESCRIPTION #5PEBAR GRADE 60 1.043LBIL (SELL BY THE POUND ONLY) RB0560 3 J43A TAGS PUCE REBA R PATCH DELIVER 3127117 USER stsi EM 26 EFRAIN(CRAVI} MARTINE, I QTY Um PRICE AWOUNT 734 CO/ 38.00, 278,92 IF ACCOUNT IS CURRENT AND IF PAID BY THE 10th TAX % 1 % IOTH N 30 OF THE FOLLOWING MONTH OY CASH OR CHECK, DEDUCT 2.79 TOTAL Do not write below this line " 0 UR SER VICE HA KES THE DIFFERENCE" I I SOINV 08-417644 11111111111111 IN I 111 111 1111 YOUH ORDER NO OATS OF OROFR I OEl.lvcR Y DATE OROER No I SHIP BY USER MA WILL 03/24/17 03/27/17 OUR TRUCK EM IN(CHAVI) RANI?" I P/EciFs um Tq 4% L DESCRipriolv QTY i um PRICE AMOUNT 375 LB 16VL5 x x #5 REBAR GRADE 60 1.043 LRIL 375 GOT 38,00 142,50 (SELL BY THE POUND ONLY) 880560 I J43B TAGS PILE CAP PATCH DELIVER 3127117 I IF ACCOUNT IS CURRENT AND IF PAID BY THE 10th TAX % 1%10THN 30 I - OF THE FOLLOWING MONTH BY CASH OR CHECK, DEDUCT 1.43 TOTAL I ill ''(1111C WIffifflarmal SOM 08-417643 I1 I III IN 1111111111111111 1111111111111111111111111111111111111 Foreman: Ryon Antonides Day is Job Location. E= fl ra J Date �) Class %Complete Crew Member s I Immol 1- 11 1 ISOM TOTAL MAN EM Class %Complete Work Performed Did - y - o - u - po — ur — concrete today? Who was the supplier? What concrete pump was used? Who was your pump operator? .How many yards were poured? What did you pour? Equipment, Subcontractors used or on site 7 1-1 - — L J ' IN wow, tj [ F VII Fiff I Foreman: Ryon Antonides Day Date X; Job Location: Copy for: Class Activity CC F_ CrjW Members 4-4-4 Iv 9 V TOTAL MAN HOURS ELI H Old you pour concrete today? Who was the concrete supplier? What concrete pump was used? Who was your pump op*ator,?-' II -How many yards were What did you poi? Equipment, Subcontractors used or on site 77 1 .'� , m =WI Class 1% Complete lWork Performed V/-- Foreman Date Job Location: Copy for: Class Activity C rew Members ITOTAL MAN HOURS j J �Who was the co crete suoDlier? Ezsc� • I How many yards were poured? I Ez ..�- .1 'Equipment, Subconfra damused or on site .1 et Foreman Job Location. Copy for; Class J Activity Crew Members 0 iL 4- ----------- ITOTAL MAN HOURS !Class %Complete or Performed 4 .1 Equipment, Subcontractors used or on site Did you pour concrete today? Who was the concrete supplier? What concrete pump was used? Who was your pump operator? How many yards were poured? What did you pour? Did you pour concrete today?_ Who was the concrafe suPplier? What concrete pump was used? Who was your pump operator? How many yards were poured? 7 77 What did you pour? [Equipment, Subcontractors used or on 31te � v / u ^ ' Foreman - A Day Date Job Location: Copy for: Class 1% Complete Work Performed 4!K!,(>t4i pe � Did you pour concrete today? lWho was the concrete supplier? I lWhat concrete pump was used? I lWho was your pump operator? 11 Itiow many yards were poured? i Subcontractors used or on site 'TOTAL MAN HOURS Class 1% Complete Work Performed 4!K!,(>t4i pe � Did you pour concrete today? lWho was the concrete supplier? I lWhat concrete pump was used? I lWho was your pump operator? 11 Itiow many yards were poured? i Subcontractors used or on site BELLA CONSTRUCTION DAILY REPORT Foreman: Day: ) Date L-1 ---7- / 'I Job Location: F V 1 f I &-V -- Copy for: , - -h C%nss Class J Act ivity Work Performed CA - 1 Li d -1 4 Le V 0 0 Deliveries 78 Equipment, Subcontractors used or on site Problem Areas LL: O vi 4y E- a (D E 0 . -V U -.e. 0 Fi a = a R0, . r- d ;o 6 .2 =— rn al 13 E E 0 E. 5 E -2 E a a 1 w ¢ :3 0 d w a H wi "i U a U a a LU M iCrew Members 0 0 C) 0 N a N tq W� M C3 ' In V 0 C3. V7 0 U) V1 0 d 0 0 0 W� 0 0 43 0. V A r\ - UU, rL 4 < C- c EIE TT TOTAL HOURS , - -h C%nss % Complete Work Performed CA - 1 Li d -1 4 Le V Deliveries Equipment, Subcontractors used or on site Problem Areas Is there anything you need for tomorrow? BELLA CONSTRUCTION DAILY REPORT 1 4M SA - Day: so Job Location: P0. v 1 I c, Copy for: Date: L Class LY. Cornplele lWork Performed I 1-h r, t �z Cot 4L M-K S� * e - p Defiverles EquipmLfthi, Su bc onlraciors used or on site Problem Areas Is there anything you need for tomorrow? 0' r /0,111 V e� A&H ;,� � Class r-fly0v E 0 91- 0 4L: cc, 0 V ed 0 0 0 ir, 0 in Crew Members 0 ck a .0 CI -cl L�6 , y v rr Fn 0 U CD Q to jj L Z< 4_1 d — 7 T 1 7 [ TOTAL MAN HOURS Class LY. Cornplele lWork Performed I 1-h r, t �z Cot 4L M-K S� * e - p Defiverles EquipmLfthi, Su bc onlraciors used or on site Problem Areas Is there anything you need for tomorrow? 0' r /0,111 V e� A&H ;,� � Change OWNER X Order Request ARCHITECT CONTRACTOR X FIELD U RKE AIA Document 6710 SUBCONTRACTOR Construction Grcmp Inc. PROJECT Bernstein Park CHANGE ORDER NUMBER: 030 6751 5th Street DATE: 10/27/2017 Stock Island< Florida 33040 CONTIRRACTOR PROJECT#: 1611 CONTRACTOR: Burke Construction Group, Inc. 10145 N.W. 19th Street Doral, Florida 33172 W&A"w" PCO # I Title Schedule Impact Amount 030 12nd Hurricane Irma Time Extension 0.00 TOTAL: $0.00 RTFTT,Mqrsi -�� PCO # 030: 2nd Hurricane Irma Time Extension Burke Construction Group, Inc. page 1 of 2 Printed On: 10/27/ 2017 03 :42 PM FN= � OWNER ARCHITECT CONTRACTOR FIELD SUBCONTRACTOR 1 0 URKE 0 01 Construction Gt h1C. $ 7,921,975.00 ($106,585.01) $ 7,815,389.99 $ 0.00 $ 7,815,389.99 60 days Added Time Above: 12/16/2017 Reservations: This proposal is based solely on the usual cost elements such as labor material and normal markups, and does not include any amount for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, acceleration and or impact costs, unless speciffically stated. The right is expressly reseved to amend and make claim for any and all of these related items prior to final settlement of this contract. Bill Horn (Architect) 915 Eaton Street Key West Florida 33040 Monroe County Engineering 1100 Simonton Street Key West Florida 33040 Burke Construction Group, Inc. 10145 NW 19th Street Miami Florida 33172 SIGNATURE DATE SIGNATURE DATE SIGNATURE M. Burke Construction Group, Inc. page 2 of 2 Printed On: 10/27/ 2017 03:42 PM TO: Board of County Commissioners From Assistant County Administrator Date: November 13, 2017 RE: Change Orders Pk�ttached is a proposed Change Order #11 Burke Construction Group, Inc., Redevelopment of Bernstein Park. The Contract Sum will be increased $$14,656.21. The Contract Time will be increased 60 days with the date of Substantial Completion as sf the date of this Change Order is December 15, 2017. According to Ordinance No. 004-1999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners at least 24 hours prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. IMMTW A Ma of