#1st Change Order 11/20/2017TO (Contractor): ABC Construction, Inc.
7215 \W 7' Street
Miami, Florida 33126
CONTRAC T: GAKA%Jk-1- i.
CONTRACTDATE: November 22, 2016
You are hereby authorized and directed to make the following change(s) in this Contract:
Due to Hurricane Irma and unexpected high tides, the existing . The area
., base material became s aturated and unusable
will be dewatered and the existinp- base material will be excavated and replaced with new lime rock.
The original Contract Sum ...........
S 9 250 �QQUQ
Net change by previously approved Change Orders ..,......
N A
The Contract Sum will be tochanged
by this Change Order...,.,,,.,,,, ......
$ 37 _7-33,30
The new Contract Sum including this Change Order
will be ..... ........... ...............................
$ 9 287 733.30
The Contract Time will be increased by,----- ..... — ...... — ........
N A
Signature of the Contractor indicates agreement with the terms of this Change Order, including any adjustment in the
Contract Sum and/or the Contract Time, Adjusted cost and time include all direct, indirect and impact costs and time
for delays, disruption, inefficiency, acceleration and all other claims.
RECOMMFNDED:
y gate
2OE OR
' WPNEY
P Pr
PR
PR ��SpEM
f
A13(' Con ructio
Inc,
Date
AUTHORIZED.
�
Monroe County
\XVVN
1100 Simonton Street
Key West- FL 33040
21c 2-013—
— A c �in g o �un
�Mlnis�or
TITLE: Lanes 20,21 of Phase 3 Tierra recommendations DATE: 1012412017
PROJECT: Keys Strengthen Rehabilitate Commercial Apron
TO: Attn: Doug Alger
Jacobs
Avaition / Utilities
Palm Beach Gardens, Florida 33410
Phone'904-636-5432 Fax:561,799,6579
JOB: Cale P145
CONTRACT/PO: GA P145
SUBMITTED: 10/24/2017
COMPLETED:
REQUIRED:
DESCRIPTION
Here is the additional cost for the recommendations from Tierra for lanes 20 and 21 of phase 3,
Note: ABC reserves the right to claim for additional time and additional compensation for the time related
to this change.
Num Item
Description Ref
Cry Unit
Unit Price
Amount
1
Excavate Trench (30ftX2ftX2,6ft)
f.000 Lump
3,75000
3,750,00
2
Unclassified Excavation
150.000 Cu. yd.
19.50
2,92500
3
Replace Base Material (all)
653,000 Six Yd.
29,00
18,937.00
4
Soil Compaction Test
1.000 Lump
1,386.00
1,386,00
5
Tech Time for Collection Sample
1000 Lump
58500
585,00
6
Dowatering Fees
336,000 Hrs
20.00
6-720S0
7
011-1 & Profit 10%
1.000 Lump
3,430.30
3.430-30
Item Total:
$37,733.30
Total:
$0.00
Total:
$37,733,30
From: Alger, Doug <Doug.Alger jacobs.com>
Sent: Tuesday, October 17, 201710:49 AM
To: jgonzalez@abcconstruction.cc
Cc: ndke@ a bcconstru ctlon.cc; Eowker, Christopher Ennis, less
Subject: Tierra recommendation
El
used a n the site visit on Friday 1011312017, At the time of the visit the we
We discussed that you will Y t ex c a vate
feet below the top of base. /a the trench you will need a 2 Inch or biggeripung; to remove the water and keep the
le
trenches emptied. Once the water level Is at or below 3feet . air r Doing
T he : . iiE' . . shou l d b Placed and cam :X # .
Doug Alger I X
ri d
200 W, Forsyth Street,Suite 1520
Jacksonville, FL 32202
as .............. ®.... «e...„ a..<..- .. «..»...m ®_.. ,..
NOTICE - This communication may contain confidential and privileged information that Is for the sale use of the ntended recipient. Any
viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this
message in error, please notify us immediately by replying to tine message and deleting at from your computer.
PRICE QUOTATION
Alten4on Jorge Gonzalez DATE' 10/20/17
ABC Construction
7215 NW 7th Strect
Miami, FL 33126
ITEMIZED QUANTITIES
Location: KWIA Apron Project Key West Intemational Airport 1
Scope: Excavation + Limerock Base
Item
Description
Guantity
1.0
150.0
053.0
Units
Cost per Uril
Line Item Cost
S 3,75000
$ 2,925.00
$ /8 937.00
Notes
1
2
3
Excavate Trench 30FTx2FTx2.5FT
Unclassified Excavation
Replace Base Material 8"
LS
CY
SY
$ 3,750.00
S 1950 .
s 29.00
Subtotal
Per tonnancelPayment Bonds (520A0fr
WbiizationlDemobifizallon
General Conditions Permils, Manag Pedestrian Saftey, etc 1
LS
LS
LS
$ 25..612.00
4 _
5
5
1.0
1.0
1.0
s
S
S
S
_
5
$
Total:
$ 25,612.00
Notes:
Inclusions:
Exclusions:
Net 30 payment terms ro sal valid ror 90 days _
Scope as descrTbed abov
Bonding. surveying. enginveling, dewatenng restoration, etc
Prepared by:
�sleu. ,`f,�
Estimator
Charley To ppino l3 Sons, Inc.
Date:
10120/17
Sheet
1 of 1
Change Order Attachment per Ordinance o® 004-1999
0 Change Order was not included in the original contract specifications. Yes Z No [:1
If Yes, explanation: Base material had to be excavated and replaced with new lime rock
due to Hurricane Irma and unexpected high tides which caused base material to become
saturated and unusable.
9 Change Order was included in the original specifications. Yes 0 No N]
If Yes, explanation of increase in price;
Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No
E
If Yes, explanation as to why it is not subject for a calling for bids:
0 Project architect approves the change order. Yes 0 No El
If no, explanation of why:
0 Change Order is correcting an error or omission in design document. Yes ❑plo Z
Should a claim under the applicable professional liability policy be made? Yes El No [K
M�