12/15-15 Baggage ConveyerC'., Kevin Madok, CPA Clerk of the Circuit Court & ComptrollerMonroe County, Florida DATE: December 1, 2017 TO: Beth Leto, Airports Business Manager FROM: Pamela G. Hancock, D.C. SUBJECT: November 14th BOCC Meeting Attached is an electronic copy of Item Fl 1, Jacobs Project Management Co.'s Task Order No. 12115-15 for the Services Authorized: Baggage Conveyor System Upgrade -Design Assessment and Construction Phase Services PSO#15 in the amount of $50,504.00, for your handling. Should you have any questions, please feel free to contact me at ext. 3130. Thank you. cc: County Attorney Finance File KEY WEST MARATHON PLANTATION KEY 500 Whitehead Street 3117 Overseas Highway 88820 Overseas Highway Key West, Florida 33040 Marathon, Florida 33050 Plantation Key, Florida 33070 305-294-4641 305-289-6027 305-852-7145 PK/ROTH BUILDING 50 High Point Road Plantation Key, Florida 33070 305-852-7145 1W i MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date �Ob— 636/S�'- Sbob�o - Client Project No. G hmpl50 —S303 to Task Order No. 12/15-1 Engineer Project No. E9Y37915 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 15, 2017 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized — Baggage Conveyor System Upgrade — Design Assessment & Construction Phase Services Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 1 page(s). Pricing N/A Time and Expense per. Agreement and Appendix B to the Agreement. X Firm Fixed Price of $ 50,504.00 N/A Other (Describe): ule ,.S&I ieo may commence on Execution �"�• — — >ISTAN/CAIINTY ATTORNEY, ,,``JServi will cease by 547 days Date BOARD OF COUNTY COMMISSIONERS r;TTES AEVIN MADOK, CLERK OF MONROE COUNTY, FLORIDA ts_ By _� Mayor/Chan an UJ -ter l J AM NSUI PANT: JACOBS PROJECT MANAGEMENT CO By W' Title File: MSTR APS — Mon oe County Page 1 of 1 l lej//L—? Exhibit A —Scope of Work (12/15 - 15) Monroe County Key West International Airport (EYW) Baggage Conveyor System Upgrade — Design Assessment and Construction Phase Services EXISTING CONDITIONS The baggage conveyor system in Baggage Screening Room #231 requires some upgrades due to the increases in passenger volume. The current configuration does not'allow for adequate `stored' bags in the system prior to screening and also requires the manual handling of checked bags. The intended reconfiguration of the baggage conveyor and shifting of the screening equipment further downline will alleviate the current inefficiencies. In addition, the upgraded system will be configured to accommodate future screening equipment. G&S Airport Conveyor was the original baggage equipment manufacturer and installer and has provided design drawings for the required revisions. The original revised layout has been reviewed and approved by the involved stakeholders and will be the basis of design. This design will be reviewed and modified to accommodate future screening equipment and reconfigured if necessary. SCOPE OF WORK Jacobs will provide Data Collection, Procurement and Construction Administration Support Services. The scope will include the following per our previous meetings with the client. • Procurement - Jacobs will coordinate with Monroe County; Legal, Procurement, and Airports to assist in the contracting of G&S Airport Conveyors. • Construction Administration Support Services — Jacobs will administer the contract for construction of the revised baggage conveyor system. In addition, Jacobs will provide the following general services for this project: • Management of the project. • Coordination with EYW airport staff and conveyor manufacturer as required. • Coordination with JWI for their design review and Construction Services. • Preparation of meeting minutes. WORK PHASES Based on the above description of the scope of work, we propose to perform the following tasks: ARTICLE A — PROCUREMENT Based on the information collected under Article A Jacobs will coordinate with Monroe County Legal department and, Procurement. This will be a sole source procurement with G&S Airport Conveyors as the existing baggage conveyor system (mechanical and software) is a proprietary system and therefore the upgraded system will be the same. Jacobs will draft the contract with G&S to be executed by the county and will coordinate with Procurement and airport staff. ARTICLE B — DESIGN ASSESSMENT AND CONSTRUCTION PHASE SERVICES Construction Administration for the baggage conveyor upgrades will be performed. The specific tasks Jacobs will perform are: 1. Respond to all Requests for Information (RFI's) 2. Review all shop drawing submittals for conformance to the plans and specifications and respond to the CONTRACTOR and Airport with detailed summary of the applicability and acceptability of the shop drawing. 3. Prepare for and attend a Pre -Construction meeting. 4. Attend site visits and project construction meetings. Observe work in progress and provide reports to Owner. Assume two (2) site visits (Bi-Monthly) throughout the course of the construction. 5. Attend weekly progress meeting, via conference call, when not in attendance at Bi-monthly site visits. Assume two (2) conference calls for progress meetings throughout the course of the construction. 6. Prepare and negotiate change orders, as necessary. 7. Attend Final Inspection and prepare Punchlist. 8. Prepare and submit closeout and warranty package. QUALIFICATIONS / CLARIFICATIONS The following Qualifications and Clarifications are a part of our scope of work: ■ Owner and G&S Airport Conveyor will provide all estimates, design drawings and technical specifications. ■ G&S Airport Conveyor is responsible for all design drawings; conveyor systems, electrical and data. ■ G&S Airport Conveyor is responsible for all permitting. ADDITIONAL SERVICES Services not included in our scope of work include, but are not limited to, the following: ■ Any services not specifically listed above in Scope of Work and Work Phases. ■ Cost estimating. ■ Architect/Engineer construction and /or delegated (special or threshold) engineer inspections. ■ Attendance and/or presentation to public hearings and/or other meetings with municipal agencies. ■ Permitting. ■ Fees for Municipal and permit agencies. ■ Construction Documents PROJECT SCHEDULE: The tentative complete project schedule is as follows: Item Duration (Business Days) Procurement 10 days Pre -Construction Meeting 5 days Construction Administration Support Services 45 days JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: Baggage Conveyor System Upgrade - Design Assessment & Construction Phase Services (12115 -15) FEE SUMMARY BASIC SERVICES Hours Fee DBE AMOUNT Article A: Procurement 12 $ 2,110 Article B: Design Assessment / Construction Phase Services 44 $ 8,869 Total Basic Services Lump Sum Fee 56 $ 10,979 $ - SUBCONSULTANT SERVICES Hours Fee Article B: Design Assessment/Construction Phase Services J.A. Watts, Inc.(Lump Sum $ 39,525 Total Subconsultants Services Lump Sum Fee 0 $ 39,525 TOTAL LUMP SUM PROJECT FEE 56 $ 50,504 $ - DBE Percent 0.00% 1 J.W morts\_MONROE COUNTy1PSO's\ 2017 P50's (ESY379XX New Conk e)'PSO 15 - Baggage Conveyor System - CAT- - EV W Baggage C—p, System Upg,da-OasgnBCA-101117.xisx JACOBS ENGINEERING GROUP Airport: Project: Article A: Procurement JOB HOUR AND FEE ESTIMATE Monroe County Key West International Airport Baggage Conveyor System Upgrade - Design Assessment & Construction Phase Services (12/15 -15) WiD fkM ' `- Proec[Director Sr, Prot ''NTana er`. Sr. En 'peel. Project =' Engineer . ".En 'near ' Deli n'er: Sr.'CADD Tech Clerical TOTALr 1 Contract Coordination with Monroe County Airports and Attorney 4 4 2 Contract Coordination with BHS contractor 8 8 TOTAL HOURS 0 12 01 0 0 01 0 0 12 RATE $ 200.00 $ 174.00 $ 147.00 $ 121.00 $ 93.00 $ 76.00 $ 101.00 $ 54.00 PAYROLL ESTIMATE $ $ 2,088.00 $ $ $ $ $ $ $ 2,088.00 Task Subconsultants J.A. Watts, Inc. Total Subconsultants $ Task Exnenses: Mileage (120miles round trip @ $0.555/mi)x2 $ - Airfare Meals and Per Diem Reproduction/Misc. $ 22.00 Total Expenses $ 22.00 TOTAL PAYROLL $ 2,088 Subconsultants $ - Expenses $ 22 Lump Sum Fee Total $ 2,110 TOTAL FEE $ 2,110 3 JACOBS ENGINEERING GROUP Airport: Project: Monroe County Key West International Airport Baggage Conveyor System Upgrade - Design Assessment & Construction Phase Services (12115 -15) A.I:.Io n. noe:o.. / Ph... Sor..:.oe ". WORKITEM:' .:; Director Sr Prof Mane er,: - SeProled `Eo ineer. Eh ineer:: . "En'rieer Desi 'e' Sr. CADD Tech- Clericih ' TOTAL? I Design Assessment coordination with airport, JA Watts and Baggage Manuf. 8 8 2 Pre Construction Meeting 8 8 3 Weekly Construction Meeting - Telcon (6 weeks) 12 12 4 Site Observation punchlist and commissioning 16 16 5 Design Assessment / Construction Support Services / ISAT Testing See J.A. Watts, Inc. below 0 TOTAL HOURS 0 441 0 01 0 01 44 RATE $ - 200.00 1 $ 174.00 1 $ 147.00 1 $ 121.00 1$ 93.00 1 $ 76.00 $ 101.00 $ 54.00 PAYROLL ESTIMATE $ - 1 $ 7,656 1 $ - I $ . I$ $ $ 7,656 Task Subconsultants 2,3,4,5 J.A. Watts, Inc. $ 31,400.00 Includes: 10 day trips @ $325 (Flight $250, Meals, $75 3,250.00 Inclucles; 3 weeK long tops (fD ti3,025 (Fllgnt $250, Meals $375, Lodging $1,000) 4,875.00 Total Subconsultants $ 39,525.00 Task Expenses: 2,4 Mileage (480miles round trip @ $0.555/mi)x2 $ 532.80 Meals and Per Diem ($75 day)x2 $ 150.00 Lodging ($250 day)x2 $ 500.00 Tolls ($15)x2 $ 30.00 Total Expenses $ 1,212.80 TOTAL PAYROLL $ 7,656 Subconsultants $ 39,525 Expenses $ 1,213 Lump Sum Fee Total $ 48,394 TOTAL FEE $ 48,394 J:W ryasS MIXJROE COUNMPSO's\ ]IH] GSOa (E9Y]]glIXNew eonvanlw5015 -Baggage Lomryw System-CPrFee -EYW Baggage Comryor System tlpgraCeOesignBCA-t01,1> vlsv 1 KEY WEST E1NAUONA.L.r AMRT DESIGN REVIEW & BAGGAGE HANDLING SYSTEM CAPACITY STUDY jwl J. A. Watts, Inc. J W. f .A. Watts, Inc.. : J. A. Watts, I n c . 940 West Adams "Sweet Suite 400 E cient.Efiective. Beyond Expectation.q Chicago, Illinois 60607 . Phone: 312.997.3720 Fax: 312.997.3726 www.iWincorporated.com August 3,,2017 Ryan Forney,AIA Senior Project Manager. Jacobs: 3300 PGA.Boulevard, Suite 780 Palm Beach Garden, FL 33410 Re:. Proposal to provide -a -Design Review -and Baggage Handling -System (BHS).Capacity Study Key West International Airport (EYW) Dear Mr. Forney: J:A.Watts Inc. OWI) is pleased to submit our revised proposal to.provide a design..revieW and BHS Capacity 'Study for EYW : In the enclosed proposal, you will find our team resumes, approach, and fee:proposal. Our JWI team brings extensive BHS experience at airports across the. country, and we will, bring those lessons learned to the Jacobs Team and EYW. You have my personal commitment: that selecting. Jwl vvill afford Jacobs and .EYW the assurance. that your .h . project will be an overwhelming success. Should you have any questions, Please do not hesitate to contact me at (3.12) 997-3720. 'Sincerely, Julie Watts President TABLE OF owl CONTENTS LM �II I . Company Overview 2. Project Approach 3. Resumes 4. Fee 1. COMPANY OVERVIEW J.A. Watts, Inc. (JWI) is a woman -owned, certified DBE providing exceptional owner's representation, construction management and project management for public and private owners since 1999. Known for our unmistakable culture of treating clients and employees like family, we've built our reputation by developing long-term relationships and providing an energetic, diverse and inclusive workplace. With headquarters in Chicago, IL and offices around the United States, we provide cost effective access to any assignment, anywhere in the world. JW1 J. A. Watts, Inc. Project Understanding The current system in EYW consists of a single Reveal CT80 in a simplified - mini inline configuration fed by two ticket counter belts. Both ticket counter feeds are labeled OBI. The west feed contains OBI -I through OBI-8 and the East feed contains OBI-9 through OBI-15. OBI-8 merges onto OBI-16 which continues to OBI-18 before being pushed on to a roller conveyor that feeds the CT80. Bags are manually pushed forward into the CT80 for screening and screened bags are fed onto a roller conveyor by the CT80. Alarm bags are held in the exit tunnel and need to be released onto the roller conveyor deliberately by the TSA to be removed for hand search. Clear bags from the EDS have to be lifted and placed on the OB2 line to be conveyed to the single sortation carousel. In this configuration, the BHS only needs four bags per load point to cascade back to the ticket counter. Die back will happen frequently when there is one bag on the search table and one suspect bag being held in the Reveal Exit Tunnel. It is understood that this is a common occurrence. JW1 J. A. Watts, Inc. Scope of Work: EYW'BHS: Design Assessment/Construction Support with Second EDS Approval Based on the justification and TSA acceptance of a second:EDS: JWl:will work with the contractor to establish a: cadence for meetings and further develop the design: through. the 30%, 60%, and 100% submittals. We will lead the **ILDT (Integrated Local Design Team) to: _:. Define the zoning scheme, select :system types, and estimate design=year:: baggage screen ing.demand • :'Select the most promising alternati.ves:for.further development and evaluation • Refine the .level of definition::needed for the selected alternatives to support more detailed evaluations • Obtain TSA staff, equipment, and maintenance cost estimates:.to perform the life -cycle cost analysis • Perform rough order -of -magnitude (ROM) evaluations, including 20=year life cycle cost:analyses ..... .. JWl will be involved through :the design and build phases representing'the owner and performing the following tasks: Review an answer. RFIs Review submittals • Perform periodic QAIQC on workperformed prior'to. -being: turned over for service Hold regular meetings with.Jacobs, the Airport.Authority and the BHS contractor to.ensure the scope . - and schedule are being met Coordinate with the TSA for the move of the existing ED.S as well as the ORT (Operational Readiness Test) performed by the'TSA after a move. • Perform the pre ISAT_testing' to validate the systems capabilities' prior to TSA testing Coordinate .with and assist the TSA with the .ISAT testing of the system .**The.ILDT should include a professional planning and design team comprised of architects., engineers, planners, CBIS designers, cost estimators, safety professionals and project managers. W1 J.A..Watts, Inc. . 3. RESUMES In order to ensure that every aspect of your design review and BHS Capacity Study are executed with the utmost expertise, JWI has developed a staffing strategy that will maximize effectiveness and minimize cost. On the following pages, we have provided resumes of our proposed staff. jW1 J. A. Watts, Inc. ERIC SANTARLASCI PROJECT EXECUTIVE Eric is a proven leader in the airport baggage automation industry. With over 14 years of professional management experience leading large deployments of highly sophisticated equipment and managing large groups of technicians across the country, Eric is well versed in delivering projects for airlines and airports. Education Project Experience Iona College, New Rochelle (NY) ECRS Service Consulting, Multiple Projects As President, Eric performed Owner Authorized Representative (OAR) services for airports regarding the installation, integration, and certification of inline Baggage Handling Systems (BHS). Performed design analysis of baggage systems, as well as phasing and constructibility. Performed punchlist creation, review and sign -off for the BHS owner. Performed design and specification review for the design of a new Checked Baggage Inspection System (CBIS) installation and recapitalization. Project managed and led the design team of CBIS recapitalization efforts. Consulted as a technical resource concerning the maintenance, training, and process development of BHS. Created BHS contingency plans detailing the movement of bags, resources, and procedures to minimize the impact to resident airlines. Performed BHS and Checkpoint Lane Security Audits for throughput and customer satisfaction. Worked with TSA and other airport stakeholders to optimize passenger throughput by reviewing and providing feedback on procedures, technology, and personnel. Joint Security Infrastructure Group, Multiple Projects One of three founders of Join Security Infrastructure Group. Constructed and managed the corporate infrastructure and software architecture. Created, populated, designed, and implemented th current CMMS (Maintenance Connection) as well as any policies surrounding usage. Performed consulting work as the technical knowledge expert for X-ray field service and support. Performed HR functions such as resume review and new hire orientation. Performed Program Management Services for major airlines when airports are converted to automated baggage screening. Managed the installation and maintenance of the Clear Registered Traveler product line. Managed and supported day-to-day activities of the Technical Support Group. JW1 J. A. Watts, I nc. ERIC SANTARLASCI PROJECT EXECUTIVE Project Experience Continued L-3 Communications Security and Detection : System s, Multiple Projects. . Managed the day-to-day operations of the technical supportgroup consisting of nine senior level technicians and - two -technical support su.pervisors:The team, supports over.200 technicians maintaining over2000 products worldwide. Created the installationand technical support plans that are in use:by all members of customer service today. Oversaw, the. activities of all installations within the US, Canada, and South America. Scheduled and executed the implementation of all engineering change orders. using Microsoft Project while maintaining configuration management for the quality team. Supported the needs of the .operations team in the Asia and UK offices.: Liaised with the Engineering, Quality, -and. -Production departments as well as the vendors to ensure maintenance of all products. Led several correctiveaction teams focused on increasing the. efficiency of sales, production, shipment, and installation. Responsible for relationship maintenance,:and management of emergency issues. Created and managed the te3ch support website. Created online installation site survey forms and automated tools request.forms as well as maintained an information message board. Education BS, Electrical Engineering, University of Illinois at Chicago Affiliations Institute of Electrical and Electronic Engineers Related Skills Primavera MicrosoftVisual Basic (Programming) MicrosoftVisio TED ASAVALERTPANICH SENIOR PROJECT MANAGER Ted is an experienced professional in project management and project engineering in the material handling field, particularly airport baggage handling systems (BHS). He is a highly motivated and enthusiastic individual, capable of working on his own initiative as well as within a team environment. He is proactive with a strong work ethic and a demonstrated ability to manage multiple tasks.Ted is experienced in reviewing mechanical and electrical shop drawings, field memo documentation, functionality and device testing, coordination of project schedules, and more. Project Experience CICATEC,TSA ORD Terminal 5 Baggage Handling Systems Optimization Responsible for design management and TSA review coordination. Assisted in review and development of 30%/70%/ 100% design submittals and ensured compliance with the TSA's Planning Guidelines and Design Standards (PGDS) document. Created project bid package and RFP, and assisted in RFI review/response process. Reviewed contractor bids for accuracy and completeness and provide recommendations to the client. United Airlines ORD Terminal I CBIS Optimization Served as Baggage Handling System (BHS) Specialist responsible for review and coordination of contractor RFIs, submittals, commissioning overview, change order review, and cost estimating. Attended factory acceptance testing and provided feedback for United Airline's consideration. Performed site walk-throughs, participated in commissioning and reviews work for compliance to specifications and drawings, as well as TSA/UA standards. United Airlines ORD Terminal I Pre -Conditioned Air Upgrade and Replacement Responsible for weekly coordination meetings and project oversight. Coordinated with the control tower as needed in order to remove and replace the existing PCA units overnight. Assisted in development of a solution to rectify a design flaw regarding electrical code requirements. Reviewed RFIs and change order requests and coordinated submittal reviews with the engineer of record. Managed project closeout including punchlists and deliverables such as record drawings, warranty information, etc. JW1 J. A. Watts, Inc. TED ASAVALERTPANICH SENIOR PROJECT MANAGER Project Experience Continued CICATEC: ORDTerminal.5 400 HZ GPU.Upgrade Responsible for weekly coordination; meetings and pro jectoversight. Coordinated with the control tower on a weekly basis, providing information regarding gate; availability and associated construction durations. Responded to RFIs and change order requests and coordinated submittal review. Engaged the engineer of record when necessary in order.to resolve unforeseep circumstances and scheduled commissioning of the:various:phases of work. Managed. project closeout including punchlists. and deliverables, such. as record drawings, warranty information, etc. CICATEC ORDTerminal 5 Pre -Conditioned Air .Upgrade Responsible for weekly coordination meetings and, project oversight. Coordinated with the control tower as needed in. order to remove and replace the.exiisting. PCA units:. Attended factory acceptance testing to. ensure that the chi Ilers.performed to specification prior to shipping to the site. Reviewed RFIs and change order requests and coordinated submittal reviews -with. the engineer of record. Managed project closeout including punchlists and deliverables such.as record drawings_.and warranty information. CICATEC ORDTerminal 5 GSE Battery Chaeger.Upgrade Responsible for weekly coordination meetings. and project oversight.. Coordinated with the control tower and various ground handlers in order to develop a schedule to systematically. phase :in new battery chargers while Minimizing availability -downtime. Reviewed RFIs and change order requests and, coordinated ;submittal reviews with the engineer of record. Managed project closeout including punchlists and deliverables such as record drawings:and warranty information. CICATEC ORDTerminal 5 UPS Replacement Responsible for weekly;coordination meetings :arid project oversight: Coordinated with numerous stakeholders: And airlines during overnight electrical shutdowns required. to upgrade existing electrical equipment in order td.support the new. UPS units. Reviewed RFIs and change.order requests: and coordinated submittal reviews with.the engineer of record. Managed project closeout including punchlists and deliverables such as record drawings and warranty information. CICATEC ORDTerminal 5 Dumbwaiter Replacement Responsible:for weekly: coordination meetings:and project oversight:.Coordinated removal and replacement of the existing dumbwaiters with affected airlines and ground. handlers in order -to minimize operational impact during construction. Reviewed RFIs and change order requests and coordinated submittal reviews with the . engineer:of:record.Assisted city engineers in closing out permits. Managed project closeout including punc.hfists And deliverables such as record drawings, and warranty information. 4. FEE On the following page, we have provided our fee proposal. jWI J. A. Watts, I nc. FEE PROPOSAL Project Name: EYW BHS: Desiqn Assessment/Construction Support with Second EDS Approval Date Completed: 29-Jun-17 REIMBURSABLE EXPENSES Per night hotel = $ 250.00 Day Trip q of day trips included one week trips t# of week trips included Flight $ 250.00 10 Flight $ 250.00 3' Meals $ 75.00 $ 375.00 Hotel $1,000.00 Total $ 325.00 $ 3,250.00 $1,625.00 $ a,875.00 Lump Sum $ 8,125.00 JW1 J.A.Watts, Inc.