DATE: December 1, 2017
TO: Beth Leto, Airports
Business Manager
FROM: Pamela G. Hancock, D.C.
SUBJECT: November 14th BOCC Meeting
Attached is an electronic copy of Item Fl 1, Jacobs Project Management Co.'s Task Order
No. 12115-15 for the Services Authorized: Baggage Conveyor System Upgrade -Design
Assessment and Construction Phase Services PSO#15 in the amount of $50,504.00, for your
handling.
Should you have any questions, please feel free to contact me at ext. 3130. Thank you.
cc: County Attorney
Finance
File
KEY WEST MARATHON PLANTATION KEY
500 Whitehead Street 3117 Overseas Highway 88820 Overseas Highway
Key West, Florida 33040 Marathon, Florida 33050 Plantation Key, Florida 33070
305-294-4641 305-289-6027 305-852-7145
PK/ROTH BUILDING
50 High Point Road
Plantation Key, Florida 33070
305-852-7145
1W
i
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
TASK ORDER FORM
Effective Date
�Ob— 636/S�'- Sbob�o -
Client Project No. G hmpl50 —S303 to
Task Order No. 12/15-1
Engineer Project No. E9Y37915
This Task Order is entered into on the effective date noted above pursuant to the "Master
Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS
PROJECT MANAGEMENT CO. ("Consultant"), dated February 15, 2017 ("Agreement"). The
Agreement is incorporated herein and forms an integral part of this Task Order.
Services Authorized — Baggage Conveyor System Upgrade — Design Assessment &
Construction Phase Services
Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and
incorporated herein, which Exhibit A is marked with the above noted Task Order No. and
consists of 1 page(s).
Pricing
N/A Time and Expense per. Agreement and Appendix B to the Agreement.
X Firm Fixed Price of $ 50,504.00
N/A Other (Describe):
ule
,.S&I ieo may commence on Execution �"�• — —
>ISTAN/CAIINTY ATTORNEY,
,,``JServi will cease by 547 days Date
BOARD OF COUNTY COMMISSIONERS
r;TTES AEVIN MADOK, CLERK OF MONROE COUNTY, FLORIDA
ts_ By
_� Mayor/Chan an
UJ -ter
l J AM
NSUI PANT:
JACOBS PROJECT MANAGEMENT CO
By
W' Title
File: MSTR APS — Mon oe County
Page 1 of 1
l
lej//L—?
Exhibit A —Scope of Work (12/15 - 15)
Monroe County
Key West International Airport (EYW)
Baggage Conveyor System Upgrade — Design Assessment and Construction
Phase Services
EXISTING CONDITIONS
The baggage conveyor system in Baggage Screening Room #231 requires some upgrades
due to the increases in passenger volume. The current configuration does not'allow for
adequate `stored' bags in the system prior to screening and also requires the manual
handling of checked bags. The intended reconfiguration of the baggage conveyor and
shifting of the screening equipment further downline will alleviate the current
inefficiencies. In addition, the upgraded system will be configured to accommodate
future screening equipment.
G&S Airport Conveyor was the original baggage equipment manufacturer and installer
and has provided design drawings for the required revisions. The original revised layout
has been reviewed and approved by the involved stakeholders and will be the basis of
design. This design will be reviewed and modified to accommodate future screening
equipment and reconfigured if necessary.
SCOPE OF WORK
Jacobs will provide Data Collection, Procurement and Construction Administration
Support Services. The scope will include the following per our previous meetings with
the client.
• Procurement - Jacobs will coordinate with Monroe County; Legal, Procurement,
and Airports to assist in the contracting of G&S Airport Conveyors.
• Construction Administration Support Services — Jacobs will administer the
contract for construction of the revised baggage conveyor system.
In addition, Jacobs will provide the following general services for this project:
• Management of the project.
• Coordination with EYW airport staff and conveyor manufacturer as required.
• Coordination with JWI for their design review and Construction Services.
• Preparation of meeting minutes.
WORK PHASES
Based on the above description of the scope of work, we propose to perform the
following tasks:
ARTICLE A — PROCUREMENT
Based on the information collected under Article A Jacobs will coordinate with Monroe
County Legal department and, Procurement. This will be a sole source procurement with
G&S Airport Conveyors as the existing baggage conveyor system (mechanical and
software) is a proprietary system and therefore the upgraded system will be the same.
Jacobs will draft the contract with G&S to be executed by the county and will coordinate
with Procurement and airport staff.
ARTICLE B — DESIGN ASSESSMENT AND CONSTRUCTION PHASE SERVICES
Construction Administration for the baggage conveyor upgrades will be performed. The specific
tasks Jacobs will perform are:
1. Respond to all Requests for Information (RFI's)
2. Review all shop drawing submittals for conformance to the plans and specifications and
respond to the CONTRACTOR and Airport with detailed summary of the applicability and
acceptability of the shop drawing.
3. Prepare for and attend a Pre -Construction meeting.
4. Attend site visits and project construction meetings. Observe work in progress and provide
reports to Owner. Assume two (2) site visits (Bi-Monthly) throughout the course of the
construction.
5. Attend weekly progress meeting, via conference call, when not in attendance at Bi-monthly
site visits. Assume two (2) conference calls for progress meetings throughout the course of
the construction.
6. Prepare and negotiate change orders, as necessary.
7. Attend Final Inspection and prepare Punchlist.
8. Prepare and submit closeout and warranty package.
QUALIFICATIONS / CLARIFICATIONS
The following Qualifications and Clarifications are a part of our scope of work:
■ Owner and G&S Airport Conveyor will provide all estimates, design
drawings and technical specifications.
■ G&S Airport Conveyor is responsible for all design drawings; conveyor
systems, electrical and data.
■ G&S Airport Conveyor is responsible for all permitting.
ADDITIONAL SERVICES
Services not included in our scope of work include, but are not limited to, the following:
■ Any services not specifically listed above in Scope of Work and Work
Phases.
■ Cost estimating.
■ Architect/Engineer construction and /or delegated (special or threshold)
engineer inspections.
■ Attendance and/or presentation to public hearings and/or other meetings
with municipal agencies.
■ Permitting.
■ Fees for Municipal and permit agencies.
■ Construction Documents
PROJECT SCHEDULE:
The tentative complete project schedule is as follows:
Item
Duration (Business Days)
Procurement 10 days
Pre -Construction Meeting 5 days
Construction Administration Support Services 45 days
JACOBS ENGINEERING GROUP
JOB HOUR AND FEE ESTIMATE
Monroe County
Airport:
Key West International Airport
Project:
Baggage Conveyor System Upgrade - Design Assessment & Construction Phase Services (12115 -15)
FEE SUMMARY
BASIC SERVICES
Hours Fee DBE AMOUNT
Article A: Procurement
12
$
2,110
Article B: Design Assessment / Construction Phase Services
44
$
8,869
Total Basic Services Lump Sum Fee
56
$
10,979 $ -
SUBCONSULTANT SERVICES
Hours
Fee
Article B: Design Assessment/Construction Phase Services
J.A. Watts, Inc.(Lump
Sum
$
39,525
Total Subconsultants Services Lump Sum Fee
0
$
39,525
TOTAL LUMP SUM PROJECT FEE 56 $ 50,504 $ -
DBE Percent 0.00%
1
J.W morts\_MONROE COUNTy1PSO's\ 2017 P50's (ESY379XX New Conk e)'PSO 15 - Baggage Conveyor System - CAT- - EV W Baggage C—p, System Upg,da-OasgnBCA-101117.xisx
JACOBS ENGINEERING GROUP
Airport:
Project:
Article A: Procurement
JOB HOUR AND FEE ESTIMATE
Monroe County
Key West International Airport
Baggage Conveyor System Upgrade - Design Assessment & Construction Phase Services (12/15 -15)
WiD fkM ' `-
Proec[Director
Sr, Prot
''NTana er`.
Sr. En 'peel.
Project
=' Engineer .
".En 'near '
Deli n'er:
Sr.'CADD
Tech
Clerical
TOTALr
1
Contract Coordination with Monroe County
Airports and Attorney
4
4
2
Contract Coordination with BHS contractor
8
8
TOTAL HOURS
0
12
01
0
0
01
0
0
12
RATE
$ 200.00
$ 174.00
$ 147.00
$ 121.00
$ 93.00
$ 76.00
$ 101.00
$ 54.00
PAYROLL ESTIMATE
$
$ 2,088.00
$
$
$
$
$
$
$ 2,088.00
Task Subconsultants
J.A. Watts, Inc.
Total Subconsultants $
Task Exnenses:
Mileage (120miles round trip @
$0.555/mi)x2 $ -
Airfare
Meals and Per Diem
Reproduction/Misc. $ 22.00
Total Expenses $ 22.00
TOTAL PAYROLL
$ 2,088
Subconsultants
$ -
Expenses
$ 22
Lump Sum Fee Total
$ 2,110
TOTAL FEE
$ 2,110
3
JACOBS ENGINEERING GROUP
Airport:
Project:
Monroe County
Key West International Airport
Baggage Conveyor System Upgrade - Design Assessment & Construction Phase Services (12115 -15)
A.I:.Io n. noe:o.. / Ph... Sor..:.oe
". WORKITEM:' .:;
Director
Sr Prof
Mane er,:
-
SeProled
`Eo ineer.
Eh ineer::
.
"En'rieer
Desi 'e'
Sr. CADD
Tech-
Clericih
'
TOTAL?
I
Design Assessment coordination with airport, JA
Watts and Baggage Manuf.
8
8
2
Pre Construction Meeting
8
8
3
Weekly Construction Meeting - Telcon (6 weeks)
12
12
4
Site Observation punchlist and commissioning
16
16
5
Design Assessment / Construction Support Services /
ISAT Testing
See J.A. Watts, Inc. below
0
TOTAL HOURS
0
441
0
01
0
01
44
RATE
$ - 200.00
1 $ 174.00
1 $ 147.00
1 $ 121.00
1$ 93.00
1 $ 76.00
$ 101.00
$ 54.00
PAYROLL ESTIMATE
$ -
1 $ 7,656
1 $ -
I $ .
I$
$
$ 7,656
Task Subconsultants
2,3,4,5 J.A. Watts, Inc.
$ 31,400.00
Includes: 10 day trips @ $325 (Flight $250, Meals,
$75
3,250.00
Inclucles; 3 weeK long tops (fD ti3,025 (Fllgnt
$250, Meals $375, Lodging $1,000)
4,875.00
Total Subconsultants
$ 39,525.00
Task Expenses:
2,4 Mileage (480miles round trip @ $0.555/mi)x2 $ 532.80
Meals and Per Diem ($75 day)x2 $ 150.00
Lodging ($250 day)x2 $ 500.00
Tolls ($15)x2 $ 30.00
Total Expenses $ 1,212.80
TOTAL PAYROLL $ 7,656
Subconsultants $ 39,525
Expenses $ 1,213
Lump Sum Fee Total $ 48,394
TOTAL FEE $ 48,394
J:W ryasS MIXJROE COUNMPSO's\ ]IH] GSOa (E9Y]]glIXNew eonvanlw5015 -Baggage Lomryw System-CPrFee -EYW Baggage Comryor System tlpgraCeOesignBCA-t01,1> vlsv 1
KEY WEST
E1NAUONA.L.r AMRT
DESIGN REVIEW &
BAGGAGE HANDLING SYSTEM
CAPACITY STUDY
jwl
J. A. Watts, Inc.
J W.
f .A. Watts, Inc.. :
J. A. Watts, I n c . 940 West Adams "Sweet
Suite 400
E cient.Efiective. Beyond Expectation.q Chicago, Illinois 60607 .
Phone: 312.997.3720
Fax: 312.997.3726
www.iWincorporated.com
August 3,,2017
Ryan Forney,AIA
Senior Project Manager.
Jacobs:
3300 PGA.Boulevard, Suite 780
Palm Beach Garden, FL 33410
Re:. Proposal to provide -a -Design Review -and Baggage Handling -System (BHS).Capacity Study
Key West International Airport (EYW)
Dear Mr. Forney:
J:A.Watts Inc. OWI) is pleased to submit our revised proposal to.provide a design..revieW and BHS Capacity
'Study for EYW : In the enclosed proposal, you will find our team resumes, approach, and fee:proposal. Our
JWI team brings extensive BHS experience at airports across the. country, and we will, bring those lessons
learned to the Jacobs Team and EYW.
You have my personal commitment: that selecting. Jwl vvill afford Jacobs and .EYW the assurance. that your
.h .
project will be an overwhelming success. Should you have any questions, Please do not hesitate to contact
me at (3.12) 997-3720.
'Sincerely,
Julie Watts
President
TABLE OF
owl CONTENTS
LM
�II
I . Company Overview
2. Project Approach
3. Resumes
4. Fee
1. COMPANY OVERVIEW
J.A. Watts, Inc. (JWI) is a woman -owned, certified DBE providing
exceptional owner's representation, construction management and
project management for public and private owners since 1999. Known
for our unmistakable culture of treating clients and employees like
family, we've built our reputation by developing long-term relationships
and providing an energetic, diverse and inclusive workplace. With
headquarters in Chicago, IL and offices around the United States, we
provide cost effective access to any assignment, anywhere in the world.
JW1
J. A. Watts, Inc.
Project Understanding
The current system in EYW consists of a single Reveal CT80 in a simplified
- mini inline configuration fed by two ticket counter belts. Both ticket
counter feeds are labeled OBI. The west feed contains OBI -I through
OBI-8 and the East feed contains OBI-9 through OBI-15. OBI-8 merges
onto OBI-16 which continues to OBI-18 before being pushed on to a
roller conveyor that feeds the CT80. Bags are manually pushed forward
into the CT80 for screening and screened bags are fed onto a roller
conveyor by the CT80. Alarm bags are held in the exit tunnel and need
to be released onto the roller conveyor deliberately by the TSA to be
removed for hand search. Clear bags from the EDS have to be lifted and
placed on the OB2 line to be conveyed to the single sortation carousel.
In this configuration, the BHS only needs four bags per load point to
cascade back to the ticket counter. Die back will happen frequently
when there is one bag on the search table and one suspect bag being
held in the Reveal Exit Tunnel. It is understood that this is a common
occurrence.
JW1
J. A. Watts, Inc.
Scope of Work: EYW'BHS: Design Assessment/Construction Support with Second EDS Approval
Based on the justification and TSA acceptance of a second:EDS:
JWl:will work with the contractor to establish a: cadence for meetings and further develop the design: through.
the 30%, 60%, and 100% submittals. We will lead the **ILDT (Integrated Local Design Team) to:
_:. Define the zoning scheme, select :system types, and estimate design=year:: baggage screen ing.demand
• :'Select the most promising alternati.ves:for.further development and evaluation
• Refine the .level of definition::needed for the selected alternatives to support more detailed evaluations
• Obtain TSA staff, equipment, and maintenance cost estimates:.to perform the life -cycle cost analysis
• Perform rough order -of -magnitude (ROM) evaluations, including 20=year life cycle cost:analyses
..... ..
JWl will be involved through :the design and build phases representing'the owner and performing the following
tasks:
Review an answer. RFIs
Review submittals
• Perform periodic QAIQC on workperformed prior'to. -being: turned over for service
Hold regular meetings with.Jacobs, the Airport.Authority and the BHS contractor to.ensure the scope . -
and schedule are being met
Coordinate with the TSA for the move of the existing ED.S as well as the ORT (Operational Readiness
Test) performed by the'TSA after a move.
•
Perform the pre ISAT_testing' to validate the systems capabilities' prior to TSA testing
Coordinate .with and assist the TSA with the .ISAT testing of the system
.**The.ILDT should include a professional planning and design team comprised of architects.,
engineers, planners, CBIS designers, cost estimators, safety professionals and project
managers. W1
J.A..Watts, Inc. .
3. RESUMES
In order to ensure that every aspect of your design review and BHS
Capacity Study are executed with the utmost expertise, JWI has developed
a staffing strategy that will maximize effectiveness and minimize cost.
On the following pages, we have provided resumes of our proposed staff.
jW1
J. A. Watts, Inc.
ERIC SANTARLASCI
PROJECT EXECUTIVE
Eric is a proven leader in the airport baggage automation industry.
With over 14 years of professional management experience leading
large deployments of highly sophisticated equipment and managing
large groups of technicians across the country, Eric is well versed in
delivering projects for airlines and airports.
Education Project Experience
Iona College, New Rochelle (NY) ECRS Service Consulting, Multiple Projects
As President, Eric performed Owner Authorized Representative
(OAR) services for airports regarding the installation, integration,
and certification of inline Baggage Handling Systems (BHS).
Performed design analysis of baggage systems, as well as phasing and
constructibility. Performed punchlist creation, review and sign -off
for the BHS owner. Performed design and specification review for
the design of a new Checked Baggage Inspection System (CBIS)
installation and recapitalization. Project managed and led the design
team of CBIS recapitalization efforts. Consulted as a technical
resource concerning the maintenance, training, and process
development of BHS. Created BHS contingency plans detailing
the movement of bags, resources, and procedures to minimize the
impact to resident airlines. Performed BHS and Checkpoint Lane
Security Audits for throughput and customer satisfaction. Worked
with TSA and other airport stakeholders to optimize passenger
throughput by reviewing and providing feedback on procedures,
technology, and personnel.
Joint Security Infrastructure Group, Multiple Projects
One of three founders of Join Security Infrastructure Group.
Constructed and managed the corporate infrastructure and
software architecture. Created, populated, designed, and
implemented th current CMMS (Maintenance Connection) as well
as any policies surrounding usage. Performed consulting work
as the technical knowledge expert for X-ray field service and
support. Performed HR functions such as resume review and new
hire orientation. Performed Program Management Services for
major airlines when airports are converted to automated baggage
screening. Managed the installation and maintenance of the Clear
Registered Traveler product line. Managed and supported day-to-day
activities of the Technical Support Group.
JW1
J. A. Watts, I nc.
ERIC SANTARLASCI
PROJECT EXECUTIVE
Project Experience Continued
L-3 Communications Security and Detection : System s, Multiple Projects. .
Managed the day-to-day operations of the technical supportgroup consisting of nine senior level technicians
and - two -technical support su.pervisors:The team, supports over.200 technicians maintaining over2000
products worldwide. Created the installationand technical support plans that are in use:by all members of
customer service today. Oversaw, the. activities of all installations within the US, Canada, and South America.
Scheduled and executed the implementation of all engineering change orders. using Microsoft Project while
maintaining configuration management for the quality team. Supported the needs of the .operations team in the
Asia and UK offices.: Liaised with the Engineering, Quality, -and. -Production departments as well as the vendors
to ensure maintenance of all products. Led several correctiveaction teams focused on increasing the. efficiency
of sales, production, shipment, and installation. Responsible for relationship maintenance,:and management of
emergency issues. Created and managed the te3ch support website. Created online installation site survey
forms and automated tools request.forms as well as maintained an information message board.
Education
BS, Electrical Engineering,
University of Illinois at Chicago
Affiliations
Institute of Electrical and Electronic
Engineers
Related Skills
Primavera
MicrosoftVisual Basic (Programming)
MicrosoftVisio
TED ASAVALERTPANICH
SENIOR PROJECT MANAGER
Ted is an experienced professional in project management and
project engineering in the material handling field, particularly airport
baggage handling systems (BHS). He is a highly motivated and
enthusiastic individual, capable of working on his own initiative as
well as within a team environment. He is proactive with a strong
work ethic and a demonstrated ability to manage multiple tasks.Ted
is experienced in reviewing mechanical and electrical shop drawings,
field memo documentation, functionality and device testing,
coordination of project schedules, and more.
Project Experience
CICATEC,TSA ORD Terminal 5 Baggage Handling
Systems Optimization
Responsible for design management and TSA review coordination.
Assisted in review and development of 30%/70%/ 100% design
submittals and ensured compliance with the TSA's Planning
Guidelines and Design Standards (PGDS) document. Created
project bid package and RFP, and assisted in RFI review/response
process. Reviewed contractor bids for accuracy and completeness
and provide recommendations to the client.
United Airlines ORD Terminal I CBIS Optimization
Served as Baggage Handling System (BHS) Specialist responsible
for review and coordination of contractor RFIs, submittals,
commissioning overview, change order review, and cost estimating.
Attended factory acceptance testing and provided feedback for
United Airline's consideration. Performed site walk-throughs,
participated in commissioning and reviews work for compliance to
specifications and drawings, as well as TSA/UA standards.
United Airlines ORD Terminal I Pre -Conditioned Air
Upgrade and Replacement
Responsible for weekly coordination meetings and project
oversight. Coordinated with the control tower as needed in order
to remove and replace the existing PCA units overnight. Assisted
in development of a solution to rectify a design flaw regarding
electrical code requirements. Reviewed RFIs and change order
requests and coordinated submittal reviews with the engineer
of record. Managed project closeout including punchlists and
deliverables such as record drawings, warranty information, etc.
JW1
J. A. Watts, Inc.
TED ASAVALERTPANICH
SENIOR PROJECT MANAGER
Project Experience Continued
CICATEC: ORDTerminal.5 400 HZ GPU.Upgrade
Responsible for weekly coordination; meetings and pro jectoversight. Coordinated with the control tower on a
weekly basis, providing information regarding gate; availability and associated construction durations. Responded
to RFIs and change order requests and coordinated submittal review. Engaged the engineer of record when
necessary in order.to resolve unforeseep circumstances and scheduled commissioning of the:various:phases
of work. Managed. project closeout including punchlists. and deliverables, such. as record drawings, warranty
information, etc.
CICATEC ORDTerminal 5 Pre -Conditioned Air .Upgrade
Responsible for weekly coordination meetings and, project oversight. Coordinated with the control tower as
needed in. order to remove and replace the.exiisting. PCA units:. Attended factory acceptance testing to. ensure
that the chi Ilers.performed to specification prior to shipping to the site. Reviewed RFIs and change order
requests and coordinated submittal reviews -with. the engineer of record. Managed project closeout including
punchlists and deliverables such.as record drawings_.and warranty information.
CICATEC ORDTerminal 5 GSE Battery Chaeger.Upgrade
Responsible for weekly coordination meetings. and project oversight.. Coordinated with the control tower and
various ground handlers in order to develop a schedule to systematically. phase :in new battery chargers while
Minimizing availability -downtime. Reviewed RFIs and change order requests and, coordinated ;submittal reviews
with the engineer of record. Managed project closeout including punchlists and deliverables such as record
drawings:and warranty information.
CICATEC ORDTerminal 5 UPS Replacement
Responsible for weekly;coordination meetings :arid project oversight: Coordinated with numerous stakeholders:
And airlines during overnight electrical shutdowns required. to upgrade existing electrical equipment in order
td.support the new. UPS units. Reviewed RFIs and change.order requests: and coordinated submittal reviews
with.the engineer of record. Managed project closeout including punchlists and deliverables such as record
drawings and warranty information.
CICATEC ORDTerminal 5 Dumbwaiter Replacement
Responsible:for weekly: coordination meetings:and project oversight:.Coordinated removal and replacement of
the existing dumbwaiters with affected airlines and ground. handlers in order -to minimize operational impact
during construction. Reviewed RFIs and change order requests and coordinated submittal reviews with the .
engineer:of:record.Assisted city engineers in closing out permits. Managed project closeout including punc.hfists
And deliverables such as record drawings, and warranty information.
4. FEE
On the following page, we have provided our fee proposal.
jWI
J. A. Watts, I nc.
FEE PROPOSAL
Project Name: EYW BHS: Desiqn Assessment/Construction Support with Second EDS Approval
Date Completed: 29-Jun-17
REIMBURSABLE EXPENSES
Per night hotel = $ 250.00
Day Trip
q of day trips
included
one week trips
t# of week trips
included
Flight
$ 250.00
10
Flight
$ 250.00
3'
Meals
$ 75.00
$ 375.00
Hotel
$1,000.00
Total
$ 325.00
$ 3,250.00
$1,625.00
$ a,875.00
Lump Sum
$ 8,125.00
JW1
J.A.Watts, Inc.