2017-02 CBP FacilityC' .,
Kevin Madok, CPA
Clerk of the Circuit Court & Comptroller — Monroe County, Florida
DATE: December 20, 2017
TO: Beth Leto, Airports
Business Manager
FROM: Pamela G. Hancock, D.C.
SUBJECT: December 13th BOCC Meeting
Attached are electronic copies of the following items for your handling:
C4 Second Amendment to Contract with Gardens of Eden of the Florida Keys, Inc.,
for landscaping services at Key West International Airport increasing hourly rate from
$25.18 /hour to $25.71 /hour and annual contract amount from $100,700.00 /year to
$102,814.70 /year for annual CPI adjustment of 2.1 %.
C5 An updated Task Order 12/15 -14 for Airport Noise Program Coordinator Services
PSO #14 in the amount of $84,471.00 to be funded 90% by FAA Grant #037 -55, and 10%
Passenger Facility Charges (PFC #17), with no increase in total price.
C6 McFarland Johnson Task Order No. 2017 -02 in the amount of $519,164.00 for
Engineering Design and Bidding Services for the Customs and Border Protection Facility - Phase
III to Final at the Key West International Airport, to be paid from FDOT Grant AQH10 (50 %)
and Airport Operating Fund 404 (50 %).
Should you have any questions, please feel free to contact me at ext. 3130. Thank you.
cc: County Attorney
Finance
File
KEY WEST
500 Whitehead Street
Key West, Florida 33040
305 - 294 -4641
MARATHON
3117 Overseas Highway
Marathon, Florida 33050
305 - 289 -6027
PLANTATION KEY
88820 Overseas Highway
Plantation Key, Florida 33070
305 - 852 -7145
PK/ROTH BUILDING
50 High Point Road
Plantation Key, Florida 33070
305 - 852 -7145
V i ;
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
TASK ORDER FORM
Effective Date upon execution Task Order No. 2017 -02
404- 630169- 560620—
Client Project No. GAKD129- 530310 Engineer Project No. 18221.02
This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for
Professional Services" between Monroe County, Florida ( "Client ") and McFarland Johnson Inc.
( "Consultant'), dated February 15, 2017 ( "Agreement "). The Agreement is incorporated herein and
forms an integral part of this Task Order.
Services Authorized: Engineering Design and Bidding Services for the Customs and Border
Protection (CBP) Facility — Phase III to Final at Key West International Airport (EYW)
Client authorizes Consultant to perform the _ g Engineerin Services described in Exhibit A attached
hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and
consists of 7 page(s).
Pricing
N/A Time and Expense per Agreement and Appendix B to the Agreement.'
cl
"
�--
0 --
R
M
X Firm Fixed Price of $ 519,164
C) M
c7
c)
Other (Describe):
C-)
to
C�
1 h4
Schedule �,
=
rn
Services'ma. )cupmence on Execution
'{` i
••
p
Service �uill`eease by 365 days
r—
C
y l
O
ex c6 i r ���
(SEAL)
ATTEST: KEVIN MADOK, CLERK
Witness r A4.
Title 04UA*,ZJ
File:
BOARD OF COUNTY COMMISSIONERS
OF MONROE COUNTY, FLORIDA
By
Mayor/ClCd rman
CONSULTANT:
MCF ARLA SON INC.
By
SJ
Page 1 of 1
EXHIBIT A
Task Order 2017-02
SCOPE OF SERVICES
FOR
MONROE COUNTY
KEY WEST INTERNATIONAL AIRPORT
ENGINEERING DESIGN AND BIDDING SERVICES
FOR THE
CUSTOMS AND BORDER PROTECTION FACILITY—PHASE III TO FINAL
PROJECT BACKGROUND
Key West International Airport (EYW) has been working to increase the size of their current U.S.
Customs and Border Protection Facility (CBP) and some time ago reached an agreement with
the CBP for the preliminary design of the facility. A basic floor plan representing the preliminary
design is shown in Figure 1, which shows the existing Greyhound Bus facilities in green, and the
Airport police and badging in blue. The preliminary CBP floor plans are shown in yellow. It is
estimated that the floor shown is approximately 10,890 square feet in gross area. Of that,
approximately 300 square feet is, or will be, dedicated to the bus station, approximately 2,495
square feet would be dedicated to the Airport police and badging, and approximately 8,095 square
feet would be dedicated to the expanded CBP facilities. The area in Figure 1 that is shaded in a
darker yellow, to the right, is currently under construction. All other areas are currently existing.
Figure 1: Preliminary CBP Layout
' ,t,---.-r
um*
—II— ��■ 0
5 la. UL3 I
C '-_ :u] n I I II
J
-Es.;
°W I NI= 14 V . ..' j .°
I I " i� _1rJ(çQc o uL Ir
C
ill'' a'
iiiii
■ fl l fT'�o; 'A
LEVEL I-OPTION 4 j' I
Key West International Airport
CBP Phase Ill to Final Page 1 of 4
Design and Bidding -Scope of Services
Because about 18 months has passed and the consultants previously working on the project are
no longer involved, the CBP would like to re- validate the previous design prior to commencing
with the Phase III project design. Based on preliminary coordination with CBP staff, various CBP
Airport Technical Design Standards (ATDS) were used in the development of the Preliminary CBP
Layout presented in Figure 1. It could have been the 2012 ATDS, which is currently the standard
that is technically in effect. However, elements of the Preliminary CBP Layout appear to be an
early version of the March 2017 Draft ATDS. It is anticipated that the re- validation of the
Preliminary CBP Layout would include a verification of which ATDS is to be used in the
development of the EYW CBP as the design moves forward.
This proposal also assumes that furniture and equipment will be included in this project and that
little to no currently used CBP equipment would be carried over into the new project. Further, it is
anticipated that the construction of this project could be accomplished in as many as three
additional phases based on anticipated available funding. One element of the project will be to
develop a phasing plan that will not only anticipate available funding, but would also ensure that
that the bus station, Airport police and badging and the existing CBP operation could remain
operational during construction and through each phase of the project.
The phasing and subsequent duration of each construction period as well as an operational plan
will be addressed during each phase of the project. This scope of work does not include either
construction administration or resident inspector services, which will be completed under a
separate scope of services and fee.
Description of Base Design Services:
Base design services for the project include:
• Existing Conditions Verification (detailed verification of structural, mechanical,
electrical, fire protection, and plumbing facilities)
• Review Site Conditions
• Team Coordination
o Revision /development of Base Drawings per the Field Survey
Re- validation of the Existing Preliminary CBP Layout
o Consultation with the Airport, County, and CBP
o Team Coordination
• Revision of Preliminary Layout as Required by CBP
• Development of Phasing and Operational Plan
• Schematic Design (30 %)
• Preparation of Preliminary Schematic Design Package
• Phasing and Operational Plan Review
• Printing and Issuing Redline Review Sets
• Quality Control
• CBP /Airport Review Meeting
Design Development (60 %)
• Airport Review Coordination Meeting
• Design Development Drawing Preparation
Key West International Airport
CBP Phase III to Final Page 2 of 4
Design and Bidding - Scope of Services
R i
•
Phasing and Operational Plan Review
•
Specification Preparation
•
Print and Issue Redline Review Sets
•
Quality Control
•
CBP /Airport Review Meeting
• Construction Documents (90 %)
•
Airport Review Coordination Meeting
•
Preparation of Construction Document Package
•
Phasing and Operational Plan Review
•
Preparation of Final Specifications
•
Printing and Issuing of Redline Review Sets
•
Quality Control
•
CBP /Airport Review Meeting
• Construction Documents (100 %)
•
Consultant Coordination
•
Preparation of Construction Document Package
•
Phasing and Operational Plan Review
•
Preparation of Final Specifications
•
Printing and Distribution of Documents
• Cost Estimating
•
Revised Preliminary Layout
•
Schematic Design (30 %) Phase Estimate
•
Design Development Phase (60 %) Estimate
•
Construction Documents (90 %) Estimate
•
Construction Documents (100 %) Estimate
• Permit/Bidding Phase
o
Permit Submittal
•
Review Meeting with Permit Agency
•
Prepare Response to Permit Agency Comments
o
Coordination with Consultants
•
Distribute /Post Drawings for Bid
•
Preparation of Addenda
Deliverables
Progress set deliverables will be printed and distributed for review at the end of:
• Re- validation of Preliminary CBP Layout
• Schematic Design (30 %)
• Design Development (60 %)
• Construction Documents (90 %)
• Construction Documents (100 %).
Cost Estimates
Cost Estimates will be prepared at the end of:
• Re- validation of Preliminary CBP Layout
Key West International Airport
CBP Phase III to Final
Design and Bidding - Scope of Services
Page 3 of 4
e
• Schematic Design (30 %)
• Design Development (60 %)
• Construction Documents (90 %)
• Construction Documents (100 %).
Meetings
Seven (7) on- site.meetings are included in this proposal:
1. Existing Conditions Verification.
2. Re- validation of the Existing Preliminary CBP Layout meeting with Airport and CBP
3. 30% milestone review meeting with Airport and CBP.
4. 60% milestone review meeting with Airport and CBP.
5. 90% milestone review meeting with Airport and CBP.
6. On additional Meeting to be Used as Required
7. Meeting with County Building Department for Permit Review
SCHEDULE
Milestone
Duration
Ending
Issue Notice to Proceed for Design
2 January 2018
Existing Conditions Documentation
14 Days
16 January 2018
Re- validation of Preliminary CBP Layout
51 Days
6 March 2018
Schematic Design Phase 30%
42 Days
17 April 2018
Design Development Phase 60%
56 Days
14 June 2018
Construction Documentation Phase 90%
56 Days
9 August 2018
Bid Documents (100 %)
21 Days
30 August 2018
Airport/County Review
17 Days
16 September 2018
Advertise for Bid
45 Days
1 November 2018
Board Approval for Construction
14 Days
15 November 2018
Construction
TBD
TBD
COMPENSATION PROPOSAL
The attached detailed fee breakdown presents the schedule of fees and direct expenses for a
total project lump sum fee in the amount of $ 519,164.
Key West International Airport
CBP Phase III to Final Page 4 of 4
Design and Bidding - Scope of Services
•
Key West International Airport -CBP Design & Bidding Services Phase Ill to Final
Monroe County
November 2017
FEE SUMMARY �' McFarland Johnson
DESIGN/PLANNING
SERVICES
1. DIRECT TECHNICAL LABOR $54,736.00
2. DIRECT EXPENSES $3,856.00
3. SUBCONSULTANT COSTS $460,571.44
AVCON (MEP/Structural/Facilities) $225,109.00
Schenkal Schultz(Architecture/Interior Design) $159,200.00
KMI International(Estimating) $15,475.00
JSM&Assoc. (Baggage Handling) $60,787.44
4. TOTAL FEE ESTIMATE $519,163.44
5.TOTAL LUMP SUM FEE FOR ALL SERVICES $519,164
Key West International Airport-CBP Design & Bidding Services Phase Ill to Final
Monroe County 1�� McFarland Johnson _
November 2017
ESTIMATED HOURS
HOURS BY CLASSIFICATION
VP DM SPM SPE PE SE AE JE ST T SUM
$294.00 $208.00 $199.00 $153.00 $141.00 $118.00 $101.00 $82.00 $94.00 $83.00
PHASE/TASK DESCRIPTION
1 Existing Conditions Verification I 8 2 I I I f 10
2 Revalidation of the Existing Preliminary CBP Layout I 24 2 I I I 2 28
3 Schematic Design(30%) 2 I 12 60 I I I I 2 76
4 Design Development(60%) 2 I 16 64 I I I I 2 84
5 Construction Documents(90%) 2 I 16 40 I I I I 58
6 Construction Documents(100%) 1 I 8 24 I I I I 4 37
7 Cost Estimating 1 I I 4 I 8 1 I I 13
8 Permit/Bidding Phase 1 I I 8 I 8 I I I I I 4 21
9 0
10 II
11 II
12 II
II J
Total Hours-Design I Planning Services 9 96 208 14 327
Total Labor Cost-Design/Planning Services $2,646 $19,104 $31,824 $1,162 $54,736
Y
1•
Key West International Airport - CBP Design & Bidding Services
Monroe County
November 2017
McFarland Johnson
DIRECT COSTS
DESIGN /
PLANNING
SERVICES
Travel Related Costs:
Vehicle Cost Plus Fuel
Lodging and Meals
Per Diem
$220
$1,036
Reproduction
CADD Plots
Prints
Photocopies
Photo Costs
Telephone /Fax:
Postage /Delivery
Miscellaneous (travel)
M
$3,856
$3,856