AIRPORTS
Key West
December 1Attended Noise Ad-Hoc meeting in KW, discussed operational measures, NIP and
reduced the number of meetings from 6 to 4.
December 2Attended the monthly airline meeting with tenants.
December 2Attended meeting with Airport volunteer Marta, on the new welcoming center,
discussed Logo, number of volunteers ready (4) and hopefully opening in January
16.
December 3Had phone meetingwith Adam Wolf from Congressman Curbelo’s office to
discuss FAA reauthorization items of importance to EYW and MTH.
December 8Met with Mayor Carruthers to discuss airport issues.
December 9Attended BOCC meeting in Key Largo
December 10Attended airport project meeting with Jacobs, also invited Ameri-bridge to inspect
airport for future jet ways/bridges.
December 10Met with Newton and Associates for 2016 financial timelines and action plan.
December 11Met with Key West Wildlife Center and Audubon to discuss reducing bird strikes
on the walkway between the two terminals with glass coverings.
December Performed night closure of runway for new grass installation replacing first attempt
12-13by DN Higgins.
December 15Attended TDC lunch at Marriott,discussed forming a Friends of the Airport group
with business and community leaders / interested individuals in 2016.
December 21Met with MSCO and airport operations personnel to review final Ground
Transportation Resolution changes before I send the draft to the operators for final
comment.
December 24-31DD provided Christmas coverage at airport as various staff traveled for the
Holidays
Marathon
December 14 MTH sewer connection project pre-construction meeting with CDM Smith, D.N.
Higgins, and Airport staff.
December 15Airport hosted Courtyard Marriott staff to conduct their employee orientation
training class in the departure lounge.
December 16Miscellaneous Planning Study meeting with Jacobs, Ricondo, Airport staff, and
Airport tenantsto discuss the possible options to resolve the Runway / Taxiway
separation issue at MTH.
December 17Customs change order meeting with County Project Management and Pedro
Falcon to discuss final changes for the MTH CBP project.
December 18Initial Disaster Drill planning meeting with MFD Chief Johnson and Airport staff.
December 20Monroe County Fire conducted EVOC driver training on the main terminal ramp.
December 29Meeting with Waste Management to discuss establishing an arrangement to
process international garbage for the new CBP facility.
December 29Meeting with MCFA and hangar contractors to discuss the installation of a new
fire hydrant near Marathon General Aviation.
COMMUNITY SUPPORT SERVICES
OAA, Older Americans Act Programs:
Nutrition (Information in this section is for the period 10/21/2015 -11/20/2015:
C-1 Congregate Meals totaled 1205 units during this period.
C-2 Home Delivered Meals Hots totaled 253 units, and Home Delivered Meals Frozen totaled
3645 units. We continue to receive a large number of referrals for Home Delivered Meals.
In-Home Services (Information in this section is for the period 10/21/2015-11/20/2015):
III-B Chore: 0 units this period, 0 units year-to-date, 0% achieved.
III-B Screening and Assessment: 0units this period, 40 units year-to-date, 99.88% achieved.
III-B Homemaking/Personal Care: 0 units this period, 775 units year-to-date, 100% achieved.
III-E Screening and Assessment: 6 units this period, 44.25 units year to date, 100% achieved.
III-E Chore:0 units this period, 0 units year-to-date, 0% achieved.
III-E In-Home Respite: 4.5 units this period, 206.5 units year-to-date, 26.68% year-to-date-
achieved.
III-E Facility Respite: 0 units this period, 4130.75 units year to date, 111% year-to-dateachieved.
Non-OAA Programs:
CCDA (Community Care for Disabled Adults) for November2015:
Case Management:14.75 units for the month were produced; 85.50 units year-to-date.
Homemaking:124.25 units for the month were produced; 651 units year-to date.
Home-Delivered Meals: 60 meals for the month were provided; 395 meals year-to-date.
Personal Care:61 units for the monthly were produced;263.25 units year-to-date.
Overall Program Achievement was 45.58% achieved, 4% underachieved.
CCE (CommunityCare for the Elderly) for the period 10/21/2015-11/20/2015:
Case Management: 65.75 units for the period and 232.25 units year-to-date.29.51% achieved
year-to-date.
Case Aide: 0 unit achieved and 0 unit year-to-date, 0 % achieved year-to-date.
Companionship: 15 units achieved and 56 units year-to-date, 4.90% achieved year-to-date.
Home Modification:0 units achieved and 0 units year-to-date, 0% achieved year-to-date.
Enhanced Chore: 0 units achieved and 0 units year-to-date, 0% achieved year-to-date.
Chore: 0 units achieved and 68.50 units year-to-date, 100% achieved year-to-date.
Homemaking: 633.5 units for the period and 2740.0 units year-to-date 43.32% achieved year-to-
date.There are 56 clients on the waiting list.
Specialized Medical Equipment: 0 unit for the period and 0 unit year-to-date, 0% achieved year-
to-date.
Transportation: 0 units for the period and 0 units year-to-date, 0% achieved year-to-date.
Personal Care:437.75 units for the period and 2205 units year-to-date. 40.87% achievedyear-to-
date. There are 19 clients on the waiting list.
Respite: 162.50 units for the period and 590.75 units year-to-date.60.88% achieved year to date.
There are 9 clients on the waiting list.
CCE overall is at 36.46% achievement.We are 5.21% underachieved
ADI (Alzheimer’s Disease Initiative) for the period 10/21/2015-11/20/2015: 1299.25 units were
produced in the period and 4525.70 units year to date.49.0 % achieved. 8% over achieved
HCE (Home Care for the Elderly Program) for the period 11/16/15-12/15/15:19.25 billable units
this period, 87.75 billable units year-to-date at the beginning of the contract year, 41.70 %
achieved.
Monroe County Transit
Department Activity for December 2015
One-way trips provided: 1,433
Unduplicated clients served: 201
Special Needs Clients registered: 522
Deposited Revenue: $1818.50
Periods Expenditures: $32,717.09
Percentage Spent Fiscal YTD: 12%
Social Services Department –December 2015
Community Support Services
Offices in: Key West, Marathon, Plantation Key
Incoming calls, provision of information and referrals 411
Staff responded to incoming calls providing information and referrals to callers based
on specific inquiries and/or needs. These inquiries range from how and where to apply for Food Stamp
benefits, where the closest food bank is located, how to report suspected abuse, or to find out what available
services there are at the time.
Other callers are scheduled for intake by Social Services case management staff to cover
Possible programs such as LIHEAP, ESG rent assistance, prescription drug assistance, and welfare
assistance.
Info and Written Referrals229
Unduplicated Welfare client households that received service 48
New Welfare cases receiving service24
Low Income Home Energy Assistance Program cases-29$8,650.00
Low Income Crisis Assistance cases –24$5,148.76
Home and field visits42
Home and field visits cover visits to In-Home, Nutrition, WAP, and ESG rent clients.
Case Managers make these visits to perform annual or semi-annual updates for In-Home
and Nutrition clients. WAP clients are visited for testing for possible Weatherization
services to their homes. ESG rent clients are visited for the Habitability Study required
prior to receiving rentalassistance through this grant.
Office visits 171
Office visits reflects the number of visitors that come into to all three locations of our
Social Services offices throughout themonth.
Prescriptions 4$782.89
HCRA3
BAYSHORE MANOR
Bayshore Manor’s current census is eleven residents. The current census is three private pay, 7
subsidized and one short term resident. Bayshore Manor provided 416.75 hours of OA3E respite care and
114 hours of ADI care this month. Bayshore Manor has seven OA3E clients and one ADI client.
There are two clients on the waiting list.
Revenue for December 2015 $24,708.07
Expendituresfor the same period$49,741.71
Percentage of the budget spent year to date 17.59%
EXTENSION SERVICES
Number of services provided: 152 phone calls, 19 office visits, 10 visits to clients, 20 learning
events with 263 participants, 4 media submissions, and 738 publications distributed. Total
Budget for FY 15/16: $212,351.00; Year to Date Expenditures and Encumbrances: $114,673.32;
Remaining Balance: $97,677.68; Percentage of budget spent and/or encumbered year-to-date:
54%.
The County Extension Director/Family & Community Development Agent accomplished the
following activities:
Worked with staff to host 450 participants for the 7th Annual Southeast Florida Regional Climate
Leadership Summit including exhibitor placement, volunteer management, and agenda planning.
A display was developed to represent Monroe County’s initiatives and impact for 2015 on issues
such as sea level rise, canal restoration, and STAR community rating. Five Sustainable
SM
Floridiansgraduates volunteered at the summit aswell as staff from the other three compact
counties. Also was a presenter under “Shipshape and Sustainable.” The summit presentations
were recorded and are available at http://greenkeys.info.
Worked nationally with a peer group to update the “Climate Change Handbook: A Citizen’s
Guide to Thoughtful Action” which is expected to be completed in the spring of 2016.
Was nominated by IFAS Dean Dr. Nick Place to apply for a national Extension climate team, the
“eXtension i-Three Corps” initiative. The application included public voting and over 300 local
community members voted for the County Extension Director. The applicants will be notified of
appointments by January 1.
The Environmental Horticulture Agent accomplishedthe following activities:
Worked with staff from Islamorada Environmental Resources to develop an upcoming eight-
week residential horticulture workshop series that will be in three hours/sessions with a
combination presentation and hands-on activities. “Landscaping on the Rock” will run February
4 through March 24, 2016.
Lead the involvement of 14 after-school students and a teacher at Grimal Grove in lecture and
hands-on activities about Big Pine Key native plants.
Held seven Regional Plant Clinics. Eleven Master Gardeners assisted 19 people by answering
questions regarding plants and insects.
The Florida Sea Grant Marine Extension Agent accomplished the following activities:
Held three Florida Keys Water Watch Workshops. There are currently 38 sites with a total of 185
water quality-sampling events in Monroe County.
Attended the 7th Annual Southeast Florida Regional Climate Leadership Summit at the Casa
Marina in Key West.
Attended the Florida Keys National Marine Sanctuary Water Quality Protection Program Canal
Subcommittee meeting in Marathon.
EMERGENCY SERVICES
FIRE RESCUE
Attended Customer Service Seminar hosted by the Key West Chamber of Commerce.
Training academy construction progressing on schedule.
EMS Division organized and conducted Santa Parades for Stock Island, Big Pine, Summerland,
Ramrod, Conch Key and Duck Key.
EMERGENCY MANAGEMENT
Completed and submitted Monroe County’s 2016 Turkey Point Nuclear Power Plant Letter
of Certification to Florida Power & Light. The certification is requiredby the Nuclear
Regulatory Commission in order to maintain licensing of Turkey Point Nuclear Power Plant
as it attests to our readiness in responding to any potential emergency at the Turkey Point
Nuclear Plant.
Provided copy of the updated 2015 Local Mitigation Plan and the 510 Activity Worksheet to
Growth Management Community Rating System (CRS) Consultant. They are beginning to
gather documentation for the County’s application to join the CRS program.
Met with Miami Dade EM, Miami Dade Fairgrounds and a representative from BCC
Engineering Firm to discuss their draft report on the structural engineering study they
conducted of the Arnold and Edwards Halls as part of the on-going shelter retrofit project at
the Fairgrounds.
Completed the After Action Report for Loss of Water Supply Exercise and updated the plan
where appropriate. All phases of this initial project have been completed and closed out.
Successfully met all Florida Division of Emergency Management’s 2015 Scope Of Work
requirements.
EMS/TRAUMA STAR
Trauma Star flew Forty-Seven (47) patients to mainland hospitals for definitive care in the month of
December.
Completed training and testing for three (3) Provisional Paramedics to move to charge medic status.
th
In house Paramedic Program completed4semester of program.
Conducted 2 day EMS training and orientation for five (5) new hires.
Restructured Operative IQ inventory system for each ALS apparatus.
Conducted Flight Medic Assessment process for five (5) paramedics.
Completed CRM and Air Medical Ground crew training for three (3) Flight Medics.
Attended the Quarterly Trauma Star Safety Meeting.
Conducted a conference meeting with Florida Keys health coalition and Infant Swim Rescue for
preliminary plans to certify Infant swim rescue instructors to offer free infant swim survival training
to children in Monroe County.
Continued with field training of paramedics on quality assurance/billing issues of ePCR reports.
KWIA (EYW)
Attended / participated with fire prevention education at KWIA’s annual children’s
Christmas party, Flight to the North Pole.
Organized and participated with Key West’s annual Christmas Parade.
Initiated MCI Trailer rehab / refurbishment project.
FIRE MARSHAL
Attended bi-monthy Fire Prevention/Fire Marshal meeting for upper keys municipalities.
Craig Marston transitioned into Prevention Bureau and Captain Leonard back to field.
Coordination/Pre construction meeting in Upper Keys for two new major projects upcoming at Ocean
Reef Club.
FIRE ACADEMY/TRAINING
Target Solutions–continuing education and SOP training, online.
Firefighting Tactics and Strategies II courses delivered to ten (10) employees.
Selection of two (2) Training Officers; filled one position, with second position filled mid-January.
Orientation training held for five (5) new hires.
Completed all stations Facility Training.
EMPLOYEE SERVICES
TURNOVER NUMBERS:
November .39% Total for 2015: 15%
Resignations: 2Terminations: 0Retirements: 0Deceased: 0Layoffs: 0
December: .77%
Resignations: 4Terminations: 0Retirements: 0Deceased: 0Layoffs: 0
HUMAN RESOURCES
Still working with departments to complete the new job descriptions. So far out of 232, 183 have been
completed.
Held required office Safety meeting in accordance with Safety Policy. Two total for the year.
Accepting Personnel Policy Board nominations.
BENEFITS
130 plan participants utilized open enrollment.It took 1170 individual transactions to execute the
requested open enrollment changes for plan participants.
Prescription Benefits Manager annual Executive meeting held
Payment setup for ACA Transitional Reinsurance Fee for 2015
W-2 reporting of Health Plan coverage sent to employers
Sections 6055 & 6056 IRS reporting of health insurance coverage completed and submitted
2016 opt-out mental health parity act accomplished on HIOS website
Health/Prescription benefit numbers:
WORKERS COMPENSATION
Annual SI-5 report submitted.
2015 (#s are
reported one
month
Monthly Cases
behind)
Aug Sept Oct Nov
New Medical4 3 6 5
New Non-Medical 1 4 5 1
Total Closed Cases 8 0 19 2
Total Current Open
89 96 88 92
Cases
Open Litigation
15 14 14 14
Previous Month
Closed/Settled 1 0 0 0
New Litigation 0 0 0 0
Total Current Open
14 14 14 14
Litigated cases
SAFETY
CPR Class Tavernier –8 attendees
Investigated 10 injury reports and 6 property/public reports
2015 INJURY TOTALS
103 Recordable Reports
2%
0%
SPRAIN/STRAIN
3%
4%
SLIP/TRIP
5%
31%
TRAUMA
10%
DRIVING RELATED INJURIES
COMBAT (SHERRIFF)
5%
LACERATION
POISON PLANT EXPOSURE
12%
ANIMAL BITE
DEBRIS IN EYE
28%
SMOKE INHALATION
INFORMATION TECHNOLOGY
̹a_MX_Controller'|
Ͷͷͻ
Distinct clients: 12087 (Daily average: 1607)
Data transferred: Total: 5.58
Usage
Top applications by usage
ApplicationUsage% Usage
1Netflix942.03 GB16.5%
2Google Video617.80 GB10.8%
3Miscellaneous secure web586.64 GB10.3%
4Miscellaneous web539.35 GB9.4%
5iTunes455.28 GB8.0%
6CDNs421.15 GB7.4%
7Miscellaneous video353.02 GB6.2%
8Facebook349.49 GB6.1%
9Software updates163.91 GB2.9%
10apple.com149.79 GB2.6%
Clients per day
Topclients by usage
Operating
DescriptionManufacturersystemUsage% Usage
AzureWave
1GabrielOther110.31 GB1.9%
Technology
2OinkIntelAndroid87.63 GB1.5%
3FIRETOUGH5SonyOther82.98 GB1.5%
4GOOCH-PCLite-OnOther75.37 GB1.3%
AzureWave
5BRETSOther66.48 GB1.2%
Technology
6HPA0D3C1D7B3CECisco-LinksysAndroid61.92 GB1.1%
7JSamsungOther53.37 GB0.9%
8SPOT1-PCAsiaRFLinksys router52.42 GB0.9%
9iPhone-75AppleOther51.35 GB0.9%
10Andrews-iPadAppleOther49.18 GB0.9%
Top operating systems by usage
Operating
system# Clients%ClientsUsage% Usage
1Android779464.5%2.38 TB42.6%
2Other369030.5%2.31 TB41.5%
3iOS131210.9%646.95 GB11.3%
4Mac OS X560.5%105.88 GB1.9%
5Windows 8300.2%76.61 GB1.3%
Windows
6420.3%49.09 GB0.9%
7/Vista
Linksys
71<0.1%23.42 GB0.4%
router
Windows
8150.1%3.53 GB0.1%
XP
9Wii70.1%2.12 GB<0.1%
OEMed
10wireless 1<0.1%1.05 GB<0.1%
router
Top client device manufacturers by usage
Manufacturer# Clients% ClientsUsage% Usage
1Apple678056.1%2.93 TB52.6%
2Samsung10939.0%412.72 GB7.2%
3Intel4203.5%285.86 GB5.0%
Hon
42101.7%284.61 GB5.0%
Hai/Foxconn
AzureWave
5550.5%238.46 GB4.2%
Technology
6Lite-On1461.2%236.21 GB4.1%
Murata
77496.2%211.45 GB3.7%
Manufacturing
8Other122110.1%93.05 GB1.6%
LG
92201.8%86.61 GB1.5%
Electronics
10Microsoft980.8%85.13 GB1.5%
In December, IT also:
Completed 147 Work Orders
Migrated OneView & Hydrants from Linux to Windows for alignment with other county
application operating systems and tools
Continued the deployment of ESET antivirus as a replacement product for Kaspersky antivirus
Migrated Growth Management shared drive data to modern hardware
Produced an analysis of county servers and identified required replacements due to
hardware/software obsolescence
MCTV server troubleshooting and repair at QTS facility
Online Activities
Facebook Likes: 211 (+45 Since April)
o
Twitter Followers: 1035 (+177 Since April)
o
December Site Visits: 32,564 (-2,332Since November)
o
December Unique Site Visits: 26,117 (-1,498 Since November)
o
Top Key Word Site Searches:Search, Permits, Property Search, Employment
o
Web Updates including: Web News, Intranet, Benefits, Recycling, Hazardous Waste,
o
Greenkeys.info, OMB, Employment
Updated mdmView which is an Access database used by Workers' Comp
Updated security setup and configuration for the Special Needs Registry
Worked with the Library staff to ensure the Userful application upgrade was successful
LIBRARY
Library visitors numbered 27,792 in November; these customers checked out 25,583 items
Public access PC and wireless sessions were logged at 9,800 for the month, 7% over the figure
for last year. Wireless users alone were estimated at more than 40% over the previous month.
Staff members attribute this high usage to the lower cost and proliferation of portable devices,
along with the increased bandwidth available to library patrons. Smartphones and other smaller
devices are also being used to connect to the public wi-fi unobserved, driving the actual customer
number even higher. Library staff have noticed steady increases in library users requiring
assistance with e-government websites, such as food stampsand unemployment, as well as job
seekers and housing hunters.
The circulation of e-books totaled 1,925, an increase of19% over last year’s figure.
Library staff participated in 31 outreach events during the month, with 1,570 attendees from the
Library communities enjoying the programs.
New Library cards brought 345 new patrons added to the roster of cardholders. This number
exceeded the previous year by 44%, and the previous month by 55%.
Staff answered 8,615 reference questions via e-mail, test, chat, phone, and in-person formats,
demonstrating that the librarian is still the ultimate search engine.
344,601 eVisits were made to the Library’s web resources in November, an increase of 6% over
last year.
Though the season was just beginning in November, we have already seen evidence that this will
be another active winter for Library staff and patrons.
VETERANS AFFAIRS
CLIENTS ASSISTED
VA Phone Calls 736
Office Visits 387
New Clients34
Field Visits10
Benefits Delivery at Discharge8
8LIJMRERGMEPHEXEJSVXLIQSRXLWSJ(IGIQFIVXSXEPW
deparǤ
ǯ
Ǥ
ENGINEERING / ROADS
Card SoundBridgeRepair Project–Contract for CEI services on January agenda. Received five
th
construction bids on December 16. The lowest responsible bidder was Coastal Gunite Construction at
$2,969,512. Staff is preparing construction contract for January agenda.
th
. Staff reviewed
Card SoundToll Study–Progress meeting held with HDR on December 14
preliminary design/build criteria plans and provided comments. HDR received 899 responses to the
toll survey and are tabulating results.
LakeSurpriseEstatesRoadwayand DrainageImprovement Project–Contractor is installing drainage
structures; amendment to task order to add preliminary analysis for additional sea level rise adjustment
on January agenda. EAC provided draft preliminary study and recommendations to staff on December
22, 2015.
Roadwayand DrainageImprovement Program–Staff responding to requests for clarification on Stock
Island II(Maloney/McDonald Avenue) Roadway Improvement Project Engineering Design and Permitting
th
services RFQ; responses are due on January 14.
KeyLargo I Roadwayand DrainageImprovement Project-EAC provided draft survey information to
staff; Engineering staff working with GIS and sea level rise consultant to determine minimum design
elevation to account for current sea level rise projections.
Key Largo II (Bay Harbor, Sunset Point, Sunrise Point, Lime Grove Estates and Rays Cuda Canal)
Roadway and Drainage Improvement Project –Task order for engineering design and permitting
services has been sent to CDM Smith, on call consultant for signature.
NoNameKeyBridgeRepair Project–Work is nearing completion; FDOT final construction audit is
scheduled for January 6, 2016. Punch list will be developed at audit to work to final completion.
Pigeon KeyRamp RepairProject–Conceptual/preliminary design report provided by Metric on
th
December 18
; staff reviewing. Report was submitted to FDOT for entry into Electronic Plans
Review database for review and comment by FDOT personnel.
Sexton CoveRoadwayand DrainageImprovement Project–Staff requested updated engineer’s
estimate of construction from CDM. Preparing construction bid documents for bid advertisement in
February/March 2016.
Stock IslandRoadwayand DrainageImprovement Project–Consultant preparing 90% plans. Staff
working with sea level rise consultant to determine minimum desired elevation to incorporate most recent
flooding and sea level rise data. Anticipate scheduling public information meeting in January, 2016.
US 1 BaysidePedestrianBridge–Contracts for CEI and construction awarded at December BOCC
meeting. Anticipate pre-construction meeting in January, 2016.
nd
–
US 1 BaysideTrail FDOT provided final material certification on December 22. Awaiting submittal
of retainage invoice by contractor so that project may be closed out.
th
9AvenueStock IslandDrainageProject–Project complete. Engineer of Record creating digital
record drawings from as built.
GrouperLane(KeyLargo)DrainageProject–Work is ongoing; contractor has ordered new drainage
structures to account for increase in road elevation to address recent high levels of nuisance flooding.
Duck KeySecurityDistrict Cameras –Contract with TYCO Integrated Security approved at December
BOCC meeting. Staff is beginning coordination with FKEC, Comcast and contractors to install utility poles
and utility service to camera sites.
Garrison Bight BridgeRepair Project–Contract for engineering design and permitting services is
on the January 2016 agenda for approval.
Sugarloaf Boulevard Bridge Replacement Project –Design project kick off meeting with
thth
consultant held on December 16; preliminary utility coordination meeting held on December 17.
Identified some construction challenges with regard to proximity to electrical lines. Anticipate
participating in Sugarloaf Homeowners Association meeting in January or February 2016 to provide
introduction to proposed design and address questions.
ROAD DEPARTMENT
Lower Keys
Mulch Deliveries -15 loads with a total of 52.5 tons of mulch, savings of $6,483.75 on
dump fees.
Repaired guardrail at Niles Road, Summerland Key.
nd
Replaced manhole at the corner of 2Avenue, Stock Island.
Chip/Brush -20 miles.
Right of Ways Mowed -24 miles.
.
Weed eating operation -12 miles
Cold patch pot holes-1.5 tons.
Road sweeping-8 miles.
Sign Technician -35 locates; 58 signs; and, 43 posts.
Obtain revenue of $75.30 from recycled signs.
Upper Keys
Buzz bar/chipper operation –17.83miles.
Mowing operation –80.71miles.
Trench drains –1,288 feet, 40 tons #4 rock used.
Sweeping operation –88.6 miles.
Shoulder work –471 feet, 30 tons of #57 rock used.
Sign Department –24 new signs, 15 posts installed, and 11 underground locates performed.
Material pick-up at CEMEX in Kendall –35.93 tons.
Tree removal/stump grinding –2 trees/3 stumps.
Bucket work –2 subdivision.
Pot holes repaired –2 subdivisions, 250 lbs. cold patch used.
Trash pickup –46 bags.
Safety meetings –November 24, 2015 and December 4, 2015.
Special Projects
Cone off traffic light at mile marker 100 with 100 cones due to malfunctioning traffic light, and
cleaned up when light was repaired.
Moved old phone poles from Magnolia to Harry Harris Park for Parks Department.
Picked up and disposed of seaweed at Harry Harris Park for Parks Department.
Repaired shoulder/drain on Shared Use Path.
CARD SOUND
Mowingoperation-21miles.
Trashpickup–2,180lbs.
Miles driven for trash pickup –110 miles.
TOLLSNOTCOLLECTED
$4,786.00 (due to heavy traffic).
Lifting of toll due to heavy traffic -
PROJECT MANAGEMENT / FACILITIES
Marathon Customs Facility-CBP has added additional change order items not in approved specs and
drawings. New completion date estimated for late February 2016.
Senior Nutrition Center-Drafting ILA with the City of Key West Housing Authority for use of space at
th
the Kennedy Street Facility. Draft to be completed onJanuary 6.
Magnolia Street/Public Works-Construction proceeding on schedule.
Harvey Government Center Paint-Contract approved. Work to begin when permits clear January 2016.
Crawl Key Fire Academy-Construction proceeding on schedule.
Atlantic Boulevard Relocation-Redesign received and under review.
-
Bernstein ParkBids due in January.
Summerland Fire Station-Property scheduled to close in February.
st
Plantation Key Government Center-Site plan application to be completed and submitted in full 1week
of January.
th
Marathon Library-First programming meeting scheduled for January 152016.
CORRECTION FACILITIES
Stock Island Detention Center
Exterior painting of Jail Complex has been completed.
New Dish Machine arrived and installation is complete.
Quarterly fire testing has been performed.
Quarterly fire sprinkler testing has been performed.
Fire sprinkler line repaired in Unit B.
Juvenile Justice Building
New fire system installation has been completed.
Quarterly fire testing has been performed.
Quarterly fire sprinkler testing has been performed.
Marathon State Attorney’s Office
Painted central offices, back hallway and service area.
Marathon Government Annex
Painted two of Emergency Management’s officesand Director’s lobby.
Built 8’ storage table for Emergency Management.
Completed rebuilding of fire sprinkler pump.
Layton Fire Station
Assisted Technical Services with network installation.
Conch Key Fire Station
Painted stairway walls.
FACILITIES MAINTENANCE/PARKS & BEACHES
LOWER KEYS
Replaced kitchen cabinets and plumbing fixtures in the breakroom at the Harvey
Government Center.
Completed renovation of the Cudjoe EMS kitchen.
Resumed construction of added closets at Bayshore Manor.
Installed a baby changing station at the Key West Library.
18
Replaced exhaust fan motors for the Big Pine Key Fire Station truck bay and the elevator
equipment room.
Started painting the Key West DMV building and completed landscape trimming and
replacement of front sign.
Continued replacement of the Key West Lighthouse perimeter wall wood fence pickets.
Assembled new furniture for Worker’s Compensation Office at the Gato Building.
Performed tree trimming at Bayshore Manor.
Continued extensive interior painting of the Key WestLibrary.
Replaced lighting fixtures at the West Martello Restroom building.
Tested and repaired all Higgs Beach Dog Park lighting fixtures and electrical outlets.
Performed semi-annual testing of clean agent fire suppression systems at the Records
Facility Clerk’s computer room/evidence storage room and Historic Courthouse Property
Appraiser computer room.
Performed FKAA required backflow preventer testing for the Historic Courthouse, Lester
Building, Key West Lighthouse, Bernstein and Bay Point Parks.
Pest control services were completed for Lower Keys Facilities and Parks.
Issued purchase order for the upgrade of the water level sensing and control system from
float type to a Multitrode system at the Wilhelmina Harvey Park stormwater system.
UPPER KEYS
Murray Nelson Government Center
Provided assistance in (6) events.
Assisted Code Compliance painting/preparing office 226 for new employee.
Repaired water leak in walls in office #225 &# 226.
Resolved (2) plumbing issues.
Repaired doors and replaced (4) door locks.
nd
Replaced (2) exit lights in 2floor mechanical room.
Pressure cleaned main entrance exterior wall.
Laid decorative river rock by main building entrance. (work in process)
Contractor working on repair/replace of condensing water pump #4.
Removed old benches and installed (9) nine new benches at Peace Park.
Plantation Key Courthouse
Inspected roof for rodents and set up traps.
Replaced (12) lamps and (2) ballasts.
Pressure cleaned roof and gutters in courtroom B.
Repaired several roof leaks in courtroom A & B around computer and hallway areas.
Contractor repaired A/C in the criminal/recording office.
Ellis Building
Adjusted timers.
Air quality test was performed inhouse.
Repaired back door.
Repaired roof leak in women’s restroom.
Plantation Key Garage
Resolved (1) plumbing issue.
Tavernier Fire Dept.
Installed prevention box 22 & 25 (traffic light control and coordination).
Public Works Plantation Key Shed
Repaired roof.
Repaired water line.
19
Spottswood Building
Provided assistance to the Social Services Department installing new carpet in the
Supervisor’s office, Assistant’s office, transportation office, and printer room. Fixed
filing cabinet, relocated some cabinets, and provided new driver, Tammy Colarusso, with
a key to the Social Services main entrance door.
Repaired employee’s exit door.
AARP
Resolved (2) plumbing issues.
Key Largo Library
Replaced (1) regular lamp with an LED lamp.
Replaced electrical receptacle.
Uninstalled hurricane shutters.
Installed purse/robe hooks on women’s restroom stall doors.
Contractor was solicited to repair a roof leak under warranty.
Islamorada Library
Resolved (2) plumbing issues.
Contractor Nationwide attended to an emergency call due to sewer backing up into
library restrooms.
Key Largo Tax Collectors
Finished walls at the new location.
Installed (10) lamps and (1) exit light.
Contractor replaced broken capacitor in one A/C unit.
Animal Shelter
Performed a temporary repair on the roof.
Key Largo Transfer Station
Repaired several leaks on the main waterline.
PARKS & BEACHES:
Key Largo Park
Removed benches and installed some old benches from Peace Park.
Resolved (2) plumbing issues.
Removed graffiti.
Installed grainer at the shop.
Contractor repaired sprinkler main water leak.
Harry Harris Park
Replaced (6) regular lamps with LED lamps.
Resolved (1) plumbing issue.
Friendship Park
Replaced (2) lamps.
Notes:
Preventive Maintenance completed on some HVAC units.
Provided assistance to the Mesquite Productions filming crew throughout the Upper Keys
for thefilming of the Bloodline series.
Provide assistance to Citizens Pictures and Silverprod USA Celebrity Network through
Rita Troxel.
Harry Harris Park is scheduled for Softball and Baseball games.
(17) Employees attended the Monthly Safety training.
Removed old and installed new park rules signs throughout all the Upper Keys Parks.
20
Fire Extinguisher inspections for the Murray Nelson and Ellis Buildings were completed.
FLEET MANAGEMENT
Garage staff completed safety training (confined spaces and backing up).
Filled Key West Lead Mechanic position that has been vacant since March 2015.
Three garages combined provided preventative maintenance and completed
approximately 250 unit safety inspections.
Three garages combined opened and/or completed approximately 500 work orders.
Three garages combined processed and distributed approximately 19,000 gallons of
unleaded gasoline and 7,500 gallons of diesel fuel.
Key West garage mechanics diagnosed and repaired Solid Waste Department Clam truck
after outsourced contractors failed at the repairs.
Activated and transferred 1 used van for Tech Services Department use.
Received and processed 2 new Kubota zero turn mowers for Lower Keys Parks/Beaches
Department.
Received and processed 3 new Ford F150 pick-up trucks for Solid Waste Department.
Processed new clam truck for Solid Waste Department.
Processed new moving storage truck for Facilities Maintenance Department.
Received new sewer clean-out vacuum truck for Key West Road Department.
2 Fleet Department employees attended customer services training seminar.
4 Fleet Department Mechanics attended 2 day new electrical training seminar.
Ordered 2 new Ford Escapes for Code Compliance Department.
Ordered 1 new Dodge Journey for Emergency Management.
Ordered 6 new Dodge Pick-up trucks for various Public Works Departments.
Ordered 2 work storage/transport trailers for Parks/Beaches.
Ordered 1 new clam truck for Solid Waste Department.
SOLID WASTE MANAGEMENT
Recycling Department
Staff was in Waste Management, Marathon Garbage and Keys Sanitary service areas
with the ongoing inspections of commercial and residential solid waste and recycling
services.
Staff is still working with Fishermen’s Hospitals Director of Human Resources Chris
Fletcher. Mr. Fletcher is reinstituting a recycling program that was stop by the previous
administration. Mr. Fletcher is conducting staff meetings with each department trying to
figure out what the initial participation rate will be. Once these meetings are complete,
Mr. Fletcher, county staff and the franchise hauler will determine the best option for a
recycling.
Staff is updating and compiling a new a list of second hand and consignment stores
throughout the Keys. Staff will provide a new Keys Reuse Business guide for placement
on the county website.
Staff continues to work with commercial businesses in the lower keys who have not
converted to single stream recycling. The businesses are being discouraged from single
stream recycling by the franchise hauler. These businesses were provided a cardboard
21
only dumpster and recycling carts for everything else. Most of these businesses, when
switched to single stream, will be able to save a little money each month and reduce the
amount of collection bins on their property.
Since staff has had a 4 yard single stream recycling dumpster placed at Little Torch
Cottages, 48 units have begun recycling for the first time since the complex opened. The
franchise hauler was required to provide an 18gallon recycling bin to each unit for the
convenience of hauling recyclables to the recycling dumpster. Staff provided the county
recycling and household hazardous waste brochures to each resident and left some at the
leasing office for new tenants.
The Management Company and tenants both enjoy and have made great strides in
recycling as the picture below illustrates. Management has plans to reduce the size of the
garbage dumpster after the new year as a result.
Staff has had the new 2015 recycling brochure placed on the county website. Staff is also
having correctionsmade to the solid waste portion of the website. Some of the
information is outdated or incorrect.
Staff has presented the new owner of Bobalu’s with a cost savings breakdown if they
were to implement recycling. Bobalu’s could save approximately $52.00 permonth by
starting a recycling program. Staff will provide recycling information for kitchen staff if
they decide to recycle.
Staff helped with household hazardous waste collections at the Key Largo and Cudjoe
Key transfer stations.
Hazardous Material Department
Staff held six household hazardous waste (HHW) collections in December and accepted
material from 115Monroe County residents and businesses.
Staff filled 13 boxes of electronic waste to be recycled, weighing approximately 7,800
lbs. during this month.
Staff recycled over 300 lbs. of lead sealed batteries; and recycled 40 lbs. of rechargeable
batteries.
Staff crushed 320 fluorescent, and mercury containing bulbs in house.
22
Our Hazardous and E-Waste Commercial Collection participants included: staff shipped
out 24pallets of electronics weighing 14,522 lbs.; staff recycled 400 gallons of
contaminated fluids; and staff bulked 220 gallons of latex paints for recycling.
23
24
25
26
Does not include "Boat ImprovementFund" Revenue.
Office=1/Area=Lower Keys: Stock Island up to 7 mile bridge.
Office=2/Area=Middle Keys: Starts at Duck Key to Fiesta Key Channel #5, excludes-Marathon, Grassy Key, City of Layton, Islamorada, and Lower Matecumbe.
Office=3/Area=Upper Keys: North of Tavernier Creek Bridge up to Ocean Reef.
Nov 2015
MONROE COUNTY GROWTH MANAGEMENT
REVENUE TAKEN IN BY OFFICE RECEIPT#
Lower Keys
$57,801
Upper Keys
$294,814
Middle Keys
$280,379
Ocean Reef
$45,609
Does not include "Boat ImprovementFund" Revenue.
Office=1/Area=Lower Keys: Stock Island up to 7 mile bridge.
Office=2/Area=Middle Keys: Starts at Duck Key to Fiesta Key Channel #5, excludes-Marathon, Grassy Key, City of Layton, Islamorada, and Lower Matecumbe.
Office=3/Area=Upper Keys: North of Tavernier Creek Bridge up to Ocean Reef.
27
BUILDING DEPARTMENT
28
29
30
PLANNING AND ENVIRONMENTAL RESOURCES DEPARTMENT
The goal of the Monroe County Planning and Environmental Resources Department is to
foster
sustainable, quality development in the county while conserving and promoting
stewardship of the
county's fragile environment and the unique character of its diverse island communities.
The functions of this department are implemented by the following offices:
•Comprehensive Planning & Current Planning
•Environmental Resources
•Marine Resources
The Planning Office is responsible for the administration of the adopted Monroe County
Comprehensive Plan and Land Development Regulations. The Department processes
amendments to
31
the Comprehensive Plan and Land Development Regulations. Additionally, the
department reviews
development proposals for compliance with the Comprehensive Plan and Land
Development
Regulations, including environmental compliance.
The Environmental Resources Office services include the review of applications for
compliance with
environmentalregulations, such as: clearing limits, wetland delineation, landscaping,
stormwater,
land clearing and FEMA required review of potential endangered species impacts under
the Permit
Referral Process (PRP).
The Marine Resources Office provides a variety of services focusing on protection of the
marine
environment, provision of maritime infrastructure, and the preservation of public water
access.
32
33
34
35
36
37
38
GIS OFFICE
GIS Projects -Data/Map Requests/Technical/Programming
-
Rockland Key –NASKW Noise Contours Mapping -Planning
-
Land Acquisition Fund–Analysis -Planning
-
Census Housing Units –Analysis –Planning
-
Big Pine Key –AT & T Addressing
-
Elevation Certificates –Mapping (in progress)
-
Conservation Easements –Mapping (in progress)
-
Aerial Map Book scanning (in progress)
GIS Addressing
-
18 New physical address assignments
39
MARINE RESOURCES OFFICE
Channel Marker Program:
MonthChannel Marker/Buoy Replacement Costs
Dec 2014
$5,400.00
January 2015
$2,830.00
February
$0.00
March
$3,000.00
April
$2,825.00
May
$0.00
June
$0.00
July
$41,965.00
August
$0.00
September
$3,700.00
October
$1,140.00
November
$6,107.00
Total
$66,967.00
A large regulatory buoy replacement job was completed in July 2015, with funding
assistance from an FWC Boating Improvement Program grant. Total annual costs for
marker/buoy replacements for the past twelve month period were approximately 21%
lower thanthe same timeframe in 2014($84,689.50).
40
Derelict Vessel Program:
MonthDerelictVessel Removal Costs
Dec 2014
$23,368.00
January 2015
$22,093.00
February
$5,850.00
March
$0.00
April
$1,400.00
May
$13,000.00
June
$55,256.00
July
$7,600.00
August
$11,510.00
September
$11,449.00
October
$10,400.00
November
$18,300.00
Total
$180,226.00
41
Derelict vessel removal costs for the past twelve month period were approximately21%
higher than the same timeframe in 2014 ($149,238). Note that one of the six vessels
removed in June 2015 was a large vessel which was funded by an FWC Boating
Improvement Program grant at a cost of $42,500.
Vessel Pumpout Program:
42
Pumpout numbers have consistently exceeded current quota of 1500 per month, which
became effective April1, 2015.
CODE COMPLIANCE DEPARTMENT
The Code Compliance Department responds to complaints received from various sources,
walk-ins, phone calls, e-mails, staff and other outside agencies and departments. Staff
also, is proactive identifying codeviolations while conducting routine field inspections.
Department TotalsNew Cases 85Inspections1100New Citations 0
43
44
UPPER KEYS –
NEW CASES35INSPECTIONS COMPLETED 231SM 1
CITATIONS ISSUED0CEB0
45
MIDDLE KEYS –
NEW CASES24INSPECTIONS COMPLETED676SM28
CITATIONS ISSUED0CEB 0
46
LOWER KEYS –
NEW CASES26INSPECTIONS COMPLETED193SM2
CITATIONS ISSUED0CEB0
47
Sustainability and Canals:
th
Hosted the 7Annual Climate Leadership Summiton December 1-3 in Key West,
425 attended.
Presented on sea level rise for the FL Natural Resources Leadership Institutein Key
Largo on January 7, 2016.
th th
Hosted 2 public workshops on sea level rise on October 6for Stock Island and 7
for Big Pine Key
Hosted 3 public workshops on release of the draft Sustainability Action Planon
ththnd
October 14in Key Largo, the 19in Sugarloaf and 22in Marathon
Moving forward with 2 demonstration projects for tidal flooding in the upper and
lower Keys.
Finalizing the due diligence process on the vendor for the yard waste processing, will
provide an update at the January BOCC.
Backfilling of Canal #29 in Key Largo work is fully complete. No settling occurred
in the canal bottom during the 90 day monitoring period.
Vacuum dredging of the Dr.’s Arm canal on Big Pine is complete, as is the sand
capping process. Organic removal work started on Canal #290 on Avenue J in Big
Pine in January 2016 and is underway.
The contract for the installation of Air Curtains (weed gates) at Canal #266 Dr’s Arm
and #287 Atlantic Estates is anticipated to be submitted at the January 2016 BOCC
for approval
The contract for the installation of a Culvert on Canal #277 in Tropical Bay Estates
on Big Pine is anticipated to be submitted at the January 2016 BOCC for approval.
48