Loading...
1st Change Order 10/18/2017KEVIN MADOK, CPA MONROE COUNTY CLERK OF THE CIRCUIT COURT & COMPTROLLER DATE: January 24, 2017 TO: Rhonda Haag, Director Sustainability & Projects FROM: Pamela G. Hanco ,deputy Clerk SUBJECT: October 18" BOCC Meeting Enclosed is a duplicate original of Item M4, a 1-year $0.00 time extension Change Order No. 1 to the contract with Adventure Environmental, Inc. for the C83 canal restoration project in Key Largo, to place die air curtain installation on hold to allow time for consideration of a potential canal skimming program. Should you have any questions, please feel Free to contact me at ext. 3130. Thank you. cc: County Attorney Finance File ,,'i' M.C.A INsTR. 8800.2 Enclosure (1) March 28, 2017 Page 3 MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Organic Removal, Backfilling, and CHANGE ORDER NO: 1 Air Curtain Water Quality Improvement Project Canal #83 INITIATION DATE: March 6, 2017 TO CONTRACTOR: Adventure Environmental, Inc. CONTRACT DATE: November 22, 2016 The Contract. is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) ........................................... $ 1,524,040.00 Net change by previously authorized Change Orders ...................................................$ 0.00 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was .............$ 1.524.040.00 The (Contract Sum) (Guaranteed Maximum Price) will 'creased) (decreased) 1,524,040.00 unchanged by this Change Order ....... $ The new (Contract Sum) (Gu red Maximum Priceme uding this Change Order is ....... $ 1,524,040.00 The Contract Time will 131 increase (decreased) (unchanged) by .................................. 1 Year The date of Substantial Comp a ion m of the date of this Change Order is ......................... August 3, 2018 Detailed description of change order and justification: v � The 1 year is for the County to issue a solicitation and test a demonstratioi rogranUor canal skimming. At the end of the 1 year period, at the County s option, it then to P determined if the air curtain will be installed. If so, the Contractor will instalptrat the fflce -n r�tit specified in the contract. If not, the Contract will terminate and the funds f air . r curtain will be retained b the County. Y�o :X m f%.A-..:n n O/_ w# #k- —;ni—1 i.wn#r'r.# nr;t ,..e-:1 co ENGINEER: CONTRACTOR: Engineer(if applicable), r /0Vi� Date BOARD OF COUNTY COMMISSIONERS ATTEST: OF MONROE1COOUNTY FLORIDA By Ma hairman A' AWANT . #%� i c :. ,:,�L / Date I ' � M.C.A, INSTR. 8800.2 Enclosure (2) March 28, 2017 Page 4 Change Order Attachment per Ordinance No. 024-2015 .. • Change Order was not included in the original contract specifications. Yes R No ❑ If Yes, explanation: The 1 year is for the County to issue a solicitation and test a demonstration program for canal stdmming. • Change Order was included in the original specifications. Yes ❑ No ❑■ If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No ❑■ If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ❑■ No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No ❑fi Should a claim under the applicable professional liability policy be made? Yes ❑ No H Explain: Wa