#2nd Change Order 11/02/201671 U I#-xz- 7-11 V I a ZEMZSME•� From: County Administrator/Assistant County Administrator/Acting County Administrator Date: November 2, 2016 Attached is a proposed Change Order #2 OAC Action Construction, Corp,, Key Wes) Airport Customs Facility Phase 11 project. The Contract Sum will be increased $6,830.16. The date of Substantial Completion as of the date of this Change Order is January 5, 2017. According to Ordinance No. 004-1999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners at least 24 hours prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. Signature County Administrator/Assistant County Administrator/Acting County Administrator M FTIONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 2 Key West Airport Customs Facility Phase 11 3491 S. Roosevelt Blvd, Key West, FL 33040 INITIATION DATE: July 12, 2016 TO CONTRACTOR: CONTRACT DATE: November 17, 2015 OAC Action Construction, Corp. 12540 SW 130 Street, Suite 3 Miami, FL 33186 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order as ....... $1,373,631.45 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order ........ � $6,830.16 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ......... $1,380,461.61 The Contract Time will be (increased) (decreased) (unchanged) by ......... ......................... 0 Days The date of StAstattial Courfletiat as of tWe datq-QUt's CW;Psqe Order is ... Ja-tuaji 5, 2017 This change order is for the costs associated with relocating the sewer line from the existing annex building which is in the way of the building piles. The location of this utility was not documented on the plans and was clearly visible during a site walk. This chancie Order is 0.52% of the oriciinal contract price. ARCHITECT: October 27, 2016 K2M Desi Date CONTRACTOR: OAAction' Corrakf6tion, Inc. jute Dir. PROJECT MANAGEMENT: �^Z l6 Doug tposito Date �,Zjj6a COUNTY/ASSISTANT ADMINISTRATOR:'---,Z�--�& (�� Ro an bAstesi Date Ketin Wilson Christine Hurley I'li I :: 1 11111111 111 ill ZI RIP111111"Fil 1, If Yes, explanation: Design did not document existing utilities that were clearly visible from a gimple site walk. Change resulted in moving a sewer line that was in the way of the building piles and requires a permitted permanent move of the line. 04M, 111ii- Explain: Errors and omissions will be resolved with Architect after change order number 41 which addressed the movement of additional utilities and a change ',■ the grade bea system. i PRICE QU TATION an to: William Rema PROJECT: Re -located existing 4" Gravity line OAC Action Construction, Corp KWIA 12540 SW 130 St Suite 3 Miami, FL 33186 ENGINEER: K2M SCOPE OF WORK. - Subject to a mutually acceptable agreement, we propose to provide, in accordance with the following referenced plans, all labor, material and equipment required to perform and complete the relocation of the existing sewer to alliviate the installation of the building foundation. Plans by K2M 1001 Whitehead St, Suite 101 Key West, FL 33040 Drawings: GO 1 2 Drawing Index, Code Information ADS 1.0 Crawl Space Demolition Plan Pl 1.1 Plumbing Plans SCOPE OF WORK AND SEQUENCE OF EVENTS 1 Expose existing lines at CO's 2 Trench new path 3 Install new line and CO's as requested, 4 Backfill Dated Rev Jan-16 2016 07 08 RF112 Jan-16 2016C7,08 RF112 Jan-16 2016 07.08 RF112 QUALIFICATIONS AND EXCEPTIONS.- 1 Proposal valid for 30 days 2 Electrical work is not considered on this proposal 3 Removal of Asbestos hazardous material not included 4 Permit fees are not included Permit fees to be reimbursed by Owner to Contractor at cost. 5 Construction debris to be placed on site dumpster, Contractor to supply construction debris clumpster 6 Compaction test to be performed by others 7 Visual inspection only, it is not considered head preassure test. SCOPE OF WORK - PRICE SCHEDULE: 1 Re-ro :� gravity me as per scope of work _�_epfctecl above Total Lump Sum ®®- Page 1 of 1 Confidential F; :vz e 11 iNk I! c I I ji A CL U) Q 0 m CL ri i r Er! and "I-j m .rf , M 1 0 co 0- F- A