#4th Change Order 01/17/2017M NR E COUNTY/ENGINEERING/ PROJECT MANAGEMENT TITLE: CONTRACT CHANGE ORDER PROJECT Key West Airport Customs Facility Phase 3491 S. Roosevelt Blvd, Key West, FL 33040 r 2. 201 TO CONTRACTOR: O A Action • • 12540 SW 130 Street, +r Miami, FL :r This change order is for the costs associat as a result of the redesian to the piles and grade beams after the foundation of the existing annex buildin was found to be in the wa y of the on inal design. Movement of several existing utilities iricluclinq data and communications infrastructure to a non-breakaway structure is required as well as replacing a section of break- away wall with non-breakaway structure to mount critical utilities. Time associated with the redesign and permitting the additional revisions have delayed the proiect. Substantial tom letion moves from February 19 2017 to June 15 2017. This change Order is 4.54% of the original contract price. Not valid until signed by Own er, Architect (if applicable). and Contractor Kevin Wilson Christine Hurley A on M ir$ 41 Change Order was not included in the original contract specifications- Yes 0 No E) If Yes, explanation: Redesign of building piles and grade beam locations required relocation of critical infrastructure including security, data and communications. A revision to the design and additional permitting is required. Time associated with the design and permitting the additional work has delayed the project. M- • W.. MM= azmaff• . • •� • r - 1!1I!I!l I I I 1 111%1 1 M�l • lZme IIIIIIIII I ��� !F11111 Ilip! I !I I . I '=M. � O PN CL U) C5, CM O N CL 0 1 . 7 1 a I M® c1t r v0 m 'I a a o 0 0 R 0 00 15 5 C) U cn- c m , Lu W a8 0.V 1 2 < c 0 5 $ m E E cc ' m c. aid 0 ol 0' LL Lu 0 F, ai 0 > g a. di > 4d E 'oi Q E [�] E x� u C CL 0 W O 0 00 00 O U . . . IN 3: N 0 000 0 0 P 0 O coo 0 0 O ON 0 .1 • ui n ui • N E -- M IG Z OI uj 0 0.0 0 m C7 SOS 0 ONJ o i 00 m 0 Q� w 4 -E 0 Z w 0 0 CL -1 m o m IF 0 U) a. 0 'n 0 I 00 15 5 C) U cn- c m , Lu W a8 0.V 1 2 < c 0 5 $ m E E cc ' m c. aid 0 ol 0' LL Lu 0 F, ai 0 > g a. di > I Bill To Action Construction, Corp 3491 S Roosevelt Blvd Key West, FL 33040 Ship To Key West International Airport 3491 S Roosevelt Blvd Key West, FL 33040 Code P.0, Number Terms Ship Date Via Release # Sales Order CC KWA J16-0271 Net 30 10/10/2016 Truck 13L-1607552 1608718 Quantity Description Price Each Amount 6,738 #07 Black Rebar 0,35 2,358.30T 814 #05 Black Reber 0.35 284M7 864 #03 Black Feb ar 0,35 30140T 8,416 TOTAL QUANTITY I Delivery 150800 150.00 Subtotal 3,095.60 Subtotal $3,095,60 Sales Tax (7.5%) 5220.92 Total 53,316.52 7265 NW 74th Street Customer! OAC Miarni, FL 33166 USA Job Number: 116-0271 Phone: (305) 285-5188 Ship Via Our Truck Fax- (305) 285-5168 17,08 , Jobsite Customer P 0': S ACTION CONSTRUCTION, CORP , H KEY WEST INTERNATIONAL AIRPORT Contact: WILLIAM REINA 1 3491 S. ROOSEVELT BLVD phone (305) 256-6655 P Key West, FL 33040 USA Special Instructions Requested Delivery Date: 101612016 Title to materials remains with seller Until materials are Palo Tor in run. ourser assumes all costs of collections including reasonable attorney's fees. Delivery is F,O.B curbside. Buyer assumes liability for any damages incurred beyond curbside. 1 112% per month service charge on all past due accounts. Buyer has two working days to notify Amercian Reber Fabricators, LLC, during regular business hours of any materials shortages. defects and/or damages in shipment or delivery. Failure to notify American Reber Fabricators, LLC., as noted, constitutes full and final acceptance of materials as shipped. Gmwntech Group Solutions, LLo CHANGE ORDER No 02 Project : Furnish Labor and Equipment to erect foundation, columns and concrete slab at KW - Airport Owner: Monroe County Contractor: OAC Action Construction, Corp. Ohg|na|CnntraoDrderAmuunL ----------------- $50.000-00 mmuCxanyeafromPreviouoChongoOndors ------ —. $4.200.00 Contract Amount prior to this ChangeOrder -------' $54.200.00 Net Increase /(Daureaso ) u, this Change Order ---........................... $ 8,400.00 Contract Amount with all approved Change Orders .... ... $62,600.00 This Change order includes the costs, overhead and profit to cover the additional scope of work not included on original contract scope of work and as it is listed below. DEMO AND CONSTRUCTION OF STRUCTURAL COLUMN Item Description Quantity Unit Unit Value Total Value I I Remove existing breakaway wall Worner) furnish and I I I'S1 s 8A00.00 8A00 . 00 Ito be flush with the exterior as per drawings dated: lJan-24,2016 and includina Revision 405 - 2016.08.29 m Subtotal OH & Profit (Included) Grand Total S . NOTES: This Chmn8e order excludes reba materials and concrete, rebaF materials - nd concrete to be supplied --- by Prime Contractor _ This Change order |d c i - n - t, electrical scope, plumbir�q and aily other not listed on contract drawlig�m_ related to the above listed scooe of work. Net Total ........................ Total Greentech Group Solutions, LLC By: Title : Date : � 8,400.00 1 xcnepteu: OAC Action Construction Corp. By: Title : Date : To: Subcontractor/Vendor Contract Date: N/A Contract Ad.: N/A Change Order No.: 001 Scope of Mork: Labor, material, tools, and equipment for the installation of new conduit from new pull box to High-Mast Light with associated conduit, branch circuitry, excavation, termination, and pull box The contract is hereby revised by the following Items: The original contract value was: $ The net change by previously authorized Change Orders is $ The Contract Value prior to this Subcontract Change Order was $ The Contract Value will be changed by this Subcontract Change Order in the amount of $ 4,116.49 The new Contract Value including this Subcontract Change Order will be $ The Contract duration will be changed by 0 Days Please sign and return all copies to our office within 7 days. After our signature, a copy will be returned to you. OAC Action Construction Group 12540 Say 130 Street Unit 2-3 Miami. Florida 33186 SURCONTRA0 OR/V[ NLiQFr Florida Keys Electric, Inc, 5730 2nd Avenue Key West, Florida 33040 I 1; P1 n I LP r f: Signature: Title: Project Superintendent Title: President EM -d 7 Subcontract Change Order EL -CTRAICA"c. No.002REV Project: Florida Keys Electric, Inc, KWIA - Customs Facility Phase 11 5730 2nd Avenue 3491 South Roosevelt Blvd, Key West, FL 33040 Key West, Florida 33040 Office. 305-296-4028 Fax, 305-296-9283 To: Subcontractor/Vendor The contract Is hereby revised by the following Items: Material. $ 1,307.78 Obor $ 24,705,79 The original contract value was: $ The net change by previously authorized Change Orders is $ The Contract Value prior to this Subcontract Change Order was $ The Contract Value will be changed by this Subcontract Change Order in the amount of $ 26,013,57 The new Contract Value including this Subcontract Change Order will be $ The Contract duration will be changed by 0 Days Please sign and return all copies to our office within 7 days, After our signature, a copy will be returned to you. IMMUMMM SUBCONTRACTOR/VENDOR Elias Aguayo Signature: Title: Project Superintendent Date By,: Raymond Vazquez Signature: Title: President Date: — tjU*)ztfb-0bUb rax: (,$U0)ZVb-11U7 Invoice Description: KW AIRPORT - 4089 PUMP MIX Item Date Description of Work Units Unit Cost Amount 1 11/04/2016 PUMP MIX - 4000 PSI WITH ASTM #89 P-ROCK 2.00 190.75 381.50- TICKET # 121976 2 11/04/2016 FUEL SURCHARGE 1.00 7.00 7°00 3 11104/2016 EN\ARONMENTAL FEE 1.00 8.00 4 Sales Tax @ 7.50 % 29.74 -X