Loading...
Item O63 CM ounty of onroe BOARD OF COUNTY COMMISSIONERS  Mayor Heather Carruthers, District 3 Mayor Pro Tem George Neugent, District 2 TheFloridaKeys Danny L. Kolhage, District 1 David Rice, District 4 Sylvia J. Murphy, District 5 County Commission Meeting September 21, 2016 Agenda Item Number: O.6  Agenda Item Summary #2015 BULK ITEM: DEPARTMENT: Yes Sustainability TIME APPROXIMATE:STAFF CONTACT: Rhonda Haag (305) 453-8774 N/A AGENDA ITEM WORDING: Request approval to negotiate with the proposers in rank order for the C83 canal restoration project in Key Largo. ITEM BACKGROUND: Approval is requested to negotiate a final price and terms and conditions with the contractors in the order listed. The original Engineers estimate for the C83 project was $2.5 Million, based on the limited sediment and bathymetric data obtained during the Phase II Canal Management Master Plan. Sediment cores collected during the design phase provided subsequent The Request for Proposals was issued on 6/27/16. A non-mandatory pre-proposal conference was held on 7/29/16. Proposals were opened on 8/18/16. Three proposals were received and provided to the selection committee for independent review and evaluation. The evaluation included a review of cost, experience, qualifications, technical proposal and miscellaneous other criteria. The selection committee met on 9/06/16 to discuss and rank the proposals, which were ranked as follows: Firm Rank Price Adventure Environmental 1 $1,607,830.00 BC Peabody 2 $1,544,049.98 Earth Tech 3 $1,734,183.50 The Canal #83 Combined Organic Removal and Backfilling project is the first combination muck removal and backfilling project to be conducted. It is designed for muck removal to depths greater than - Amendment Policy 202.8.6 allowed an exemption to Policy 202.8.4 only for the first two organic removal demonstration projects to be completed with dredging below -6 feet Mean Low Water without backfilling. Policy 202.8.6 specified that prior to results of 2 years of monitoring at the first two sites, additional organic removal projects to depths exceeding -6 feet Mean Low Water need to include backfilling. This Canal #83 project will allow a comparison of the additional water quality improvement by including backfilling to a muck removal project to assist in future determination as to whether backfilling is needed after organic removal in order to meet water quality standards. It is 4EGOIX4K 3 much more expensive to include it. The presence of the muck in this canal has depleted the dissolved oxygen levels in the canal waters and the removal of the muck and subsequent backfilling to enhance natural flushing will help to restore the canal waters to State Department of Environmental Protection Dissolved Oxygen standards. Canal #83 in Rock Harbor on Grouper Lane in southern Key Largo was selected utilizing the Canal Management Master Plan ranking criteria. This project will be the new seventh demonstration canal project to be implemented. This canal is among the worst as to water quality in the entire County. PREVIOUS RELEVANT BOCC ACTION: 3/23/16: Approval to advertise a Request for Proposals for completing a combination Organic Removal and Backfilling Canal Restoration Demonstration Project in Canal #84 Rock Harbor, Monroe County, Florida. [Note: C83 was subsequently selected once it was determined that no volunteered access lots were available on C84.] CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: Approval DOCUMENTATION: C83 Final Ranking FINANCIAL IMPACT: Effective Date: Expiration Date: Total Dollar Value of Contract: To be determined Total Cost to County: Current Year Portion: Budgeted: Source of Funds: Infrastructure Tax Funds CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: No If yes, amount: Grant: No County Match: No Insurance Required: Not yet Additional Details: REVIEWED BY: Rhonda Haag Completed 09/06/2016 11:29 AM Pedro Mercado Completed 09/06/2016 2:31 PM Budget and Finance Completed 09/06/2016 2:35 PM Maria Slavik Completed 09/06/2016 2:35 PM Kathy Peters Completed 09/06/2016 5:45 PM Board of County Commissioners Pending 09/21/2016 9:00 AM 4EGOIX4K 3E 4EGOIX4K