Loading...
Item P01 4 CM ounty of onroe BOARD OF COUNTY COMMISSIONERS  Mayor Heather Carruthers, District 3 Mayor Pro Tem George Neugent, District 2 TheFloridaKeys Danny L. Kolhage, District 1 David Rice, District 4 Sylvia J. Murphy, District 5 County Commission Meeting October 19, 2016 Agenda Item Number: P.1  Agenda Item Summary #2247 BULK ITEM: DEPARTMENT: No County Administrator TIME APPROXIMATE:STAFF CONTACT: Lindsey Ballard (305) 292-4443 N/A AGENDA ITEM WORDING: County Administrator Monthly Report ITEM BACKGROUND: PREVIOUS RELEVANT BOCC ACTION: CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: DOCUMENTATION: CAD 1 Monthly Report FINANCIAL IMPACT: Effective Date: Expiration Date: Total Dollar Value of Contract: Total Cost to County: Current Year Portion: Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: If yes, amount: 4EGOIX4K 4 Grant: County Match : Insurance Required: Additional Details: REVIEWED BY: Kathy Peters Completed 10/04/2016 7:38 PM Board of County Commissioners Pending 10/19/2016 9:00 AM 4EGOIX4K 4E M E M O R A N D U M Office of the County Administrator TO:Board of County Commissioners FROM:Roman Gastesi County Administrator DATE:October 4, 2016 SUBJECT:County Divisions’ Monthly Activity Report for October2016 ______________________________________________________________________________ MONTHLY ACTIVITY REPORT –OCTOBER2016 Airports: Key West September 1Received TSA Partnership Award in FLL with MCSO attending. September 6, 8 ,12Attended Public Meetings for Budget. September 7Met with Mike K. –United Airlines facilities. September 8PAPI precon. for the replacement of FAA VASI navigational aids. September 9Meeting with volunteer Welcoming Center (Marta) on upcoming season. September 9Meeting with City of Key West Parks director Rod and Marcus related to security at Little Hamaca park. September 14 Attended Disabled American Veterans meeting at Marathon related to lease term. September 16Participated in Florida Airports Council “Training” committee. September 21BOCC inKey Largo. September 22United Express Airline visit with IT, ground prep and management personnel. September 2390% meeting with staff for the new Emergency Alert System design / bid study. September 26Consultant RFQ –submittal review committee meeting (public) to determine the airports recommendation to the BOCC for consultant services for the next 5 years. Don DeGraw, Beth Leto and Cary Knight on committee. September 28Car Rental meeting with managers. Marathon September 13Sewer progress meeting with D.N. Higgins and CDM Smith. September 15Attended the Grand Opening of the new Marathon City Hall. September 20Hosted Marathon Airport Tenant meeting. September 21Guest speaker at the Marathon Rotary Club. September 22Marathon Storage Hangars construction progress meeting. September 27Attended the Health Fair at the Marathon Government Center. 1 4EGOIX4K 4E Veterans Affairs:    Š‘‡ƒŽŽ•ͼ͸ͷ  ˆˆ‹…‡‹•‹–•͸͹͸ ‡™Ž‹‡–• 39 ‹‡Ž†‹•‹–•3 ‡‡ˆ‹–•‡Ž‹˜‡”›ƒ–‹•…Šƒ”‰‡11    ”ƒ•’‘”–ƒ–‹‘ƒŽŽ•͸ͷͿ ‡–‡”ƒ•”ƒ•’‘”–‡†ͷͷͿ   Š‡ˆ‹ƒ…‹ƒŽ†ƒ–ƒˆ‘”–Š‡‘–Š‘ˆ‡’–‡„‡”–‘–ƒŽ•͈403,622.45–Š‹•‹†‹…ƒ–‡•–Š‡ƒ‘—–‘ˆ‡™ ”‡˜‡—‡„”‘—‰Š–‹–‘‘”‘‡‘—–›†‡”‹˜‡†ˆ”‘…Žƒ‹•ˆ‹Ž‡†„›–Š‡‡–‹”‡‡–‡”ƒ•ˆˆƒ‹”• †‡’ƒ”–‡–Ǥ Extension Services: Number of services provided: 206 phone calls, 44 office visits, 27 visits to clients, 47 learning events with 499 participants, 5 media submissions, and 549 publications distributed. Total Budget for FY 15/16: $210,583.00; Year to Date Expenditures and Encumbrances: $182,026.36; Remaining Balance: $28,556.64; Percentage of budget spent and/or encumbered year-to-date: 86%. The County Extension Director/Family & Community Development Agent accomplished the following activities: Was inducted as president of the Florida Association of Natural Resource Extension Professionals (FANREP). Created the agenda and led the annual membership meeting, developed and recorded online voting, and led two board meetings. Was selected to present an abstract to Extension agents outlining the creative “Borrow, Adapt, Adopt” model that was used to provide tools and technical assistance to local governments dealing with climate change. As a member of the Florida Sea Grant Work Action Group on climate change, the group was selected to present ½ day training on climate change issues called “Climate Change Isn’t Part of My Program Area, Is it?” Worked withspecialists from all five major program areas to develop program specific climate impacts that Extension agents can include in their programming efforts. The Environmental Horticulture Agent accomplished the following activities: Participated in a Monroe County Integrated Pest Management meeting. Topics discussed were pesticide materials listed in the manual, developing upcoming Green Industries-Best Management Practices (GI-BMP) workshop for Public Works employees, and developing upcoming pesticide educational programming. Attended a Miami-Dade County Extension pesticide training class “Limited Lawn and Ornamental” to prepare for Monroe County pesticide education training course. Involved with improving the Grimal Grove plant propagation and nursey through reconstruction, planting, and maintenance, along with five Master Gardeners. 2 4EGOIX4K 4E The Florida Sea Grant Marine Extension Agent accomplished the following activities: Attended the annual Extension Professional Associations of Florida (EPAF) Conference in Dayton Beach where she was given the Early Career Leadership Award and delivered a presentation with Dr. Maia McGuire on the Florida Microplastics Awareness Program. Finished certification to begin collecting phytoplankton information for the NOAA Phytoplankton Monitoring Network, along with three volunteers. Taught three Florida Keys Water Watch (FKWW) workshops. There are currently 58 sites in Monroe County. The Economic Resource Development Agent accomplished the following activities: Had several meetings with various community agencies, government and nongovernment organizations, educational institutions, and private businesses. Gathered extensive secondary GIS data and data functionality for Monroe County businesses, consumer expenditures, and economic conditions. Agreed to be on committee for food waste stream strategies for Key West restaurants. Currently developing a wage and benefit survey instrument for the Lower Keys, based on conversations with the Lower Keys Chamber of Commerce. Sustainability and Projects Department : Canals: C83 Key Largomuck removal 1.Issued an RFP for the /backfilling/weed gate combination project, demo project #7.Received 3 proposals in August all under the original $2M estimate. Approval to negotiate with the selected contractor was placed on the September BOCC agenda. The final contract is placed on the October agenda. a)Met with the daycare owner on Canal 83 to ensure he had no questions about the dust abatement actions the County would be implementing for the project. canal financing BOCC special meeting 2.Planning to host a on November 14 to discuss potential financing options for construction and operations and maintenance. $50,000 grant award from DEP 3.Received the draft grant agreement for the for partial funding of C290 theair curtain weed gate. RFQ for on-call professional engineering 4.Issued an services for canal master planning, canal design, and environmental design. RFQ opened September 28. Seven firms applied for the various work categories. 5.Presented on our canalrestoration program at the Water Quality Protection Program Steering Committee on September 7, 2016 Sustainability: 1.Working with Parsons and Erin Deady to finalize the conceptual designs for the Key Largo and Big Pine Key road demonstration projects to relieve tidal flooding. Hosting two community meetings a)to present the various options, one in Big Pine on thst October 19, and the second in Key largo on October 21–see attached. b)Anticipating presenting the technical findings to the BOCC in November and then following up with a policy discussion at the December BOCC meeting in Key Largo. announce the King Tides 2.Preparing a press release to this year for the period October 16-20.– see below. PACE 3.Preparing for the County’s participation in the -Property Assessed Clean Energy – program. 3 4EGOIX4K 4E 4.Presented on our sustainability program at the FAEP conference in Bonita Springs on September 22, 2016 4 4EGOIX4K 4E : Growth Management REVENUE vs. EXPENSES FISCAL YEARS 2013, 2014, 2015 and CURRENT FY 2016 Note: Revenue numbers reflect amounts collected via Community Plus cashier only. 5 4EGOIX4K 4E PLANNING & ENVIRONMENTAL RESOURCES, BUILDING AND CODE COMPLIANCE DEPARTMENTS Monroe County issues permits to assure compliance with Federal, State and local laws. The following four charts represent the main services provided: Permits; Job Value; Plan Review; and Inspections that guide development in Monroe County . 6 4EGOIX4K 4E Note: Total permits have hit an all-time high over the past decade. Aug 2016 Total Issued Permits by Fiscal Year 7,363 8,000 6,134 7,000 5,882 5,563 6,000 5,064 4,819 4,790 4,763 4,517 4,355 5,000 3,973 3,816 4,000 3,000 2,000 1,000 0 Aug 2016 Total Job Value for Issued Permits by Fiscal Year $263.9M 300000000 $248.8M $243.4M 250000000 $186.2M $184.1M $179.8M $176.M $165.M 200000000 $135.6M $139.6M $121.M 150000000 $96.M 100000000 50000000 0 7 4EGOIX4K 4E 8 4EGOIX4K 4E Aug 2016 Total Number of Plan Reviews on Applied Permits by Fiscal Year 25000 20,508 19,102 20000 16,238 13,693 13,510 13,285 15000 12,582 11,800 10,743 10000 7,170 5,013 4,674 5000 0 Excludes"N/A" and Logged CSR "L" resulted reviews 9 4EGOIX4K 4E PLANNING AND ENVIRONMENTAL RESOURCES DEPARMENT The goal of the Monroe County Planning and Environmental Resources Department is to foster sustainable, quality development in the county while conserving and promoting stewardship of the county's fragile environment and the unique character of its diverse island communities. The functions of this department are implemented by the following offices: Planning Office The is responsible for the administration of the adopted Monroe County Comprehensive Plan and Land Development Regulations. The Department processes amendments to the Comprehensive Plan and Land Development Regulations. Additionally, the department reviews development proposals for compliance with the Comprehensive Plan and Land Development Regulations, including community character, growth management provisions and environmental compliance. Environmental Resources Office The services include the review of applications for compliance with environmental regulations, such as: clearing limits, wetland delineation, landscaping, stormwater, land clearing and FEMA required review of potential endangered species impacts under the Permit Referral Process (PRP). Environmental Restoration Office The manages the County’s habitat restoration and improvement projects to enhance and preserve county-owned landsand partners with State and Federal agencies on maintaining conservation lands, specifically covering the removal of invasive exotic species and planting of native species. Geographical Information Systems (GIS) Office The develops, maintains, and disseminates geographic data and GIS resources to enhance county functions and provides resources making geographic data available to the public and preparing maps depicting various data. Marine Resources Office The provides a variety of services focusing on protection of the marine environment, the provision of maritime infrastructure, and the preservation of public water access, including: (1) vessel pump-out services are provided throughout unincorporated Monroe County; (2) the removal and disposal of derelict and abandoned vessels that have become an environmental or navigational hazard; and (3) working with FWC funded projects to replace regulatory buoys, channel markers, and other waterway management needs to improve recreational boating access and safety. 10 4EGOIX4K 4E Planning & Environmental Resources Applications (P-Z) August 2016 -July 2016 Public Assembly Road Abandonment ROGO Shoreline Approvals TDR Temp Const Staging Text Amendments 2016 Jun Tier Amendment 2016 Jul Time Extensions 2016 Aug TRE Vacation Rentals Variance Variance - Dock (Long) Variance - PC 01234567891011121314151617181920 # of applications 11 4EGOIX4K 4E Planning & Environmental Resources August 2016 -Applications 10 9 8 7 6 5 4 3 2 1 0 Planning & Environmental Resources August 2015 -Applications 10 9 8 7 6 5 4 3 2 1 0 12 4EGOIX4K 4E 13 4EGOIX4K 4E Planning & Environmental Resources Comparison of Total Annual Applications 400 350 300 250 200 150 100 50 2010201120122013201420152016 Jan -Aug 31 GIS OFFICE -ƒ–ƒȀƒ’‡“—‡•–•Ȁ‡…Š‹…al/Programming -Plat Book Mapping - Planning -Train GIS Intern – Megan Fryman -Existing Conditions – Mapping – Environmental -LiDAR – Mapping – Key Largo – Environmental -Duck Key Security District – Mapping - Attorneys -SPON Application – Planning -Elevation Certificates & LiDAR Points – Mapping (in progress) ††”‡••‹‰ 23 New physical address assignments - 14 4EGOIX4K 4E MARINE RESOURCES OFFICE Channel Marker Program: MonthChannel Marker/Buoy Replacement Costs September 2015$3,700.00 October$1,140.00 November$6,107.00 December$0.00 January 2016$0.00 February$0.00 March$0.00 April$0.00 May$2,500.00 June$2,844.00 July$0.00 August$609.00 Total$16,900.00 15 4EGOIX4K 4E Total annual costs for marker/buoy replacements for the past twelve-month period were approximately 73% lower thanthe same timeframe in 2015 ($61,520). Several marker/buoy replacement jobs will occur over the next several months. Channel Marker Program (Continued): An FWC Florida Boating Improvement Program (FBIP) grant for $70,278 for channel marker repairs was approved by the Board in August 2016, providing for additional marker repairs and replacements that will be performed throughout the late fall and early winter. Derelict VesselProgram: 16 4EGOIX4K 4E MonthDerelict Vessel Removal Costs Sept 2015$11,449.00 October$10,400.00 November$18,300.00 December$41,937.00 January 2016$14,841,00 February$48,486.00 March$2,969.00 April$22,168.00 May$16,377.00 June$26,642.00 July$17,769.00 August$50,857.00 Total$267,354.00 Derelict vessel removal costs for the past twelve-month period were approximately35% higher than the same timeframe in 2015 ($198,657). Note that the County received an FWC Florida Boating Improvement Program (FBIP) derelict vessel removal grant in April 2016, affording for 17 4EGOIX4K 4E additional removals which began in July and were completed in August. Additional FWC grant funding is being sought at this time for additional derelict vesselremovals in the fall of 2016. Grant Funding Levels $80,000 $70,000 $60,000 $50,000 FWC/FBIP $40,000 $30,000 $20,000 $10,000 $0 An FWC/FBIP grant in the amount of $74,943 was executed in April 2016 for removal of sixteen derelict vessels. The removals were completed in August 2016. An FWC/FBIP grant in the amount of $74,943 was executed in April 2016 for removal of sixteen derelict vessels. The removals were completed in August 2016. An FWC/FBIP grant in the amount of $74,943 was executed in April 2016 for removal of sixteen derelict vessels. The removals were completed in August 2016. 18 4EGOIX4K 4E State Funding Levels $800,000 $672,350 $700,000 Legislative $600,000 CVA $500,000 Total $400,000 $350,000 $300,000 $200,000 $100,000 $0 Vessel Pumpout Program (cont.): Pumpout numbers have consistently exceeded the current quota of 1500 per month, which became effective April 1, 2015. State funding for the pumpout program was transferred from Pumpout USA to the County in November 2015. Total State funding increased in July 2016 to $672,350, covering approximately 92% of the County’s program cost of $729,800 for one year. CODE COMPLIANCE DEPARTMENT The Code Compliance Department responds to complaints received from various sources, walk- ins, phone calls, e-mails, staff and other outside agencies and departments. Staff also, is proactive identifying code violations while conducting routine field inspections. DEPARTMENTTOTALS: 1781,4952 New Cases:Inspections:New Citations: 1800 1600 1541 1494 1492 1495 1490 1467 1406 1388 1364 1400 1243 1246 1163 1200 1100 1000 19 4EGOIX4K 800 4E UPPER KEYS: 28280200 New InspectionsSpecialCitationsCEB: Cases:Completed:Magistrate:Issued: 20 4EGOIX4K 4E MIDDLE KEYS: 1069353200 New InspectionsSpecialCitationsCEB: Cases:Completed:Magistrate:Issued: 1000 935 900 TOTAL NEW CASES 800 NEW CASES BY INSPECTOR 700 TOTAL INSPECTIONS 600 COMPLETED 500 INSPECTIONS COMPLETED BY 400 INSPECTOR CASES HEARD BEFORE 300 SPECIAL MAGISTRATE 21 4EGOIX4K 191 185 200 173 154 CASES HEARD BEFORE 142 4E LOWER KEYS: 44280020 New InspectionsSpecialCitationsCEB: Cases:Completed:Magistrate:Issued: 22 4EGOIX4K 4E Employee Services: TURNOVER NUMBERS: 8SXEPXS 838%07 %ZKIQT 6IWMKREXMSRW8IVQMREXMSRW6IXMVIQIRXW(IGIEWIHHEXI 8YVRSZIV  838%07  %ZK 8SXEPXS 838%07 IQT 6IWMKREXMSRW8IVQMREXMSRW6IXMVIQIRXW(IGIEWIHHEXI8YVRSZIV 8YVRSZIV  XSHEXI .%2  *)&  1%6  %46  1%=  .92)  .90=  %9+  7)48  23 4EGOIX4K 4E 3'8  23:  ()'  838%07  HUMAN RESOURCES: (11)232 Updated job descriptions:left to complete out of total.–4% left. 6 Salary Increase requests reviewed Attended 3 day Optimization workshop Phone call with Christine Hurley, Teresa and Kevin Lundgreen for Evergreen Kickoff Met with Martin Sentifelt Christine H., Cynthia Hall and Tea on Disaster Workers Worked with John on Roads and Bridges survey Met with Teresa on DOL Ruling instructions BENEFITS Distributes September Working Wellness Distribution of monthly Quantum Newsletter for employees and supervisors Special Meeting in Marathon HR Optimization Workshops Discussion of the EGWP with Envision and Gallagher continues 2016 Health and Wellness Fairs Completed RDS application for this plan year VSP renewal approved at BOCC meeting –Gallagher handling renewal .%29%6=*)&69%6=1%6',%46-01%=.92).90=%9+978 2);,-6)7 8)61-2%8-327 2);6)8-6))71)(-'%0 2);6)8-6))70-*) 320= ()')%7)(0-*) '0%-17 ;%-:)63*46)1-91 0-*)-27 %'8-:);-8,1)(-'%0  %'8-:)2321)(-'%0 6)8-6))7;-8,1)(-'%0 6)8-6))70-*)320= 796:-:-2+74397)7 '3&6% 24 4EGOIX4K 4E WORKERS COMPENSATION Initiate new annual payroll review of all agencies for the Excess insurance policy premiums Reconcile Excess policy accounts with claim expenditures and request reimbursements Review internal billing accounts with OMB for revenue budgets Participate in HRIS ‘Optimization’ three dayworkshop TPA Contract and legal defense agreement approved by BOCC –follow up completed Participated in several case conferences for litigated cases Facilitate and host legal symposium concerning WC Presumption Laws Monthly CasesFY numbers are reported monthly in arrears SeptOctNovDecJan FebMarAprilMayJuneJulyAug New Medical3656496786711 New Non-Medical451361333350 Total Closed Cases019271311134240118 Total Current Open 968892949190869279888589 Cases Open Litigation 161414141313131313131313 Previous Month Closed/Settled000100100011 New Litigation000000100000 Total Current Open 161414131313131313131412 Litigated cases SAFETY Investigated 16 Employee Injury Reports Investigated 3 Risk Claims Coordinated and attended Electrical Safety training attended by 40 employees from PW and Project Management Completed 4 prerequisite FEMA classes in preparation for training at EOC in October Attended Pest Management committee meeting Begin research for AED Grant application process Compile reports and statistical data for upcoming Safety Committee meeting Monroe County Year to Date Injury Incidence Rate for 2016: 9.16 Ratecalculation included BOCC, MCFR, Sheriff’s Office and Constitutionals. National Average including Public Administration, Police Services, Fire Services: 9.9 Injury Incidence Rates are calculated as injuries per year per 100 employees. 25 4EGOIX4K 4E 26 4EGOIX4K 4E Social Services: OAA, Older Americans Act Programs: Nutrition (Information in this section is for the period 7/21/2016-8/20/2016: C-1 Congregate Meals totaled 934 units during this period. C-2 Home Delivered Meals Hots totaled 284 units, and Home Delivered Meals Frozen totaled 3745units. In-Home Services (Information in this section is for the period 7/21/2016-8/20/2016): III-B Chore: 49.75 units this period, 212 unit’s year-to-date, 5.5% achieved. III-B Screening and Assessment: 3.5 units this period, 61.5 units year-to-date, 71.74% achieved. III-B Homemaking/Personal Care: 451.25 units this period, 3023units year-to-date,30.99 % achieved. III-E Screening and Assessment: 5 units this period, 63 units year to date, 55.93% achieved. III-E Chore:0 units this period, 2 units year-to-date, 0% achieved. III-E In-Home Respite: 67.25 units this period, 572.25 units year-to-date, 14.18% year-to-date- achieved. III-E Facility Respite: 513.25 units this period, 3835.75 units year to date, 51.60% year-to-date achieved. Non-OAA Programs: CCDA (Community Care for Disabled Adults) for August 2016 : 27 4EGOIX4K 4E Case Management:7.50 units for the month were produced Homemaking:77.50 units for the month were produced Home-Delivered Meals: 25 meals for the month were provided Personal Care:26.50 units for the monthly were produced CCE (Community Care for the Elderly) for the period 7/21/2016-8/20/2016: Case Management: 75 units for the period and 91 unit’s year-to-date.11.56% achieved year-to- date. Case Aide: 5.50 unit achieved and 5.50 unit year-to-date, 1.84 % achieved year-to-date. Companionship: 9 units achieved and 15 units year-to-date, 1.31% achieved year-to-date. Home Modification:0 units achieved and 0 units year-to-date, 0% achieved year-to-date. Enhanced Chore: 0 units achieved and 0 units year-to-date, 0% achieved year-to-date. Chore: 36.25 units achieved 59.75 units year-to-date, 47.09% achieved year-to-date. Homemaking: 632.25 units for the period and 1,015.75 units year-to-date 16.06% achieved year- to-date. Specialized Medical Equipment: 2 unit for the period and 2 unit year-to-date, 2.68% achieved year-to-date. Personal Care:632.50 units for the period and 1,023.00 units year-to-date. 18.96% achieved year-to-date. Respite: 256 units for the period and 427 units year-to-date.44.01% achieved year to date. CCE overall is at 18.65 % achievement. ADI (Alzheimer’s Disease Initiative) for the period 7/21/2016-8/20/2016: 232.75 units were produced for IN HOME RESPITE and 365.50 units year to date, 8.28% achieved to date. 263.5 units for this period for FACILITY RESPITE and 681.75 year to date 13.88 % achieved to date. HCE (Home Care for the Elderly Program) for the period 7/16/16-8/15/16:15 billable units this period 15 billable units year-to-date at the beginning of the contract year, 7.14% achieved. Monroe County Transit Department Activity for September 2016 One-way trips provided: 1,799 Unduplicated clients served: 252 Special Needs Clients registered: 587 Deposited Revenue: $433.00 Periods Expenditures: $58,731.91 Percentage Spent Fiscal YTD:86.1% Social Services Department –September 2016 Community Support Services Offices in: Key West, Marathon, Plantation Key 28 4EGOIX4K 4E Incoming calls, provision of information and referrals 481 Staff responded to incoming calls providing information and referrals to callers based on specific inquiries and/or needs. These inquiries rangefrom how and where to apply for Food Stamp benefits, where the closest food bank is located, how to report suspected abuse, or to find out what available services there are at the time. Other callers are scheduled for intake by Social Services case management staff to cover Possible programs such as LIHEAP, ESG rent assistance, prescription drug assistance, and welfare assistance. Info and Written Referrals187 Unduplicated Welfare client households that received service 131 New Welfare cases receiving service 67 Low Income Home Energy Assistance Program cases-26 $11,520.61 Low Income Crisis Assistance cases –10 $4,477.93 Home and field visits32 Home and field visits cover visits to In-Home, Nutrition, WAP, and ESG rent clients. Case Managers make these visits to perform annual or semi-annual updates for In-Home and Nutrition clients. WAP clients are visited for testing for possible Weatherization services to their homes. ESG rent clients are visited for the Habitability Study required prior to receiving rental assistance through this grant. Office visits 253 Office visits reflects the number of visitors that come into to all three locations of our Social Services offices throughout the month. Shelter Welfare3$2,109.00 BAYSHORE MANOR Bayshore Manor’s current census is twelve residents. The current census is four private pay, six subsidize and two short term residents. Bayshore Manor provided 613.25 hours of OA3E respite care and 0 hours of CCE care this month. Bayshore Manor has seven OA3E clients. There are three clients on the waiting list. Revenue for September 2016$28,532.33 Expendituresfor the same period$33,169.95 Percentage of the budget spent year to date86.35% Engineering/Roads: 29 4EGOIX4K 4E Card SoundBridgeRepair Project –Spall repair underneath the bridge is ongoing. Intermittent lane closures for deck repairs continue in the evenings. Project audit by FDOT is scheduled for th October 12. The project is approximately 26% complete. Card Sound Toll Study –Consultant presented results of Toll Study at September BOCC meeting. Staff discussed various discount programs with representative from the Ocean Reef Chamber of th Commerce on September 28. Consultant continuing negotiations with FTE and Transcore. LakeSurpriseEstates Roadwayand DrainageImprovement Project –Drainage work is complete and contractor/CEI are inspecting structures. Contractor is continuing final grading of road base on roads being reconstructed. Paving has been delayed due to weather. Stock Island I Roadway and Drainage ImprovementProject –Engineer of Record is revising plans to incorporate sea level rise adaptation; a public information meeting for the project is scheduled for October 18th. Stock Island II (Maloney & McDonald Ave) Roadway Improvement Project –Staff negotiated nd cost proposal for engineering design and permitting; revised proposal received on September 22. Staff preparing contract for BOCC approval. KeyLargo I Roadwayand Drainage Improvement Project –Staff provided comments to Engineer of Record on draft 100% plans; South Florida Water Management District Environmental Resources Permit was received. Key Largo II (Bay Harbor, Sunset Point, Sunrise Point, Lime Grove Estates and Rays Cuda Canal) Roadway and Drainage Improvement Project –County staff provided direction to Engineer of Record regarding realigning roads in project. Will be processing amendment for additional surveying due to identification of additional roadway within the project limits that will be overlaid (unnamed alleys). Pigeon Key Ramp RepairProject- Engineer of Record is evaluating State Historic Preservation office guidelines with respect to flexibility to address access by emergency vehicles, ADA, in engineering design alternatives. Sexton Cove Roadwayand Drainage ImprovementProject –Pre-construction meeting with H&R thst Paving was held on September 30. Notice to proceed with October 31as the first contract date was issued. Contract period is 173 days. US 1 Bayside PedestrianBridge –Contractor is currently forming bridge deck and grading path on north side of bridge; anticipate pouring concrete deck in mid-October. Duck KeySecurityDistrict Cameras –Electrical service poles have been installed and are waiting for building department inspections. Security camera equipment installations are scheduled to begin in early October. Staff is currently working with Comcast on setting up accounts for modems. Garrison Bight BridgeRepair Project –60% plans were submitted to Florida Department of Transportation for review on September 1; staff and consultant are awaiting comments. South Florida Water Management District has issued the environmental resources permit; Florida Keys National Marine Sanctuary has issued coordination notification and indicated that no additional authorization is required from them. Consultant is coordinating with Army Corps and Coast Guard. Sugarloaf Boulevard Bridge Replacement Project –60% plans have been submitted to Florida Department of Transportation (FDOT) for review. Staff is awaiting confirmation from FDOT of federal grant funding for construction prior to proceeding with design and permitting. Staff met th with representative from the homeowners association on September 28to discuss alternative design to adapt for sea level rise. Key LargoTraffic Signals –Contractor installed new conduit to two pedestrian signal heads at Atlantic Boulevard traffic signal in response to signal going to flash; new McCain 2070 controllers were installed in the three emergency fire signal beacons in Key Largo. Staff will be onsite with contractor to install new wireless pre-emption equipment at the MM 106 and MM 92 fire station the first week in October. 30 4EGOIX4K 4E Duck Key Bridge Study – Task order for Duck Key Bridges Cultural Resources Assessment was approved at theSeptember BOCC meeting. Consultant is preparing project schedule. ROAD DEPARTMENT Lower Keys Mulch deliveries -7 loads with a total of 24.5 tons of mulch, savings of $3,025.75 indump fees. Chip/brush -16 miles. Right of ways mowed -20 miles. Weed eating -8 miles. Cold patch pot holes –3 tons. Road sweeping -2 miles. Sign Technician -19 locates; 44 signs; and, 24 posts. nd Cleaned debris off drains -Flagler Avenue and 2Avenue, Stock Island. Cleaned injection Wells on Big Coppitt Key, Stock Island and Key West. Cleaned up debris on Laurel Avenue, Stock Island and Niles Road, Summerland Key. Cut down pine tree on Sugarloaf Boulevard. Transported two bucket trucks back to Key West from Altec in West Palm Beach and Palmetto Ford Miami. Pumped standing water from Avenues C and D on Big Coppitt Key. Delivered sand from Rockland Key to Higgs Beach. Attended Maintenance of Traffic Intermediate Training, September 21, 2016. Attended make up class for Trustee Training, September 23, 2016. Attended annualHealth Fair, September 29, 2016. Upper Keys Buzz bar/chipper operation-20.32 miles. Mowing operation-65.30 miles. Sweeping operation-43.41 miles. Sign Department-16 new signs installed;3 new sign posts installed; and, 3 locates performed. Material pick up at CEMEX-87.7 tons. Pot holes patched-12 subdivisions and 500 lbs.of cold patch used. Trash bags picked up-37 bags. Trench drains refurbished-48 foot long;9 feet deep;18 tons of # 4 rock used. Special Projects Toredown baseball dug-outs at Harry Harris Park for Parks Department Removedall turf from baseball fields at Key Largo Park for Parks Department Installedand spread 36 tons of #4 rock on shoulder at CR905,just before Ocean Reef entrance (not complete). Removedold abandoned boat from County ROW (requested by FWC). Maintenance of Traffic Training, September 21-22, 2016. MovedRoad Department from Plantation Key Officeto new Magnolia Street Office. Card Sound Report Buzz bar / chipper operation-11 miles. Mowing operation-32 miles. Weed eatingoperation-3 miles. 31 4EGOIX4K 4E Trash pickup–2,740 lbs. Miles driven to pick uptrash-110 miles. Tolls Not Collected Tolls not collected due toheavy traffic, in August,$8,424.00. PROJECT MANAGEMENT / FACILITIES th Senior Nutrition Center -Design review and appliance coordination to be completed by October 8. Anticipated schedule:design 60-90 days; permitting 30 days; construction 90 days; anticipated completion is December 2016. MCSO Property Locker- Programming complete. A/E firm producing construction documents:design 60-90 days; permitting 90 days;construction 120 days; anticipated completion is Spring 2017. th Crawl Key Fire Academy -Repairs have commenced, to be complete October 15. Contractor’s performance has been acceptable to date. Higgs BeachAtlantic Boulevard Relocation -Scheduled 90% design review scheduled for Late October. rd Bernstein Park- County issued a stop work order September 23for failure to secure permits necessary to begin work. Stop work order was lifted 24 hours later after county verified all permits were issued. Cudjoe Fire Station -Anticipate the program report to be presented at the November BOCC meeting. Plantation Key Government Center -In site plan review. Nine months into 10-14 month review process. st Marathon Library -60% design review anticipated for October 31. Transfer Stations- Providing all locations with temporary facilities while we wait for permits. Anticipated Schedule: permits by November15th; construction 180 days; anticipated completion is Spring 2017. Key West Customs Border PatrolFacility- We anticipate a 45 day delay. Grade beams, columns and utility th relocates being redesigned and will need plan review with the county. Construction expected to resume October 15 EOC Marathon -Reviewing proposals for programming services. st Rowell’s Water Front Park- A/ESelection Committee will meet October 21 Higgs Beach Sand Re-nourishment- TDC grant awarded for $1,325,000.00. Engineering begins in October. 32 4EGOIX4K 4E 33 4EGOIX4K 4E Correction Facilities Roth Building Repaired the roof at the Roth building. Correction Facilities Stock Island Detention Center Removed Metro equipment from the Administrative Building’sroof. Conducted the first of two preconstruction meetings for the MCSO HVAC upgrade project. Fire alarm and sprinkler testing completed. Facilities Maintenance/Parks & Beaches Lower Keys Worked with field engineers to perform equipment inventory for all Lower Keys Facilities. Completed restoration of the Key West African Cemetery Memorial. Completed installation of a new commercial ice makerand convection oven at Bayshore Manor. 34 4EGOIX4K 4E Completed construction of a new picnic shelter in Wilhelmina Harvey Park on Big Coppitt Key. Completed construction of two new picnic shelters in Baypoint Park on Saddlebunch Key. Completed installation of office partition wall, shelving and desk/counters for the Engineering Department and continued installations for Project Management. Completed the Higgs Beach Tennis Court Pickle Ball conversion of two existing tennis courts into six Pickle Ball courts. Completed the resurfacing of Watson Field tennis courts on Big Pine Key. Placed new clay and graded the Watson Field baseball field. Completed repairs of the Cudjoe EMS vehicle canopywest wall. Performed Harvey Government Center quarterly chiller operational inspections and valve repairs. Replaced a window air conditioner at the Key West Facilities Maintenance office for the Road Department. Replaced hot water heater at the Key West Animal Shelter. Replaced vandalized toilet at Watson Field on Big Pine Key. Replaced the toilet wax ring for a toilet at the Key West Library. Assembled plant boxes for Bayshore Manor. Performed tree trimming for the Key West Animal Shelter and Higgs Beach Dog Park. Performed FKAA required backflow preventer testing for the Key West Courthouse Annex. Performed lighting maintenance at the Historic Courthouse, Courthouse Annex, Harvey Government Center, Bayshore Manor, Stock Island Fire Station and the County Attorney offices. Performed air conditioner maintenance at the Key West Garage, Key West Library, Big Pine Key DMV, Library and AARP Building. Painted Gato Building offices, Big Pine Key Park Community Center and deputy house, Key West Library Auditorium, picnic tables at Watson Field and Veterans Park and parking lot striping at Veterans Park, Big Pine Key Fire Station, Watson Field, AARP Building and Big Pine Key Park. Middle Keys Marathon Government Center Installed two doors in hallway and removed one door interoffice on the first floor. Painted seven officesand moved furniture on the first floor. RepairedCCTV System interiorand addedexterior. New MEC for BAS Communication, A/C Controls Medical Examiner’s Office Replaced smoke alarm system. Replacedoutside air ductwork AHU3andAHU2. Grassy Key Tower Replacedtwo a/c wall units. Marathon Courthouse Installed brick pavers in Courtyard to access benches. 35 4EGOIX4K 4E Marathon State Attorney’s Office InstalledLVP flooring in lobby and hallways. Marathon Government Center Annex InstalledLVP flooring in Social Services lobby. Upper Keys Murray Nelson Government Center Provided assistance in 13 events. Assisted Building Department withmoving 61 boxesinto building.Repaireddesk and chair, relocated furniture, installed wheels on new cabinet, pickedup and storedboxes. Assisted Supervisor of Elections Office with cleaning the storage roomandassembling cardboard storage drawers. Provided support closing community room doors and storing boxes at their storage room located at Hood Avenuein Tavernier. Plantation Key Courthouse Replaced 4 lamps. Trimmed tree in parking area in front of the building. Assisted State Attorney’s Office withpulling video cable from the new televisionin Courtroom “A” to judge's bench andopening locked file cabinet. Painted walls in office #201. Resolved 3 plumbing issues. Repaired back door, emergency door and lobby door. Replacedfirst aid box in Judge Garcia’s Office. Back office in Courtroom “A" was totally refurbished (painted, removed trash, and installed carpet). Contractor fixed the CivilDivision’s A/C. Drilled hole in security office to bring phone cord out. Repaired door/gates which were difficult to open. Contractor repaired rear combination gate lock. Ellis Building Resolved anA/C issue. Resolved aplumbing issue. Resolved a water leak issue on the water fountain. Installed televisionmounting bracket in the Court Administrator’s Office. Magnolia Building Moved some offices to the new location. Contractor retreated area for fleas. Painted doors, finished details and installed vertical blinds. Contractor unclogged drain line. Tavernier Fire Department Resolved anA/C issue. Repaired knobs and switches. Installed 2 traffic light control boxes: one at MM106,Key Largo;and,the other at Fire Station #22. 36 4EGOIX4K 4E Plantation Key Garage Contractor paintedthe exterior of thebuilding. Animal Shelter Repaired fixture that fell from the kennel ceiling. Contractor re-roofed Animal Shelter Building#3 and kennel building. Key Largo Library Resolved 3 plumbing issues. Repaired linoleum flooring in kitchen area. Removed a dead rat from the book dropcontainer. Islamorada Library Replaced 2) lamps and 4 ballast. Repaired small water leak in the main lobby ceiling. Repaired top latch on the left door leading into the community room. Performed tree and bush trimming in front of the building. Hung sign and checked all locks on the sliding glasses. Spottswood Building Assisted Social Services by providing a front door key for new driver. Senior Center/AARP Contractor repaired A/C. Repaired wheelchair access ramp handrail. Moved some furniture. Sunset Point Park Removed apicnic table due safety issue. Key Largo Community Park and Duplex Painted 3 water fountains. Painted outside bathrooms, and 6 doors atthe concession stand area. Resolved aplumbing issue. Installed water heater in one of the duplex units and fixed glass door lock. Assisted YMCA with repairing 2 cabinet doors in the concession area. Notes Preventive Maintenance completed for some HVAC units. Performed a safety inspection at the Key Largo Community Park Skate Park. Performed playground high and low frequency inspection for all Upper Keys Parks with Playgrounds. Supervisor attended the Integrated Pest Management meetingonSeptember 6, 2016. Employees and supervisor attended Basic Electrical Safety training-classon September 9, 2016. Majority of employees attended the Annual Health and Wellness Fairon September 28, 2016. Employees attended the Green Industries-Best Management Practices workshopon September 28, 2016. Harry Harris Park was scheduled for softball and baseball practices and tournaments. 37 4EGOIX4K 4E Rowell’s Waterfront Park is supporting Pumpout USAFlorida Keys providing temporary storage of pump out vessels & vehicles during hurricane season whenever necessary. Harry Harris Park held an event for theIsland Christian School for the Cross Country Meet. FLEET MANAGEMENT Garage staff completed monthly safety training (Heat Stress). Three garages combined provided preventative maintenance and completed approximately 106 unit safety inspections. Fivevehicles temporarily removed from service due to pending safety recall. Three garages combined opened and/or completed approximately 220 work orders. Three garages combined processed and distributed approximately 9,800 gallons of unleaded gasoline and 4,800 gallons of diesel fuel. Working with Airport to resolve tire wear problem with Fire Rescue truck. Began bid process for new fuel delivery contract. Began researching new vehicle information for various departments. Began conversation and pilot test program on aFleet assigned vehicle with GPS provider. Took delivery of new electric vehicle for Facilities Maintenance Department. Completed inventory donation transferring Ford Explorer to Sheriff’s Office; and, 2 Ford vans to SPCA/Animal Control. Completed inventory transfer; removing 2 generators from County inventory. Processed monthly Preventative Maintenance Inspection Due reports for County, Sheriff, and Health Department units. Processed monthly fuel billing accounts receivable. Processed monthly fuel billing School Board accounts payable. Processed monthly invoices for Not In-Program unit agencies. Processed daily/monthly parts and supply accounts payable invoices; approximately 250 total invoices. Processing accident repairs for various departments. Processing factory safety recalls for various departments. Verified toll by plate invoices for various departments. Continuing conversation with companyregarding standardization of garage oil/lubes. Began implementing apparatus inspection and maintenance program for Fire Rescue. Began conversation with State of Florida’s FHP, FWC and FDEP regarding Fleet assistance with speedometer calibration and/or vehicle maintenance. Assisting Fire Rescue with surplus vehicle disposal. Working with Property Manager and County Attorney; addressing written policy for selling and/or disposing of surplus vehicles. Fivemechanic/techs attended electrical safety training. TwoFleet employees attending outlook fundamentals training. Continuing Upper Keys and Lower Keys garage facility repairs and enhancements. Continuing preparation upcoming vehicle and equipment surplus sale. Continuing preparation disposal of obsolete and/or defective junk items. Rescued Project Management vehicle stranded in Miami. Marathon Senior Citizen Center generator repairs ongoing. Threebucket trucks; inspected, repaired and certified for service. Prepping Fleet bulk supply; delivery and storage truck. Working on transferand repair; Upper Keys Road Department clam truck. Completed (FDEP mandated) annual fuel tank operability testing. 38 4EGOIX4K 4E Completed (FDEP mandated) tightness test for Gato Buildingunderground fuel tank. Seeking quotes for Road Department front loader forks. Purchased personal safety equipment item for mechanics; mechanic creeper seats. Seeking quotes for Facilities HD lift gate. Finalizing upper keys garage generator replacement. New Employee Training, Cross Training and/or Refresher Training for all Fleet Employees ongoing. SOLID WASTE MANAGEMENT Recycling Department Staff was in Waste Management, Marathon Garbage and Keys Sanitary service areas with the ongoing inspections of commercial and residential solid waste and recycling services. Staff received 134 phone calls and answered questions on recycling, HHW, bulky item disposal etc. Staff met with Monroe County’s Public Information Officer Cammy Clark to discuss advertising and marketing campaign for Corks for Kids (aka recycled art in the schools made with wine corks). The plan includes multiple radio interviews and PSA’s announcements, internet and news publication coverage. Staff will meet again to finalize details of the project and start in October. Staff provided recycling brochures and laminated signsfor Mrs. Stacey Kidwell of Long Key Townhomes. Mrs. Kidwell is going to distribute the brochures to the residences and hang the laminated signs by the recycling dumpster. Mrs. Kidwell hopes this will help in increasing the recycling and reduce the contamination in the recycling bin located on the property. Staff is working on the fall edition of the ReNewsrecycling newsletter. Staff met with Key Largo Harbor Marina tenant Louise Caldron. Mrs. Caldron was concerned about the marina not being provided recycling by the county. Staff informed Mrs. Caldron that the marina would be a commercial account and would need to set up service directly with the franchise hauler for that area. Staff provided recycling brochures and a few recycling options for the marina to pursue. Mrs. Caldron will talk with the other owners at the marina about these options in an effort to start recycling. Staff will monitor progress. Staff met with the MARC House concerning the use of used latex paint. The MARCHouse would like to use some of the latex paint collect by our HHW program for artsandcrafts. They would also use the paint for maintenance purposes around their property. Staff will collect the good used latex paint from the county’s HHW program for their use. Staff is applying for the 2017 Keep America Beautiful recycling in public spaces grant. If awarded this grant will provide recycling containers for the use in public parks, marinas,etc. Staff met with Gerald Good an owner at Bayside Condominiums about recycling. Mr. Good wanted to know the cost and options for recycling at the complex. Staff informed Mr. Good that there would be no cost to him or anyone at the complex. Staff informed Mr. Good that each condominium owner pays the county’s solid waste assessment and is entitled to recycling services. Staff provided recycling brochures and contact information for the owners so they can request recycling carts from the franchise hauler in their area. Staff continues to collect wine corks from the collection locations that were set up throughout Monroe County. Staff has collected 35 gallons of corks for recycled art. Hazardous Material Department Staff held six household hazardous waste (HHW) collections in March and accepted material from 106Monroe County residents and 7 businesses. Staff held a special Saturday collection located in Marathon and accepted material from approximately 80residents. During this event, staff collected 4,200lbs. of HHW and 3,200 lbs.of electronic waste (E-waste). Staff set up an informational booth and assisted with the Marc House during their annual “ReMARCable tour de Keys” race. 39 4EGOIX4K 4E Staff shipped 28 boxes of Electronic Waste to be recycled, weighing 18,922 lbs. and filled 6 boxes of electronic waste during this month. Staff recycled over 940 lbs. of lead sealed batteries. Our Hazardous and E-Waste Commercial Collection participants included: Monroe County Parks and Beaches, Salvation Army, Waste Management, Galleon Resort, Florida Keys Mosquito Control, and one local business. Staff crushed 155fluorescent and mercury containing bulbs in house. Staff filled one 55 gallon drum with aerosol cans. Staff recycled 600 gallons of contaminated fluids. Staff bulked 495 gallons of latex paints and 110 gallons of oil based paints for recycling. 40 4EGOIX4K