Loading...
2nd Change Order 02/13/2018r . P Counter Key West Lighthouse Ticket • 02/02/201 This chang order introduces a new handrail ad acent to the new sidewalk to serve as a Dedestrian channeGzer and for reroutinq the existin g alarm wire within a conduit at an increased cost of 770.40 and 81 additional da s. The handrail will req lime for des+ n and HARC app roval as well as the time for construction. Thus the szrbstantial completion date will be adjusted from December 11, 2017 to March 2 2098. This change order is 90.03% of the original contract value. Not valid until signed b Owner Architect (if aoolicabie ). and C ARCHITECT: 2 �`� l' Date CONTRACTOR: �� ,/� .2-Al q. * Change Order was not included in the original contract specifications. Yes 0 No.1l, If Yes, explanation: This change order introduces a new handrail adjacent to the new sidewalk to serve as a pedestrian channelizer and for rerouting the existing alarm wire within a conduit at an increased cost of $2,605.03 and 81 additional days. The handrail will require time for design and HARC approval as well as the time for construction. Thus the substantial completion date will be adjusted from December 11, 2017 to March 2, 2018.. 0 Change Order was included in the original specifications. Yes [] No 2 0 Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes 0 No 19 W07 0 Change Order is correcting an error or omission in design document. Yes E]No E Should a claim under the applicable professional liability policy be made? Yes E] No M Explain: AMI We OTC a h 0"O Bin C OF THE FLORIDA KEYS DESIGN BUILD CONTRACTORS February 01, 2018 Attn: Ray Sanders I 100 Simonton Street 2- , Key West, FL 33040 SubJect: Request for Change Order #02 We hereby propose to furnish materials, equipment and perform the labor necessary to complete the following changes: 2-Lighthouse Ticket Counter Changes 2.01 Install 1/2" EMT conduit for alarm wire 2.02 Paint conduit 2.03 Supervision I Is @ 340 $340.00 1 hrs @ 40 $40.00 4 hrs @ 45 $180.00 Subtotal $560.00 Overhead 5% $28.00 Profit 51 $29.40 TOTAL $617.40 1 LS @ 1290 $1,290.00 1 LS @ 11.94 7.50% 0.896 $12.84 8 hrs @ 40 $320.00 1 LS @ 150 $150.00 4 hrs @ 45 $180.00 Subtotal $1,952.84 Overhead 5% $97.64 Profit 5% $102.52 TOTAL $2,153.00 Page 1 of 5 Any alteration or deviatiort from above specifications invoIving extra costs will be executed only upon written orders Mid will beCOIlle an extra charge over and above the estimate. All agree3rrents contirtgent upolt strikes, accidcnts, or delays heyond our control. ( )caner to Carry tire, tornado and other necessary insurance triton above worst. Workers C'onzl and General IJabiIity insurance on above work will be taken out by SEA TECH, C. Note - This proposal may be withdrawn by us if not accepted within days. ACCEPTANCE P SAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment will be made as outlined above. Page 2 of 5 Nearshare Electric, Inc, State Certified Electrical Contract7r #EC13001186 Owner: KfV Light Station Giftshop Scope of Work Phone: Seatech (,105)872-0888 Job# 170512 Project: Entry Alterations Confidential Project Addresx: 938 Whitehead St. KW, PL 33040 + Install/Furnish (1)'h" EMT conduit on wall to sleeve (1) CAT 5 telephone wire * Electrical wiring methods and material in conformance with NEC and local code requirements * Workers Comp /General Liability Insurance + Taxes + Warranty EXCLUDED FROM BID: * Pen fees 4 Any Scope of work nol clearly shown on drawings or within the bid documents and/or specifications is not included in this pr o p osa l. We propose to fiarm 111"Wrial and ktbor. complete in accordance %villi [lie above specifications. for [lie I Limp sum of. Three I I undred And Fort►- Dollars ............ Authorized Signature Matthew A pell Date 0I/22/2018 5680 1st Avenue #5 — Sto Island —1'"l, — 330 40 — Phowe (305) 294-3991 — Fax (305) 294-3043 — Nearshore@'bellsouth.tiet R LaChapelle From: Ryon LaChapelle Sent: Monday, January 22, 2018 9:25 AM To: Ryon LaChapelle Subject: FW: railing quote Sent: Monday, January 22, 2018 8:52 AM To: Ryon LaChapelle <Ryon L@seatech.cc> Subject: Re: railing quote $1,200 $ •0 sales tax Total $1,290 EMM All Keys Welding and Fabrication, LLC. 29132 Tulip Lane Big Pine Key, FL 33043 305.924.3344 allkevsweldinp(Zpan f.COm Shopping Cart FREE Shipping on eligible items. SAKRETE 5000 Plus 80 lb, Concrete U-71 Model #65200370 How To Get It Qty Item Total Addi vx [Js� I FART ETTI SAKRETE 80 lb. SAKRETE 60 lb, SAKRETE 50 lb, Gray Concrete Mix Sand Mix Fast Set Concrete (82) (16) (35) 1 4 -10 ,sa,h $ 6 80 /each $ 3 98 1each Recently Viewed lte Plasgad Black SAKRETE 80 lb. SAKRETE 8 in. x 48 Rh( Large Concrete Crack Resistant in. Concrete Form Pei (187) (10) $ 12 98 /each $ 6 40 /each $ 9 75 /each $4C T�FO Nos