County Commission Meeting
February 21, 2018
Agenda Item Number: C.16
Agenda Item Summary #3924
BULK ITEM: Yes DEPARTMENT: Airports
TIME APPROXIMATE: STAFF CONTACT: Donald DeGraw (305) 809 -5200
none
AGENDA ITEM WORDING: Approval of change orders 8, 9, 10, 11, 12 and 13 with OAC
Action Construction Corp., increasing contract time by 84 days and contract sum by $111,193.37 for
the Key West International Airport Customs Facility Phase II project, funded by FDOT grant (50 %)
and Fund 404 Operating (50 %).
ITEM BACKGROUND: Change Order #8 adds 30 days and $57,017.99 for additional work to
revised civil drawings revised October 12, 2017, that includes new concrete curbs, sidewalk, sod,
limerock, ADA ramp and fill for underside of crawl space.
Change Order #9 adds 21 days and $16,019.04 for additional work installing lighting and fire
sprinkler in the crawl space that are not part of the original plans and are part of the revised plans.
Change Order #10 adds 21 days and $31,291.77 for additional work for installing new galvanized
steel stair with reinforced concrete pads which are not part of the original plans and are part of the
revised civil plans.
Change Order #11 adds 7 days and $7,295.19 for additional work for installation of extra steel
angles on the perimeter of the building to properly secure the steel joists and decks of the new
building.
Change Order #12 adds 5 days and $3,833.82 for use of copper lines instead of PVC as requested.
Change Order #13 is a credit of $4,264.44 for cameras not being installed during this phase of the
project.
PREVIOUS RELEVANT BOCC ACTION: Approval of original agreement with OAC on
December 9, 2015, and approval of First Amendment to Agreement on February 15, 2017, adding
grant compliance conditions to the original agreement. Approval of Change Orders #6 and #7 on
January 17, 2018.
CONTRACT /AGREEMENT CHANGES:
Adds 84 days bringing substantial completion to February 21, 2018 and $111,193.37 bringing total
contract sum to $1,598,941.36.
STAFF RECOMMENDATION: Approval.
DOCUMENTATION:
OAC COs 8 -13 (MinuteTraq)
FINANCIAL IMPACT:
Effective Date: 11/29/2017
Expiration Date: 02/21/2018
Total Dollar Value of Contract: $111,193.37
Total Cost to County: n/a
Current Year Portion:
Budgeted: Yes
Source of Funds: FDOT (50 %) & Fund 404 (50 %)
CPI:
Indirect Costs:
Estimated Ongoing Costs Not Included in above dollar amounts:
Revenue Producing: No
Grant:
County Match:
Insurance Required:
Additional Details:
If yes, amount:
REVIEWED BY:
Beth Leto
Completed
02/06/2018 3:17 PM
Donald DeGraw
Completed
02/06/2018 3:31 PM
Pedro Mercado
Completed
02/06/2018 3:40 PM
Budget and Finance
Completed
02/06/2018 3:49 PM
Maria Slavik
Completed
02/06/2018 3:52 PM
Kathy Peters
Completed
02/06/2018 4:28 PM
Board of County Commissioners
Pending
02/21/2018 9:00 AM
MONROE COWN/ENGINEERING/ PROJECT' MANAGEMEJ
CoNTRAcr CHANGE ORDER
? TITLE:
'� It Renovations
TO CONTRACTOR:
11980 SW 144 Ct, Suite 101
Miami, FL 33186
The Contract ka changed asfollows:
Iq
CONTRACT DATE: December 09, 201
The original (GuenanhsedMexknunnPrice)-- --- 1.812.500.00
Net change by previously authorized Change ------ 176.247.89
The (Guaranteed Maximum Price) prior to
The (Contract S ) (Guaranteed M i Phce)will he (incrgeagd) (decreased)
The ke--.$ 1.544.765.88
The Contract Time will be ----..----. 30 days
The date of Substantial Completion as of the date of this Change Order is ............ December 29, 2017
Detailed description of change order and justification:
Not valid until signed by Owner, Architect (if app LicableLand Contractor
DIRECTOR PRO B0�NT
(SEAL) '
ATTEST: KEVIN MADOK, CLERK
MM
Deft
"I I mill
If Yes, explanation: The civil drawings were an omission by the architect and includes the work
4._ 4.`4 in the detailed description of change order and justification.
0 Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes No
If Yes, explanation as to why it is not subject for a calling for bids:
911TOMMOMMITSTS-11F., M,
- - 0
. .... .... ... ... . ... .......... .... .... .... .... .... ... - -- - - ------- ---- - - ---- -----------
i ing"th'i's change order, K2M does not agree or stipulate that any -- of the
work to be performed or expenses incurred in connection therewith were
necessitated by errors or omissions on its part. K2M unconditionally reserves a// of
its rights in connection with the foregoing.
MONROE CouNWANGWERwG/ PRojEcr MANAGEmENT
CoNTRAcr CHANGE ORDER
PROJECT TITLE:
Faetifity
7hase 11 Renovations
TO CONTRACTOR:
OAC—Actis +x,-C
11980 SW 144 Ct, Suite 101
Miami, FL 33186
CHANGE ORDER NO: 9
0
INITIATION DATE* November 2, 2017
C
'r
0 6
CONTRACT DATE: December 09, 201 04
00
The Contract is changed as follows:
The original (Contract Sum) (Guaranteed Maximum Price) .............. ...... ..... -$1,312,500.00
Net change by previously authorized Change Orders ........ ........ ............ —..$ 175,247.99
The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was... ..........$1,544,765.88 0
The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) 7 E
(unchanged) by this Change Order. ...... $ 16,019.04 0
The new (Contract Sum)-(Guaranteed Maximum Price) including this Change Order is ....... $ 1,560,785.02 0-
The Contract Time will be (increased) (decreased) (unchanged) by ......... - ....... -- ...... .... 21 days <
The date of Substantial Completion as of the date of this Change Order is ............ January 19, 2018
Detailed description of change order and justification:
This change order is for additional work for installation of lighting and fire sprinkler in the crawl space that
are not part of the original plans and are part of revised plans.
MUWOFIJEME� Mfl— --- —
FANNIUMA
CONTRACTOR:
A
M Irk
. ........... 7 4�
o �- kr
DIRECTOR PROJECT MANAGEMENT
(SEAL)
ATTEST: KEVIN MADOK, CLERK
IM
2 ' 4�
I
U
Date E
Mayor/Chairman Date
00
0
0
0
U
Date E
Mayor/Chairman Date
11 11�11 IF ;11 11�11 1 11111111 11 �piiil�1111 l� �� 1
I I Kill
. 1111111!� ii I r?
6 Change Order was not included in the original contract specifications. Yes No
If Yes, explanation. The lighting and sprinkler in the crawl space is required by NFPA and were an
omission by the architect and includes the work described in the detailed description of change order
and justification.
If Yes, explanation of increase in price:
• Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes No
1111 1 !1 1 11��
1 • 0 It I A - a
its rights in connection with theforegoing.
PROJECT TITLE:
Phase It Renovations
0 1 110
11980 SW 144 Ct, Suite 101
Miami, FL 33186
00
RR
(SEAL)
ATTEST: KEVIN MADOK, CLERK
IM
Mayor/Chairman
0
to
Change Order was not included in the original contract specifications. Yes No
If Yes, explanation: The fueling point for the back-up generator which was designed to be
installed in the structure is 14 feet off the cround.
accessing the fueling point that provided 3 points of contact as required by OSHA.
4 Change Order was included in the original specifications. Yes No
Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ,No
Project architect approves the change order. Yes No
"r ROJECT TITLE-
7�hase 11 Renovations
TO CONTRACTOR:
OAC Action Construction, Corp.
11980 SW 144 Ct, Suite 101
Miami, FL 33186
EHMM����
CONTRACT DATE: December 09, 201
The original (Contract Sum) (Guaranteed Maximum Price) ...... .............. ............... $ 1,312,500.00
Net change by previously authorized Change Orders ............................................. ... -$ 175,247,99
The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was. ............$1,592,076,79
The (Contract Sum) (Guaranteed Maximum Price) will be ( (decreased)
(unchanged) by this Change Order. .....$ 7,295.19
The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order 1,599,371.98
The Contract Time will be (increased) (decreased) (unchanged) by ............. ...... ......... 07 days
The date of Substantial Completion as of the date of this Change Order is ........ ... February 16, 2018
Detailed description of change order and justification:
I "n&
-1 -ahwija
in order to properly secure the steel joists and deck of the new building. This is not part of the original scope
• work.
Not valid until signed by Owner, Architect (if applicable), and Contractor
oil T-
r'
4 A
OA, Acjion CofAtrucfion, Corp. Date
Mayor/Chairman
Em.
•
If Yes, explanation: The additional steel angles were required to properly secure the roof of the new
building and were an omission from the original contract specifications,
0 Change Order was included in the original specifications, Yes No
If Yes, explanation of increase in price:
0 Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes - No,
If Yes, explanation as to why it is not subject for a calling for bids:
H� �#
Should a claim under the applicable professional liability policy be made? Yes No
Explain: Errors and omissions will be resolved with Architect at the end of the project.
��� . . .................. . .. . .. . .. . .......................... . .. . .. . .............................. . .. . .................................................................... V V
Tn RR' sno?"o'gror' Van;
work to be performed or expenses incurred in connection therewith were
necessitated by errors or omissions on its part. K2M unconditionally reserves oil of
its rights in connection with theforegaing.
MAO
PROJECT TITLE:
Phase 11 Renovations
TO
QAC Action Construction, Corp.
11080 SVV144[t, Suite 101
K8!mmn|, FL 33186
CONTRACT DATE: December 09, 201
The Contract is changed emfollows
The original (Contract <Sum (Guaranteed Maximum Price) ... —........................ 1,312,500�00
Net change by previously authorized Change Ordpr ------- 175,24799
The p6ma 98
The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased)
(unchanged) by this Change Order ...... 1 3,833,82
The is .'—.$ 1.603.20&00
The Contract Time denreased)(unuhanged) by ................... .......... 05 days
The date nf Substantial Completion aoof the date of this Change Order �.. .......... February 21.2018
scope of work.
Not valid until signed !U Owner, Architect (if applicable), and Contractor
�����
ATTEST: KEVIN MADOK, CLEJ
ON
III
III EZI23M
® Change Order was not included in the original contract specifications. Yes No
If Yes, explanation: This is an owner requested change.
EM
If Yes, explanation of increase in price:
• Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes No
If Yes, explanation as to why it is not subject for a calling for bids:
If no, explanation of why:
III
Should a claim under the applicable professional liability policy be made? Yes No
Explain:
I
0 Kej Z I I
'- I M *9, V - - � a
PROJECT TITLE:
Phase 11 Renovations
TO CONTRACTOR:
OAC Action Construction, Corp.
11980 SW 144 Ct, Suite 101
Miami, FL 33186
The Contract is changed as follows:
The original (Contract Sum) (Guaranteed Maximum Price) ............................ ...... --.$ 1,312,500.00
Net change by previously authorized Change Orders- ........ ... --- .............................. $ 175,247.99
The (Contract S um) (G uaranteed Maximum Price) prior to this Change order was... 1, 603,205.80
The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased
(unchanged) by this Change Order. ..... $ 4,264.44
The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ....... $ 1,598, 941, 36
The Contract Time will be (increased) (decreased) (unchanged) by..... . ... .................... 0 days
The date of Substantial Completion as of the date of this Change Order is. . ....... February 21, 2018
fl� =-. VITS-7,1M
Not valid until signed by Owner, Architect of applicable), and Contractor
Uall:111101ft
I
LOIOILN19: U
DIRECTOR OF AIRP(WS
A
{ 2M $I* 111c Date
X
OA n Const' o Date
Date
(SEAL) I
ATTEST: KEVIN NZ OK, CLERK
BY:
Deputy Clerk
75M
0 Change Order was not included in the original contract specifications. Yes No
R 1 1 1 111 1 1 11 IM ! I I I ! I I � I I I
III IIIII IIIIIIIIp''11''Imirmil- g��-g
If Yes, explanation of increase in price:
9 Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes No
If no, explanation of why:
31111190 • r
Should a claim under the applicable professional liability policy be made? Yes No
Explain: