Item G47
BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: November 20, 2013 Division: Public Works/Engineering __ Bulk Item: Yes X No _ Department: _Project Management Staff Contact Person/Phone #: David R Hill X4307 AGENDA ITEM WORDING: Receipt of monthly report on change orders reviewed by the County Administrator's Office. ITEM BACKGROUND: There were three change orders considered and approved by the County Administrator and /or Deputy Administrator for the period beginning October 1, 2013, and ending October 31, 2013 totaling $4,600.00 There were no change orders denied. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 026 -1998 was adopted in order to provide that the County Administrator may approve separate, non - cumulative change orders for construction projects and professional service contracts in amounts not to exceed $25,000.00 or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT /AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: N/A TOTAL COST: N/A Indirect Costs BUDGETED: Yes N/A No DIFFERENTIAL OF LOCAL PREFERENCE: N/A COST TO COUNTY: N/A SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes No X AMOUNT PER MONTH Year APPROVED BY: County Atty OMB /Purchasing Risk Management DOCUMENTATION: Included X DISPOSITION: Not Required, AGENDA ITEM # Revised 7/09 CHANGE ORDERS CONSIDERED BY THE COUNTY ADMINISTRATOR'S OFFICE FOR THE PERIOD 10/01/13 — 10/31/13 Total $4,600.00 * Approved PROJECT CO# AMOUNT DESCRIPTION DATE CONSIDERED CAUSE ADA Compliance Seg #4 1 $0.00 No cost time extension to Substantial Completion by 156 days *10/01/13 Contractor needed additional time to establish design drawings. Freeman Justice Center Lobby Expansion 1 $0.00 No cost time extension to Substantial Completion by 21 days. *10/23/13 Certain areas of work are limited to non - business hours which caused a delay. Lester Building Roof Replacement 2 $4,600.00 Additional cost to replace cracked roof drains, from PVC to cast iron drain pipes. *10/30/13 Air Plenum spaces cannot hold any kind of combustible or toxic material such as PVC. Total $4,600.00 * Approved MONROE COUNTY /ENGINEERING / PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 1 ADA Compliance Segment #4 INITIATION DATE: 09127113 TO CONTRACTOR: CONTRACT DATE: May 15, 2013 Pedro Falcon Electrical Contractors, Inc. 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) ........................ ....................$300,400.00 Net change by previously authorized Change Orders ..................... ..............................$ 0.00 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was .............$ 300,400.00 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order ....... $ 0.00 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ....... $ 300,400.00 The Contract Time will be (increased (decreased) (unchanged) by ... ............................... 156 Days The date of Substantial Completion as of the date of this Change Order is ..................... March 6, 2014 Detailed description of change order and justification: No cost time extension to Substantial Completion by 156 days, from October 1, 2013 to March 6, 2014. Final completion shall be obtained 31 days thereafter, or April 6, 2014. This change Order is 0.00% of the original contract price_ Nat valid until signed by Owner, Architect (if applicable), and Contractor CONTRACTOR: Pedro F_ con Electricpt Contractors, Inc. Date r DIRECTOR PROJECT MANAGEMENT David R. Pill, CGC Q Date DIRECTOR PUBLIC WORKS /ENG: ` 3 K in Wilson Date COUNTY /DEPUTY ADMINISTRATOR: Roman Gastesi /Debbie Frederick Date 0 N Change Order Attachment per Ordinance No. 004 -1999 0 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: A no cost time extension of 156 days, from October 1, 2093 to March 6, 2014. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ❑ No If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: MEMORAND UM TO: Board of County Commissioners From: Roman Gastesi County Administrator Date: October 1, 2013 RE: Change Order Attached is a proposed change order for Pedro Falcon Electrical Contractors, Inc. (Change Order #1 is for an increase of $o.00 for a no cost time extension of 156 days, from October 1, 2013 to March 6, 2014). According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Administrator intends to approve this change order on Wednesday, October 2, 2013. Roman Gastesi County Administrator DF:cac � nis c n oun Stanley- Amanda From: Stanley- Amanda Sent: Tuesday, October 01, 2013 5:00 PM To: County Commissioners and Aides Subject: Change Order #1 Pedro Falcon Electrical Contractors Attachments: Change order - #1 Pedro Falcon Electrical Contractors.pdf Good afternoon, Attached is the Change Order for Pedro Falcon Electrical Contractors, which will be approved by the County Administrator tomorrow. If you have any questions feel free to contact our office. Have a great day. AmanL Stanky Senior Administrative Assistant Monroe County Administrator's Office 0 11oo Simonton Street, Suite 2 -205 Key West, FL 33040 3 3 Fax MO Nw E COuNTy /E NGNEEiuNG/ PRojEcr MANAGEMENT CONTRACF CHANGE ORDER PROJECT TITLE: Freeman Justice Center Lobby Expansion Key West, Florida TO CONTRACTOR: SeaTech of the Florida Keys, Inc. 830 Crane Blvd. Sugarloaf Key, FL 33042 CHANGE ORDER N0 :1 INITIATION DATE: October 21, 2013 CONTRACT DATE: March 20, 2013 The Contract Is changed as follows: The original (Con ct Sum) (Guaranteed Maximum Price) ........................ ....................$235,972.00 Net change by previously authorized Change Orders................................................... $ 0.00 The ( Captract Sum (Guaranteed Maximum Price) prior to this Change order was .............$ 285,972.00 The ( Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) /'unch by this Change Order ....... $ 0.00 The new (Contract Suml (Guaranteed Maximum Price) including this Change Order Is ....... $ 235,972.00 The Contract Time will be (increased (decreased) (unchanged) by ... ............................... 21 Days The date of Substantial Completion as of the date of this Change Order is .................. December 12, 201 S Detailed description of change order and justification: No cost time g1kaika of8i dam, tri N tte tow In 0.00% of lh Not valid until sinned by Qwngr. AMhitect,01 atWicabte?, and CarU for ARCHITECT: 10122/13 7 Cue Sowards Aguila Architects Date W CONTRACTOR: D col Sea Tech Florida Keys, Inc. Date COURT ADMINISTRATOR rL, — Holly El 16 Date DIRECTOR PW /ENGINEERING: �a 23 zi�3 MOM Date DIRECTOR PROJECT MANAGEMENT• 0 '�•�" Zv( avid R. Hill C-GO Date COUNTY/DEPUTY ADMINISTRATOR ` a3' - Acting County Administra Change Order Attachment per Ordinance No. 004 -1999 0 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Contractor is limited to completing certain areas of work during non - business hours which has caused delays. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: 0 Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Attn: David Hill, CGC Monroe County Board of County Commissioners 500 Whitehead Street Key West, FL 33040 Re: Freeman Justice Center Lobby Expansion Subject: Time Extension Dear Mr. Hill, Sea Tech is requesting a 21 day no cost time extension to our contract in accordance with Section 6.2.7 of the general conditions of the contract. There have been issues with coordinating installation of the sheet metal duct and the fire sprinklers. We have been limited to completing these areas of work only during non - business hours, which has caused some delay of the critical path. Our updated schedule is attached showing the new substantial completion date of December 06, 2013. Sea Tech has every intention of accelerating the work progress to reduce the time indicated on the project schedule. Sea `Tech also anticipates less time from substantial completion to final completion, which should keep the final completion time within the 180 days allocated. Please advise if you need additional information. I may be reached at (305) 872 -0888. Sincerely, Ryon. Ryon LaChapelle Project Manager - '-;�id7' 830 Crane Blvd., PO Box 420529, Summerland Key, FL 33042 (305) 872 -0888 F IC Lobby Expansions Update 10/21/2013 Classic WBS Layout 21- Oct -13 13:4 ¢x { 1 k C I: :.: ....:. . ,t ., ., 1..,.;, .1P� - 7 .... .. 'H . .L... ♦. n r. :. KII'4f F Avh". d Z � 1.. !r. ..+G •. c ... ._. ..;�. � .y: 1. a: �. ._ „n. ., g :_ .. ,. -f. �'?'. ,\.,. 1 4 {r ,.a% J;P R °'. s .X - ,.F �,. .. ,:[ � �{ a:;. -. ,. .w.. ,., y . 3it n.4 , r : 1 s } .- .. 'x: 6ro` - 1 �r lu ”. Z. .r.4. . > ..,r. � k. �..s 1 �`+ C +-^” v F 5 , 1. ; .. Z �u �A,fl.'. I/ ) ,.. \ Y i. k I - ;,k. tu.+ ? %v. ,nY .r''r�,.d4w ✓ .N,. sr�e`, rrhk,'i �x� „, r.i. t. a {. 1919 ,..11;' ' � t P k?[ff" •t� "YGb S. ! i ';Y. I .,. S'. ..n .. + +r.: ..',�� .. ... , ., .f n'rh. ^�,� to - A.�kret,,'.,nl .�.�� 000 Contract Award 1 09- Apr -13A 09-Apr-13A 100% CordractAward I_ 010 _ Payment/Performance Bonds 1 09- Apr -13A 09-Apr-1 100 % , Payment/Performance Bonds 030 1. PreCon Meeting 1 10-Jun-13A 10-Jun-13A 100% I PreCon Meeting 020 Permd 1 17- Apr -13A 20-Jun 13A 100% Permit 035 Notice to Proceed 1 24- Jun -13A 24- Jun -13A 100% Notice to Proceed L 040 _ Mobolize _ 2 24 24-Jun-13A ! 26- Jun -13A 100% Mobolize 050 Protect Area 4' 26- Jun - • 01- Jul -13A 100% d Protect Area 060 I_ Remove Concrete Slab/Curb - 203 Ju - l 13A 07 Jul 13A 100% Remove Concrete Slab/Curb 070 Construct Grade Beam 10 Jul 13A 29 Jul -13A 100% WIIIIIIIIII Construct Grade Bea 080 Construct Concrete Slab 15 30- Jul -13A 06-Aug-13A 100% construct concrete Slab 090 Construct Masonry Wall 3 i 07-Au g 13A 16- Aug-.13A 100% 1 6 Construct Masoni V Wall 120 Construct Temporary Plywood Wall 5'117-Aug-13A 18-Aug-13A 100% Bo Construct Teml orary Plywood Wall 130 Demo Wall 4 26-Aug-13A 100% Demo Wall 105 Mechanical Mobilization 1 26-Sep-13A 26- Sep -13A _ __ 100% 1 Mec nical Mobilization 180 Insulation 2 02- Sep -13A 02 Oct 13A 100% OMEN Ins dation 150 Rough Fire Protection _. ion 07 Oct 13A 5 05- Oct -13A _._ 100% o ® R ugh Fire Protection 190 install GWB Wall 10 27-Aug-13A 11- Oct -13A 100% Install GWB Wall 115 Sheetmetal Ductwork 10 27- Sep 13A 18.O 13A __- ct 100% o ® Sheetmetal Ductwork 135 Frame Glass Wall _.. 51 07 Oct -13A 21-Oct-13A _- 100% m Frame Glass Wall 110 Rough Mechanical FC-2 & VAV 10 15-Oct-13A 04- Nov-13 _._._ . -. 0% m Rough Mechanical 140 Rough Electrical 5 04-Sep-13A 06-Nov-13 75% ( Rough Electrical 210 Install Glass Wall 3i ct-13 08- Nov-13 0% Install Glass Wall 200 Install GWB Ceiling 10 27-Aug-13A 11 Nov-13 - ..... 50% Install GWB Ceti 160 Install Granite Tile Floor 10 05- Nov -13 18- Nov-13 0 % = Install Granite 170 .. _ Stucco Block Wall 5 -Au 13A 19 -Now13 --- 90% 1 Stucco Block 100 Relocate Scanner /Signs . 2 19-Nov-13 20- Nov-13 __ 0% o U Relocate Scan 220 Pamt 8 12 Nov 13 1 21-Nov-13 0% Paint 230 Finish Mechanical 322 Nov -13 26-Nov-13 - 0% e ® Finish Mech 240 Finish Electrical 3i 22-Nov-13 26- Nov-13 0% _ ® Finish Electr 250 Finish Fire Protection 3i 22-Nov-13 :26-Nov-13 0% o M Finish Fire 260 Install Crown Molding 4! 27- Nov -13 04- Dec -13 0% _ ® Install Cro 270 Install Wood Base 41 27-Nov-13 04- Dec -13 0% _ ® Install Wo 275 Substantial Com letwn p -. 0 04-Dec-13 0% ♦ Substanti 280 Punch List 10r 05- Dec -13 18- Dec -13 0% o Punc 290 Close Out 10i 19- Dec -13 02-Jan-14 0% e Actual Level of Effort ® Actual Work Page 1 of 1 TASK filter: All Activities ° Primary Baseline i Remaining Work © Oracle Corporatio ONROE C0UMV GINEERING/ FROJECT MANAGEAGNT COACT CHANG ORDER PROJECT TITLE: Lancelot LeaterJustice Boding RoorReplacement TO CONTRACTOR: Advanced Roofing, Inc. 1950 NW 22" Street Fort Lauderdale, FL 33311 CHANGE ORDER NO: 2 1NiTIA1ION DATE: October 18, 2013 CONTRACT DATE: May 15, 2013 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) ... ............................... . ..$332,405.00 Net change by previously authorized Change Orders ..................... ..............................$ 8,900.00 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was ..............$ 341,305.00 The (Contract Sum) (Guaranteed Maximum Price) viii be figgLeggeg (decreased) (unchanged) by this Change Order ....... $ 4,600.00 The new (Contract Sum (Guaranteed Maximum Price) including this Change Order is ....... $ 345,905.00 The Contract Time will be (increased (decreased) ( unchanged) by .. ............................... 33 Days The date of Substantial Completion as of the date of this Change Order is ...................November 11, 2013 ARCHITECT: Willis . Horn Architect, P.A. Date CONTRACTOR: C— Adva in Inc. Date DIRECTOR PROJECT MANAGEMENT: t� --�5'- ZO 7 avid R. Hill CGC p DIRECTOR PUBLIC WORKS /ENG_ ZS�(�� 2 K in lson p COUN Y /DEPUTYADMINISTRATOR C�! 7 / Ro Debble Frederick ate Detailed description of change order and justittcation: Change Order Attachment per Ordinance No. 004 -1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The old cracked cast iron drain pipes were discovered while replacing the roof. PVC was the original replacement, but then it was discovered the pipes were in an air plenum which cannot hold any kind of combustible or toxic material. The pipes are to be replaced by cast iron pipes. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: 0 Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: MEMORANDUM TO: Board of County Commissioners From: Debbie Frederick Deputy County Administrator Date: October 28, 2013 RE: Change Order Attached is a proposed change order for Advanced Roofing, Inc. (Change Order *2 is for an increase of $4600.00 for a time extension of 33 days, from October 9, 2013 to November 11, 2013. This is to replace the PVC drain pipes on the old and cracked roof drains for the Lancelot Lester Justice Building Roof Replacement). According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Administrator intends to aggr - oye this ch nge order on 3�day, October 29, 2013. -- - ebbie Frederick Deputy County Administrator DF:cac Stanley- Amanda From: Stanley- Amanda Sent: Monday, October 28, 2013 4:30 PM To: County Commissioners and Aides Subject: Change Order #2 Advanced Roofing Attachments: Change Order #2Advanced Roofing Inc.pdf Good afternoon, Attached is Change order #2 for Advanced Roofing Inc. for a 33 day extension for the roof replacement at the Lester Building. This is to be approved by the County Administrator tomorrow. Feel free to contact me if you have any further questions. Amanda Stanfey Senior Administrative Assistant Monroe County Administrator's Office yx� izoo Simonton Street, Suite 2 -205 Key West, FL 33040 3 3 Fax EXPERIE MATTERS. A VAN E a R 0 FI CC CO24413 ESTABLISHED 1983 October 18, 2013 Mr. Michael Nalepa Monroe County Project Management HISTORIC GATO CIGAR FACTORY 1100 Simonton Street, Suite #2 -216 Key West, FL 33040 Nalepa- mike@monroecounty.fl.gov Re: Lancelot Lester Justice Building Drain Repair Change Order 2 Dear Mr. Nalepa, Remove two individual sections of cracked cast iron drain pipes from two roof drains and dispose of properly. Install two 75' sections of new cast iron drain pipe tied into the existing cast iron system. QUOTATION For the sum of: $4,600.00 (Four Thousand Six Hundred Dollars) In addition to the original- Change order one In the amount of $8.900.00 Should you have any further questions please contact Jim Loftus at 954 - 522 -6868 extension 1168 or e-mail limi . advancedroofing.com T ank you, Jim us Servi a Manager JL /ch 800 638.6869 TEL 954.522.6868 FAX 954,bUt5. ;dVbt 1950 NW 22 " Sireet I Fort Lauderdale) Florida 33311