Loading...
1st Change Order 03/02/2018• " • ' "' • 1 � 1101 CoNTRAcr CHANGE O RDER PROJECT TITLE: Murray E. Nelson Government and Cultural Center Exterior Painting TO CONTRACTOR: S.B. Painting and grounds Maintenance Inc INITIATION DATE: 2/26/2018 CHANGE ORDER 1 CONTRACT DATE: 711812017 The Contract is changed as follows: The original ( Contract Sum (Guaranteed Maximum Price) ......................... ...................$67,942.00 Net change by previously authorized Change Orders ..................... ..............................$ 0 The ( Contract Sum) (Guaranteed Maximum Price) prior to this Change order was .............$67,942.00 The ( Contract Sum (Guaranteed Maximum Price) will be (Increased (decreased) (unchanged) by this Change Order ....... $3,600.00 The new ( Contract Sum )_(Guaranteed Maximum Price) Including this Change Order Is ....... $71,542.00 The Contract Time will be (increased) (decreased) ( unchanged) by ... ............................... 0 Days The date of Substantial Completion as of the date of this Change Order is ........................ 3/23/2018 Detailed description of change order and Justification: Ex erior a s err 7 s"r t r §1= wash n h n wi h o f /rri cae of Paint the se orrd flood deck and Qaint the wooded kiosk in the park behind the Murray Nelson erg .er to rrr Ich building colors This Chang order is 5.29% of the on in 1 ggnLrp p 6 g@ ARCHITECT: N/A Da t e rf _0_I CONTRACTOR: i s DIRECTOR PROJECT MANAGEMENT fi A ll J COUNTY /ASSISTANT ADMINISTRATOR: _/''' R6man CAstesi Date even vvnson Christine Hurley Monroe Count Owners City: Owners Zip Key West 33040 Project Name & Address: Murray Nelson EXTERIOR PAINTING BID PROPOSAL wner's Address: 1100 Simonto ST. 2 -216 wner's Phone: Owner's Work Phone. 305 - 292 -4523 2314 Patterson Avenue Key West, Florida 33040 305.304.6994 www.sb - painting.com buckaloosteve @msn.com License No. SP4174 & SP3391 Email: Rivera -chris @monroecounty - fl.gov a. Scope of Work: S.B. Painting and Grounds Maint. Inc. hereby submits the following specifications and estimates to paint and /or improve the exterior of the above premises: 1. X Inspect the surfaces to be painted to determine the work that needs to be performed. 2. x Chemically treat surfaces that are glossy, chalky, rusty, moldy or that have mildew to provide a good surface to receive the new paint. 3. x Waterblast all surfaces to be painted to clean and to remove loose paint. or... 4. Low - pressure wash and clean all surfaces to be painted. 5. Stripping. WhereJHow? .... .. __. .�... ---, .... _. _ _........_.- 6. Remove loose peeling paint by hand scraping, wire brushing, hand sanding, or power sanding. 7. X Feather sand bare wood surfaces to make the finish smoother and to make paint voids less visible. 8. Fill holes, cracks, or specified damaged areas in the wood surfaces as needed. 9. ( X Re -set or replace loose or popped nails as needed. 10. x Patch holes, cracks, or any specified damaged areas in the stucco surfaces as needed. 11. x Perform all necessary caulking to non - expansion areas as needed. 12. X Replace any loose glazing material on painted windows as needed. 13. x Mask off and cover surfaces, as needed, to protect them from paint and primer. 14. Apply a full coat of compatible, manufacturers recommended primer to all surfaces to be painted. 15. x Apply a full coat of compatible, manufacturers recommended primer to bare surfaces only. 16. X Apply a full coat of our recommended paint or finish to all surfaces. Recommended paint 17. X Split colors on overhang and sidewalls. 18. X Overhang and sidewalls to be same colors. 19. X Apply a full coat of exterior varnish to all stained doors. 20. X Clean up and remove any debris with customer provided trash container and replace objects previously removed or relocated. 21. x Inspect finished job with our customer and correct any items of concern to assure quality control. Scope: ,Exterior garbage enclosure to be. pressure washed arrd.followdd by Two finish coats,_= $1,600,00 Second Floor deck to be pressure washed followed by Two coats of finish paint.= $ 1,800.00 Wood stand in parr area to be pressure wshed followed by two coats of finish paint._= $ 300.00 b. Not Included: This proposal does _not- include: c. WE PROPOSE to furnish material, equipment and labor in accor- dance with the above specifications for the sum of: $3,600 dollars NOTE: This proposal may be withdrawn if not accepted within 45 days from 2/23/2018 date Respectfully submitted by: AeU l!!a2l � i Company Representative approved and accepted (second owner- if any) date d. WE ACCEPT the prices, specifications, and terms as stated in this bid proposal are approved. We authorize you to draw up all neces- sary contract documents so work can begin. approved and accepted (owner or owner's authorized agent) date Form XBP -C Copyright 0 1996 -2016 ACT Contractors Forms (800) 820 -5656 www.calform.com Page ONE of Total Pages MEMORANDUM TO: Board of County Commissioners From: Assistant County Administrator Date: March 1, 2018 RE Change Orders Attached is a proposed Change Order #1 S.B. Painting & Grounds Maintenance Inc., Murray E. Nelson Government and Cultural Center Exterior Painting. The Contract Sum will be increased $3,600.00. The date of Substantial Completion as of the date of this Change Order March 23, 2018. According to Ordinance No. 004 -1999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners at least 24 hours prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. Signature � sistance County Administrator Kevin G. Wilson Print Name of