#3rd Change Order 03/02/2018Jacobs Key West International Airport 02/18 Monroe County Strengthen/Rehabilitate Commercial Apron Project No. GAKAP148 CHANGE ORDER PROJECT: CHANGE ORDER NO.: 3 Strengthen/Rehabilitate Commercial Apron INITIATED ON: February 14, 2018 CONTRACT: GAKAP148 TO (Contractor): ABC Construction, Inc. 7215 NW 7h Street Miami, Florida 33126 CONTRACT DATE: November 22, 2016 You are hereby authorized and directed to make the following change(s) in this Contract: Due to unforeseen conditions, the existing lime rock base material is not thick enough and therefore the specified compaction cannot be achieved. The existing material will be excavated and replaced with lime rock at the discretion of the OAR. A new unit price has been established for this additional work The unit price of lime rock is $111 64/CY which includes supplying, placing, and compacting the lime rock base material Excavation will be paid for under Item P-152-1. The original Contract Sum ............................... Net change by previously approved Change Orders......... The Contract Sum will be unchanged by this Change Order ...................... The new Contract Sum including this Change Order willbe ............................................... The Contract Time will be increased by ........................................ $ 9,250,000.00 $ 37,733.30 $ TBD $ 9,287,733.30 N/A Signature of the Contractor indicates agreement with the terms of this Change Order, including any adjustment in the Contract Sum and/or the Contract Time. Adjusted cost and time include all direct, indirect and impact costs and time for delays, disruption, inefficiency, acceleration and all other claims. RECOMMENDED: Jacobs Engineering 02-1 v 01 By date Key West International Airport 3491 South Roosevelt Blvd. Key West, FL 33040 .. . C�- / By Dke AGREED TO: ABC Construction, Inc. AUTHORIZED: Monroe County 1100 Simonton Street Key Wes 33040 31 By 11 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Due to unforeseen conditions, the existing lime rock base material is not thick enough and therefore the specified compaction cannot be achieved. The existing material will be excavated and replaced with lime rock at the discretion of the OAR. • Change Order was included in the original specifications. Yes ❑ No ❑ If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: ABC CONSTRUCTION, INC. PROPOSED CHANGE ORDER 7215 NW 7th Street Phone: 305-663-0322 No. 5 MIAMI, FL. 33126 Fax: 305-267-2403 TITLE: Crushed Limerock Base Material DATE: 02/14/2018 PROJECT: Keys Strengthen Rehabilitate Commercial Apron TO: Attn: Lasa (Adams) Ennis, P.E. Jacobs 200 West Forsyth Street Suite 1520 Jacksonville, Florida 32202 Phone:904.636.5432 Fax:561.799.6579 DESCRIPTION This CO is based on the proposal provided from Topino (Attached) Cost Break Down Topino Price $ 99.50/CY ABC O/P 10% Bond 2% JOB: GAKAP145 CONTRACT/PO: GAKAP145 SUBMITTED: COMPLETED: REQUIRED: ABC reserves its right to claim for addtional time and conpensation related to this change. Num Item Description Ref 1 Item No. Furnish and Install Crushed 34 Limerock Base material uaze: UZI I-f/LU 10 Qty Unit Unit Price Amount 0.000 Cu. Yd 111.64 0.00 Total: $0.00 By: Date: AgNME11111 qw E PRICE QUOTATION Attention: Jorge Gonzalez DATE 2/14/18 ABC Construction 7215 NW 7th Street Miami, FL 33126 KWIA Apron Project, Key West International Airport Crushed Limerock Base Material (as directed by EOR) ------ U-sm Descrpt,on Quanti Units Units Cost er Unit er Unit Line Item Cost Notes 1 Crushed Limerock Base Material (Furnish & Install) 1 0 cy 99 0 s 9950 S 9950 Subtotal s 9950 2 Performance/Payment Bonds ($20 00/Thousand) 1 0 LS S s - 3 Mobilization/Demobilization 1 0 LS $ $ 4 General Conditions (Permits..Management Pedestrian Saftey etc 1 C LS $ $ - Total: $ 99.50 Notes: Net 30 payment terms pMosal valid for 90 days Inclusions: scope as described above Exclusions: Bond;n2 sunvtUn engineering dewatenny restoration, etc Prepared by: Estimator Charley Toppino & Sons, Inc. Sheet I of I Date: 12114/18