Loading...
Task Order 04/20/2015TASK ORDER PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES BETWEEN MONROE COUNTY AND CURRIE SOWARDS AGUILA ARCHITECTS FOR PLANTATION KEY WWTP — ABANDONMENT PLAN In accordance with the Continuing Contract for Professional Architectural and Engineering Services, made and entered on the 21 day of January, 2015 between MONROE COUNTY, hereinafter referred to as the "County" and CURRIE SOWARDS AGUILA ARCHITECTS, hereinafter referred to as "Consultant" where professional services are allowed if construction costs do not exceed $2,000,000.00. All terms and conditions of the referenced Professional Architectural and Engineering Services Agreement apply to this Task Order, unless the Task Order modifies an Article of the Agreement of which will be specifically referenced in this Task Order and the modification shall be precisely described. These additions apply only to the project referenced in this Task Order. This Task Order is effective on the 20 of, April 2015. 1. In accordance to Article II SCOPE OF BASIC SERVICES on the Professional Architectural and Engineering Services Agreement dated January 21, 2015, the Consultant will provide design services as described below: Consultant shall provide the services of Kimley -Horn and Associates, Sub - Consultant, for the design and development of the documents necessary for the decommissioning and abandonment of the wastewater treatment facilities located at the P.K. Government Center and the Roth sub - station. Sub - Consultant is responsible for all terms and conditions of the Continuing Contract Agreement with Consultant dated January 21, 2015 unless otherwise stated in this Task Order. SCOPE OF WORK Preparation of design through construction documents including plans and specifications for bidding and permitting. Plans for both P.K. Government Center and the Roth building shall be in accordance with the Florida Department of Environmental Protection Agency, (FDEP), Rule 62- 620.610 (15). Sub - Consultant to submit plans and coordinate abandonment with the FDEP South District. Demolition plans and specifications shall include the removal of all equipment, structures, leveling the existing area, and abandoning the effluent wells. Plans and specifications for the provision of and installation of two new onsite grinder stations with associated forcemain piping (1 for each location) shall be to connect the grinder stations to the existing onsite sanitary sewer collection system and pump the current onsite wastewater flows with the new force main piping to the offsite and adjacent public sanitary sewer system for wastewater treatment. P.K. Government Center, Roth Bldg WWTP Decommissioning The scope of work does not include modifications to the existing onsite sanitary sewer collection system or emergency generator facilities with associated fuel systems for either site. Survey data will be provided by the County. TASK 1: P.K. Government Center — Abandonment Plan Sub - Consultant shall prepare a written plan for the abandonment of the wastewater facility at the PK Government Center. The plan will consist of Inventory of operating components to be removed. • General terms and actions to be taken by the owner and contractor to safe guard public health and safety such as de- chlorination, disinfection of facilities, removal of sludge, fluids, and settleables, and lime stabilization of tanks. • Disposal plan for materials and equipment. • Schedule for de- activation of facility and plan to address wastewater currently being treated. • Coordination with the FDEP Department of Underground Injection Control *UIC) to define permitting requirements for abandoning and plugging the two effluent wells per Rules, 62-528.625 and 62- 528.645, F.A.C. Sub - Consultant shall prepare drawings depicting a demolition plan and site leveling plan for bidding, decommissioning, equipment removal, leveling the site, and to obtain permitting through the FDEP UIC and County. Sub - Consultant shall submit the written plan and drawings to the FDEP at least 60 days prior to abandonment in accordance to FDEP Rule 62- 620.610 (15). Sub - Consultant shall respond to FDEP South District questions and comments to the plan and modify the plan accordingly. Sub - Consultant to attend one site visit during the project with FDEP South District representative to answer questions. TASK 2: P.K. Government Center — Onsite Wastewater Grinder Station Sub - Consultant shall review existing performance data for the onsite wastewater grinder station and assume new operating conditions with increased operating pressures associated with pumping wastewater offsite to a nearby sanitary sewer manhole. The intent is to propose a new duplex, submersible wastewater grinder station with 2" HDPE force main piping from the proposed grinder station to the existing offsite manhole. Sub - Consultant shall comply with all requirements of governmental authorities having jurisdiction over the project to include permit approvals of the new onsite grinder station. Sub - Consultant to prepare and submit permit application package. Sub - Consultant to provide all drawings and specifications necessary for the new grinder station to be incorporated in the drawings referenced for the decommissioning plan. Drawings to include Schematic design phase requirements through Construction documents phase requirements. P.K. Government Center, Roth Bldg WWTP Decommissioning Z Sub - Consultant to attend one meeting with the County's representative during the design process to review the grinder station project approach and associated drawings. Sub - Consultant to answer all Request for Information (RFI) questions from prospective bidders. ASSUMPTIONS: • An adjacent public sanitary sewer system is available nearby the site with adequate capacity to accept the new flows from the Plantation Key WWTP site. • The new onsite grinder station sizing will be similar to the existing station and that the existing electrical services is adequate for the new station. • No fencing and landscape features are required in association with the new grinder station. TASK 3: Roth Building — Abandonment Plan Sub - Consultant shall prepare a written plan for the abandonment of the current wastewater facility at the Roth Building site. The plan will consist of: • Inventory of operating components to be removed. • General terms and actions to be taken by the owner and contractor to safe guard public health and safety such as de- chlorination, disinfection of facilities, removal of sludge, fluids, and settleables, and lime stabilization of tanks. • Disposal plan for materials and equipment. • Schedule for de- activation of facility and plan to address wastewater currently being treated. • Coordination with the FDEP Department of Underground Injection Control *UIC) to define permitting requirements for abandoning and plugging the two effluent wells per Rules 62- 528.625 and 62- 528.645, F.A.C. Sub - Consultant shall prepare drawings depicting a demolition plan and site leveling plan for bidding, decommissioning, equipment removal, leveling the site, and to obtain permitting through the FDEP UIC and County. Sub - Consultant shall submit the written plan and drawings to the FDEP at least 60 days prior to abandonment in accordance to FDEP Rule 62- 620.610 (15). Sub - Consultant shall respond to FDEP South District questions and comments to the plan and modify the plan accordingly. Sub - Consultant to attend one site visit during the project with FDEP South District representative to answer questions. TASK 4: Roth Building — Onsite Wastewater Grinder Station Sub - Consultant shall review existing performance data for the onsite wastewater grinder station and assume new operating conditions with increased operating pressures associated with pumping wastewater offsite to a nearby sanitary sewer manhole. The intent is to propose a new duplex, submersible wastewater grinder station with 2" HDPE force main piping from the proposed grinder station to the existing offsite manhole. P.K. Government Center, Roth Bldg WWTP Decommissioning 3 Sub - Consultant shall comply with all requirements of governmental authorities having jurisdiction over the project to include permit approvals of the new onsite grinder station. Sub - Consultant to prepare and submit permit application package. Sub - Consultant to provide all drawings and specifications necessary for the new grinder station to be incorporated in the drawings referenced for the decommissioning plan. Drawings to include Schematic design phase requirements through Construction documents phase requirements. Sub - Consultant to attend one meeting with the County's representative during the design process to review the grinder station project approach and associated drawings. Sub - Consultant to answer all Request for Information (RFI) questions from prospective bidders. ASSUMPTIONS: • Details for the wastewater facility for the Roth Building are assumed to be similar to the P.K. Government Center facility. • An adjacent public sanitary sewer system is available nearby the site with adequate capacity to accept the new flows from the Plantation Key WWTP site. • The new onsite grinder station sizing will be similar to the existing station and that the existing electrical services is adequate for the new station. • No fencing and landscape features are required in association with the new grinder station. ADDITIONAL SERVICES: Any additional service deemed necessary during the project shall be billed at hourly rates described in Attachment A. COMPENSATION: In accordance to Article VII of the Continuing Contract dated January 21, 2015, the County shall pay the Consultant in current funds a lump sum fee of Sixty -Five Thousand Five Hundred Dollars and 00 /100 ($65,500.00) billed monthly on a percentage complete for the Tasks as described below: Task 1: P.K. Government Center WWTP Abandonment Plan Task 2: P.K. Government Center Grinder Station Task 3: Roth Building WWTP Abandonment Plan Task 4: Roth Building Grinder Station Total $19,000.00 $16,500.00 $15,000.00 $15 $65,500.00 P.K. Government Center, Roth Bldg WWTP Decommissioning 4 REIMBURSABLE EXPENSES: Permitting and application fees will be paid directly by the Sub - Consultant and shall be reimbursed by the County. All other terms and conditions of the Task Order shall be in accordance with the Architectural and Engineering Services Agreement dated January 21, 2015. IN WITNESS WHEREOF, each party caused Task Order to be executed by its duly authorized representative. CONSULTANT April 17, 2015 Currie Sowards Aguila Architects Date P.K. Government Center, Roth Bldg VtrWTP Decommissioning rJ ATTACHMENT A HOURLY RATES Plantation Key Government Center WWTP — Decommissioning Plan Roth WWTP — Decommissioning Plan Consulting Engineers Hourly Rate Schedule Category HourLy-Rate Principal $240.00 Project Manager $200.00 Senior Engineer $180.00 Engineer $140.00 Draftsman/CADD Operator $115.00 Construction Observation $105.00 Clerical/Administrative $85.00 P.K. Government Center, Roth Bldg WWTP Decommissioning