Loading...
Item C28BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: May 20, 2015 Division: public Worms/ingneerin Y Bulk Item: Yes __.X_ No Department: Project Management Staff Contact Person/Phone #: Kevin Wilson X8797 AGENDA ITEM WORDING: Receipt of monthly report on change orders reviewed by the County Administrator's Office. ITEM BACKGROUND: There was one change order considered and approved by the County Administrator and/or Deputy Administrator for the period beginning April 1, 2015 and ending April 30, 2015 for $42,400.43. There were no change orders denied by County staff. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 026-1998 was adopted in order to provide that the County Administrator may approve separate, non -cumulative change orders for construction projects and professional service contracts in amounts not to exceed $25,000.00 or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: N/A TOTAL COST: N/A Indirect Costs BUDGETED: Yes N/A No DIFFERENTIAL OF LOCAL PREFERENCE: N/A COST TO COUNTY: N/A SOURCE OF FUNDS: N/A_ REVENUE PRODUCING: Yes No X AMOUNT PER MONTH Year APPROVED BY: County Atty _ OMB/Purchasing Risk Management DOCUMENTATION: Included X Not Required DISPOSITION: AGENDA ITEM # PM L Revised 7/09 CHANGE ORDERS CONSIDERED BY THE COUNTY ADMINISTRATOR'S OFFICE FOR THE PERIOD 04/01/15 — 04/30/15 PROJECT CO# AMOUNT DESCRIPTION DATE CAUSE CONSIDERED . Marathon Airport Customs #3 Terminal $42,400.43 Furnish and install an electrical sub -panel and provide electrical power for certain equipment. 28 day extension to substantial completion. *04/07/15 Electrical hook up power was inadvertently omitted from the drawings for electrical provisions for the A/C equipment and hot water heater. The on -site panel does not provide enough space, and a sub -panel must be installed. S Total $42,400.43 * Approved W CONTRAcr CHANGE ORDER PROJECT TITLE: hr9waPirorrdr Ayod Cvv=Pc m F=�csi(ty CHANGE ORDER NO: 3 4P• I TION DATE: March 26, 2015 TO CONTRACT60 CONTRAC.T OATS, . uc y 16, 201 Paoa Falcon fftectricar C:onfrautuirs 39 16O Avonue Cq erg Phe Key, FL XW43 '_0 c o,k m t N Know as trJfltam (U aruntaed bla murI) P Ice BEN W3 30 Net € h ::rrae id'7 6a€s=v,r;u,,lad rl.�,rlsJSltierl Change 3 32f�; 5%L :ia the a. �rntmp ,.kuml . u r sr t� mi MaArmum Fr use+ p or Vn this C.;t ,7ge or of ,,aim �� 3 2 3 771 ,a r The Ia ,xrrtt. t r�itess} (Wama@rum Maximum Fir tvrr Adl b, xmPamgeW by his f t -sn<3.e Order' $ 12400,43 rme a a t zr s 4,s r_ 3,araMe d Maxmi,m Price; nah-ding Bhis Charge Order a $ t,166 t r 9 a3 Thrw ';,roitPnt 1`irt u a mB tar dt.C[;'=)3utit};rlt 5r .: rit LF 2k3 day-,; F he .I.gle a' ,`' "b amnal C ,a#'}i•rta:I4 o as {fit Me ime "-..ft Me . ;°t•➢i° e o4`tier �s Aigust 12 2C 1.3 Deka Ia a dumpnon of cnange order Ord jl.astitlmon 1.:'� �+` s dfr+` 1' � aY�' a3MpNY+� t es? tt'S,• rya! ,lr e'zf�ar•P<it:.#d ita^�"t7sW'a' Jt ,`3 rho-; � r4eA tA+? r r s`�€ a ' f� I =ae�ra,taaa�€�� ' nYde"!@ :r„ sty aarP , rJ, r t ha rtpf taaa- de ra g urrak .r" pa eerartcf7lrsrr: rr > _ a r �t ,v r ±g« Wir _ i"�}a$ i,°`7.8,ie # Jie taF ;, '� k;8"1ta 'i�at�� £3PJrt�ldia�� CQi"id JrJt ?7�P7G`z� r� + sak t 3fir, trztszr C �a�wtztia ssals 1 .,+rust t;c�tar.ss;s+r °a�tB� sarbtaP �i �a�aY .7� +rrr�kar-, WS ,�,rF+ NI ""fit".:,1""t,3 m r�l ara. r4 { te, ..CONTRACTOR W �'r••�Iv�t � 1 r' rls �.,trsr.-:� , sa�ix "a- �F`°:; �tra��= r a(`rz>aa€t7 �r,�tta WE 31 OR PUBU .7 a,./Or" Kk S EN, tQ.._c tv 6 APR 2015 . " M , t is a, f Data t C�C1�•,i�3_,"(�F�'r3z.,, ACIP.19:�'r.IST ¢r�,IO f ✓ �� r8 i f°mod.. Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Electrical hook up power was inadvertently omitted from the drawings for the electrical provisions for air conditioning equipment and hot water heater. The electrical panel on -site does not provide enough space for the addition of electrical provisions for the above equipment. A sub -panel must be installed. e Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: a Project architect approves the change order. Yes ® No ❑ If no, explanation of why: e Change Order is correcting an error or omission in design document. Yes ®No ❑ Should a claim under the applicable professional liability policy be made? Yes ❑ No ❑ Explain: To be determined. General & Electrical Contracting 31160,Avenue (-', Rig Pine hey, F/ J ?043-41416 (305) 872-2200 - Fax (305)S72 - 219 - JWcom,?0,'beUsmdth net CGC 1507617 ) ECIJ00,3410 Request for Change Order 26 March 2015 Project: %Lw£qhon \irptwt ustoins I nn'nal Change Order Request No: .1 IyLe Description: Mocfi'!J1cxmi.-, AddPower in Coottravi Syb:aynel 11'er-Revised [-.2� 1.2 & EJU) 1 200 Ani�['20, 21,08V 3PH 4v%,- 42 ('1-cuic I,Lriwl 1 200 ,",ryLp (--� E FH 2-`,6200W'11 I 31,1,25A)o 20 LI, 1 2-1 2L"A I 'S, -') 5,7 . 4 0 I I Al F 0 U D I i n ....... 349,50 (6' 2-1 -,-$46,20 (15)2-11`2 EVI Supponc-,�..... S41 25 (7(l L!.) ?--1 '21- S(,,,Ii 40 PVC Condui 12 31 19,8(-,; (10) '2- [ :2" Sch 40 1- 1 H, M 1,F) 15" CrRS I erm- 74, 3" G1,'-S, SLIPP011- ... $44 2Q (3 ) 1 21" x 12- -",: (,,' L)f' AIM-0011 BOX, 1 12 00 Ind"strial - Commercial ® Irrstitutional - Viffity ["'Stablished 1985 (920 t,,F)"'44/0 AWG 1'1-1VV-NNCU Wilre $3, 5 42, 0 0 FXCa.VafLe4-'0r-L- Drill EqUipment... L,andscape R,estoratitofil Subtotal Materials ..... ... VJ30,24 Sales Tax on Materials, ... $534.77 Total Materials ..... ......... ...... .$'7;665.01 l,abort 87,54 Mf IS / $-4830....... -$4,228.18 $1,606.71 'r.lixes"Insurarice, Eu- ....... Total L.abor., ........ -- ......... .......... ........ ... , - -.35,834.89 Electrical Supt. General Conditions .... ........ ............. ...... -- .......... . -3850.00 Project Coordination- 0 Hours (4;$ 100.00.. ........ --.— ........ — .... . —.381000.00 SUBTOTAL LABOR, COORDINATION NIA'rERIALS, DISPOSAL, & EQUIPMENT-- ........... ...... ...... -- ....... ....... -....$22,349.90 Overhead(&, 5% ...... ...................... _ ........ ...... .............................. 17.50 Subtotal ............. .... --323,467.40 Profit(4) 5Vgo.--- .... . .. - ...... ............................. .... $1,17137 TOTAL ALL OF THE ABOVE SECTION A: ......... $249640.77 afff=v ( 140 L ) 1/_" E MT C.rrrrumit............ ... .... .. ... $44,66 (30) fv" E MT Ccinnectoi's................ ...... 11 55 11) 11.)' F M T Supports t151 FM 1 "r U[)Icrrgs. ................ ..... $13,/ (5) 1— ENIT .....,, 222,00 F1�5)''x" F"IN T SUppoms................... ...... .. ..S 14,85 (9 f sVt` Elegy; C'ot necticyn,,.,,.,s................... ..,,.` 1 24.74 (600 C_F) ,010 AWC.i 1.HW ( 1 Wire Sr<:trrcteF_l, .... $122,03 (4) IT) 41 1 H WN 4_ P, I Wire , ............ (80 LF) 06 1H%VN,, t_E� Wire., . ....... ,S 9 t t?} _10 Arrip 3R Disconnects CU's..,,,....... t Labor, 1 1 1.�u� 9 �r���flrr�trrrrrr.>��. E1C» �' � r�,.....,,,. ..... .... ........ ...,- Total..,*.u.r..h.......,..a.>.............. ...-35,3 , Electrical Supt. General Conditions ..................................................... $350.00 Multiple Electrical PM Site Investigations ....... ........ — ........ $1,018.00 Project Coordination: 80 Hours Cd,' $100.00 .... ....... ............. _ ............... ................ — ....... $8,000.00 SUBTOTAL LABOR, COORDINATION'MATERIALS, DISPOSAL & EQUIPMENT— .................. ................... ........ $16,108.53 OverheadA. 5% ................ ...... ................. ....... .......... ........................ $805.43 Subtotal...... ...... ....................... ..... ......... .......... $16,913.96 Profit(0), 5%...— ............... .................. --- ............................................. .......... ... $845.70 TOTAL ALL OF THE ABOVE SECTION B: ......... $ t 7,759.66 Permit Fees and Design Drawings are Not Included in this proposal. If additional permit fees are required the Owner is to reimburse all permit fees. Net Amount of Request for Change ........ --.,-,-...—..342,400.43 Additional Time Requested for Change- j) �J ZA11-jr-1 J1 . .... — - LR°— ------ - a-- , Respectfully Submitted,