Loading...
03rd Change Order 02/02/2017MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: The Redevelopment of Bernstein Park TO CONTRACTOR: Burke Construction Group, Inc. 10145 NW le St Doral FL 33172 CHANGE ORDER NO: 3 INITIATION DATE: January 18, 2017 CONTRACT DATE: April 20, 2016 The Contract is changed as follows: The original (Contract Sum ) (Guaranteed Maximum Price) ..... ............................$7, 921,975.00 Net change by previously authorized Change Orders ....................... ..................$(202,321.13) The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was... $7,719,653.87 The (Contract Sum ) (Guaranteed Maximum Price) will be (increased (decreased) (unchanged) by this Change Order ......... $1,064.30 The new (Contract Sum ) (Guaranteed Maximum Price) including this Change Order is .................................. I ............................................................................ $7,720,718.17 The Contract Time will be (increased) (decreased) (unchanged by ..............................0 Days The date of Substantial Completion as of the date of this Change Order is... Friday, July 14, 2017 Detailed description of change order and justification: -11 a I - . T-r-orermIn FrOTO ARCHITECT: VVIIIi 411 - 2 11 MMA CONTRACTOR /7 David h DIRECTOR PROJECT MANAGEMENT: Doug S COUNTY/ASSISTANT ADMINISTRATOR: Roman J to Kevin ftilson, Christine Hurley Date Change Order Attachment per Ordinance No. 004 -1999 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Designer provided revision to meet AIWA Code that will require a new flood panel to accommodate the counter of the concession stand being lower then the flood !elevation • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater).Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: + Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ®No ❑ Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Error was caught prior to the construction of the counter therefore contract price only increases by the amount of the additional Flood panel. Prime Contract Change Order #005: Flood Panel Add TO: Monroe County Engineering FROM: Burke Construction Group, Inc. 1100 Simonton Street Panel Add 10145 NW 19th Street Key West, Florida 33040 TOTAL: Miami Florida 33172 DATE CREATED: 1/17/2017 CREATED BY Silveira (Burke Construction Group, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: Armando Silveira (Burke Construction REVIEWED BY. Group, Inc.) DUE DATE: REVIEW DATE:. INVOICED DATE: 'PAID DATE: SCHEDULE IMPACT. 0 days EXECUTED: No CONTRACT FOR: 1:Redevelopmenl of Bernstein Park TOTAL AMOUNT: $ 1,064.30 DESCRIPTION: Cost to add (1 ea) flood panel to concession stand per owners request. ATTACHMENTS: A - "1, Gf�CIIJNi? P L,G.SCIii V "'Lf�P�,Eat1P hdtilato St�ie.Y}tI9 c�trlCZ�srpn �3lt:�gi[¢I 4�t -1 r aj$91i` 4,:kt3 r < >:sat��r:/8S'+�t�:9`�.{1 id+�re(;,S+:rrt I':srk) c:¢4l IUTIw1 !`L wNCG fyOIIGOC rnr TSSK /'HAN!]R ryRTIFD• ­ PC # Title Schedule Impact Amount 005 'Flood Panel Add 1,064.30 TOTAL: $1,064.30' CHANGE ORDER LINE ITEMS: PCO 8 005: Flood Panel Add M I Chet Code Description Type Amount 1 08316 -FLOOD PANELS Provide end Install (1 ea) flood panel b wncoulon eland. Labor S967.54 Subtold 5967.54 Gvo nde4d: &0% on on ling it 4rn tw — 46.38 Pruflt: 6.00% on all line Item types: 46.35 Grand Total: 51,066.50 Burke Construction Group, Inc, page 1 of 2 Printed On: 1/17/ 2017 02:33 PM �ti a A/A Document G710 OWNER ARCHITECT CONTRACTOR FIELD SUBCONTRACTOR The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Orderwas The contract sum would be changed by this Change Order In the amount of The new contract sum including this Change Order will be The Contract Time will be (increased) (decreased) (unchanged) by The date of Substablial Completion as of the date of this Change Order therefore is Master Permit Issue Date: _ _ Contract Base Days: j,j Construction Group Inc. $ 7,921,975.00 ($202,321.13) $ 7,719,653.87 $ 1,064.30 $ 7,720,718.17 0 days Adtled fimeAbovee: Reservations: This proposal is based solely on the usual cost elements such as labor material and normal markups, and does not Include any amount for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, acceleration and or impact costs, unless speciffically staled. The right is expressly reseved to amend and make claim for any and all of these related items prior to final settlement of this contract. Bill Horn (Architect) Florida SIGNATURE Burke Construction Group, Inc. Monroe County Engineering Burke Construction Group, Inc. 1100 Simonton Street 10145 NW 191h Street Key West Florida 33040 Miami Florida 33172 DATE SIGNATURE DATE SIGNATURE DATE page 2 of 2 Printed On: 1/17/ 2017 02:33 PM Armando Silveira From: Kristen Argalas < kristenwphorn@aol.com > Sent: Thursday, December 22, 201611:04 AM To: Armando Silveira Cc: yongue johnnie @monroecounty - fl.gov; sanders - ray @monroecounty - fl.gov; wphorn @aol.com; frankwphorn @aol.com; Darren Whiteside Subject: Bernstein Park Concession Counter Attachments: A -2 GROUND FLOOR PLAN.pdf; concession elev.pdf Armando, As discussed last week, we will need to drop the counter at the 6' -0" wide opening in the concession area. Currently the coiling shutter at the concession runs on the interior of the wall. The 6' -0" opening as defined in the attached will need to have its associated counter lowered to the elevation of 36" AFF (we do not need to do the typ. 34" because this is a service counter not a dining counter) as measured height from the exterior of the concession area. We are proposing that a flood panel to be 6 "h x 7' -0 "w at a minimum. A min and max dimension is called out so we can get more standard sizes in order to reduce any costs. The flood panel will be attached to the surface of the building, above the counter top so we do not have to have panel run on the outside of the projecting counter top. Secure to the building per manuf, specifications. The panel type is to be similar in style to the other flood panels in this project. We believe this will be the most efficient way to approach this counter with out much change to the scope. As this work has not been done, the only added cost we can think of is the additional flood panel. Were you ever able to get in touch with the fabricator of the coiling shutter to see if there will be any extra slck in the shutter to accommodate an additional 6 "? Please let us know if there are other cost items that were not considered. Thank you, Kristen Argalas, LEED AP BD +C R A 1A Aff r 5 I f r a ;� � sW I 7� W� l m a t ® Jim ® a 4 d 0 o w ° wa N N 3 V a J M I W =)8 U iO l�d��Q�2 CHANGE ORDER # SAKQ4747 SHIP TO: Bernstein Park Strack Island, FL 33157 BAK Representative: Chan Therese ge Order Date: 01117/2017 Ptoduct Specahst Expiration Date: 02/1612017 941-981-3669ex1.203 theresa@sakenWpdse corn P — PRO "jECT' AME PROPOSAL # N K04674-03 Bernstein Park ply Unh Price Ext. Fries - Ad itional Opening as per Customers Request 72" w x 6" h 1 $90424 $90424 STE-1W Stuckable Aluminum Flood Barrier System INCLUDED: All aluminum jambs, sealants, and hardware neCaSS2TY for install.60fl Poslive Pressure Seating - face Mount Jambs SubTotal $90424 Saks TM $6330 Shipping $000 Total $967.64 Prepared by: r-, Page Proposal No.: E, Change Ord& No.: This Change Older is In va,#unction with the Proposal Number referenced above. SAK E"WPHMS is not ""Wnsible for the wrong dimension sires at if the quoted quantities an this Change Order are inwrrft-L If YOU find that we have quoted an extra opening, mined an opening or we have an opening size wrong, please let Us imm Immediately. Payment Terms are as per the Proposal Numbermferenced above. Lead Times areas per proposal Number referenced on this Change Order. To accept this Change Order sign here and return Immediately: Signed: Date: Print Name: I dim Change Ov&-r wdl ue W11WOMIJ acwpn2tj V4ilyw[wlj 11, Sig,cu 4O hZ% biiOn AM A"AMWWOM W Stec FnIM"Mm ln �+7 $JPMYg I hu Ulgng. Ond.,, Me Wy k N Inm Eledfit3ry 114% noft'l x1100. "",' 1 �d Illib—I OV- - -TO" P1.1 tho vmuenye ostler will "Mowit 91'w WWMAA Av,.V w W- tN yW ­0 W50. in W,. Pf-F-OA NUMW IMM on M Chmo ---------- - - - by Page Pmws'd N", Change Order No: a 0 � ~ d w D ► W - wa v Noce ¢�-� 3 ir i. M w -� � W =)O BAK Representative; Therese Gharige Order Date. 01/17/2017 Produd Speciaiist Expiration Dav, 0 211 612 01 7 941-981-3669exr203 PROPOSAL9 PROJECT NAME: SAK04574-03 I Bernstein Park Uml P,x, Additional Opening as per Customers Request $904.24 MA 24 51F - 100 Sturkablp Auunmwu, r iorsd fiararaer Syslarn NCI-Uf)�D Al D;Um�"W,swbr, 84ialaflfti, arid hard —re ne—saryfor n5ralliml 11 i3OMOM preirsbut seating - troe Mown jrrmot SubTotal MA 24 Saks Tax $63 30 Shipping $000 Total $967.54 Prep.ed by: Page Proposal No.: Ch Ordw No: 0 This Change Order is in conjunction with the Proposal Number PeNvencud above, SAK Welpfiges is not responsibl f th wrong dimension sizes or if the quoted quantlHas on this Change Order are Incurred. If VOufi4 that Wah4VU quoted an e.Wm opening, missed on openingor we have an opening W&WAM9, please let us knew Payment Terms are as per the Proposal Number re a lea 7 7ma$ are as Per Proposal Number referenced an this Change Order. To accept this Change Order sign here and return Immediately: Signed,,__ Date: PriniNaine: Ps' 4'j ['r' " [ M C WJ . QPW WOV -hyli 011 V. )ft e e,.pl hay a t-0 Hwy gin ! Intl Ch wg 0,u", `, fA,y t .......0 dgE s jldt WjW t", ,,$ j, te -', v'I'Mu'a, t,uVo, ­d m cI v. -1h U, fiw on Ine crl�n "I"N" ktow, ed by Page r1rWSW Na,. Charge OF& Nv MEMORANDUM TO: Board of County Commissioners From: Kevin Wilson Assistant County Administrator Date: February 1, 2017 RE: Change Orders Attached is a proposed Change Order #3 Burke Construction Group, Inc., The Redevelopment of Bernstein Park. The Contract Sum has increased by $1,064.30. The date of Substantial Completion remains unchanged. According to Ordinance No. 004 -1999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Assistant County Administrator intends to approve this change order on Thursday, February 2, 2017. Kevin Wilson Assistant County Administrator KW /ef