County Commission Meeting
April 19, 2018
Agenda Item Number: C.11
Agenda Item Summary #4049
BULK ITEM: Yes DEPARTMENT: Project Management / Facilities
TIME APPROXIMATE: STAFF CONTACT: Raymond Sanders (305) 295 -4338
N/A
AGENDA ITEM WORDING: Approval to utilize and implement the Guaranteed Maximum Price
(GMP) from the Biltmore Construction Co. Inc, Construction Manager at Risk (CMAR) proposal for
the construction of the Plantation Key Government Center and Roth Building Wastewater Treatment
Plant Replacement and Abandonment project. This project is funded by infrastructure sales surtax in
the amount of $783,765.00.
ITEM BACKGROUND: The existing wastewater treatment facilities serving the Plantation Key
Courthouse Campus and Plantation Key Roth Building must be decommissioned and connected to
the Islamorada central sewer system. On April 20, 2015, the County and Currie, Sowards, Aguila
Architects (CSA) executed a task order for engineering and design plans to design and develop the
documents necessary for the decommissioning and abandonment of the wastewater treatment
facilities located at the P.K. Government Center and the Roth sub - station. The County's CMAR
(Biltmore Construction) has provided the attached GMP for this phase of the project. In addition to
the requirement to connect to the sewer system this work is designed to accommodate the proposed
new Plantation Key Courthouse and Detention facility.
PREVIOUS RELEVANT BOCC ACTION: 1/21/15 - BOCC approved a continuing contract with
CSA. 12/13/17 - BOCC approved a contract with Biltmore Construction Company for CMAR
services for the P. K. Government Center.
CONTRACT /AGREEMENT CHANGES:
Guaranteed Maximum Price on Biltmore's CMAR Contract
STAFF RECOMMENDATION: Approval as outlined above.
DOCUMENTATION:
2018.03.16 - PK -Roth Wastewater Replacement and Abandonment GMP
FINANCIAL IMPACT:
Effective Date: April 19, 2018
Expiration Date:
Total Dollar Value of Contract: $783,765.00
Total Cost to County: $783,765.00
Current Year Portion: $783,765.00
Budgeted: Yes
Source of Funds: 304 23000 PE1301 and PE1401
CPI: N/A
Indirect Costs: $0
Estimated Ongoing Costs Not Included in above dollar amounts: $0
Revenue Producing: No
Grant: No
County Match: $0
Insurance Required: Yes
Additional Details:
If yes, amount:
Yes
04/19/18 304 -23000 - PHYSICAL ENVIRONMENT $738,765.00
PE1301 may need PE1401
REVIEWED BY:
Ann Mytnik
Completed
04/02/2018 7:02 AM
Cary Knight
Completed
04/03/2018 1:35 PM
Kevin Wilson
Completed
04/03/2018 2:07 PM
Chris Ambrosio
Completed
04/03/2018 2:39 PM
Budget and Finance
Completed
04/03/2018 3:14 PM
Maria Slavik
Completed
04/03/2018 3:18 PM
Kathy Peters
Completed
04/03/2018 4:43 PM
Board of County Commissioners
Pending
04/19/2018 9:00 AM
1 1,
BILTMORE
C CONSTRUCTION CO., INC. Plantation Key Government Center
TABLE OF CONTENTS
❖ Article 1— Guaranteed Maximum Price (GMP) Proposal
Project Summary
Exhibit A- Enumeration of Contract Documents
Exhibit B - Allowance Items
Exhibit C - Assumptions and Clarifications
Exhibit D - Construction Schedule
Page 1
11 ' V
� JI(
.......... w...'
BILLTMORE
S T R U C T I O N CO., INC. Plantation Key Government Center
ARTICLE 1 - Guaranteed Maximum Price (GMP) Proposal
Biltmore Construction Co., Inc. proposes to complete the work, as described herein, for the Guaranteed
Maximum Price of: SEVEN HUNDRED EIGHTY - THRE E THOUSAND SEVEN HU SIXTY -FIVE
DOLLARS ( 786 j§g
This Price is for the performance of the Work as described herein and in accordance with the Contract
Documents.
By acceptance of the GMP and issuance of a Purchase Order and /or Notice to Proceed, Monroe County
hereby incorporates the GMP into the Agreement between Owner and Construction Manager.
Page 2
7 .. 1
b3r� l_��ls
I CONSTRUCTION CO., INC..
Plantation Key Government Center
& Roth Building
WWTP Replacement & Abandonment
Plantation Key Judicial Center and Detention Facility
Guaranteed Maximum Price (GMP) Proposal 991 -001
PROJECT SUMMARY
The Project includes the demolition and removal of the existing wastewater treatment plant for the
Plantation Key Judicial Center and Detention Facility including all electrical service to the plant. In its
place a new lift station will be installed for the Plantation Key Judicial Center and Detention prior to the
removal of the existing treatment plant.
The second part of the work included in this GMP is the demolition and removal of the existing
wastewater treatment plant that services the Plantation Key Judicial Roth Building including all electrical
service to the plant. In its place a new lift station will be installed for the Plantation Key Roth Building
prior to the removal of the existing treatment plant.
�= t
p � 7
Page 3
EXHIBIT A — Enumeration of Contract Documents
Contract Documents include: the Drawings, Specifications, Addenda (Construction Documents), the
Agreement, General Conditions, Supplementary Conditions as expressly noted herein, and this Exhibit A,
as well as the Guaranteed Maximum Price (GMP) Proposal in its entirety. This GMP Proposal is expressly
recognized as a Contract Document inasmuch as it forms the basis upon which the Guaranteed
Maximum Price is based. As such, in the event there is any disagreement, conflict, or ambiguity between
the GMP Proposal and any other Contract Document, the GMP Proposal shall govern.
The Owner's issuance of any Notice to Proceed, Purchase Order, or any other written directive or
instructions to proceed with the Work, after this signed GMP Proposal has been delivered by Biltmore to
the Owner, shall constitute an express acceptance of the foregoing Enumeration of Contract Documents
and the enforceability thereof.
See Attached Exhibit "A" Enumeration of Doc
Page 4
��� ,
• • 3 •
•
Biltmore Construction Co., Inc.
Date: 3/7/20
1 -0991 PK Courthouse WWTP
Number
Title
Date Rev.
Received Date Status
Comments
Civil
GCC -00
Cover Sheet
1/10/2018
N/A
Kimley Horn
GCC -01
Abandonment Site Plan
1/10/2018
N/A
Kimley Horn
GCC -02
Abandonment Site Plan
1/10/2018
N/A
Kimley Horn
GCC -03
Site Photos 2
1/10/2018
N/A
Kimley Horn
GCC -04
Site Photos 2
1/10/2018
N/A
Kimley Horn
GCC -05
Original Construction Plan Sheets
1/10/2018
N/A
Kimley Horn
GCC -06
Original Construction Plan Sheets
1/10/2019
N/A
Kimley Horn
GCC -07
Original Construction Plan Sheets
1/10/2018
N/A
Kimley Horn
GCC -08
Original Construction Plan Sheets
1/10/2018
N/A
Kimley Horn
GCC -09
Utility Site Plan
1/10/2018
N/A
Kimley Horn
GCC -10
Pump Station Site Plan
1/10/2018
N/A
Kimley Horn
GCC -11
Sewer Details
1/10/2018
N/A
Kimley Horn
GCC -12
Pump Station Details & Notes
1/10/2018
N/A
Kimley Horn
RBC -00
Cover Sheet
1/10/2018
N/A
Kimley Horn
RBC -01
Abandonment Site Plan
1/10/2018
N/A
Kimley Horn
RBC -02
Abandonment Site Photos 1
1/10/2018
N/A
Kimley Horn
RBC -03
Abandonment Site Photos 2
1/10/2018
N/A
Kimley Horn
RBC -04
Abandonment Site Photos 3
1/10/2018
N/A
Kimley Horn
RBC -05
Pump Station Site Plan
1/10/2018
N/A
Kimley Horn
RBC -06
Sewer Details
1/10/2018
N/A
Kimley Horn
RBC -07
Pump Station Details and Notes
1/10/2018
N/A
Kimley Horn
Electrical
GCE -0.1
Electrical Notes, Symbols, Luminaire
1/10/2018
N/A
Kimley Horn
List
GCE -1.1
Electrical Plan
1/10/2018
N/A
Kimley Horn
GCE -2.1
Pump Station Details
1/10/2018
N/A
Kimley Horn
GCE -2.2
Control Panel Details
1/10/2018
N/A
Kimley Horn
GCE -3.1
Electrical Details
1/10/2018
N/A
Kimley Horn
RBE -0.1
Electrical Notes, Symbols, Luminaire
1/10/2018
N/A
Kimley Horn
List
RBE -1.1
Electrical Plan
1/10/2018
N/A
Kimley Horn
RBE -2.1
Pump Station Details
1/10/2018
N/A
Kimley Horn
RBE -2.2
Control Panel and Electrical Details
1/10/2018
N/A
Kimley Horn
E iltrrrt re s�
str ction Co Inc f Original Doc t nnen
t,
CONSTRUCTION C BIELTMO R -
NC
i 3t �Ij
Plantation Key Government Center
& Roth Building
WWTP Replacement & Abandonment
Plantation Key Judicial Center and Detention Facility
Guaranteed Maximum Price (GMP) Proposal 991 -001
EXHIBIT B — Allowance Items
The Allowances noted below represent reasonably anticipated values included in this GMP Proposal to
cover the cost of certain items absent or not specified in sufficient detail in the Construction Documents
as listed in the ENUMERATION OF CONTRACT DOCUMENTS Section of this GMP Proposal or for which
uncertainty remains. The amount of the Allowance stipulated herein is inclusive of all labor, materials,
equipment taxes, delivery, insurances, bond and fees necessary to perform the anticipated work, unless
otherwise noted.
Allowances for work as represented in this GMP Proposal govern over the actual items contained in the
Contract Documents. Variations between the Allowance values and the actual cost of these prescribed
items may be reflected in add or deduct Change Order(s) to this GMP Proposal.
The ASSUMPTIONS AND CLARIFICATIONS section of this GMP Proposal may provide a more detailed
description of these Allowances.
DESCRIPTION OF ALLOWANCES FOR JUDICIAL BUILDING AND ALLOWANCE
DETE CENTER W ASTE WATER TREATMEN PLANT AMOUNT
�.... m __mm I _ ._......._... - -- --
General Works Allowance $2,500.00
Permit Allowance 1 $1,000.00
Builders Risk Insurance Allowance $ 3,866.00
Page 5
r
�� ss
( t :`CON BIELTM OR E
STRUCTION CO., INC.
Plantation Key Government Center
& Roth Building
WWTP Replacement & Abandonment
Plantation Key Judicial Center and Detention Facility
Guaranteed Maximum Price (GMP) Proposal 991 -001
EXHIBIT C — Assumptions and Clarifications
The Contract Documents are amended by Biltmore Construction Co., Inc. as follows:
1. The following are not included in the GMP Proposal:
A. Survey of Asbestos Containing Material or any other hazardous or unsuitable material,
unless specifically noted as an item included in the Scope of Work.
B. Impact Fees /Inspection Fees.
C. Performance Specifications.
2. Warranties and Guarantees:
A. Biltmore Construction Co., Inc. Warranties and Guarantees
Biltmore Construction Co., Inc. warrants to the Owner that the materials and workmanship
furnished under this Contract will be of good quality and new unless otherwise required or
permitted by the Construction /Contract Documents, that the Work will be free from defects not
inherent in the quality required or permitted, and that the Work will conform with the
requirements of the Construction /Contract Documents. Work not conforming to these
requirements may be considered defective. Biltmore Construction Co., Inc.'s warranty excludes
remedy for damage or defect caused by insufficient maintenance, improper operation, or
normal wear and tear under normal usage. The term and duration of this express warranty is
one (1) year from the Date of Substantial Completion. The provisions herein shall not prevent
the Owner from proceeding directly against the manufacturer and /or installer for such longer
period of time as allowed by State Statute.
B. Installer /Subcontractor Warranties and Guarantees
The Subcontractor shall warrant to the Owner and to Biltmore Construction Co., Inc. that all
workmanship and materials are free from defects in installation. The express
warranty /guarantee shall be consistent with the durations stipulated in the
Construction /Contract Documents. The period customarily being one 1 year from the Date of
Substantial Completion established in the Construction /Contract Documents.
Page 6
t �
',;-I f�
4 {
Notwithstanding anything to the contrary, neither Biltmore Construction Co., Inc., nor its Surety,
nor the Subcontractor shall have any joint /several liability relating to, nor shall they be obligated
to underwrite, or in any way become guarantor(s) of any manufacturer's warranty /guaranty or
product to the Owner. The Owner shall be provided with the "standard" manufacturer's
warranty, and it shall satisfy the requirements under the Construction /Contract Documents
relating thereto.
C. Manufacturer's Express Warranties/ Guarantees
Biltmore Construction Co., Inc. shall collect and transmit to the Owner any and all standard
manufacturer's warranties and standard manufacturer's guarantees specified in the
Construction /Contract Documents. The obligation and liability of Biltmore Construction Co., Inc.
and /or its Surety is limited to the collection and proper transmittal of these warranties and
guarantees to the Owner.
D. Extended Warranties
a.
This proposal is qualified to include only those extended warranties available as standard from
CL
LD
the manufacturers. The Contractor, installers, and applicators will not provide extended
warranties or guarantees.
3. Special conditions relating to Owner purchased / Contractor installed items and associated tax
exemptions:
Notwithstanding any provision to the contrary, should the Owner elect to purchase items
directly and avoid any sales taxes or other taxes, the Owner will defend, indemnify, and hold
harmless Biltmore Construction Co., Inc. absolutely from and against any claim, audit,
investigation, cost, or assertion of any kind made by, or on behalf of, the Florida Department of
_
Revenue or other such agency that may arise during and / or subsequent to the completion of
CL
the project. Under no circumstances shall Biltmore Construction Co., Inc. or its subcontractors
be liable for the sales taxes associated with the Owner purchased items.
4. Builder's Risk Insurance:
Biltmore Construction shall purchase and maintain, until the date of Substantial Completion of this
project, a standard Special Form (all "Risks of Physical Loss ") Completed Value Builder's Risk insurai
policy in the amount of the initial contract sum (GMP), including any subsequent modifications the!,
insuring the interests of the Owner, Biltmore Construction Co., Inc., and Subcontractors in the Wor
'
under this contract. A separate flood policy will be included as part of this insurance.
Go
T 11
CD
eD
Page 7
_
€ p
t} S
All premiums and deductible costs related to this property insurance shall be seen as cost of the we
and paid by the Owner.
A. The following items are the responsibility of the Owner and are not included in this GMP:
Property insurance premiums and /or deductible costs.
1. Property insurance coverage on existing buildings and /or contents.
2. Property insurance coverage on the Work under this Contract after the date of Substan
Completion.
Basis of this GMP Proposal relative to 100% Permitted Drawing Document Review Comments and
other potential design change' subsequent to the submittal of this proposal:
This proposal is provided based on the 100% Permitted documents. If the Scope of Work
changes or permit review requires additional changes to the work the GMP Proposal and its
associated costs are subject to change.
6. Time and Price - Impacted Materials & Equipment (Escalation /Availability of Materials):
As of the date of this Contract Agreement and /or during the performance of the Work, certain
markets providing materials and equipment necessary to complete the Project may experience
significant industry -wide fluctuation in cost, delivery, and availability. As a result, should there
be any fluctuations that materially affect the cost, delivery, and /or availability of such items,
regardless if same should occur before the acceptance of the GMP Proposal, or subsequent to
the acceptance, the Owner agrees to make an equitable adjustment in the Contract Time and /or
Guaranteed Maximum Price as applicable. Notwithstanding any other provision to the contrary,
the Contractor shall not be liable to the Owner for any expenses, losses or damages arising from
a delay in delivery of a potentially time and price impacted material /equipment item not the
fault of the Contractor.
7. Subcontractor Payments:
Notwithstanding anything to the contrary, the Owner specifically acknowledges and agrees that the
Construction Manager (Contractor) operates on a pay - when -paid basis with its subcontractors, and
nothing contained herein or elsewhere shall be interpreted to require the Construction Manager
and /or its Surety to remit any payment (including final payment) to subcontractors prior to the receipt
of payment (including final) from the Owner.
8. No cost is included for any Florida Keys Electric Co -Op work related to primary power.
9. This GMP is not a line item GMP and the costs should not be considered as such.
Page 8
'a ;
11, rvm..a....
CONSTRUCTION CO.. INC. Plnntntinn Kev Government Center
10. This GMP Proposal is based on both waste water plants being decommissioned at the same time
11. GMP Proposal includes rerouting of the 6" sewer line to avoid interference with the existing electrical
services for the existing Judicial Center and Detention Facility WWTP.
12. All work is to be done during normal work hours. No overnight work is included in this GMP
13. All finishes are included as specified on the drawings and specifications. All colors are to be selected
from normal range of colors unless specified.
14. Utility consumption costs, other than temporary utilities for construction, are excluded.
15. Any unused allowances, general works cost, phase fee, contingency and general conditions will
revert to the Owner at the completion of the project.
16. This GMP does not included any cost for testing or removal /replacement of any contaminated or
unsuitable soil.
17. This GMP does not include any costs for testing of the existing piping, structures or sanitary system
18. The Construction Manager (CM) Contingency is to be used by the CM for work included in the
original contract.
19. The billable rates for the CM personnel listed in the General Requirements are based on the rates
listed on Page 12 of this GMP Proposal.
20. The sod included in this proposal is Bahia.
21. No retainage will be held on Bonds and Insurances.
22. Costs are included for materials testing to include soil densities.
23. The issuance of Performance and Payment Bonds will be provided after the approval of the GMP
and issuance of the Notice to Proceed by the Owner.
24. In the case where a vendor requires advance payment for materials, Monroe County Government
will allow the CM to bill in advance and make advance payment to the CM for those materials. This
provision would typically apply to items usually purchased directly by the Owner.
Page 9
t
.. ��
25. Costs for a jobsite office trailer are not included.
26. Temporary electrical, water and sewer utility consumption costs are not included. All utility
consumption cost will be paid directly by the Owner.
27. An Allowance of $1,000.00 is included for each project for the permit /administration cost for the
Villages permitting authority.
28. No cost is included for the Department of Environmental Protection permits as those have already
been paid for and received by Monroe County Government.
Please see the "Guaranteed Maximum Price Breakdown" which follows.
Page 10
l
- 6 - 6 — N S T R U C T I O N C O.. INC. Plnntntinn Kev Gnvernment Center
WWTP
Page 11
# M
Base GMP
Bid/Trade
Itemized llescrilttitlji of the Work
Amount
IA
I General Works Allowance
$2,500.00
22A
WWTP Demo/New Utility Work
$147,344.00
26A
Electrical
$26,180,00
32B
Fencing
$2,950.00
Subcontractor
Direct Cost SDCj
$178,974.00
Liability ility Insurance
$3,866 00
Performanc and R, ment Bond
�y _.a. - .__..
$3,866.00
..........
Permit Allowance
$1,000.00
Builders Ris Insu rance In c Li di npk Deductible l xp�n Allowance
$3,866.00
-
(`on�I�t�nn 11 c ���� cn � ��� _ .nv. -,
General rt
$13,575.00
3 ,
Construction Phase Fee
$120,999.00
ll�
Cons truction Cost ud et CCB
�m,.. Y.a�__.
$326,146.00
u.M ..�...
Overhead and Profit 10% of (GMP) ...........
$38,656.00
Preconstruction Fee 1% of (GMP)
$3,866.00
Total Con struction Budget (TCB)
$368,668.00
Construction Manmler Contingency ( 10
$17,897.00
Total Guaranteed Maximum Price (GMP)
$386,565.00
Page 11
# M
IA Gener Works A llowance $2,500.00
.....
22A WWTP D emo/New Utility Wo $139, 554.00
26A Elec trical $38,18
--
32A Lands -- _ _
32B Fencing $2,950.00
Liability In suranc e $3,972.00
..... "I ..�..... _....... _.... ..._.... - ....._
Performanc and Paynie it. Bo nd $3,972.00
_. _... _.. - - - - --
Permit Allowance $1,000.00
Bu ilder s Risk Ins urance lncltiding. Deductib l x en ses Allowance $3,972.00
_._....__ M.. ...
General Coai clitiotas /f��.csuir $13,575.00
Construction Phase Fee $120,999.00
Overhead and Profit 10 /0 of (GMP) $39,720.00
Preconstruction Fee 1% of ( GMP) —
$3,972.00
Construction Mean ap-cr Contitwencv H 0 %) € $18,729.00
Total GMP Judicial Center and Detention Facilit:v WWTP
Total GMP Roth Building WWTP
$386,565.00
$397,200.00
Page 12
� m_ r_
CONSTRUCTION CO., INC. Plantation Key Government Center
GENERAL REQUIREMENTS BREAKDOWN:
DES CRIPTIO N U
UNIT COST PE MONTH T
TOTAL
Cell Phone 5
5 months x $90 ..........
$4,50 0.00
IT Costs 1
1 Lump Sum $
$500.00
Office Supplie 5
5 m onths x $100. $
$500.00
Postage & Delivery 5
5 mon x $120.00 per month $
$600.00
Tem porary Labor 1
108 Ma Hours x $43.00 pe hour $
$4,6
_. _.. _
_.. �.. w �
$1,4
_._ .
.... m --- .
$300.00
Fire Extingui 1
-- .......... . .
$2 00.00
m. -
- -..... n ..
Total I $27,1
Page 13
r �
J
n M
CONSTRUCT ION C O., I N C. Plantation Key Government Center
& Roth Building
WWTP Replacement & Abandonment
Plantation Key Judicial Center and Detention Facility
Guaranteed Maximum Price (GMP) Proposal 991 -001
DE SCRIPTIO N
( UNIT COST PER M ONTH
TOTAL
Project Coordinator
Sr. Project Manager
Pro Eng ineer
1 ........ ............. 60 MH ....... x $115 00 per hour
........
433 MH x $99.00 per hour
502 MH x $46 00 per hou
$18,400.00 _.
$42,867.00
$23,094.00
. ......
General Superintendent
_
160 MH x $92.00 per hour
$14,720.00
Superintendent
866 MH x $80.00 per hour
$ 69,280.00
Job Clerical
501 MH X $42.00 per hour
$2 1,042.00
__.. _._
Safety Dir ector
------------------- -
1 L ump Sum
-
$3,500.00
Acc ounting Manager
100 MH X $ 75.00 per hour
$7,500.00
.
Accounting Clerical
.� ......_._ _ .
200 MH X $46.00 per hour
— — _ -,
$9,200.00
Hou 5 Month x $1,400.00 per m onth $7,000.00
...... - — w...—
Per Diem 5 Months x $1,300.00 per m onth $6,500.00
Travel 10 trips x $1,400.00 per trip m - $14,000.00
Vehicle Rental 5 trips x $979.00 per trip $4,895.00
Total 1 1 $241,998.00
Page 14
Page 15
. . . . . . . . . .
Monroe County Courthouse and Detention Facility
Decommissioning and Demo of (2) Waste Water Plants
ask Name
Duration IStart Tinish
1st Quarter I 2nd Quarter I 3rd Quarter 1 4th
2
(Bidding
Bid Date
Review & Tabulate Bids
(Prepare GMP
IGMP Review
(GMP Approval
Drawings
Permits
Issue Notice to Proceed
0 R IF i
Issue Contracts
Submittals
(Mobilize
'Install New Lift Station's
New Sewer Connections
New Lateral Lines to Street
- --- ------- - --------
E lectrical and Controls
Tie Existing Lines In To New Lift stations
( Old Tanks & System
' Tanks Out
jDemo Old Tanks & Systems
! Fill and Restore Site's
Install New Lift Station's
New Sewer Connections
New Lateral Lines to Street
!30 days
1 0 days
.10 days
10 days
1 6 days
113 days
12 days
,20 days
' 5 days
i20 days
20 days
110 days
110 days
18 days
.5 days
' 1 8 days
5 days
I S days
15 days
110 days
.5 days
110 days
i8 days
15 days
Mon 1/15/18
Fri 2/23/18
'Mon 2/26/18
Mon 3/12/18
( Mon 3/26/18
!Tue 4/3/18
IMon 2/26/18
Wed 3/14/18
Fri 4/20/18
Fri 4/27/18
'Fri 5/11/18
(Fri 5/25/18
Fri 6/8/18
Tue 6/12/18
'Fri 6/22/18
:Fri 6/22/18
Wed 7/4/18
Wed 7/11/18
Wed 7/18/18
Wed 7/25/18
Wed 8/8/18
Fri 6/22/18
Fri 7/6/18
Wed 7/18/18
Fri 2/2
Fri 2/23/18
IFri 8
IFri 3/23/18
!Mon 4/2/18
IThu 4/19/18
ITue 3/13/18
Tue 4/10/1 8
Thu 4/26/18 '1
(Thu 5/24/18
Thu 6/7/18
IThu 6/7/18
IThu 6/21/18
IThu 6/21/18 1
Thu 6/28/18
I 1
(Tue 7/3/18
Tue 7/10/18
Tue 7/17/18
'Tue 7/24/18
!Tue 8/7/18
Tue 8/14/18
I ( Thu 7/5/18
(Tue 7/17/18
(Tue 7/24/18
"l o w
ir
3
4
5
6
7
8
9
10
12
13
14
is
16
17
18
19
20
21
22
23
24
25
26
27
Wed 3/14/18 Pace 1 Biltmore Construction Co- Inc,
— Attachment: 2018-03.16 - IPIK-Roth Wastewater Replacement and Abandonment GMP (Approval of Biltmore Construction's IPIK-Roth Wastewater —
Monroe County Courthouse and Detention Facility
Decommissioning and Demo of (2) Waste Water Plants
ID (Task Name
28 jElectrical and Controls
29 !Tie Existing Lines In To New Lift stations
30 IDecommission Old Tanks & System
31 (Pump Tanks Out
32 IDemo Old Tanks & Systems
33 IFill and Restore Site's
34 ISod at Roth Complex
35 jProject Completion
36
37
38 1145 Calendar Days
Duration Start lFinish luarter I 1st Ouarter I 2nd Ouarter I 3rd Ouarter 1 4th
8 days
Wed 7/25/18
'Fri 8/3/18
5 days
Mon 8/6/18
... ............. — -----
Fri 8/10/18
5 days
;Mon 8/13/18
' Fri 8/17/18
5 days
Mon 8/20/18
Fri 8/24/18
10 days
Mon 8/27/18
-Fri 9/7/18
5 days
Mon 9/10/18
Fri 9/14/18
3 days
Mon 9/17/18
Wed 9/19/18
D days
Wed 9/19/18
'Wed 9/19/18 9/19
v
Wed 3/14/18 Paae 2 Biltmore Construction Co., Inc.
— Attachment: 2018-03.16 - PK-Roth Wastewater Replacement and Abandonment GIVIP (Approval of Biltmore Construction's PK-Roth Wastewater — -
This GMP Proposal must be accepted in writing by the Owner on or before May 31, 2018. After said
date this GIVIP Proposal shall be null and void, absent the express written acceptance by0ltmore
Construction Co., Inc.
Name: Travis Parker
Print Name
Title: Vice President
Monroe County
8y:
Signature
Name:
Print Name APPROVED AS_T0 FORM
ASSISTANT COUNTY ATTORNEY
Page |7