Loading...
Item D4County of Monroe <r BOARD OF COUNTY COMMISSIONERS � Mayor David Rice, District 4 IleOI1da Keys ��x t t 0. Mayor Pro Tem Sylvia J. Murphy, District 5 Danny L. Kolhage, District I P f,< George Neugent, District 2 a Heather Carruthers, District 3 County Commission Meeting April 19, 2018 Agenda Item Number: D.4 Agenda Item Summary #4101 BULK ITEM: Yes DEPARTMENT: Budget and Finance TIME APPROXIMATE: STAFF CONTACT: Julie Cuneo (305) 292 -4460 N/A AGENDA ITEM WORDING: Report of Hurricane Irma finance activity by the Office of Management and Budget ITEM BACKGROUND: PREVIOUS RELEVANT BOCC ACTION: CONTRACT /AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: DOCUMENTATION: Hurricane Irma Project Update April 2018 REVISED 4 9 18 FINANCIAL IMPACT: Effective Date: Expiration Date: Total Dollar Value of Contract: Total Cost to County: Current Year Portion: Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: Grant: County Match: Insurance Required: Additional Details: If yes, amount: NONE REVIEWED BY: Kathy Peters Completed 04/03/2018 6:09 PM Board of County Commissioners Pending 04/19/2018 9:00 AM D.4.a R E m c x PacketPg.1342 Tina Boan, Sr. Director I Monroe County Budget and Finance Projects Submitted to FEMA as of 3/30/18 Total Category A: $5,157,54200 Total Category B: $12,293,552.60 R E m c 2 Packet Pg. 13 33 Date Uploaded to Project Cost Project Cost Project ID FEMA Portal Description of Project Submitted Obligated MC-B-003 FEMA5072 PW 22 11/14/2017 Force Account Labor 100% Cost Share $2,701,506.15 $2,667,613.65 MC-B-018 FEMA9657 PW 41 12/1/2017 Temporary Sanitary Facilities 100% Cost Share $62,005.00 $60,949.50 MC-B-019 FEMA8880 PW 39 12/1/2017 Fire /Rescue Medical Supplies 100% Cost Share $110,477.79 $106,465.29 MC-B-020 FEMA9376 PW48 12/1/2017 Temporary Fencing 100% Cost Share $25,008.00 $23,507.50 MC-B-021 FEMA9386 12/1/2017 Satellite Systems 100% Cost Share $102,586.00 MC-B-010 FEMA11613 PW 164 1/13/2018 Force Account Vehicle & Equipment 100% Cost Share $611,817.33 $524,114.82 MC-A-023 FEMA11667 1/13/2018 Higgs Beach Sand Cleanup 100% Cost Share $65,188.00 MC-B-015 FEMA16549 1/13/2018 Emergency Repairs of Roads and Bridges 100% Cost Share $11,780.00 Temporary Road Repair 75% Cost Share (labor, road signs, MC -B -025 1/25/2018 orange cones, barricades, asphalt and rock) $66,303.00 MC -B -035 Emergency Operations Center 100% Cost Share (materials, FEMA16038 2/16/2018 contracts, rentals) $222,859.79 FEMA16035 2/16/2018 Base Camp 100% Cost Share $6,593,062.05 MC-A-002 FEMA9400 2/16/2018 Contract Debris Removal 90% Cost Share $5,092,359.00 FEMA32556 2/16/2018 Temporary Repairs 100% Cost Share $447,721.08 FEMA 16162 3/22/2018 Sheltering and Evacuation 100% Cost Share $546,943.22 FEMA 37290 3/21/2018 lEmergency Operations Support 100% Cost Share $791,483.19 $17,451,099.60 $3,382,650.76 Total Category A: $5,157,54200 Total Category B: $12,293,552.60 R E m c 2 Packet Pg. 13 33 Note -- estimates are preliminary and do not include mitigation and Marathon Airport Items in blue are new or updated estimates. Category E includes the addition of Key West International Airport. Packet Pg. 1344 D.4.a Preliminary Cost Estimates by Category as of 3/30/18 >_ Total Estimate County Portion Category A Debris Removal- -Land 90/5/5 Cost Share $5,092,359 $254,618 = Category A Debris Removal- -Land 75/12.5/12.5 Cost Share $20,995,466 $2,624,433 co rn v Category A Debris Removal -- Marine 75/12.5/12.5 Cost Share FEMA $6,000,000 $750,000 Category A Debris Removal -- Marine 75/25 Cost Share NRCS $31,712,006 $7,928,001 w W Category A Debris Removal Monitoring -- Marine 100/0 Cost Share $2,378,400 $0 c CO N Category B Emergency & Protective Measures 100 /0 /0 Cost Share $12,688,886 $0 a Category B Emergency & Protective Measures 75/12.5/12.5 Cost Share $1,716,303 $214,538 2 Category C Roads & Bridges FEMA 75/12.5/12.5 Cost Share $2,195,187 $274,398 a CL Category D Water Control Facilities FEMA 75/12.5/12.5 Cost Share $3,870,000 $483,750 m a Category E Buildings & Equipment FEMA 75/12.5/12.5 Cost Share $7,215,371 $901,921 E Category G Parks, Recreational Facilities & Other Items FEMA 75/12.5/12.5 Cost Share $9,825,112 $1,228,139 c $103,689,090 $14,659,799 Note -- estimates are preliminary and do not include mitigation and Marathon Airport Items in blue are new or updated estimates. Category E includes the addition of Key West International Airport. Packet Pg. 1344 D.4.a Expenses by Fund as of 3/30/18 Hurricane Irma Activity by Fund FY17 FY18 Actual Actual Actual Total Grant Fund - Fund 125 125 0459110 Personnel $2,509,179 $490,878 $3,000,057 125 0459110 Operating $3,470,917 $8,064,208 $11,535,124 125 0459110 Capital $46,642 $2,545 $49,187 Total $6,026,738 $8,557,631 $14,584,368 Marathon Airport - Fund 403 403 635102 Personnel $30,116 $7,988 $38,105 403 635102 Operating $3,505 $175,940 $179,444 403 635102 Capital $0 $0 $0 Total $33,621 $183,928 $217,549 Key West Airport - Fund 404 404 630191 Personnel $77,258 $1,094 $78,352 404 630191 Operating $28,516 $83,817 $112,333 404 630191 Capital $0 $5,026 $5,026 Total $105,773 $89,937 $195,710 MSD Solid Waste - Fund 414 414 40003 Personnel $49,396 $1,883 $51,279 414 40003 Operating $1,326,521 $11,932,730 $13,259,250 414 40003 Capital $0 $0 $0 $1,375,916 $11,934,613 $13,310,530 Total TOTAL $7,542,048 $20,766,109 $28,308,157 M E II PacketPg.1345 D.4.a Estimated Damages Submitted to Insurance as of 3/30/18 Buildings: Citizen's Property Insurance Wright National Flood Insurance Lloyd's of London Total After Deductibles Proceeds Received Estimated Balance M E $4,338,904 $1,477,316 $6,598,140 $12,414,360 $ 613,602 $11,800,758 Packet Pg. 1346 D.4.a Estimated Damages Submitted to Insurance as of 3/30/18 Fire Apparatus and Portable Equipment for Fire Rescue: Volunteer Firemen's Insurance Service, Inc. Total After Deductibles Proceeds Received Estimated Balance Vehicles: Florida League of Cities Total After Deductible: Proceeds Received Progressive Insurance Total After Deductible: Proceeds Received: Estimated Balance: $417,535 $ 290 9 794 $126,741 $41,194 $0 $1,272 $ 1 9 272 $41,194 M E Packet Pg. 1347 D.4.a Insurance Proceeds Received by Category as of 3/30/18 $905,668 Fire Apparatus and Portable qu . _w...... Vehicles $1,272 ngs 602 ■ Buildings - Fire Apparatus and Portable Equipment for Fire Rescue Vehicles M E x Packet Pg. 1348 D.4.a Project Management's Top 12 Work Projects Project FEMA Site Inspection Date Estimated Cost Big Pine Key Community Park & Sheriff's House 4/3/2018 r/ $2,800,000 B Dino SeRinr GeRter Watson Field* 4/13/2018 $42808 $350,000 Blue Heron Park & Community Center 4/4/2018 $300,000 Harry Harris Park 4/6/2018 $3,250 Higgs Beach Park 4/23/2018 $1,000 Key West Historic Courthouse 4/27/2018 $100 Marathon Government Annex 4/16/2018 $200 Marathon Tax Collector 4/11/2018 $250,000 Monroe County Sheriff Headquarters 4/18/2018 $1,500 Stiglitz Community Center at Watson Park 4/9/2018 $250 Tavernier Fire Station 4/20/2018 $200,000 West Martello 4/25/2018 $1,250 $11,225,000 $11,450,000 M E *Work was completed on Big Pine Senior Center, so Watson Field was put in its place. a Packet Pg. 1349 D.4.a Marine Debris Cost Estimates as of 3/30/18 NRCS Only M E Marathon County Islamorada Mobilization and Demobilization including pre - removal assessments and post verification = using side scan sonars $1,200,000 $300,000 co Operation of Temporary Debris Management Area (TDMA) Marine debris removal from waterway and transport for a prescribed distance from offload to TDMA Transport of Reduced Marine Debris from TDMA to final disposal site Tipping fees at final disposal site Monitoring Services Derelict Vessels Estimated Total: $2,000,000 $500,000 $25,063,500 $11,690,720 $1,372,429 $640,161 $2,076,077 $968,350 $2,378,400 $761,544 $0 $0 $34,090,406 $14,860,775 PacketPg.1350 D.4.a Monroe County Hazard Mitigation Grant Program as of 3/30/1P Total Potential Funding Sought - $452,912,280 Project Title Preliminary Project Cost Description County -Wide Emergency Back -up Provides emergency back -up generators, additional fuel capacity, and redundancy improvements at 39 Power Enhancements for Critical sites within the County. Protects 911, Communications Towers, Fire Departments, Marathon Airport, Facilities $6,000,OOOand County Facilities. Consists of the purchase and installation of impact- resistant windows to protect against failure due to high winds and debris. Will also protect against rain -water intrusion during high -wind events. Protects Wind- Retrofit of County Facilities $8,837,28OCounty Operational Buildings MCSO HO DJJ and several others. This project is the implementation phase of the Pilot Program developed by the Sustainability and Twin Lakes and Sands Subdivision - Engineering /Roads Departments. It proposes to achieve a minimal and consistent elevation of roads in Road Elevation and Draingage two of the most susceptible areas of the County to reduce anticipated tidal flooding and the blockage of Improvements SLR Pilot $3,900,OOOthe roads during King Tide, Storm Tide, and other atypical tidal flooding events. This project is proposed as a follow -up project to the Pilot Program. The Project would expand the road County-Wide Road Elevation and elevation process to a maximum of 68 miles of road within the County that would be vulnerable to Drainage Improvements Phase 1 of 2 $367,200,000 inundation expected by SLR within 30 years. FEMA 361 will provide federal funding to construct a "Saferoom" that provides near absolute protection Saferoom Enhancements for County from high winds. In the context of a to -be- constructed facility, if program requirements are met, FEMA EOC Phase 1 of 2 $10 000 000 ill potentially reimburse a significant portion of design and construction costs for the facility. This project proposes to undertake the required 5 -year update of the Local Mitigation Strategy Local Mitigation Strategy Update $700 document. It also includes various Sustainability initiatives that are consistent with the LMS document. M E x NMW USA D.4.a Monroe County Hazard Mitigation Grant Program as of 3/30/18 Project Title Preliminary Project Cost Description West Martello Seawall The County is proposing to install a wave - deflecting mechanism that would reduce the Improvements $500,000 currently experienced erosion of sand behind the seawall. This project is proposing to permanently install three (3) "Cellular on Wheels" ('COWS ") systems and associated signal equipment at the three main County governmental buildings Emergency Communications and (MEN, MGC, & HGC). The towers act to boost cellular communication after it is disabled by Warning Upgrades $600,OOOsome event or cause. This project would seek to upgrade communications capabilities at all required County facilities Phone System /Communications by bringing the phone systems to a higher, and internally consistent, level of service during Upgrades $400,000 disaster and peace-time operations. To provide opportunities to those homeowners whose homes were flooded, or who have non - Elevate Buildings Located within compliant structures at risk of flooding, to apply to elevate a home in order to eliminate risk to Flood roneAreas $5,225,000 he National Flood Insurance Program. To provide opportunities to those homeowners whose homes were destroyed, or those who have non -compliant structures at risk of flooding or wind damage, to apply to reconstruct a Residential Mitigation code -compliant home in order to eliminate risk to the National Flood Insurance Program and to Reconstruction Project $22,500,000 wind insurers. To provide post - disaster hazard mitigation residential wind retro- fitting opportunities to homeowners' homes that have non -compliant windows, roofing, gable end walls, vents and Residential Wind Retrofitting soffits, and exterior wall coverings so that they may reduce or eliminate long-term risks to Project $1,925,000 hemseIves and their homes from future disasters. M E x Packet Pg. 1352 D.4.a Monroe County Hazard Mitigation Grant Program as of 3/30/18 Project Title Preliminary Project Cost Description Trailer Park Acquisition and Replace 16 ground level mobile homes with 16 elevated new structures that meet current height above Reconstruction Site A $4,800,00013FE requirements and are rated for 180 mph wind loading for roofs, windows, and doors. Replace 7 ground level mobile homes with 7 elevated new structures that meet current height above BFE requirements and are rated for 180 mph wind loading for roofs, windows, and doors. The Trailer Park Acquisition and remaining 29 units would be transferred off site. The off site units will likely be sold to construct Reconstruction Site B $3,025,000additional affordable housing that meets all building code requirements. Trailer Park Acquisition and Replace 8 ground level mobile homes with 8 elevated new structures that meet current height above Reconstruction Site C $2 100 OOOBFE requirements and are rated for 180 mph wind loading for roofs windows and doors. Replace 12 ground level mobile homes with 12 elevated new structures that meet current height above BFE requirements and are rated for 180 mph wind loading for roofs, windows, and doors. The Trailer Park Acquisition and remaining 5 transient units would be transferred off site. The off site units will likely be sold to Reconstruction Site D $3,900,000 construct additional affordable housing that meets all building code requirements. Trailer Park Acquisition and Replace 16 ground level mobile homes with 16 elevated new structures that meet current height above Reconstruction Site E $5 500 OOOBFE requirements and are rated for 180 mph wind loading for roofs windows and doors. Trailer Park Acquisition and Replace 16 ground level mobile homes with 16 elevated new structures that meet current height above Reconstruction Site F $5 OOOBFE requirements and are rated for 180 mph wind loading for roofs windows and doors. Total Potential Funding Sought - $452,912,280 M E m c x Packet Pg. 1353