Loading...
Item H21BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: September 16, 2015 Department: Building Bulk ltem: Yes X No _ Staff Contact Person/Phone #: Christine Hurley, 289-2517 Ed Koconis, 453-8727 AGENDA ITEM WORDING: Approval of a resolution of the Monroe County Board of County Commissioners adopting Monroe County "Floodproofing Non -Residential Structures Permitting and Inspection Requirements Policy" dated October 1, 2015 as required pursuant to Monroe County Code Section 122-2(c). ITEM BACKGROUND: Chapter 122 of the Monroe County Code "Floodplain Management" includes rules for interpreting flood hazard issues. The building official shall be guided by the current edition of FEMA's 44 CFR, and FEMA's interpretive letters, policy statements and technical bulletins as adopted from time to time by the board of county commissioners. FEMA's Technical Bulletins ("bulletins") provide guidance concerning the building performance standards of the National Flood Insurance Program (NFIP), which are contained in Title 44 of the U.S. Code of Federal Regulations. The bulletins are intended for use primarily by State and local officials responsible for interpreting and enforcing NFIP regulations and by members of the development community, such as design professionals and builders. New bulletins, as well as updates to existing bulletins, are issued periodically as needed. The bulletins do not create regulations; rather they provide specific guidance for complying with the minimum requirements of existing NFIP regulations. Adopting these documents as well as internal County policies would serve to allow the County to not only remain in the NFIP as stated in Section 122-1(b), but also to move forward with the intent of becoming eligible to enter FEMA's Community Rating System (CRS). The proposed resolution would adopt Monroe County "Floodproofing Non -Residential Structures Permitting and Inspection Requirements Policy" dated October 1, 2015 as required pursuant to Monroe County Code Section 122-2(c). PREVIOUS RELEVANT BOCC ACTION: January 18, 1994 — BOCC approved Ordinance No. 002-1994 adding the language "as adopted by resolution from time to time by the Board of County Commissioners" to the rules for interpreting flood hazard issues. July 15, 2015 BOCC rejected proposed ordinance amending Section 122-2(c) and directed staff to continue proposing resolutions for adoption of both new and amended documents to be used by the building official for guidance on floodplain management. CONTRACT/AGREEMENT CHANGES: NIA STAFF RECOMMENDATION: Approval TOTAL COST: NIA INDIRECT COST: NIA BUDGETED: Yes No NIA DIFFERENTIAL OF LOCAL PREFERENCE: NIA COST TO COUNTY: NIA SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes _ No NIA AMOUNT PER MONTH N/A Year APPROVED BY: County Atty X�`i OMB/Purchasing Risk Management _ DOCUMENTATION: Included X Not Required_ DISPOSITION: AGENDA ITEM # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 MONROE COUNTY, FLORIDA MONROE COUNTY BOARD OF COUNTY COMMISSIONERS RESOLUTION NO. -2015 A RESOLUTION OF THE MONROE COUNTY BOARD OF COUNTY COMMISSIONERS ADOPTING MONROE COUNTY "FLOODPROOFING NON-RESIDENTIAL STRUCTURES: PERMITTING AND INSPECTION REQUIREMENTS POLICY" DATED OCTOBER 1, 2015 AS REQUIRED PURSUANT TO MONROE COUNTY CODE SECTION 122-2(C) WHEREAS, Monroe County is currently a participating community in the National Flood Insurance Program (NFIP) and is working on internal County policies to improve upon its interpretation of NFIP regulations; and WHEREAS, Monroe County desires to become eligible to enter FEMA's Community Rating System (CRS); and WHEREAS, Monroe County Code Section 122-2(c), in part, requires that in interpreting other provisions of this chapter, the building official shall be guided by the current edition of FEMA's 44 CFR, and FEMA's interpretive letters, policy statements and technical bulletins as adopted by resolution from time to time by the board of county commissioners; NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA: Section 1. Pursuant to Monroe County Code Section 122-2(c), the Board hereby adopts Monroe County "Floodproofing Non -Residential Structures: Permitting and Inspection Requirements Policy" dated October 1, 2015, A copy of which is attached hereto. Section 2. The Clerk of the Board is hereby directed to forward one (1) certified copy of this Resolution to the Building Department. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PASSED AND ADOPTED by the Board of County Commissioners of Monroe County, Florida, at a regular meeting held on the 16th of September, 2015. Mayor Danny L. Kolhage Mayor pro tem Heather Carruthers Commissioner Sylvia Murphy Commissioner George Neugent Commissioner David Rice BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA {SEAL} ATTEST: AMY HEAVILIN, CLERK Deputy Clerk Mayor Danny L. Kolhage MONROE COUNTY ATTORNEY 1),���TO FORM: STF-VE? TT Wi CAMS A a; . ,'JT [i tY ATTORNEY r3att County of Monroe Growth Management Division Building Department Murray E. Nelson Government Center 102050 Overseas Highway Key largo, Florida 33037 Voice: (305) 853-8800 FAX: (305) 853-8818 We strive to be caring, professional, and fair. Date: October 1, 2015 To: Growth Management Staff From: Wes Maltby, Interim Monroe County Building Official Board of County Commissioners Mayor Danny L. Kolhage, Dist. 1 Mayor Pro Tern Heather Carruthers, Dist. 3 George Neugent, Dist. 2 David Rice, Dist. 4 Sylvia Murphy, Dist. 5 Re: Floodproofing Non -Residential Structures: Permitting and Inspection Requirements Policy Regulatory References: The following are useful excerpts from directly relevant floodproofing regulations. They are not intended as all -encompassing reproductions of these regulations. In all cases, the original regulations should be consulted. Monroe County Land Development Code, Chapter 122 — Floodplain Management Section 122-2 (c) In interpreting other provisions of this chapter, the building official shall be guided by the current edition of FEMA's 44 CFR, and FEMA's interpretive letters, policy statements and technical bulletins as adopted by resolution from time to time by the board of county commissioners. Section 122-3(e) Within 21 calendar days of establishment of the lowest floor elevation, or upon placement of the lowest horizontal structural members of the lowest floor, whichever is applicable, it shall be the duty of the permit holder to submit to the building official a certification of the elevation of the lowest floor within A zones or the lowest portion of the lowest horizontal structural members of the lowest floor within V zones, whichever is applicable, as built in relation to mean sea level. Such certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by the same. When floodproofing is used for a building within A zones, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work done within the 21-day period and prior to submission of the certification shall be at the permit holder's risk. The building official shall review the floor elevation survey data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to )' loodproofing Non -Residential Structures: Permitting and Inspection Requirements Page I of 6 further progressive work being permitted to proceed. Failure to submit the survey or failure to make the corrections required hereby shall be causes to issue a stop -work order for the project. Section 1224(b)(2)(a) New construction and substantial improvements of any commercial, industrial or other nonresidential structures within zone AE on the community's flood insurance rate map (FIRM) shall have the lowest floor (including basement) elevated to or above the base flood level or, together with attendant utility and sanitary facilities, be designed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy. Elevating above base flood elevation may decrease the cost of flood insurance. Where a nonresidential structure is intended to be made watertight below the base flood level, a registered professional engineer or architect shall develop and/or review structural design specifications and plans for the construction and shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the applicable provisions contained herein. A record of such floodproofing certification which shall include the specific elevation (in relation to mean sea level) to which such structures are floodproofed shall be provided to the building department. Wet floodproofing is not acceptable. New construction or cumulative substantial improvements of any commercial, industrial or other nonresidential structures within zones V1-30, VE or V shall have the bottom of the Iowest horizontal structural member of the lowest floor, elevated to or above the base flood elevation. 2014 Florida Building Code 1612.5 Flood hazard documentation. The following documentation shall be prepared and sealed by a registered design professional and shall be submitted to the building official: 1. For construction in flood hazard areas not subject to high -velocity wave action: 1.1 The elevation of the lowest floor, including basement, as required by the foundation inspection and the final inspection in Section 11.0.3. 1.2. For fully enclosed areas below the design flood elevation where provisions to allow for the automatic entry and exit of floodwaters do not meet the minimum requirements in Section 2.6.2.1, ASCE 24, construction documents shall include a statement that the design will provide for equalization of hydrostatic flood forces in accordance with Section 2.6.2.2 of ASCE 24. 1.3. For dry floodproofed nonresidential buildings, construction documents shall include a statement that the dry floodproofing is designed in accordance with ASCE 24. Floodproofing Non -Residential Structures: Permitting and Inspection Requirements Page 2 of 6 American Societv of Civil EnLyineers Flood Resistant Desien and Construction (ASCE 24-05 Table 6-1 Minimum Elevation of Floodproofing, Relative to Base Flood Elevation (BFE) or Design Flood Elevation (DFE) — Outside of High Risk Flood Hazard Areas Structure Category a Minimum Elevation of Floodproofing n I BFE + 1 ft or DFE, whichever is higher II ° BFE + 1 ft or DFE, whichever is higher III BFE + l ft or DFE, whichever is higher IV BFE + 2 ft or DFE, whichever is higher a See Table 1-1 for structure category descriptions. b Wet or dry floodproofing shall extend to the same level. Dry floodproofing of residential buildings and residential and residential portions of mixed -use buildings shall not be permitted. 6.1 Scope This section addresses design and construction requirements for floodproofing new construction and substantial improvements in flood hazard areas. Design of floodproofing measures shall take into consideration and account for the flood loads and combination of loads in Section 1.6, and for nature of flood -related hazards; frequency, depth, and duration of flooding; rate of floodwater rise and fall; floodwater temperature; soil characteristics; flood -borne contaminants and debris: flood warning time; access to and from floodproofed areas; structure occupancy and use; and functional dependence. 6.2.1 Dry Floodproofing Limitations; Dry floodproofing of nonresidential structures and nonresidential areas of mixed -use structures shall not be allowed unless such structures are located outside of High Risk Flood Hazard Areas, Coastal High Hazard Areas, and Coastal A Zones. Dry floodproofing of residential structures or residential areas of mixed -use structures shall not be permitted. Dry floodproofing shall be limited to the following: 1. Where flood velocities adjacent to the structure are less than or equal to 5 ft/sec during the design flood; and 2. If human intervention is proposed, where conformance with the limitations of Section 6.2.3 is provided. 6.2.2 Dry Floodproofing Requirements: Dry floodproofed areas of structures shall 1. Be designed and constructed so that any area below the applicable elevation specified in Table 6-1, together with attendant utilities and sanitary facilities, is flood resistant with walls that are substantially impermeable to the passage of water. Walls, floors, and flood shields shall be designed and constructed to resist hydrostatic, hydrodynamic, and other flood -related loads, including the effects of buoyancy resulting from flooding to the elevation listed in Table 6-1; 2. Have any soil or fill adjacent to the structure compacted and protected against erosion and scour in accordance with Section 2.4; and 3. Have at least one door satisfying building code requirements for an exit door or primary means of escape, above the applicable elevation specified in Table 6-1, and capable of providing human ingress and egress during the design flood. Floodproofing Non -Residential Structures: Permitting and Inspection Requirements Page 3 of 6 6.2.3 Limits on Human fntervention: Dry floodproofing measures that require human intervention to activate or implement prior to or during a flood shall be permitted only when all of the following conditions are satisfied: 1. The flood warning time (alerting potential flood victims of pending flood situation) shall be a minimum of 12 hours, unless the community operates a flood warning system and implements an emergency plan to ensure safe evacuation of flood hazard areas, in which case human intervention is allowed only if the community can provide a minimum flood warning time equal to or longer than the cumulative a. time to notify person(s) responsible for installation of floodproofng measures, plus b. time for responsible persons to travel to structure to be floodproofed, plus c. time to install, activate, or implement tloodproofing measures, plus d. time to evacuate all occupants from the flood hazard area; 2. All removable shields or covers for openings such as windows, doors, and other openings in walls shall be designed to resist flood loads specified in Section 1.6; and 3. Where removable shields are to be used, a flood emergency plan shall be approved by the authority having jurisdiction and shall specify, at a minimum, the following information: storage location(s) of the shields; the method of installation; conditions activating installation; maintenance of shields and attachment devices; periodic practice of installing shields; testing sump pumps and other drainage measures; and inspecting necessary material and equipment to activate or implement tloodproofing. The flood emergency plan shall be permanently posted in at least two conspicuous locations within the structure. Code of Federal Regulations Title 44, Section 60.3(c)(4) Provide that where a non-residential structure is intended to be made watertight below the base flood level, (i) a registered professional engineer or architect shall develop and/or review structural design, specifications, and plans for the construction, and shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the applicable provisions of paragraph (c)(3)(11) or (c)(8)(ii) of this section, and (ii) a record of such certificates which includes the specific elevation (in relation to mean sea level) to which such structures are floodproofed shall be maintained with the official designated by the community under §59.22(a)(9) FEMA Publications and Technical Bulletins FEMA P-936 Floodproofing Non -Residential Buildings (2013) FEMA Technical Bulletin 3-93 Non -Residential Floodproofing — Requirements and Certification Floodproofing Non -Residential Structures: Permitting and Inspection Requirements Page 4 of 6 Conclusion Monroe County, following National Flood Insurance Program requirements, has the responsibility to determine if documents submitted as part of a plan to floodproof a non-residential structure meet the standards pursuant to Monroe County Land Development Code, Chapter 122 - Floodplain Management, the Florida Building Code, and FEMA 44 CFR, and together with guidance provide in FEMA TB 3-93 and FEMA P-936, will implement the following checklist on October 1, 2015 to do so. Dry Floodproofing shall be permitted for Non -Residential use Only [ASCE 241 Permitted in AE Zone ONLY [ASCE 24] Construction Drawings/Documents: Site plan requirements: flood zone(s), BFE(s) & DFE(s) plotted on plans. [FBC 107.3.5(1)] BFE(s) on building cross-section. [FBC Section 1612, 1612.5(1.1) & 107.3.5(8)] Flood design data (including elevation of floodproofing, specified in ASCE 24 Table 6-1) on building cross-section, along with finished first Floor (AE-Zones) or lowest horizontal cross - member of the lowest floor (VE-zones), & height of lowest adjacent grade alongside building. [FBC 1603.1(5) & 1603.1.71 Soil/fill adjacent to structure compacted & protected against erosion and scour. [ASCE 241 Building walls & floors impermeable to passage of water. Flood load calculations required. [ASCE 24] List of materials showing those below elevation of floodproofing as specified in ASCE 24 Table 6-1 — not protected by floodproofing — will be resistant to flood damage. [ASCE 24] Utilities: Identification & appropriate height above BFE of attendant utilities/machinery. [ASCE 24] Flood panel preliminary designs, showing type of panels and general installation method. Electrical, if not located within floodproofed protected portion of building Electric meters above elevation specified in Table 7-1. [ASCE 24] Disconnect switches & circuit breakers above elevation specified in Table 7-1. [ASCE 24] Maximum 120V voltage below elevation specified in Table 7-1. [ASCE 241 Submersible -type wiring/conduits/cables/switches/receptacles/fixtures. [ASCE 24] Powered from common distribution panel above and accessible from above elevation specified in Table 7-1. [ASCE 24] Sewerage backflow prevention for all sanitation connections below the elevation in Table 7.1. [ASCE 24] Statement that dry floodproofing is designed in accordance with ASCE 24 & ASCE 7. [FBC 1612.5(1.3) & ASCE 24] Load Calculations [FBC 1603.1, 1605.3.1.2, & 1612.4]: - Hydrostatic/Hydrodynamic Resistant Construction - load calculations showing structure will be resistant to expected hydrostatic/hydrodynamic pressures & buoyancy. [ASCE 24 & FBC 1603.1, 1605.3.1.2] FEMA Floodproofing Certificate - original, signed & sealed by a State of Florida licensed design professional (Construction Drawings Phase). [FBC 1612.5(1.3)] Floodproofing Non -Residential Structures: Permitting and Inspection Requirements Page 5 of 6 It. Under Construction Phase 21 Day/Building Under Construction Elevation Certificate. [Monroe County Land Development Code 122-3(e)] III. Final Inspection/Certificate of Occupancy Phase Flood panel shop designs, certified by a State of Florida licensed Engineer. Photos of each floodproofing panel in installed position. _ Load Calculations for panels [FBC 1603.1, 1605.3.1.2, & 1612.4, demonstrating flood panels themselves will withstand expected DFE loads [ASCE 24 & FBC 1603.1, 1605.3.1.2] FEMA Floodproofing Certificate — (Finished Construction_) original, signed & sealed by Florida licensed design professional [FBC 1612.5(1.3)]. Flood Emergency Operation Plan [ASCE 24 6.2.3(3)]. Also see FEMA Technical Bulletin 3-93 for Flood Emergency Operation Plan requirements. Floodproofing Inspection & Maintenance Plan [ASCE 24]. Also see FEMA Technical Bulletin 3-93 for Flood Emergency Operation Plan requirements. Building Department Floodproofing Inspection. Elevation Certificate, original, signed & sealed by a State of Florida licensed land surveyor. [FBC 1612.5(l.1)] FEMA Technical Bulletin 3-93 Non -Residential Floodproofing — Requirements and Certification (FEMA 3-93) can be downloaded from http://www.fema.gov/media-library-data/20130726-1511- 20490-5294/job6.pdf. The Flood Emergency Operation Plan and Floodproofing Inspection & Maintenance Plan requirements are outlined in detail in the FEMA TB 3-93. The FEMA TB 3-93 will be used as guidance to interpret the FEMA requirements for floodproofing non-residential structures. Floodproofing Non -Residential Structures: Permitting and Inspection Requirements Page 6 of 6 BOCC AGENDA ROUTING SLIP BUILDING DEPARTMENT Agenda Item Subject: Resolution adopting Monroe County "Pool and Cistern & Accessory Equipment Location in Special Flood Hazard Areas Policy" Date: August 21, 2015 Prepared By: Ed Koconis, AICP, Permit Manager Agenda Deadline: August 20, 2015 BOCC meeting date: September 16, 2015 # Reviewer ***Internal Deadline to Teresa:*** Notes Initials Date Permit Manager Senior Director of Building County Attorney Deadline: �Jay�r; Assistant County Administrator Deadline: FINAL review by legal X Bulk Approval Time Approximate Requested Type of Proceeding: Ad (Ad map, if applicable) Deadline Surrounding Property Owner Notice: Deadline Public Hearing Yes _Legislative N/A Discussion Time Quasi -Judicial Publish Date ***Reminder*** Once your item is complete and includes all corrections, email all final word documents to Teresa Smith.