Loading...
Item C21C ounty of M onroe {f `° " rel BOARD OF COUNTY COMMISSIONERS n Mayor David Rice, District 4 The FlOnda Key y m 1 �� Mayor Pro Tem Sylvia J. Murphy, District 5 Danny L. Kolhage, District 1 George Neugent, District 2 Heather Carruthers, District 3 County Commission Meeting June 20, 2018 Agenda Item Number: C21 Agenda Item Summary #4301 BULK ITEM: Yes DEPARTMENT: Project Management TIME APPROXIMATE: STAFF CONTACT: Ann Mytnik (305) 292 -4439 N/A AGENDA ITEM WORDING: Receipt of monthly change orders for the month of May 2018, reviewed by the County Administrator /Assistant Administrator. ITEM BACKGROUND: There were six (6) change orders considered and approved by the County Administrator /Assistant Administrator for the period beginning 05/01/18 and ending 05/31/18 for a total of $27,317.59. There were no change order requests denied. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No 027 -1998 was adopted in order to provide that the County Administrator may approve separate, non - cumulative change orders for construction projects and professional service contracts in amounts not to exceed $50,000 (as amended per Ordinance No. 024 - 2015), or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT /AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: N/A DOCUMENTATION: Change order report May FINANCIAL IMPACT: Effective Date: N/A Expiration Date: Total Dollar Value of Contract: N/A Total Cost to County: Current Year Portion: Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: Grant: County Match: Insurance Required: Additional Details: N/A If yes, amount: N/A REVIEWED BY: Cary Knight Patricia Eables Kevin Wilson Kathy Peters Board of County Commissioners Completed 06/04/2018 11:33 AM Completed 06/04/2018 6:41 PM Completed 06/04/2018 7:45 PM Completed 06/05/2018 9:47 AM Pending 06/20/2018 9:00 AM CHANGE ORDERS CONSIDERED BY THE COUNTY ADMINISTRATOR'S rf OFFICE FOR i 05/01/18 1 PROJECT CO# AMOUNT DESCRIPTION DATE CAUSE CONSIDERED I MCSO Fence Replacement 4 $0.00 - Extend the date of substantial completion by 23 *05/14/18 Delays caused by Hurricane Irma. days from 03/31/18 to 04/23/18. The original date of substantial completion established at notice to proceed was 11/13/17. Less than 6 months in total. Department of Juvenile 5 $0.00 Extend the date of substantial completion by 50 *05/17/18 Delays due to waiting for a new water Justice Center Evidence days from 03/25/18 to 05/14/18. The original heater, and issues associated with the Locker Renovation date of substantial completion established at smoke and alarm system. notice to proceed was 11/20/17. Less than 6 months. Marathon Library — 1 $8,300.00 Roof turned out to be entirely concrete which *05/17/18 Roof was originally believed to have Demolition of Adult required additional labor and materials to break been made out of wood trusses and Education Center the oversized roof slabs. rolled asphalt. Gato Building Fitness 1 $3,890.00 Contractor added a beam to the design, *05/18/18 i Original design omitted these items. Center emergency exit lighting, data cables, and low voltage boxes. A credit was given for L.E.D. li htin . Harry Harris Park Shed 1 $0.00 Extend the date of substantial completion by 179 *05/18/18 Delays caused by the park being closed days, from 11/06/17 to 05/04/18. for an extensive period of time due to the dama ges caused by Hurricane Irma. The Redevelopment of 14 $15,127.59 Add door stops on classroom closet doors. *05/25/18 Added improvements. The tree removals Bernstein Park Remove trees. Add a concrete lip at the bottom were because they conflicted with of the flood panels at entry door to shed. maintenance. Increase size of irri ation meter. Total $27,317.59 * Approved MONROE COUNTY /ENGINEERING, / PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 4 M'CSO Vence Replacement INITIATION DATE: 05110118 TO CONTRACTOR: CONTRACT DATE: July 19, 2017 Florida Fence Corp. 161 Georgia Avenue 'Pavernlar, FL 33070 -0227 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price ) .......... ............... -, —. ..._ -. ,.,..$197,250.00 Net change by previously authorized Change Orders .......... . ...... ---- ...... — ......... ,. _$ 0.00 The Contract Sum (Guaranteed Maximum Price) prior to this Change order was .......... —$ 197,250.00 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged by this Change Order ....... $ 0.00 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ...... ." 7, i0,00 The Contract Time will be (increased) (decreased) (unchanged) by ............. y N The date. of Substantial Completion as of the date of this Change Order is.... AN it 23 2018 Detailed description of change order and justification: I ncrease to [4 of; ctkstaittig1 - gotrPleflop # y dr r atrr rtt xrci _31� 2018 1p 61i t ( :��.. � � tt ±L(.g J-0t�?y paR b y the im &ct of Hurric Irma. This ch Order is 0°/0 of the origina contract price , Nol vatic until signed by Owner, Architect if applicable), and contractor CONTRACTOR: DIRECTOR PROJECT MANAGEMEN COUNTY /ASSISTANT ADMINISTRATO Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004 -1999 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Additional delays due to Hurricane Irma. Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: 0 Project architect approves the change order. Yes ❑ No If no, explanation of why: No architect on project. Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: M nik -Ann From: floridafence @aol.com Sent: Thursday, May 10, 2018 3:09 PM To: Mytnik -Ann Subject: Additional time request Attachments: Interim Affidavit.pdf; Certificate of Substantial Completion.pdf Good Afternoon Ann, It was nice to speak to you!! As discussed, the project was delayed from March 31, 2018 to April 23rd, 2018 due to impacts caused by Hurricane Irma. If you could be so kind as to prepare the Change order for us to sign, We would appreciate it. And I believe we will need a consent of surety. I have Attached the 2 documents that we had already mailed on /around April 28, 2018.. Thank you Elizabeth Sassine Florida Fence Corp 305 - 852 -4324 MO NRO E COUNTY /ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Department of Juvenile Justice Center Evidence Locker Renovation CHANGE ORDER NO: 5 INITIATION DATE: 05191118 TO CONTRACTOR: D.L. Porter Constructors, Inc. 6571 Palmer Park Cir Sarasota, FL 34238 The Contract is changed as follows: CONTRACT DATE: July 19, 2017 The original (Contract sum) (Guaranteed Maximum Price ) ........................... ..................$473,468.00 Net change by previously authorized Change Orders ...................... ..............................$ 61,827.13 The (Contract sum) (Guaranteed Maximum Price) prior to this Change order was ............... $ 535,295.13 The (Contract Sum) (Guaranteed Maximum Price) will be t;increased) (decreased) (unchanged) by this Change Order ......... $ 0.00 The new (Contract Sum (Guaranteed Maximum Price) including this Change Order is ......... $535,295.13 The Contract Time will be (increased) (decreased) (unchanged) by ... ............................... 50 Days The date of Substantial Completion as of the date of this Change Order Is ......................... May 14, 2018 Detailed description of change order and justification: Exiond ft da(o of substantial cctr�t �leliorl l� ._� . , from March 25, 2018 to Ai lnv 14_ 22 "Y (1 (rq 1q issue �V Iho yxies I ii Ig n 1 aI ( tli led ad(frfOrioI coot�lirta 13�( n IrsJenv arrrl s yy(cry l �ersr�rir]�I. CONTRACTOR: DIRECTOR PROJECT MANAGEM COUNTYIASSISTANT ADMINI TRA Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004 -1999 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Contractor had to wait for a new water heater, because the existing one failed. The smoke evacuation system and alarm system maintained in the building had issues that also caused delays. e Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: e Project architect approves the change order. Yes ® No ❑ If no, explanation of why: e Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Packet'Pg. 543 YKUML I: Juvenile Justice Building Renovation 5525 College Road Key West, FL 33040 OWNER: Monroe County Board of County Commissioners 500 Whitehead Street Key West FL 33040 ARCHITECT William P. Horn Architect 915 Eaton Street Key West, FL 33040 CHANGE ORDER REQUEST M Seven (7) DATE OF ISSUANCE: 5/10/2018 ARCHITECTS PROJECT NO.: GC PROJECT NO: 1706 CONTRACT FOR: Renovation CONTRACTOR: D.L. Porter Constructors, Inc. 6574 Palmer Park Circle Sarasota, FL 34238 We herein request changes In the Contract Sum and Contract rime for proposed modifications to the Contract Documents described herein (see description below): Request for fifty (50) calendar days to extend the substantial completion date to May, 14, 2018. Additional funds requested: Additional days requested: $ - Add 50 Days Attachments: REq, M- IE et BY: D.L. Porter Consir etors, Inc. 1 lei ) Mosher, ject Manager ACCEPTED BY: (Signature) # Unit Mat (Unit Cost) Lab. (Unit cost) Material Labor Subcontract Other Supervision I Is s $ - $ - $ . $ - $ - $ Extend Substantial Completion Date to May, 14, 2018. 1 Is $ $ _ $ $ $ $ - $ _ General disposal & cleanup as pertains to added work (2 °A) 1 Is $ $ - $ $ $ _ $ _ $ PM (JM) time reviewing with subcontractor, gathering pricing, and coordinatttig the revised wont I hrs, S - $ - S $ S S $, Subiotats Subcontractor $ Subtotals SelfPerform $ D.L. Porter Overhead & Profit (Rate 5 1 1.) Subcontractor $ D.L. Porter Overhead & Profit (Rate 10 5/6) SelfPerfonn $ Bond and Insurance S Item Total S - Additional funds requested: Additional days requested: $ - Add 50 Days Attachments: REq, M- IE et BY: D.L. Porter Consir etors, Inc. 1 lei ) Mosher, ject Manager ACCEPTED BY: (Signature) M ONROE CO UNTYANGINEERING/ i A CONT CHANGE O PROJECT TITLE: CHANGE ORDER NO: 1 Demolition of Adult Education Center In Marathon INITIATION DATE: 05111118 TO CONTRACTOR: PURCHASE ORDER #00059035 S &S Recycling & Demolition of Mansfield LLC. DATE: 04/03/18 1199 W. 4 t Street Mansfield, OH 44906 The Purchase Order scope of work is changed as follows: The original purchase order sum ............................................... ..............................$ 28,850.00 Net change by previously authorized Change Orders ...................... .......................o......$ 0.00 The purchase order sum prior to this Change order was .............. ............................... $ 28,850.00 The purchase order sum will be (increased) (decreased) (unchanged) by this Change Order..,,....,$ 8,300.00 The new purchase order sum Including this Change Order IS .................. ..............................$ 37,150.00 The Contract Time will be (increased) (decreased (unchanged by ... ............................... 0 Days The date of Substantial Completion as of the date of this Change Order is ......................... N/A _ his change rde is 2 8.7% of the orrc�inal contract ter €ce. Not valid until signed by Owner Architect if aRP and Contractor CONTRACTOR: S &S Recycling & Demolition DIRECTOR PROJECT MANAGEMEN COUNTY /ASSISTANT ADMINISTRATO M I s Christine Hurley Detailed description of change order and justification: Change Order Attachment per Ordinance No. 004 -1999 e Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: It was believed that the roof was made out of wood trusses and rolled asphalt. e Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: e Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: Project architect approves the change order. Yes ❑ No If no, explanation of why: No architect on project. e Change Order is correcting an error or omission in design document. Yes [- Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: M n ik -Ann From: Rivera -Chris Sent: Friday, May 11, 2018 9:14 AM To: Mytnik -Ann Subject: FW: Adult education center demo Ann, This is the email I received about the Marathon Adult Education Center. Thank you, Chris Rivera Project Management Monroe County Engineering 1100 Simonton Street, 2 -216 Key West, FL 33040 393- Cell 2 Key West PLEASE NOTE: FLORIDA HAS A VERY BROAD RECORDS LAW. MOST WRITTEN COMMUNICATIONS TO OR FROM THE COUNTY REGARDING COUNTY BUSINESS ARE PUBLIC RECORDS AVAILABLE TO THE PUBLIC AND MEDIA UPON REQUEST. YOUR EMAIL COMMUNICATION MAY BE SUBJECT TO PUBLIC DISCLOSURE. From: Bobby Stevens [ LnaiLt co @aol.con ] Sent: Thursday, May 10, 2018 3:30 PM To: Rivera -Chris Subject: Adult education center demo To whom it may concern, We have ran into a unforeseen circumstance at the marathon adult center demolition project in Marathon Florida, The roof of the entire building is concrete Which was not listed in bid specs This will require several addition containers and labor concrete breaking of large over sized roof slabs etc, Too complete this project we are requesting an additional $8300.00 Bobby Stevens S & S RECYCLING & DEMOLITION OF MANSFIELD LLC direct: 305-801-8076 Email: iii , fieldoliio ci'4to 1. The content of this email is confidential and intended for the recipient specified in message only. It is strictly forbidden to share any part of this message with any third party, without a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its deletion, so that we can ensure such a mistake does not occur in the future. ONROE COUNTY /ENG E G/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Gato Building fitness Center TO CONTRACTOR: Island Angles, Inc. P.O. Box 2391 Key West, FL 33045 -2391 CHANGE ORDER NO: 1 INITIATION DATE: PURCHASE ORDER: 00058632 DATE: 12/11117 The Purchase Order scope of work is changed as follows: The original purchase order sum .... ............................ ......... ......... ................$ 44,924.00 Net change by previously authorized Change Orders- ........... ......... .......d,,........$ 0.00 The purchase order sum prior to this Change order was ...... .................. ................ $ 44,924.00 The purchase order sum will be increased) (decreased) (unchanged) by this Change Order ......... $ 3,890.00 The new purchase order sum including this Change Order is .................. ..............................$ 48,814.00 The Contract Time will be (Increased) (decreased (unchanged by ... ............................... 0 Days The date of Substantial Completion as of the date of this Change Order is... N/A Detailed description of change order and Justification: This hango Order is 8,6% o f the on en i contract rice. Not vaild untii sl ned -bv Owner. Architect if a iicable and Co ctor CONTRACTOR: Island Angles, Inc. .im DIRECTOR PROJECT COUNTY /ASSISTANT ADMINISTRA Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004 -1999 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The additional beam, emergency exit light fixture, data cables & low voltage boxes, and return air duct were added after the original specifications. The credit for L.E.D. lighting is allowing for the county to self perform. Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: Project architect approves the change order. Yes ❑ No If no, explanation of why: The size and simplicity of the project did not require construction administration services from the architect. Change Order is correcting an error or omission in design document. Yes ®No ❑ Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Only the load bearing wall and emergency exit light fixture may be considered an error or omission. MONROE COUNTY /ENGINEERING / PROJECT MANAGEMENT CON'T'RACT CHANGE ORDER PROJECT TITLE: Harry Harris Park Shed TO CONTRACTOR: Pedro Falcon Contractors Inc. 31160 Avenue C Big Pine Key, FL 33043 CHANGE ORDER NO: 1 INITIATION DATE: May 11, 2018 CONTRACT DATE. June 21, 2017 The Contract is changed as follows: The original ( ontr tt SUM (Guaranteed Maxirns.irn Price) .............. ...........................$ 105,074.00 Net change by previously authorized Change Orders.. ....... „$ 0,00 The (Ccn!M!2 Sup } (Guaranteed Maxlmur Price) prior to this Change order was .............$ 105,074.00 The ( Ccntract Sum (Guaranteed Maximum Price) will be (increased) (decreased) anch n2k by this Change Order ....... $ 0.00 The new (Cone ack �rrnt (Guaranteed Maximum Price) Including this Change Order is ....... $ 105,074.00 The Contract Time will be (ingrip e ) (decreased) (unchanged) by.. ....,.,.... .................... 179 days The date of Substantial Completion as of the date of this Change Order Is ..................... May 4, 2018 Detailed description of change order and justification: xtonrl sub arrtl l court tetlon b 1 e 0 da frorrr lVc 201 to Me v 4 2016 dt a to l tgor -H rriy Pant l�elrtt� clsprl for exterrslve r air fr m aura c us __ I�l r'ric o Ir`r or: ® S�r�,terrtli r..� ft?� ? °� P, 71tr a e S! ?n tuc+rk orders �srere prravrdrd to contract ar (please Dons ruc ' n unti condi qi , leg_ rl�_wer sate to arceed Additional time levoitr! Mai 4, 2018 rs antrctpato l �„ r$ anc, r er is 0 0 � of the orlc�lna co ntract prloe, Not valid win ll signed by Owner Architect if a icak�l ), and Con ctor ARCHITECT: CONTRACTOR: N/A DIRECTOR PROJECT MANAGEMENT: COUNTY /ASSISTANT ADMINISTRATOR: Gastesi �. t MAY 2018 man Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004 -1999 e Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Harry Harris Park was closed due to extensive repairs from damage caused by Hurricane Irma on September 10, 2017. a Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: e Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: a Project architect approves the change order. Yes ❑ No If no, explanation of why: The Architect is not responsible for Construction Administration services. e Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: ._..w,.._.__..... ............. Packet'Pg. 552 ME Monroe County Engineering 1100 Simonton Street, 2 -216 Key West, FL 33040 Project Management In accordance with Section 00750 Articles 2.3, 6.2.7.1 and 8.3.1 of the General Conditions of the Contract Documents in the above referenced project., Monroe County Project Management hereby directs Pedro Falcon Contractors Inc.., to stop -work on the Harry Harris Equipment Building due to destruction caused by Hurricane Irma and the site being used for hurricane recovery purposes.. Therefore, Pedro Falcon Contractors Inc., shall cease all services and the ordering of supplies in support of Harry Harris Equipment Building and shall crease incurring any costs under this contract including but not limited to Pedro Falcons Contractors Inc., indirect costs. Any and all subcontractors shall be notified immediately that a stop -work order has been issued to the prime contractor. The stop -work order shall remain in place until December 16, 2017. As soon as feasible and prior to the expiration of the step -work order, appropriate action shall be taken to terminate the contract; cancol the stop - work order, or extend the period, if necessary, It is understood that you and I have agreed to have a conference concerning this stop -work order and re- evaluate the status of the work site and future of the project some point approximately a week before December 16, 2017. Should Pedro Falcon Contractors Inc. require additional information in regards to this stop -work order, do not hesitate to contact me. Sincerely, tti tvera Cc: Cary Knight Interim Director of Project Management �_ Packet 553 is 12/18/2017 Christian Brisson Pedro Falcon Contractors Inc. 31160 Avenue C Big Pine Key, Florida 33043 RE: Stop -work Order, Harry Harris Equipment Building Dear Christian, Monroe County Engineering 1100 Simonton Street, 2 -216 Key West, FL 33040 Project Management In accordance with Section 00750 2.3, 6.2.7.1 and 8.3.1 of the General Conditions of the Contract Documents Monroe County Project Management hereby directs Pedro Falcon contractors Inc., to stop -work on Harry Harris Equipment Building for destruction caused by Hurricane Irma Therefore, Pedro Falcon Contractors Inc., shall cease all services and the ordering of supplies in support of Harry Harris Equipment Building and shall cease incurring any casts under this contract including but not limited to Pedro Falcons Contractors Inc., indirect costs. Any and all subcontractors shall be notified immediately that a stop-work order has been issued to the prime contractor. The stop -work order shall remain in place until January 15, 2018. As soon as feasible and prior to the expiration of the stop -work order, appropriate action shall be taken to terminate the contract; cancel the stop - work order; or extend the period, if necessary. Should Pedro Falcon Contractors Inc. require additional information in regards to this stop -work order, do not hesitate to contact me. Sincerely, • °` �� ., Chris Rivera Cc: Cary Knight Interim Director of Project Management y �� w �. 1/25/2018 Christian Brisson Pedro Falcon Contractors Inc, 31160 Avenue C Big Pine Key, Florida 33043 RE: Stop -work Order, Harry Harris Equipment Building Dear Christian, Monroe Cot, nly Engineering 1100 5imont.n. Street, 2 -216 Key West, FL 33040 Project Management In accordance with Section 00750 2.3, 6.2.7.1 and 8.3.1 of the General Conditions of the Contract Documents Monroe County Project Management hereby directs Pedro Falcon contractors Inc., to stop -work on Harry Harris Equipment Building for destruction caused by Hurricane Irma therefore, Pedro Falcon Contractors Inc,., shall cease all services and the ordering of supplies in wsapport of Marry Harris Equipment Building and shall cease incurring any costs under this contract includin , but not limited to Pedro Falcons Contractors Inc., indirect costs. Any and all subcontractors shall be noiilied immediately that a stop - work order has been issued to the prime contractor. T he stop - work order shall remain in place until March 15, 2018. As soon as feasible and prior to the expiration of the stop -work order, appropriate action shall be taken to terminate the contract; cancel the stop - work order; or extend the period, if necessary. Should Pedro Falcon Contractors Inc. require additional information in regards to this stop -work order, do not hesitate to contact me. Sincerely, Chris fiver €s. Cc: Cary Knight Interim Director of Project Management �.. ,..... _�...w.._ ...... ........ I Packet'Pg. 555 ONROE COUNTY/ ENGINEERING/ PROJECT M ANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: The Redevelopment of Bernstein Park TO CONTRACTOR: Burke Construction Group, Inc,. 10145 NW 19�" St Doral FL 33172 The Contract is changed as follows: CHANGE ORDER NO: 14 INITIATION DATE: March 26"', 2018 CONTRACT DATE: April 20, 2016 The original ( Contract Sum (Guaranteed Maximum Price) ..... ............................$7, 921,975.00 Net change by previously authorized Change Orders ,,,,,,,,,,,,,,,,,,, .,$(86,614.84) The ( Contract Sum (Guaranteed Maximum Price) prior to this Change order was... $7,835,360.16 The ( Contract Sum (Guaranteed Maximum Price) will be ( increased ) (decreased) (unchanged) by this Change Order ...... $15,127.59 The new ( Contract Sum (Guaranteed Maximum Price) including this Change Order is ..$7,850,487.75 The Contract Time will be in s` decreased ( ..) (...., unchanged) �y ,.� .......................00 Days The date of Substantial Corripletiah as of the date oWlhis Cff n e Order is... March 30, 2018 Detailed description of change order and justification: Addition of door stops on classroom closet doors, Removai of umbo limbos and bou ar ville that 20nflict wit(r tle maintenance of the p ark. Addition of a concrete Illo at the bottom of the flood panels at the entr dears to the rainten nce shed. Increased size of Irrigation meter Born 5th inch to ogre in ch. 6 o e orr ina contract price, .......... ARCHITECT: CONTRACTOR: DIRECTOR PROJECT MANAGEMENT/ COUNTY /ASSISTANT ADMINISTRATOR: Roman Gmtsi Kevin Wilson, Christine Hurley Date Change Order Attachment per Ordinance No. 004 -1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Concrete is needed at the bottom of the flood panels to assure a watertight seal. Crash chains and kick down door stops will prevent the doors from hitting walls and wall mounted fixtures. • Change Order was included in the original specifications. Yes ® No ❑ If Yes, explanation of increase in price: Facilities recommended that the Bouganville and the Gumbo Limbos be eliminated at the park since they will impact the field maintenance. • Change Order exceeds $50,000 or 5% of contract price (whichever is greater).Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Change Order Request AIA Document G710 OWNER ARCHITECT CONTRACTOR FIELD SUBCONTRACTOR m BURKE M Construction p Ir PROJECT: Bernstein Park 6751 5th Street Stock Island< Florida 33040 CONTRACTOR: Burke Construction Group, Inc. 10145 N.W. 19th Street CHANGE ORDER NUMBER: 037 DATE: 2/12/2018 CONTRRACTOR PROJECT* 1611 Doral, Florida 33172 Go Prime Contract Change Order #037: Concrete for Flood Panels r CD Amount 037 1 Concrete for Flood Panels 5,533.00 TOTAL: $ 5,533.00 TO: Monroe County Engineering FROM: Burke Construction Group, Inc. 1100 Simonton Street 10145 NW 19th Street Key West, Florida 33040 Miami Florida 33172 DATE CREATED: 2/12/2018 CREATED BY: Armando Silveira (Burke Construction Group, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 1 L L DESIGNATED REVIEWER: Armando Silveira (Burke Construction REVIEWED BY: Group, Inc.) W c DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: EXECUTED: No CONTRACT FOR: 1:Redevelopment of Bernstein Park TOTAL AMOUNT: $ 5,533.00 DESCRIPTION: CL ct Cut asphalt and excavate a 12 "x1 2 "x30' section in front of Maintenance building. Install dowels and pour 4,000 psi concrete to provide sealed surface L for flood panels. L ATTACHMENTS: Concrete pucte,pdf. tM c POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # Title Schedule Impact Amount 037 1 Concrete for Flood Panels 5,533.00 TOTAL: $ 5,533.00 c u CHANGE ORDER LINE ITEMS: Burke Construction Group, Inc. page 1 of 2 Printed On: 3/19/ 2018 09:50 AM Change Order Request A/A Document G710 PCO # 03 Conc for F lood Panels I # Cost Code I Description I Type I Amount 1 03 -100 - CONCRETE / MASONRY Concrete Pump Subcontractor $ 450.00 2 03 -100- CONCRETE / MASONRY Demo (4 men 6 hrs @ $32.50) Subcontractor $ 1,040.00 3 03 -100 - CONCRETE / MASONRY Compact, vapor barrier, and install rebar ( men 6 hrs @ $32.50) Subcontractor $1,040-00 4 03 -100 - CONCRETE I MASONRY Misc materials (rebar, epoxy, drill bits, vapor barrier Subcontractor $ 250.00 5 03 -100 - CONCRETE / MASONRY Small tools ( hammer drill, plate compactor) Subcontractor $ 150.00 6 03 -100 - CONCRETE / MASONRY Concrete material 1.2 yards (Short Load at Monroe Concrete) Subcontractor $ 1,200.00 7 03 -100 - CONCRETE / MASONRY Finisher ( minimum cost) Subcontractor $ 250.00 6 03 -100 - CONCRETE / MASONRY Dumpster (concrete debris) Subcontractor $ 650.00 Subtotal: $5,030.00 Overhead : 6.00% Applies to all line item types 251.50 Profit: 5.00% Applies to all line item types 251.50 Grand Total: $6,533.00 The original (Contract Sum) $ 7,921,975.00 Net change by previously authorized Change Orders ($86,614.84) The contract sum prior to this Change Order was $ 7,835,360.16 The contract sum would be changed by this Change Order in the amount of $ 5,533.00 The new contract sum including this Change Order will be $ 7,840,893.16 The Contract Time will be (increased) (decreased) (unchanged) by The date of Substabtial Completion as of the date of this Change Order therefore is Master Permit Issue Date: 8/18/2016 Contract Base Days: Added Time Above: FIELD SUBCONTRACTOR Reservations: This proposal is based solely on the usual cost elements such as labor material and normal markups, and does not include any amount for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, acceleration and or impact costs, unless speciffically stated. The right is expressly reseved to amend and make claim for any and all of these related items prior to final settlement of this contract. Bill Horn (Architect) 915 Eaton Street Key West Florida 33040 Monroe County Engineering 1100 Simonton Street Key West Florida 33040 Burke Construction Group, Inc. 10145 NW 19th Street Miami Florida 33172 SIGNATURE DATE Burke Construction Group, Inc. SIGNATURE DATE page 2 of 2 SIGNATURE DATE Printed On: 3/19/ 2018 09:50 AM • • Change Order Request AIA Document G710 OWNER ARCHITECT CONTRACTOR FIELD SUBCONTRACTOR PROJECT: Bernstein Park 6751 5th Street Stock Island< Florida 33040 i s s • • � 038 2/12/2018 1611 CONTRACTOR: Burke Construction Group, Inc. 10145 N.W. 19th Street Doral, Florida 33172 Go PCO # Title Schedule Impact r CD Prime Contract Change Order #038: Landscape Changes by Owner C14 2,714.25 TOTAL: $ 2,714.25 TO: Monroe County Engineering FROM: Burke Construction Group, Inc. 1100 Simonton Street 10145 NW 19th Street L Key West, Florida 33040 Miami Florida 33172 DATE CREATED: 2/1212018 CREATED BY: Armando Silveira (Burke Construction Group, Inc.) L CONTRACT STATUS: Pending - In Review REVISION: 2 L DESIGNATED REVIEWER: Armando Silveira (Burke Construction REVIEWED BY: Group, Inc.) W c DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: EXECUTED: No CONTRACT FOR: 1:Redevelopment of Bernstein Park TOTAL AMOUNT: $ 2,714.25 DESCRIPTION. C CL L L Remove and replace 4 Gum bo Limbo with Sable Palm. remove and dispose of 9 bougainvilleas. ATTACHMENTS: W evi,d - Esi 1 s4�fr�srr� Agt?pYdc t.? �, �iS��p6r !g_D���g�1_It��._11_4$.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # Title Schedule Impact Amount 038 Landscape Changes by Owner 2,714.25 TOTAL: $ 2,714.25 CHANGE ORDER LINE ITEMS: Burke Construction Group, Inc. page 1 of 2 Printed On: 3/14/ 2018 02:49 PM Change OWNER x Order A Request ARCHITECT X CONTRACTOR Remove 4 Gumbo Limbo and replace with Sable Palm FIELD AIA Document G710 SUBCONTRACTOR 129.25 J M • • . t-'.0 ff usa f I..anoscape Unanges ny owner # Cost Code Description A 02 -901 - LANDSCAPE & SOD OUTSIDE THE 1 r CD Remove 4 Gumbo Limbo and replace with Sable Palm N SPORTS FIELDS 02 -901 - LANDSCAPE & SOD OUTSIDE THE 129.25 2 $2,714.25 Remove 9 bouganvileas 102-901 SPORTS FIELDS - LANDSCAPE & SOD OUTSIDE THE 3 SPORTS FIELDS Overhead and profit 10 Type I Amount Subcontractor Subcontractor Subcontractor Subtotal: OH & P: 5.00% Applies to all line item types Grand Total: Added Time Above: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The Contract Time will be (increased) (decreased) (unchanged) by The date of Substabtial Completion as of the date of this Change Order therefore is Master Permit Issue Date: 8/16/2016 Contract Base Days: $ 2,000.00 $ 350.00 ct $ 235.00 A ($86,614.84) $ 7,835,360.16 r CD $ 2,714.25 N $2,585.00 129.25 $2,714.25 L $ 7,921,975.00 ct ($86,614.84) $ 7,835,360.16 $ 2,714.25 $ 7,838,074.41 Reservations: This proposal is based solely on the usual cost elements such as labor material and normal markups, and does not include any amount for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, acceleration and or impact costs, unless speciffically stated. The right is expressly reseved to amend and make claim for any and all of these related items prior to final settlement of this contract. L Bill Horn (Architect) 915 Eaton Street Key West Florida 33040 SIGNATURE DATE Burke Construction Group, Inc. Monroe County Engineering 1100 Simonton Street Key West Florida 33040 SIGNATURE DATE page 2 of 2 W Burke Construction Group, Inc. 10145 NW 19th Street Miami Florida 33172 SIGNATURE c DATE u Printed On: 3/14/ 2018 02:49 PM Change OWNER x C.21. Order Request ARCHITECT CONTRACTOR x FIELD "I -- U RK A/A Document G710 SUBCONTRACTOR Cons i'UC��t�H �iC Otlp Ifl PROJECT: Bernstein Park CHANGE ORDER NUMBER: 039 6751 5th Street DATE: 3/16/2018 Stock Island< Florida 33040 CONTRRACTOR PROJECT #: 1611 CONTRACTOR: Burke Construction Group, Inc. 10145 N.W. 19th Street Doral, Florida 33172 I Title r Prime Contract Change Order #039: Crash Chains CD 08 -521 - DOORS /FRAMES /HARDWARE 974.09 TOTAL: $ 974.09 2 108 -521 -DOORS/FRAMES/HARDWARE TO: Monroe County Engineering FROM: Burke Construction Group, Inc. ($200.00) 1100 Simonton Street 10145 NW 19th Street Key West, Florida 33040 Miami Florida 33172 DATE CREATED: 3/16/2018 CREATED BY: Armando Silveira (Burke Construction Group, rL Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 L DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: EXECUTED: No CONTRACT FOR: 1:Redevelopment of Bernstein Park TOTAL AMOUNT: $ 974.09 DESCRIPTION: Supply and install crash chains and kick down stops in closet doors 27, 28, 34, 35, & 36. CL L ATTACHMENTS: RC7,S, Optitrl -1 {04J.pf_ L POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # I Title Schedule Impact Amount 039 1 Crash Chains 08 -521 - DOORS /FRAMES /HARDWARE 974.09 TOTAL: $ 974.09 c CHANGE ORDER LINE ITEMS: PCO # 039 : Crash Chains # Cost Code Description Type Amount 1 08 -521 - DOORS /FRAMES /HARDWARE Supply and install crash chains and kick down door stops. Labor $ 1,127,70 2 108 -521 -DOORS/FRAMES/HARDWARE Burke credit to Monroe County Labor ($200.00) Subtotal: $927.70 OH & P: 5.00% Applies to all line item types 4U9 Grand Total: 1 $974.09 Burke Construction Group, Inc. page 1 of 2 Printed On: 3/27/ 2018 03:35 PM Change Order Request AIA Document G710 OWNER ARCHITECT CONTRACTOR FIELD SUBCONTRACTOR The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The Contract Time will be (increased) (decreased) (unchanged) by The date of Substabtial Completion as of the date of this Change Order therefore is Master Permit Issue Date: Contract Base Days: $ 7,921,975.00 ($86,614.84) $ 7,835,360.16 $ 974.09 $ 7,836,334.25 Added Time Above: Reservations: This proposal is based solely on the usual cost elements such as labor material and normal markups, and does not include any amount for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, acceleration and or impact costs, unless speciffically stated. The right is expressly reseved to amend and make claim for any and all of these related items prior to final settlement of this contract. Bill Horn (Architect) 915 Eaton Street Key West Florida 33040 SIGNATURE DATE Monroe County Engineering 1100 Simonton Street Key West Florida 33040 SIGNATURE DATE Burke Construction Group, Inc. page 2 of 2 hIGH Burke Construction Group, Inc. 10145 NW 19th Street Miami Florida 33172 SIGNATURE DATE Printed On: 3/27/ 2018 03:35 PM A quatic Landscaping Design, Inc. 25405 SW 107th Av. Princeton, FL 33032 Phone # 305.257.2220 Fax # 305.258.1584 Name /Address Burke Construction Group, Inc. 1355 NW 97th Ave., #200 Doral, FL 33172 P: 305.468.6604 x241 F: 305.468.6654 Description 4 Remove 4 Gumbo Limbo and replace with Sabal Palm 14 -16' ht. 1 Remove and dispose (9) Bougainvilleas f4 ,� tf e f ­Fse 1 Irrigation: 1 Quick Coupler and 2 heads at soccer field. 11 Overhead and profit of 10% I Burke will pay the . .r s , 9F1 �I Estimate No. Total price includes tax. Some plant material and/or sizes may not be available as per specifications at time of planting. Finish grade to within +/- 2" by others. Unless otherwise specified, all permits, removals, relocates, tree protection, manual continued watering, maintenance, MOT, soils, berms, swales, excavation, backfilling, cutting /patching of asphalt/concrete, coring, boring, compacting, hardscapes, pots, planters, tree grates, root barriers, weed fabrics, furnishings, lighting, irrigation, water meters, backfllow & certification, wells, pumps, design /plans, Davis Beacon/Prevailing wage are excluded from this proposal. Proposal good for 30 days. By signing this proposal /contract, Signature you accept the prices and specifications as set forth herein, and you are authorizing us to do the work as specified. Warranty does not cover loss due to sustained winds of 75 mph or more, floods, frost, lightning, vandalism or theft. m�, www.aquaticlandscape.com Doors, Hardware, Request for Change Order Project Name: BERNSTEIN PARK Project Location: 6751 5th Street Stock Island, Fl. 33040 2000 NW 16th St, Suite B, Pompano Beach Fl. 33069 Ph. 954 - 821 -9139 • Fax 954 - 491 -9833 Date: 1/25/2018 RCO #: 05 -A Contact: Armando Silvera Burke Construction Phone: 305-322-7862 MY Description COST TOTAL Below materials requested by Daniel 1- 17 -18; Add Chains & Stops to Closet Doors 27, 28, 34, 35, 36 10 CCS -1 Heavy Duty Crash Chain Sto - Silver Zinc $52.99 $529.89 10 KDS -B Kick Dow St op (Brass Base) - 26D $15.34 $153.40 Material Cost $ 683.29 _ Tax $ 44.41 Installation $ 400.00 Total Change Order Amount $ 1,127.70 Please proceed with the above changes to this project - formal change order for this amount to follow Signature:1 I Print N ame: Date: I Title: Change Order Request AIA Document G710 OWNER ARCHITECT CONTRACTOR FIELD SUBCONTRACTOR PROJECT Bernstein Park 6751 5th Street Stock Island< Florida 33040 CONTRACTOR: Burke Construction Group, Inc. 10145 N.W. 19th Street X C.21. X B Construction Croup Its CHANGE ORDER NUMBER: 040 DATE: 4/6/2018 CONTRRACTOR PROJECT #: 1611 Doral, Florida 33172 Title Schedule Impact —® Prime Contract Change Order #040: 1 inch Irrigation Meter r CD 5,906.25 TOTAL: $ 5,906.25 TO: Monroe County Engineering FROM: Burke Construction Group, Inc. 1100 Simonton Street 10145 NW 19th Street Key West, Florida 33040 Miami Florida 33172 DATE CREATED: 4/06/2018 CREATED BY: Armando Silveira (Burke Construction Group, rL Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 L L DESIGNATED REVIEWER: REVIEWED BY: _ DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: EXECUTED: No CONTRACT FOR: 1:Redevelopment of Bernstein Park TOTAL AMOUNT: $ 5,906.25 DESCRIPTION: Cost difference between 5/8" meter to 1" meter thru FKAA. The site contractor will not charge to change the meter box and RPZ. CL L ATTACHMENTS: �- Bern tpinl ark Irn ation�001 ? �}OOp00�10,pdf, POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # Title Schedule Impact Amount 040 11 inch Irrigation Meter 5,906.25 TOTAL: $ 5,906.25 c CHANGE ORDER LINE ITEMS: rt.0 ii: u4u : i mcn irrigati meter # Cost Code Description Type Amount 1 02 -665 - WATER & SEWER 5/8" irrigation meter from FKAA Subcontractor ($3,750.00) 2 02 -665 - WATER & SEWER 1" irrigation Meter from FKAA Subcontractor 1 $ 9,375.00 Subtotal: $5,625.00 Overhead & Profit: 5.00% Applies to all line item types 261.25 Grand Total $5,906.25 Burke Construction Group, Inc. page 1 of 2 Printed On: 4/6/ 2018 04:04 PM Change OWNER I X I 1:.L71 Order Request ARCHITECT CONTRACTOR X FIELD P B AIA Document G710 161 UKKE SUBCONTRACTOR Construction Group Inc. The original (Contract Sum) $ 7,921,975.00 Net change by previously authorized Change Orders ($86,614.84) The contract sum prior to this Change Order was $ 7,835,360.16 The contract sum would be changed by this Change Order in the amount of $ 5,906.25 The new contract sum including this Change Order will be $ 7,841,266.41 The Contract Time will be (increased) (decreased) (unchanged) by The date of Substabtial Completion as of the date of this Change Order therefore is Master Permit Issue Date: Contract Base Days: Added Time Above: Reservations: This proposal is based solely on the usual cost elements such as labor material and normal markups, and does not include any amount for additional changes in the sequence of work, delays, disruptions, rescheduling, lost productivity, extended or unabsorbed overhead, overtime, acceleration and or impact costs, unless speciffically stated. The right is expressly reseved to amend and make claim for any and all of these related items prior to final settlement of this contract. Bill Horn (Architect) 915 Eaton Street Key West Florida 33040 Monroe County Engineering 1100 Simonton Street Key West Florida 33040 Burke Construction Group, Inc. 10145 NW 19th Street Miami Florida 33172 SIGNATURE DATE Burke Construction Group, Inc. SIGNATURE DATE SIGNATURE DATE page 2 of 2 Printed On: 4/6/ 2018 04:04 PM MEMORANDUM TO: Board of County Commissioners From: Assistant County Administrator Date: May 24, 2018 RE: Change Orders Attached is a proposed Change Order #14 Burke Construction Group, Inc., The Redevelopment of Bernstein Park. The Contract Sum will be increased $15,127.59. The date of Substantial Completion as of the date of this Change Order is March 30, 2018. According to Ordinance No. 004 -1999 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners at least 24 hours prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. County Administrator Kevin G. Wilson Print Name of