Loading...
02nd Task Order 01/18/2017TASK ORDER #2 FOR ON CALL PROFESSIONAL ENGINEERING SERVICES FOR CANAL RESTORATION SERVICES BETWEEN MONROE COUNTY AND AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR PUBLIC OUTREACH AND PLANNING SERVICES FOR MUNICIPAL SERVICE BENEFIT UNIT (MSBU) RELATED TO AIR CURTAIN OPERATION AND MAINTENANCE (O &M) CANAL RESTORATION DEMONSTRATION PROJECTS AT CANALS #266, #287, #290 IN BIG PINE KEY AND #83 IN KEY LARGO, MONROE COUNTY, FLORIDA In accordance with the Continuing Contract for On Call Professional Engineering Services made and entered on the 18th day of January, 2017 between Monroe County, hereinafter referred to as the "County" and Amec Foster Wheeler Environment & Infrastructure, Inc. hereinafter referred to as "Consultant" where design services are allowed if construction costs do not exceed $2,000,000. All terms and conditions of the referenced Contract for On Call Professional Engineering Services apply to the Task Order, unless the Task Order modifies an Article of the Agreement of which will be specifically referenced in this Task Order and the modification shall be precisely described. This Task Order is effective on the 18th day of January. 2017 and shall expire 60 days after the final deliverable to the County is submitted. Article II Scope of Basic Services, Paragraph 2.1.1 is amended as follows: The Consultant shall assist the County with the public outreach to inform and engage the homeowners on the Canals #266, #287, #290 in Big Pine Key and #83 in Key Largo regarding the Air Curtain Canal Restoration Demonstration Projects MSBU costs and how the program will operate. The scope of services will consist of two community meetings with homeowners of each canal (eight meetings in total) to discuss the MSBU program and inform the homeowners about the costs. The duration of each meeting is expected to be approximately one hour including presentation and questions and answers. Details of the scope of services are outlined below and included in the Consultant's proposal that is attached to this task order as Exhibit A. Public Outreach and Planning Services for MSBU related to Air Curtain O &M Canal Restoration Demonstration Projects Amec Foster Wheeler Environment & Infrastructure, Inc. January 18, 2017 Page 1 of 2 Task 1: Community Outreach Meetings The Consultant will coordinate and provide presentations for two public community meetings with each canal homeowners for a total of eight meetings. The Consultant will prepare an agenda that discusses the O &M scope of work and associated MSBU program and cost. The Consultant will prepare and submit meeting minutes to the County for review and distribution to the homeowners. The meetings will be held at locations within the communities. Article VII, Paragraph 7.1.1 is amended to include the following: The Consultant shall be paid monthly for time and expenses based on hourly rates and the following not to exceed amounts (except where noted): Task 1: Community Outreach Meetings Total (not to exceed) $ 14,556.00 $ 14,556.00 IN WITNESS WHEREOF, each party caused the Task Order to be executed by its duly authorized representative. CONSULTANT: AMEC FOSTER WHEELER ENVIRONME T & INFRASTRUCTURE INC. Signature Date WITNESS: Date FERENC BOCSI NOTARY PUBLIC STATE OF FLORIDA Comm# FF138794 Expires 7/2/2018 ueputy uiew Date: 8 �7 COUNTY , JED AS .T iC`.'n64AI BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA by: w - 2 Mayor /Chairman C. Public Outreach and Planning Services for / MSBU related to Air Curtain O &M Canal Restoration Demonstration Projects Amec Foster Wheeler Environment & Infrastructure, Inc. January 18, 2017 Page 2 of 2 — AS&V8TA19r 1 7N -- !Y Title EXHIBIT A CONSULTANT'S PROPOSAL December 21, 2016 Rhonda Haag Monroe County Sustainability /Projects Director 102050 Overseas Highway, Ste. 246 Key Largo, Florida 33037 of foster wheeler Re: Scope of Work Related to Public Outreach and Planning Services for Municipal Service Benefit Unit (MSBU) related to Air Curtain Operation and Maintenance (O &M) Canal Restoration Demonstration Projects at Canals #266, #287, #290 in Big Pine Key and #83 in Key Largo, Monroe County, Florida Dear Ms. Haag: Amec Foster Wheeler is pleased to provide you a proposal to assist the County with public outreach to inform and engage the homeowners on the Canals #266, #287, #290 in Big Pine Key and #83 in Key Largo regarding the Air Curtain Canal Restoration Demonstration Projects MSBU costs and how the program will operate. The proposed project will consist of two community meetings with homeowners of each canal (eight meetings in total) to discuss the MSBU program and inform the homeowners about the costs. The duration of each meeting is expected to be approximately one hour including presentation and questions and answers. Details of the proposed scope of services are provided below. A cost estimate to perform these services under Amec Foster Wheeler's existing contract rate schedule is also included. SCOPE OF SERVICES Task 1: Community Outreach Meetinas Amec Foster Wheeler will coordinate and provide presentations for two public community meetings with each canal homeowners for a total of eight meetings. Amec Foster Wheeler will prepare an agenda that discusses the O &M scope of work and associated MSBU program and cost. Amec Foster Wheeler will prepare and submit meeting minutes to the County for review and distribution to the homeowners. The meetings will be held at locations within the communities. COST ESTIMATE Amec Foster Wheeler has prepared a cost spreadsheet which provides details of the labor and expense by task. The total project cost estimate will be performed on a Time and Materials (T &M) basis not to exceed $14,556, unless approved by Monroe County. CLOSING Amec Foster Wheeler appreciates the opportunity to assist Monroe County with this exciting project. Should you have any questions regarding this proposal or need additional information, please contact Greg Corning at (314) 920 -8359 or via email at greg.corninQ@)amecfw.com 11Page Scope of Work for Public Outreach and Planning Services For MSBU related to Air Curtain O &M Projects Canal #266, #287, #290 in Big Pine Key and #83 in Key Largo, Florida Sincerely Amec Foster Wheeler Environment & Infrastructure, Inc. Ricardo Fraxedas, PE Chief Engineer Direct Tel: + 1 305 525 0079 Direct Fax: + 1 305 826 1799 E -mail: ricardo.fraxedas @amecfw.com Attachments: Cost Spreadsheet Amec Foster Wheeler Rate Schedule d ti. Greg Qbrning, PE a Technical Professi nal III - Engineer Direct Tel: + 1 314 920 8359 Direct Fax: + 1 305 826 1799 E -mail: greg.corninq @amecfw.com 21Page / m% � a � x&&44 1100710 � ° - _ o \ / t G9 /�� °7/ * § �� }\ / 2 (6 ��- a cm 0) ■ 2 o 04 � 2E2ca ■0_= &mot ■ ■a a e w■E & k k $2oE0 $ » » CL IM 0 c r. Luc ■e k\k k in � 0 Bk2fk k)�k R k- 2 ■ *k -j ■ � U § z Q _ kok §* co cD § ■_ vi /___ �t 0 S k fkff 2 -7��{ w ww< ca w t k z2 )� 8 \ § LU R _§ / /= § $ . 2�fy 7 \ -j k § a) � y o o _ If$a@ m fi■ k cam® §} 4 U) /k' 0 § 22 § — cE G «f /$ E LU L' « a 6��$■ - £J 'o ■ Amec Foster Wheeler Environment & Infrastructure, Inc. 2016 Schedule of Fees Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00 /hour Staff If $77.00 /hour Project $86.00/hour Senior $109.00 /hour Principal /Project Manager $155.00 /hour Senior Principal /Senior Project Manager $159.00 /hour Chief Engineer /Scientist $194.00 /hour B. Technical Services (Engineering and Science) Technician 1 $45.00 /hour Technician II $55.00 /hour Senior Technician I $60.00 /hour Senior Technician II $70.00 /hour Project Administrator /Project Coordinator /Subcontract Administrator /Project Accountant $75.00 /hour Technical Writer /Document Production $ 78.00 /hour CADD /Draftsperson (includes PC /CAD) I $66.00 /hour CADD /Draftsperson (includes PC /CAD) II $101.00.hour Admin I $40.00 /hour Admin II $52.00 /hour C. Surveying Services Field Surveyor I $43.00 /hour Field Surveyor II $47.00 /hour Survey Technician I $67.00 /hour Survey Technician II $72.00 /hour Survey Chief $75.00 /hour D. Information Management Software Engineer $92.00 /hour Data Technician $132.00 /hour Senior Software Engineer $162.00 /hour Business Analyst $132.00 /hour E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. 11. Expenses A. Travel Expenses 1. Transportation: Company pickup truck /personal vehicle, per mile —current allowable rate per County and Florida State Statutes a. Company pickup truck per day - $75.00 b. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00 /day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00 /day (min 2 days) Underwater Camera Equipment /Video up to 50 $1,900.00 /day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00 /day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In -house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% Ill. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15