HomeMy WebLinkAbout04th Change Order 07/05/2018Jacobs Key West International Airport 06A 8 Monroe County Drainage Improvements Phase 2 & 3 Project No. GAKAP149 CHANGE ORDER PROJECT: CHANGE ORDER NO.: 4 Drainage Improvements Phase 2 & 3 INITIATED ON: June 28. 2018 CONTRACT: GAKAP149 TO (Contractor): Charley Toppino & Sons 129 Toppino Industrial Drive Key West, FL 33040 CONTRACT DATE: November 22, 2016 You are hereby authorized and directed to make the following change(s) in this Contract: The proposed power pole location was modified in the field by Keys Energy. The new location increased the electrical conduit, fittings, conductors and pull box quantity from the pumped injection well. The original Contract Sum ............................... Net change by previously approved Change Orders......... The Contract Sum will be unchanged by this Change Order ...................... The new Contract Sum including this Change Order willbe ............................................... The Contract Time will be increased by .................................. S 1,655,480.85 S 29,480.00 S 14 754.20 S 1,699,715.05 0 Days Signature of the Contractor indicates agreement with the terms of this Change Order, including any adjustment in the Contract Sum and/or the Contract Time. Adjusted cost and time include all direct, indirect and impact costs and time for delays, disruption, inefficiency, acceleration and all other claims. RECOMMENDED: Jacobs Engineering jr99 y D to Key West International Airport 3491 South Roosevelt Blvd. Key West, FL 33040 .. By Date AGREED TO: Charley Toppino & Sons O.-ilni 1 2,01 el Date AUTHORIZED: Monroe County l 100 Simonton Street Key West, FL 33040 --9 �� -1-15[15 By Date 0 E Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The proposed power pole location was modified in the field by Keys Energy. The new location increased the electrical conduit, fittings, conductors and pull box quantity from the pumped injection well. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: CHARLEY TOPINO & SONS, INC. CHARLEY TOPPINO & SONS, INC. Change Order Request P.O. BOX 787 Number: 4 KEY WEST, FL 33041 Phone: 305 296-5606 Fax: 305 296-5189 PROJECT: KWIA Drainage Improvements DATE: 6/27/2018 TO: Lasa Ennis Jacobs Engineering Jacksonville, FL DESCRIPTION OF CHANGE: Change in distance to power pole ITEM DESCRIPTION I Conduit & Fittings (Parallel Runs) 2 CU Conductors (250 MCM & #4G) 3 Electric Pull Box 4 Labor 5 Tax 6 Overhead & Profit 7 8 QuanritN Unit Price too 5.56/LF 680 5.85/LF 1 Each PROJECT #: 1621 COST CODE: ANIOUNT $779.47 $3,982.75 $1,500.00 $6,650.61 $469.67 $1,371.70 TOTAL: $14,754.20 1,. It is understood and agreed that the acceptance for this Change Order by this Subcontractor constitutes an accord and satisfaction vdth the terms of this Change Order 2, The amount of the Change Order covers all direct and indirect costs. 3. It is further understood and agreed that all terms and conditions of said Contract, as it may therefore have been modified shall remain the same 4. Acceptance of the Change Order acknowledges acceptance of all previous Change Order work by the Subcontractor and Contractor as well as any adjustments to the Subcontractor amount and modifications as reflected above 5. This Change Order includes all items necessary for a complete installation including, but not necessarily limited to labor, supervisionmaterials, transportation, incidentals, taxes, and any other items necessary for a complete installation The Original Contract Sum was ..................................................... Net Change by Previously Authorized Requests & Changes .................. The Contract Sum Prior to This Change Order was. The Contract Sum Will be Increased / Decreased............ The New Contract Sum Including This Change Order The Contract Time Will / Will Not be Changed (Days).. ACCEPTED: CHARLEY TOPPINO & SONS, INC. By: Jordan Mannix-Lachner Project Admin Printed Name & Title By: Datt 6/22/2018 Date: $1,655,480.55 $ 29,480.00 $1,684,960.55 $ 14,754.20 $1,699,714.75 Printed Name & Title 0